Sie sind auf Seite 1von 16

1 2 3 4 5 6 7 8

C 07.06.04 KMH/Sallge AS BUILT REVISION SALLGE


A B 26.10.99 KAHRE VARIOUS MODIFICATIONS A
A 05.02.98 HAEHNEL OPERATOR STATIONS ADDED SALLGE

Rev. Date Name Notes Checked

REVISIONS
Purchaser:
NATHPA JHAKRI
POWER CORPORATION LTD.
B B
HIMFED Building,Shimla,India
Suppliers:
EUCONA
ABB KRAFTWERKE AG, Mannheim, Germany (Leader)
SIEMENS AG, Erlangen, Germany
C KVAERNER ENERGY A.S., Oslo, Norway C
SULZER-ESCHER WYSS LTD., Zurich, Switzerland
Principal Consultants:
CEA, New Delhi, India
Retainer Consultants:
NIPPON KOEI, Tokyo, Japan
ELECTROWATT, Zurich, Switzerland
WAPCOS, New Delhi, India
D D

NATHPA JHAKRI
HYDRO-ELECTRIC PROJECT
Generating Units and Associated Equipment-Package 1
Prepared Based on Sep.Pl.same Nr. Scale Doc type Format
an other Nr. 3

E Checked 03.03.97 Responsible dept. Title E


Sallge CIRCUIT DIAGRAM
STAR COUPLER AND Language
Approved 03.03.97 Take over dept.
Sallge OPERATOR STATIONS
en
Revision Proj.No. Nr of sheets
C KW/H 209 181 16

Drwg.No. Sheet Nr
Kraftwerke AG GKW H423379 A001

F F

C Date 30.11.96 NATHPA JHAKRI H.E.P. INDIA Resp.dept. =OPSTAT


=
Prep. Kahre KW/H 209 181 KW/HA1 +
Checked ABB Kraftwerke AG Take over dept. Sht.Nr.
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. Doc Format 3 Lang. en Nr.ofshts.
1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8

DRAWING-No. MODIFICATION DESIGNATION PLANT LOCATION CODE SHEET-No.


ZEICHNUNGS-NR. AENDERUNG BENENNUNG ANLAGEN/ORTSKENNZEICHEN BLATTNAME
PLAN-No. MODIFICATION DESIGNATION CODE LOCALISATION DE L`EQUIIPMENT FEUL No.
PLANO-No. MODIFICATION DESIGNACION CODIGO LOCALISACION DEL EQUIPO FEUL No.

A A
1 H423379 CIRCUIT DIAGRAM STAR COUPLER AND A001

2 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS STAR COUPLER INSTALLATION 0CKB01 C001

3 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS TABLE OF MB300 CONNECTIONS 0CKB01 C002

4 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS OPERATOR STATIONS AS520i CONNECTIONS C003

B B
5 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS OPERATOR STATIONS AS520i REAR VIEW OCKB01 C004

6 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS MOBILE OPERATOR STATION AS515 REAR VIEW AND CONNECTIONS C005

7 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS OPERATOR STATIONS LIST OF EQUIPMENT OCKB01 C006

8 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS SIGLISTS PARAMETERS EVENTS C007

C C
9 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS SIGLISTS PARAMETERS ALARMS C008

10 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS SIGLISTS PARAMETERS TRIPS C009

11 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS OPERATOR STATION 1 INVERTER CUBICLE OCWQ01 D001

12 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS OPERATOR STATION 2 INVERTER CUBICLE 0CWQ02 D002

D D
13 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS HEATING LIGHTING SOCKET OUTLETS 0CKB01 D003

14 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS DC - SUPPLY CONVERTERS 0CKB01 0CKB01 G001

15 H423379 CIRCUIT DIAGRAM STAR COUPLER AND OPERATOR STATIONS EQUIPMENT LIST Z001

16

E E
17

18

19

F F

C Date 19.06.97 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =
Prep. Kahre KW/H 209 181 KW/HA1 AND OPERATOR STATIONS + B001
Checked ABB Kraftwerke AG LIST OF DRAWINGS Take over dept. Sht.Nr. B001
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16

1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8

A TO OPERATOR STATIONS (SEE SHEET C003) A

TO MOBILE OPERATOR STATION (SEE SHEET C005)

