Beruflich Dokumente
Kultur Dokumente
If 1000L/s of outdoor air are to be mixed with 2000 L/s of return air then Part of the air
mixture passes through a cooling coil and the rest to be by-passed around the cooling coil.
Assuming the air leaves the cooling coil at 90 %RH then find:
Coil cooling capacity in ton-ref
Supply air temperature
Hall cooling load(space cooling load)
Draw the psychometric cycle and line diagram.
2- A summer air conditioning system consists of water chiller and an air reheater, part of
return air is mixed with the outside air before the air washer (chilled water spray) while the
other part by-pass the air washer. The following data were collected:
Inside design condition 26C DBT and 50% RH
Outside design condition 35C DBT and 26 WBT
Fresh air ventilation rate [2000 L/s]
Internal sensible heat gain [40 kW]
Internal latent heat gain [17.5 kW]
Air leaving air washer at [90 % RH]
Temperature difference between supply and inside air is 6 C and equal masses of return
air and by-pass air are used. Determine the following:
Refrigeration capacity of water chiller in ton-ref..
Heating capacity of the air heater.
By-pass to supply air mixing ratio.
Draw the psychometric cycle and line diagram.
3- The following data refer to the design feature used in designing the summer air
conditioning plant of a theater
Seating capacity [1500 person]
Inside condition [24C DBT and 50% RH]
Outside condition [34C DBT and 26 WBT]
1
Fresh air per person [12.5 CMH]
Supply air per person [50 CMH]
Moisture gain [0.003 kg/kg dry air]
Temperature difference between supply air and return air is 14 C. find the following:
The cooling capacity of the air conditiong unit.
The cooling load of the theatre
Draw the psychometric cycle and line diagram.
4- The following information was obtained in designing the summer air conditioning unit in a
print hall:
Outside conditions [38C DBT& 28C WBT]
Inside design conditions [21 C DBT& 70%RH]
Fresh air Mixing ratio [0.5]
Internal sensible heat gain [175 kW]
Internal latent heat gain [65 kW]
5- An air conditioning system is to be designed for a restaurant, the data available are
Outside conditions [34C DBT& 28C WBT]
Inside design conditions [24 C DBT& 50%RH]
The calculated sensible loads to be removed from the space [27.2 kW]
The calculated latent loads to be removed from the space [10.5 kW]
by-pass factor [0.17]
If 20%fresh air and 80%recirculated air are mixed and passed through the conditioner coil
then find the following:
Amount of total air in m3/hr
Dew-point temperature of the coil
The condition of supply air to the room
The capacity of the conditioner in ton-ref
Draw the psychometric cycle and line diagram.
6- In an air conditioning unit, air is received at a rate of 1000 kg/h at condition of 26C DBT
and 55 % RH. The unit consists of cooling coil, where the air is cooled and dehumidified to
3C DBT and 90% RH, then air passes through an electric heater and leaves it at 21C
DBT .After that air passes through an air washer .where it is humidified to 95%RH. Part of
2
the air is by-passed across the air washer to have final air relative humidity of 60%. Find the
following:
The by-pass factor of the air washer
The capacity of the cooling coil
The capacity of the heating coil
Draw the psychometric cycle and line diagram.
If the quantity of recirculated air is mixed with the conditioned air after the cooling coil, then
find the following:
condition of air before entering the hall
the mass of air entering the coil and the hall
by pass factor of the cooling coil
the refrigeration load in ton-ref
coil SHR
coil dew point
Draw the psychometric cycle and line diagram.
The rise in temperature of the air inside the auditorium is limited to 7 C, 70% of the room
air going to exhaust is recirculated and mixed with 30% fresh air. The required condition is
achieved first by cooling and dehumidification and then heating the air. The dew point of the
cooling coil is 12C. find the following
quantity of air supplied at out-door air condition in m3 /hr
The capacity of refrigeration system in ton-ref
the capacity of heating coil in kw
the bypass factor of the cooling coil
Draw the psychometric cycle and line diagram.
