REVISIONS
Purchaser:
NATHPA JHAKRI
POWER CORPORATION LTD.
B B
HIMFED Building,Shimla,India
Suppliers:
EUCONA
ABB KRAFTWERKE AG, Mannheim, Germany (Leader)
SIEMENS AG, Erlangen, Germany
C KVAERNER ENERGY A.S., Oslo, Norway C
SULZER-ESCHER WYSS LTD., Zurich, Switzerland
Principal Consultants:
CEA, New Delhi, India
Retainer Consultants:
NIPPON KOEI, Tokyo, Japan
ELECTROWATT, Zurich, Switzerland
WAPCOS, New Delhi, India
D D
NATHPA JHAKRI
HYDRO-ELECTRIC PROJECT
Generating Units and Associated Equipment-Package 1
Prepared Based on Sep.Pl.same Nr. Scale Doc type Format
an other Nr. 3
Drwg.No. Sheet Nr
Kraftwerke AG GKW H423379 A001
F F
A A
1 H423379 CIRCUIT DIAGRAM STAR COUPLER AND A001
2 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS STAR COUPLER INSTALLATION 0CKB01 C001
3 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS TABLE OF MB300 CONNECTIONS 0CKB01 C002
4 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS OPERATOR STATIONS AS520i CONNECTIONS C003
B B
5 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS OPERATOR STATIONS AS520i REAR VIEW OCKB01 C004
6 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS MOBILE OPERATOR STATION AS515 REAR VIEW AND CONNECTIONS C005
7 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS OPERATOR STATIONS LIST OF EQUIPMENT OCKB01 C006
8 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS SIGLISTS PARAMETERS EVENTS C007
C C
9 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS SIGLISTS PARAMETERS ALARMS C008
10 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS SIGLISTS PARAMETERS TRIPS C009
11 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS OPERATOR STATION 1 INVERTER CUBICLE OCWQ01 D001
12 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS OPERATOR STATION 2 INVERTER CUBICLE 0CWQ02 D002
D D
13 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS HEATING LIGHTING SOCKET OUTLETS 0CKB01 D003
14 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS DC - SUPPLY CONVERTERS 0CKB01 0CKB01 G001
15 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS EQUIPMENT LIST Z001
16
E E
17
18
19
F F
C Date 19.06.97 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =
Prep. Kahre KW/H 209 181 KW/HA1 AND OPERATOR STATIONS + B001
Checked ABB Kraftwerke AG LIST OF DRAWINGS Take over dept. Sht.Nr. B001
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16
1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8
1
1 2 3 4 5 6 7 8 9 10 11 12 ABB
B B
CS513
2
1 2 3 4 5 6 7 8 9 10 11 12
SPLITTING BOX
PM150 AC410
3
1 2 3 4 5 6 7 8 9 10 11 12
C C
MINI-0TDE
R WHITE
T RED
4 AUI-CABLE
1 2 3 4 5 6 7 8 9 10 11 12 R WHITE
T RED
20 PATCH CABLES
D T WHITE D
4
R RED
T WHITE
3
R RED
T WHITE
2
POWER SUPPLY R RED
ENT 10515 T WHITE SOCKET FOR
1 MOBILE AS515
R RED
+UE1
-UE1
+UE2
-UE2
1 2 3 4 5
SPLITTING BOX
E E
24VL+
24VL+
INTERFACE CARD
0V
0V
/G001.D8 ECFL4-BF0C
24VL+
1 2
/G001.D8
0V
+0CKB01 +1..9CKA10
F F
C Date 11.02.97 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =OPSTAT
=
F01B
Prep. KE KW/H 209 181 KW/HA1 AND OPERATOR STATIONS +
+0CKB01 C001
Checked ABB Kraftwerke AG STAR COUPLER INSTALLATION Take over dept. Sht.Nr. C001
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16
1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8
A A