MB300 FIBRE OPTIC


CABLE

1
1 2 3 4 5 6 7 8 9 10 11 12 ABB

B B

CS513

2
1 2 3 4 5 6 7 8 9 10 11 12

SPLITTING BOX

PM150 AC410

3
1 2 3 4 5 6 7 8 9 10 11 12
C C
MINI-0TDE

R WHITE
T RED
4 AUI-CABLE
1 2 3 4 5 6 7 8 9 10 11 12 R WHITE
T RED

20 PATCH CABLES

D T WHITE D
4
R RED
T WHITE
3
R RED

T WHITE
2
POWER SUPPLY R RED
ENT 10515 T WHITE SOCKET FOR
1 MOBILE AS515
R RED
+UE1
-UE1

+UE2
-UE2

1 2 3 4 5

SPLITTING BOX
E E
24VL+
24VL+

INTERFACE CARD
0V
0V

/G001.D8 ECFL4-BF0C
24VL+
1 2

/G001.D8
0V

+0CKB01 +1..9CKA10

F F

C Date 11.02.97 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =OPSTAT
=
F01B
Prep. KE KW/H 209 181 KW/HA1 AND OPERATOR STATIONS +
+0CKB01 C001
Checked ABB Kraftwerke AG STAR COUPLER INSTALLATION Take over dept. Sht.Nr. C001
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16

1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8

A A
INTERFACE CARD SPLITTING BOX MB300

NO P0RT NO P0RT NODE KKS EQUIPMENT FUNCTION CABLE NO.

1 4 1 7,8 03 1CKA10 1)
0CKB01 / 1CKA10 / MB300
1 3 1 5,6 11 1CKA10 AC410 UNIT 1 PCC

B 1 2 1 3,4 02 0CKA20 AS520 OPERATOR STATION 2 B


0CKB01 / 0CKA10 / MB300
1 1 1 1,2 01 0CKA10 AS520 OPERATOR STATION 1

2 4 2 3,4 03 3CKA10 1)
0CKB01 / 3CKA10 / MB300
2 3 2 1,2 13 3CKA10 AC410 UNIT 3 PCC

2 2 1 11,12 03 2CKA10 1)
0CKB01 / 2CKA10 / MB300
2 1 1 9,10 12 2CKA10 AC410 UNIT 2 PCC
C C
3 4 2 11,12 03 5CKA10 1)
0CKB01 / 5CKA10 / MB300
3 3 2 9,10 15 5CKA10 AC410 UNIT 5 PCC

3 2 2 7,8 03 4CKA10 1)
0CKB01 / 4CKA10 / MB300
3 1 2 5,6 14 4CKA10 AC410 UNIT 4 PCC

4 4 3 7,8 03 8CKA10 1)
D 0CKB01 / 8CKA10 / MB300 D
4 3 3 5,6 17 8CKA10 AC410 420KV PCC

4 2 3 3,4 03 6CKA10 1)
0CKB01 / 6CKA10 / MB300
4 1 3 1,2 16 6CKA10 AC410 UNIT 6 PCC

5 4 4 3,4 03 9CKA10 1)
0CKB01 / 9CKA10 / MB300
5 3 4 1,2 19 9CKA10 AC410 STATION CONTR. PCC

E 5 2 3 11,12 03 7CKA10 1) E
0CKB01 / 7CKA10 / MB300
5 1 3 9,10 18 7CKA10 AC410 COM.AUX. PCC

1) SOCKET AT 1..9CKA10 FOR 0CKA30 , MOBILE OPERATOR STATION

2) COLOUR CODE OF MB300 CABLES: BLACK TUBE (WITH RED+WHITE FIBER) FOR AC410 (NODES 11..19)
BROWN TUBE (WITH RED+WHITE FIBER) FOR MOBILE OS (NODE 3)

F F

C Date 11.02.97 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =OPSTAT
=
Prep. KE KW/H 209 181 KW/HA1 AND OPERATOR STATIONS +
+0CKB01 C002
Checked ABB Kraftwerke AG TABLE OF MB300 CONNECTIONS Take over dept. Sht.Nr. C002
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16