9- The following data refer to figure used in designing a summer air conditioning plant of a
theater capacity 1500 seats. The data available are
Inside design condition [25C DBT and 50%RH]
Outside condition [35C DBT and 26C WBT]
Fresh air per person [12.75 m3/hr]
3
Supply air per person [51 m3/hr]
Temperature difference between supply and return is 14C. calculate the following:
Room total load
Room sensible heat factor RSHR
Cooling capacity in ton-ref
Apparatus SHR
Draw the psychometric cycle and line diagram.
The air passes through a precooler then saturated using air washer. Calculate the following:
The temperature to which the air is precooled
The amount of supply air in m3/hr
The precooler cooling capacity in ton-ref
The water consumption of humidification in lit/min
Draw the psychometric cycle and line diagram.
11- In a summer air conditioning system employing evaporative cooling. Equal masses of
fresh and return air after mixing are first precooled and then adiabatically humidified to
100% by air washer. Data available are:
Inside design condition [26C DBT and 20C WBT]
Outside condition [35C DBT and 17C WBT]
The internal sensible heat [30 KW]
The internal latent heat [15.8 KW]
Calculate the following:
The water consumption in lit/min The quantity of air supply in m3/hr
The spray water temperature. The precooler capacity
12- In a summer air conditioning system, outside air at 35C DBT, 17C WBT to be mixed
with return air at 26C DBT, 60%RH . The mixture is sensibly precooled by passing through
an air cooler,then adiabatically humidified to 90% RH by passing through an air washer. If
the room sensible heat gain is 275 kW with room sensible heat factor 0.8 and mass of
return air is three times that of fresh air. Calculate:
The capacity of air precooler
The make water necessary for the air washer in CMH
Draw the psychometric cycle and line diagram.
13- A winter air conditioning unit consists of a preheating coil, a spray system, and
reheating coil. The unit is designed to handle 8000 kg /h of fresh air. The heat loss from the
4
space is 9 kW. The outside air enters the unit at 7C DBT,4C WBT . The air leaves the
spray system at 90% RH .The unit delivers air at 26 C DBT,30 % RH . Determine:
The condition maintained inside the space
The quantity of water consumed during humidification
The heating capacities of the preheating coil and reheating coil.
Draw the psychometric cycle and line diagram.
14- A building is to be heated by passing air over a heating coil. The air temperature at
heater outlet is 44C DBT.air is then humidified to satisfy the required inside design
condition.
The building heat loss [10,000W]
The inside design condition [22C DBT, 50%RH]
The outside design condition [10C DBT and 5C WBT]
Percent of fresh air [one-fourth]
Calculate the following:
The amount of supply air in CMH
The heater capacity kW
The water consumption in humidification
Draw the psychometric cycle and line diagram.
In case of adiabatic air washer or adiabatic air washer is used.
15- For ventilation purposes in a factory 3400 CMH of outside air must be handeled.
The air condition inside the factory [21C DBT, 15C WBT]
The outside air condition [10C DBT, 5C WBT]
The net heat loss from the factory [58,000W]
The supply air Temperature [38C]
After mixing process the air passes through heating coil then air washer. Calculate the
following:
The quantity of air supply CMH
The heater capacity kW
Amount of make up water L/min
Draw the psychometric cycle and line diagram.
Repeat the problem if using steam humidifier.
The AHU(air handling unit) consist of electric heater with surface temperature of 80C
followed by adiabatic air washer. Calculate the following:
The heater capacity kW
The make up water L/min
Draw the psychometric cycle and line diagram.
5
17- During a test on a winter air conditioning system including mixing plenum , main heater
and steam humidifier ,the following data is obtained:
The outside air condition [10C DBT, 7C WBT]
The inside air condition [23C DBT, 50%RH]
Air heater capacity [64.25 kW]
The water consumption by humidifier [18 Kg/hr]
The supply air temperature [32C DBT]
Calculate the following:
The heating capacity required to generate steam kW
The amount of fresh air kg/s
Outside Load (OTH)
The space Heat loss
Amount of supply air Kg/s
Draw the psychometric cycle and line diagram.
19- in an industrial air humidification system, the amount of supply air is 6800 CMH
The inside design condition [26C DBT, 70%RH]
The outside design condition [35C DBT,17C WBT]
Calculate
The individual capacities of the system component
The internal heat gain