INTERFACE CARD SPLITTING BOX MB300
1 4 1 7,8 03 1CKA10 1)
0CKB01 / 1CKA10 / MB300
1 3 1 5,6 11 1CKA10 AC410 UNIT 1 PCC
2 4 2 3,4 03 3CKA10 1)
0CKB01 / 3CKA10 / MB300
2 3 2 1,2 13 3CKA10 AC410 UNIT 3 PCC
2 2 1 11,12 03 2CKA10 1)
0CKB01 / 2CKA10 / MB300
2 1 1 9,10 12 2CKA10 AC410 UNIT 2 PCC
C C
3 4 2 11,12 03 5CKA10 1)
0CKB01 / 5CKA10 / MB300
3 3 2 9,10 15 5CKA10 AC410 UNIT 5 PCC
3 2 2 7,8 03 4CKA10 1)
0CKB01 / 4CKA10 / MB300
3 1 2 5,6 14 4CKA10 AC410 UNIT 4 PCC
4 4 3 7,8 03 8CKA10 1)
D 0CKB01 / 8CKA10 / MB300 D
4 3 3 5,6 17 8CKA10 AC410 420KV PCC
4 2 3 3,4 03 6CKA10 1)
0CKB01 / 6CKA10 / MB300
4 1 3 1,2 16 6CKA10 AC410 UNIT 6 PCC
5 4 4 3,4 03 9CKA10 1)
0CKB01 / 9CKA10 / MB300
5 3 4 1,2 19 9CKA10 AC410 STATION CONTR. PCC
E 5 2 3 11,12 03 7CKA10 1) E
0CKB01 / 7CKA10 / MB300
5 1 3 9,10 18 7CKA10 AC410 COM.AUX. PCC
2) COLOUR CODE OF MB300 CABLES: BLACK TUBE (WITH RED+WHITE FIBER) FOR AC410 (NODES 11..19)
BROWN TUBE (WITH RED+WHITE FIBER) FOR MOBILE OS (NODE 3)
F F
C Date 11.02.97 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =OPSTAT
=
Prep. KE KW/H 209 181 KW/HA1 AND OPERATOR STATIONS +
+0CKB01 C002
Checked ABB Kraftwerke AG TABLE OF MB300 CONNECTIONS Take over dept. Sht.Nr. C002
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16
1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8
/D001.E3 /D002.E3
A 240VAC 240VAC A
/D001.E4 /D002.E4
2 2 2 2
3 4 3 4
5 5
6
B PRINTER TABLES B
+0CKA10 +0CKA10
1 1
1 1
2 2
3 4 5 3 4 5
13 11 +0CKD01
6 6 f
FO CABLE
7 8 7 8 TO 8CKA10
9 10 9 10 GKWH423277
11 11 Sheet M601 /D001.E5
/D001.E2 /D002.E2
240VAC 240VAC
a a
C C
7
d
MB300
b
c
SHEET C001 c c c
9 9 9
D 8 8 8 10 D
240VAC 240VAC 240VAC 240VAC
/D001.E5 /D002.E5 /D001.E5 /D002.E5
ALARM EVENT PRINTER 1 ALARM EVENT PRINTER 2 PMR PRINTER 3 HARDCOPY PRINTER
NOTES:
F F
C Date 30.11.96 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =OPSTAT
=
Prep. Kahre KW/H 209 181 KW/HA1 AND OPERATOR STATIONS + C003
Checked ABB Kraftwerke AG OPERATOR STATIONS OS1+OS2 Take over dept. Sht.Nr. C003
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16
1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8
MONITOR CONNECTOR #2
(15-PIN HD Dsub)
DCN OR MB300
A CONNECTORS ULTRA SCSI A
CONNECTOR
5V PCI I/O SLOTS
(MARKED 1,2,3 and4)
USB
1
CONNECTOR
3 1 2
RTA BOARD
4
MONITOR CONNECTOR #1
(15-PIN HD Dsub)
C C
SERIAL RS-232
CONNECTORS
(9-PIN MALE Dsub)
KEYBOARD/MOUSE
CONNECTORS
(USB TYPE A)
PARALLEL PRINTER
CONNECTOR
(25-PIN FEMALE Dsub)
E E
AUDIO CONNECTORS
NOTE: The USB keyboard and mouse may be plugged into
TRANSFER OF CONTROL,
TOC BUTTON
F F
C Date 30.11.96 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =OPSTAT
=
Prep. Kahre KW/H 209 181 KW/HA1 AND OPERATOR STATIONS +
+OCKB01 C004
Checked ABB Kraftwerke AG OPERATOR STATIONS AS520i Take over dept. Sht.Nr. C004
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. REAR VIEW Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16
1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8
A A
to 1...9CKA10
(SEE SHEET C001)
+0CKA31
240V AC
B 3 B
1
1
2
3 4 5 12
6
8
7
10
9
C C
11 240VAC
12
+0CWQ03
D D
4 5 6
ALARM EVENT
+0CKC05
E E
F F
C Date 19.06.97 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =OPSTAT
=
Prep. Kahre KW/H 209 181 KW/HA1 AND OPERATOR STATIONS + C005