1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8

+0CKB01 +0CKA11 +0CKA12 +0CKA21 +0CKA22

/D001.E3 /D002.E3
A 240VAC 240VAC A
/D001.E4 /D002.E4
2 2 2 2

3 4 3 4
5 5

6
B PRINTER TABLES B
+0CKA10 +0CKA10
1 1
1 1
2 2
3 4 5 3 4 5
13 11 +0CKD01
6 6 f
FO CABLE
7 8 7 8 TO 8CKA10
9 10 9 10 GKWH423277
11 11 Sheet M601 /D001.E5
/D001.E2 /D002.E2
240VAC 240VAC
a a
C C

7
d
MB300
b

c
SHEET C001 c c c

9 9 9
D 8 8 8 10 D
240VAC 240VAC 240VAC 240VAC
/D001.E5 /D002.E5 /D001.E5 /D002.E5

ALARM EVENT PRINTER 1 ALARM EVENT PRINTER 2 PMR PRINTER 3 HARDCOPY PRINTER

+0CKC01 +0CKC02 +0CKC03 +0CKC04

NOTES:

E 1) FOR TERMINATIONS AT THE REAR OF E


0CKA10 / 0CKA20 PLS REFER TO SHEET C004

2) FOR EQUIPMENT 1..12 AND CABLES a..e


PLS REFER TO SHEET C006

F F

C Date 30.11.96 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =OPSTAT
=
Prep. Kahre KW/H 209 181 KW/HA1 AND OPERATOR STATIONS + C003
Checked ABB Kraftwerke AG OPERATOR STATIONS OS1+OS2 Take over dept. Sht.Nr. C003
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16

1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8

MONITOR CONNECTOR #2
(15-PIN HD Dsub)
DCN OR MB300
A CONNECTORS ULTRA SCSI A
CONNECTOR
5V PCI I/O SLOTS
(MARKED 1,2,3 and4)

USB
1
CONNECTOR

3 1 2

RTA BOARD
4

B I/O SLOTS MARKED 5 and 6 5 B


HAVE NO INTERNAL CONNECTION
6

MONITOR CONNECTOR #1
(15-PIN HD Dsub)

C C
SERIAL RS-232
CONNECTORS
(9-PIN MALE Dsub)

KEYBOARD/MOUSE
CONNECTORS
(USB TYPE A)

LOCAL AREA NETWORK, LNA


CONNECTOR (RJ-45)
D D

PARALLEL PRINTER
CONNECTOR
(25-PIN FEMALE Dsub)

E E
AUDIO CONNECTORS
NOTE: The USB keyboard and mouse may be plugged into

either USB connector on the rear of the B2000 workstation

TRANSFER OF CONTROL,

TOC BUTTON

F F

C Date 30.11.96 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =OPSTAT
=
Prep. Kahre KW/H 209 181 KW/HA1 AND OPERATOR STATIONS +
+OCKB01 C004
Checked ABB Kraftwerke AG OPERATOR STATIONS AS520i Take over dept. Sht.Nr. C004
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. REAR VIEW Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16

1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8

A A

to 1...9CKA10
(SEE SHEET C001)
+0CKA31

240V AC

B 3 B

1
1
2
3 4 5 12

6
8
7
10
9
C C
11 240VAC
12

+0CWQ03

D D

4 5 6

ALARM EVENT
+0CKC05

E E

F F

C Date 19.06.97 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =OPSTAT
=
Prep. Kahre KW/H 209 181 KW/HA1 AND OPERATOR STATIONS + C005
Checked ABB Kraftwerke AG MOBILE OPERATOR STATION AS515 Take over dept. Sht.Nr. C005
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. REAR VIEW AND CONNECTIONS Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16

1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8

Item Qty. Object Supplier Type


A A

1 2 Operator Station HP AS520/HP B2000

2 5 20" Monitor with cable HP P1120

3 3 Operator Keyboard HP

4 3 Trackball with cable HP

5 3 Mouse with cable HP

B 6 2 DAT Tape Drive HP Share Store DAT8 B

7 2 Optical Transceiver HIRSCHMANN Mini-OTDE

8 4 Alarm Event Printer OKI 395C

9 1 Print Server AXIS

10 1 Hardcopy Printer HP 2500N

11 1 HUB 8 pole

12 1 UPS
C C
13 1 Interface Module PSM Powerware Phoenix

a 2 Transceiver cable 5m Inmac


D D
b 1 Fibre optic cable ABB MB300

c 4 UTP cable 20m Inmac

d 1 Splitting box ABB 9800.63k

e 1 Parallel printer cable 1,5m Inmac

f 2 Serial cable 20m + Connector Inmac

E E

F F

C Date 30.11.96 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =OPSTAT
=
Prep. Kahre KW/H 209 181 KW/HA1 AND OPERATOR STATIONS +
+OCKB01 C006
Checked ABB Kraftwerke AG OPERATOR STATIONS Take over dept. Sht.Nr. C006
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. LIST OF EQUIPMENT Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16