Checked ABB Kraftwerke AG MOBILE OPERATOR STATION AS515 Take over dept. Sht.Nr. C005
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. REAR VIEW AND CONNECTIONS Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16
1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8
3 3 Operator Keyboard HP
11 1 HUB 8 pole
12 1 UPS
C C
13 1 Interface Module PSM Powerware Phoenix
E E
F F
C Date 30.11.96 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =OPSTAT
=
Prep. Kahre KW/H 209 181 KW/HA1 AND OPERATOR STATIONS +
+OCKB01 C006
Checked ABB Kraftwerke AG OPERATOR STATIONS Take over dept. Sht.Nr. C006
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. LIST OF EQUIPMENT Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16
1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8
VAL.TREAT EVENT TEXT 1 PROPERTY TEXT AL_PRIO ALARM TEXT PERSISTB TEXTCOMB REMARKS
EVENT TEXT 2 AUDIBLE TO BLK / FROM BLK TO BLK / FROM BLK
A 0 / / A
1 ALARM VALUE 4 / /
NORMAL
2 ALARM VALUE 2 / /
NORMAL
20 4 / /
21 ON EVENT 4 / /
B 22 OFF EVENT 4 / / B
23 OPEN EVENT 4 / /
24 CLOSE EVENT 4 / /
25 ON EVENT 4 / /
OFF
26 OPEN EVENT 4 / /
CLOSE
27 NOT ON EVENT 4 / /
C C
28 NOT OFF EVENT 4 / /
31 RAISE I EVENT 4 / /
RAISE 0
32 LOWER I EVENT 4 / /
D LOWER 0 D
33 MAN. EVENT 4 / /
AUTO
34 AVAILABLE EVENT 4 / /
35 ACTIVATED EVENT 4 / /
DEACTIV.
36 LOCAL EVENT 4 / /
E 37 REMOTE EVENT 4 / / E
41 MAINT.POSITION EVENT 4 / /
F F
c Date 19.06.97 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =
Prep. Kahre KW/H 209 181 KW/HA1 AND OPERATOR STATIONS + C007
Checked ABB Kraftwerke AG SIGLISTS PARAMETERS Take over dept. Sht.Nr. C007
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. EVENTS Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16
1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8
VAL.TREAT EVENT TEXT 1 PROPERTY TEXT AL_PRIO ALARM TEXT PERSISTB TEXTCOMB REMARKS
EVENT TEXT 2 AUDIBLE TO BLK / FROM BLK TO BLK / FROM BLK
A A
151 > ALARM 1 / /
NORMAL
156 I ALARM 1 / /
0
157 ON ALARM 1 / /
NOT ON
C C
159 MISSING ALARM 1 / /
AVAILABLE
E E
F F
C Date 19.06.97 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =
Prep. Kahre KW/H 209 181 KW/HA1 AND OPERATOR STATIONS + C008
Checked ABB Kraftwerke AG SIGLISTS PARAMETERS Take over dept. Sht.Nr. C008
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. ALARMS Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16
1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8
VAL.TREAT EVENT TEXT 1 PROPERTY TEXT AL_PRIO ALARM TEXT PERSISTB TEXTCOMB REMARKS
EVENT TEXT 2 AUDIBLE TO BLK / FROM BLK TO BLK / FROM BLK
A A
201 >> TRIP 2 / /
NORMAL
206 ON TRIP 2 / /
NOT ON
C C
D D
E E
F F
C Date 19.06.97 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =
Prep. Kahre KW/H 209 181 KW/HA1 AND OPERATOR STATIONS + C009
Checked ABB Kraftwerke AG SIGLISTS PARAMETERS Take over dept. Sht.Nr. C009
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. TRIPS Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16
1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8
-X5 101
-X5 102
48V11L+
-X5 104
103
105
B B
30 min
D D
-S1 -S2
-X5 109
/C003.A2
/C003.A3
/C003.D3
/C003.D7
/C003.C7
+0CWQ01 REFERENCE DRAWING:
KLEIN 4673.315.31.000
0CKA10 0CKA11 0CKA12 0CKC01,0CKD01
F F
C Date 19.06.97 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =OPSTAT