1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8

VAL.TREAT EVENT TEXT 1 PROPERTY TEXT AL_PRIO ALARM TEXT PERSISTB TEXTCOMB REMARKS
EVENT TEXT 2 AUDIBLE TO BLK / FROM BLK TO BLK / FROM BLK

A 0 / / A

1 ALARM VALUE 4 / /
NORMAL

2 ALARM VALUE 2 / /
NORMAL

20 4 / /

21 ON EVENT 4 / /

B 22 OFF EVENT 4 / / B

23 OPEN EVENT 4 / /

24 CLOSE EVENT 4 / /

25 ON EVENT 4 / /
OFF

26 OPEN EVENT 4 / /
CLOSE

27 NOT ON EVENT 4 / /
C C
28 NOT OFF EVENT 4 / /

29 NOT OPEN EVENT 4 / /

30 NOT CLOSE EVENT 4 / /

31 RAISE I EVENT 4 / /
RAISE 0

32 LOWER I EVENT 4 / /
D LOWER 0 D

33 MAN. EVENT 4 / /
AUTO

34 AVAILABLE EVENT 4 / /

35 ACTIVATED EVENT 4 / /
DEACTIV.

36 LOCAL EVENT 4 / /

E 37 REMOTE EVENT 4 / / E

38 TEST POSITION EVENT 4 / /

39 MANUAL EVENT 4 YES / YES NO / YES YES 5

40 AUTO EVENT 4 YES / YES NO / YES YES 5

41 MAINT.POSITION EVENT 4 / /

F F

c Date 19.06.97 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =
Prep. Kahre KW/H 209 181 KW/HA1 AND OPERATOR STATIONS + C007
Checked ABB Kraftwerke AG SIGLISTS PARAMETERS Take over dept. Sht.Nr. C007
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. EVENTS Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16

1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8

VAL.TREAT EVENT TEXT 1 PROPERTY TEXT AL_PRIO ALARM TEXT PERSISTB TEXTCOMB REMARKS
EVENT TEXT 2 AUDIBLE TO BLK / FROM BLK TO BLK / FROM BLK

A A
151 > ALARM 1 / /
NORMAL

152 < ALARM 1 / /


NORMAL

153 DISTURB. ALARM 1 / /


NORMAL

154 TRIPPED ALARM 1 / /


NORMAL
B B
155 BLOCKED ALARM 1 / /
NORMAL

156 I ALARM 1 / /
0

157 ON ALARM 1 / /
NOT ON

158 I-POS. ALARM 1 / /

C C
159 MISSING ALARM 1 / /
AVAILABLE

160 COND.MISSING ALARM 1 / /

161 DETECTED ALARM 1 / /


NORMAL

162 POS.FAILURE ALARM 1 / /


NORMAL
D D
163 NORMAL ALARM 1 / /
<

E E

F F

C Date 19.06.97 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =
Prep. Kahre KW/H 209 181 KW/HA1 AND OPERATOR STATIONS + C008
Checked ABB Kraftwerke AG SIGLISTS PARAMETERS Take over dept. Sht.Nr. C008
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. ALARMS Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16

1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8

VAL.TREAT EVENT TEXT 1 PROPERTY TEXT AL_PRIO ALARM TEXT PERSISTB TEXTCOMB REMARKS
EVENT TEXT 2 AUDIBLE TO BLK / FROM BLK TO BLK / FROM BLK

A A
201 >> TRIP 2 / /
NORMAL

202 << TRIP 2 / /


NORMAL

203 DISTURB. TRIP 2 / /


NORMAL

204 TRIPPED TRIP 2 / /


NORMAL
B B
205 I TRIP 2 / /
0

206 ON TRIP 2 / /
NOT ON

207 MISSING TRIP 2 / /


AVAILABLE

C C

D D

E E

F F

C Date 19.06.97 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =
Prep. Kahre KW/H 209 181 KW/HA1 AND OPERATOR STATIONS + C009
Checked ABB Kraftwerke AG SIGLISTS PARAMETERS Take over dept. Sht.Nr. C009
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. TRIPS Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16