=
Prep. Kahre KW/H 209 181 KW/HA1 AND OPERATOR STATIONS +
+OCWQ01 D001
Checked ABB Kraftwerke AG OPERATOR STATION 1 Take over dept. Sht.Nr. D001
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. INVERTER CUBICLE Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16
1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8
-X5 101
-X5 102
48V11L+
-X5 104
103
105
B B
SEE DWG
-X5 107 GKWH423278
106 Sh. M304
108
30 min
D D
-S1 -S2
-X5 118
-X5 119
L1,N,PE L2,N,PE L3,N,PE L4,N,PE
E E
/C003.C5
/C003.A5
/C003.A5
/C003.D5
/C003.D8
REFERENCE DRAWING:
+0CWQ02
KLEIN 4673.315.31.000
0CKA20 0CKA21 0CKA22 0CKC02, 04
F F
C Date 19.06.97 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =OPSTAT
=
Prep. Kahre KW/H 209 181 KW/HA1 AND OPERATOR STATIONS +
+0CWQ02 D002
Checked ABB Kraftwerke AG OPERATOR STATION 2 Take over dept. Sht.Nr. D002
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. INVERTER CUBICLE Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16
1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8
A A
B B
1 1 1 1
-X901 L
N PE
E E
605 606 605 606 240VN -X1 615 -X1 606 -X1 607
F F
C Date 11.02.97 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =OPSTAT
=
F60A
Prep. KE KW/H 209 181 KW/HA1 AND OPERATOR STATIONS +
+0CKB01 D003
Checked ABB Kraftwerke AG HEATING LIGHTING Take over dept. Sht.Nr. D003
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. SOCKET OUTLETS Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16
1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8
A A
7BUB11-X1 L+ L- 7BUB21-X1 L+ L-
-X1 1 2 -X1 3 4
-X1 5
1 3 13 21
1 3 13 21
-F2
-F1 2 4 14 22
B B
2 4 14 22
-X1 6
48V11L+
SEE DWG GKWH423278 Sh. M304
A K A K A K A K
-G1 + - -G2 + -
= 2 = 2
1 1
4 4
= =
D D
+ - + -
-X1 7 -X1 8
/C001.E2
-X1 10 -X1 9 brown 24VL+
/C001.E2
white 0V
E E
+0CKB01
F F
C Date 11.02.97 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =OPSTAT
=
F01B
Prep. KE KW/H 209 181 KW/HA1 AND OPERATOR STATIONS +
+0CKB01 G001
Checked ABB Kraftwerke AG DC - SUPPLY CONVERTERS Take over dept. Sht.Nr. G001
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. 0CKB01 Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16
1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8
STUECK- EINBAU- GERAETE- GERAETEBENENNUNG, BAUART, TECHNISCHE DATEN STUECK- EINBAU- GERAETE- GERAETEBENENNUNG, BAUART, TECHNISCHE DATEN
ZAHL ORT BEZEICHNUNG ZAHL ORT BEZEICHNUNG
QUAN- LOCATION APPARATUS DESCRIPTION, TYPE, TECHNICAL DATA QUAN- LOCATION APPARATUS DESCRIPTION, TYPE, TECHNICAL DATA
TITY DESIGNATION TITY DESIGNATION
QUAN- LIEU DESIGNATION DESCRIPTION, TYPE, DONNEES TECHNIQUES QUAN- LIEU DESIGNATION DESCRIPTION, TYPE, DONNEES TECHNIQUES
A TITE D`EMPLACEM. DE L`APPAREIL TITE D`EMPLACEM. DE L`APPAREIL A
NUMERO UBICACION DENOMINACION DENOMINATION, TIPO, DATOS TECHNICOS NUMERO UBICACION DENOMINACION DENOMINATION, TIPO, DATOS TECHNICOS
1 +0CKB01 -A100 19 ZOLL RACK STAR COUPLER 1 +0CKB01 -R901 CUBICLE HEATING
F F
C Date 30.11.96 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =
Prep. Kahre KW/H 209 181 KW/HA1 AND OPERATOR STATIONS + Z001
Checked ABB Kraftwerke AG EQUIPMENT LIST Take over dept. Sht.Nr. Z001
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16
1 2 3 4 A3ENS1 5 6 7 8