1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8

220V BATTERY 220V BATTERY 240VAC


-X1 L+ L- -X1 L+ L- -X1 L /N/PE
+7BUA11 +7BUA21 +7BFA11 +9CCA01
A A
-X1 L+ L- -X2 L+ L- -X3 L,N,PE

-X5 101

-F5 -F6 -F7

-X5 102

48V11L+
-X5 104
103
105
B B

-X5 107 SEE DWG


106 GKWH423278
108 Sh. M304

-A1 -A2 -A3


= = ~
C C
~ ~ ~
1,5KVA 1,5KVA 2 KVA

30 min

D D
-S1 -S2

-X5 109

-F10 -F11 -F12 -F13


110
-X5
L1,N,PE L2,N,PE L3,N,PE L4,N,PE
E E
/C003.C3

/C003.A2

/C003.A3

/C003.D3

/C003.D7

/C003.C7
+0CWQ01 REFERENCE DRAWING:

KLEIN 4673.315.31.000
0CKA10 0CKA11 0CKA12 0CKC01,0CKD01

F F

C Date 19.06.97 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =OPSTAT
=
Prep. Kahre KW/H 209 181 KW/HA1 AND OPERATOR STATIONS +
+OCWQ01 D001
Checked ABB Kraftwerke AG OPERATOR STATION 1 Take over dept. Sht.Nr. D001
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. INVERTER CUBICLE Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16

1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8

220V BATTERY 220V BATTERY 240VAC


-X2 L+ L- -X2 L+ L- -X2 L /N/PE
+7BUA11 +7BUA21 +7BFA11 +9CCA01
A A
-X1 L+ L- -X2 L+ L- -X3 L,N,PE

-X5 101

-F5 -F6 -F7

-X5 102

48V11L+
-X5 104
103
105
B B

SEE DWG
-X5 107 GKWH423278
106 Sh. M304
108

-A1 -A2 -A3


= = ~
C C
~ ~ ~
1,5KVA 1,5KVA 2 KVA

30 min

D D
-S1 -S2

-X5 118

-F10 -F11 -F12 -F13

-X5 119
L1,N,PE L2,N,PE L3,N,PE L4,N,PE
E E
/C003.C5

/C003.A5

/C003.A5

/C003.D5

/C003.D8

REFERENCE DRAWING:
+0CWQ02
KLEIN 4673.315.31.000
0CKA20 0CKA21 0CKA22 0CKC02, 04

F F

C Date 19.06.97 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =OPSTAT
=
Prep. Kahre KW/H 209 181 KW/HA1 AND OPERATOR STATIONS +
+0CWQ02 D002
Checked ABB Kraftwerke AG OPERATOR STATION 2 Take over dept. Sht.Nr. D002
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. INVERTER CUBICLE Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16

1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8

A A

B B

+0CWQ01 +0CWQ02 +9CKA10 +0CKB01

C 240V52L1 -X1 603 -X1 600 -X1 X


601 C

-X5 601,602 -X5 601,602 240V53L1 606 602 603

-X5 603,604 -X5 603,604 608 604 605

1 1 1 1

-S3 -S3 -S901 -S902


2 2 2 2

D SEE DWG GKWH423278 SH.D002 D


1 X1 1 X1 1 X1 X1
-E1 -E1 -E901 -E902
-R1 X2 -R1 X2 -R901 X2 X2
2 2 2

-X901 L

N PE

E E
605 606 605 606 240VN -X1 615 -X1 606 -X1 607

240VPE 620 608 609

F F

C Date 11.02.97 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =OPSTAT
=
F60A
Prep. KE KW/H 209 181 KW/HA1 AND OPERATOR STATIONS +
+0CKB01 D003
Checked ABB Kraftwerke AG HEATING LIGHTING Take over dept. Sht.Nr. D003
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. SOCKET OUTLETS Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16

1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8

48V BATT. 1 48V BATT. 2

A A
7BUB11-X1 L+ L- 7BUB21-X1 L+ L-

+7BUB11 +7BUB21 +9CCA01


21 22 23 24

-X1 1 2 -X1 3 4

-X1 5

1 3 13 21
1 3 13 21
-F2
-F1 2 4 14 22
B B
2 4 14 22

-X1 6

48V11L+
SEE DWG GKWH423278 Sh. M304

A K A K A K A K

C -V1 -V2 -V3 -V4 -V5 -V6 -V7 -V8 C


K A K A K A K A

-G1 + - -G2 + -

= 2 = 2
1 1
4 4

= =
D D
+ - + -
-X1 7 -X1 8
/C001.E2
-X1 10 -X1 9 brown 24VL+
/C001.E2
white 0V

E E

+0CKB01

F F

C Date 11.02.97 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =OPSTAT
=
F01B
Prep. KE KW/H 209 181 KW/HA1 AND OPERATOR STATIONS +
+0CKB01 G001
Checked ABB Kraftwerke AG DC - SUPPLY CONVERTERS Take over dept. Sht.Nr. G001
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. 0CKB01 Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16

1 2 3 4 A3ENS1 5 6 7 8
1 2 3 4 5 6 7 8
STUECK- EINBAU- GERAETE- GERAETEBENENNUNG, BAUART, TECHNISCHE DATEN STUECK- EINBAU- GERAETE- GERAETEBENENNUNG, BAUART, TECHNISCHE DATEN
ZAHL ORT BEZEICHNUNG ZAHL ORT BEZEICHNUNG
QUAN- LOCATION APPARATUS DESCRIPTION, TYPE, TECHNICAL DATA QUAN- LOCATION APPARATUS DESCRIPTION, TYPE, TECHNICAL DATA
TITY DESIGNATION TITY DESIGNATION
QUAN- LIEU DESIGNATION DESCRIPTION, TYPE, DONNEES TECHNIQUES QUAN- LIEU DESIGNATION DESCRIPTION, TYPE, DONNEES TECHNIQUES
A TITE D`EMPLACEM. DE L`APPAREIL TITE D`EMPLACEM. DE L`APPAREIL A
NUMERO UBICACION DENOMINACION DENOMINATION, TIPO, DATOS TECHNICOS NUMERO UBICACION DENOMINACION DENOMINATION, TIPO, DATOS TECHNICOS

1 +0CKB01 -A100 19 ZOLL RACK STAR COUPLER 1 +0CKB01 -R901 CUBICLE HEATING

(C001) MANUF.: ABB MANUF.: RITTAL


(D001) TYPE: SK3116
INCLUDING: 110-240V AC
1 REDUNDANT POWER SUPPLY
5 FIBRE OPTIC INTERFACE CARDS
B 4 DISTRIBUTION CHASSIS B

2 +0CKB01 -E901 CUBICLE LIGHTING 2 +0CKB01 -S901 DOOR SWITCH


-E902 -S902
MANUF.: NN MANUF.: RITTAL
TYPE: INDIAN STANDARD TYPE: PS4127
(D001) (D001)
C C

2 +0CKB01 -F1 MCB S282UC-K20 8 +0CKB01 -V1 -V8 DIODE SET


D -F2 D
MANUF.: ABB MANUF.: IXYS
TYPE: S282UC-K20 (G001) TYPE: 40A 800V
(G001) GHS 282016 R0487 GILC 200219 Z0050
WITH AUX.CONT. GHS 2701916R0001

2 +0CKB01 -G1 DC/DC CONVERTER GSW500


-G2
E MANUF.: EES E
TYPE: GSW500
(G001) INPUT VOLT.: 40..55V DC
OUTPUT VOLT.: 24V DC +/- 10%
WITH OVERVOLT.
UNDERVOLT.
TEMP.PROT.

F F

C Date 30.11.96 NATHPA JHAKRI H.E.P. INDIA Resp.dept. CIRCUIT DIAGRAM STAR COUPLER =
Prep. Kahre KW/H 209 181 KW/HA1 AND OPERATOR STATIONS + Z001
Checked ABB Kraftwerke AG EQUIPMENT LIST Take over dept. Sht.Nr. Z001
Rev.Ind Revision Date Name Appr. DDS-C Repl.by Repl. Doc Format 3 Lang. en GKW H423379 Nr.ofshts. 16

1 2 3 4 A3ENS1 5 6 7 8

Das könnte Ihnen auch gefallen