Jakarta, 10 Januari 2013
No. L-002/DE–TE/I/2013

Kepada Yth :
Bapak Budi Tamtomo
PT. Pertamina Hulu Energi
PHE Tower
Jl. TB Simatupang Kav. 99
Jakarta 12520 - Indonesia

Bapak Syaiful Islam


PT. Bukit Asam (Persero) Tbk
Menara Kadin Indonesia Lt. 15
Jl. HR Rasuna Said Blok X-5 Kav. 2-3
Jakarta 12950, Indonesia

Perihal : Persetujuan WP & B 2013 WK GMB Tanjung Enim

Lampiran :
 Copy Lembar Persetujuan WP & B 2013 WK GMB Tanjung Enim (sesuai tabel)
 Copy MOM WP & B 2013 WK GMB Tanjung Enim, tanggal 8 November 2012

Dengan hormat, Dear Sir,

Sehubungan telah diterimanya persetujuan Program Regarding to the WP & B 2013 approval we got from
Kerja dan Anggaran 2013 (WP & B 2013) No. SKMIGAS on January 9, 2013, No of Letter :
1804/SKA0000/2012/S1, tanggal 28 Desember 2011, dari 1804/SKA0000/2012/S1, dated December 28, 2012,
SKMIGAS pada tanggal 9 Januari 2013, terlampir kami along with this letter we would like to send the approval,
sampaikan lembar persetujuan WP & B 2013, sebagai as the 2013 operations reference in Tanjung Enim CBM
bahan acuan kegiatan operasional tahun 2013 di WK PSC.
GMB Tanjung Enim.

Adapun detil lembar persetujuan tersebut adalah : The approval details as follows :

AFE SURVEY TYPE PROJECT NAME SCHEDULE BUDGET NOTE


1.082.23 With Project
12-0002R Drilling/Workover TECBM#P05-CX 19, 20
7 Summary
1.179.11 With Project
12-0003R Drilling/Workover TECBM#P06-CX 19, 20
5 Summary
1.285.12 With Project
12-0004R Drilling/Workover TECBM#P07-CX 19, 20
4 Summary
With Project
13-0001 Re-Entry Completion TECBM#P04-CX 19, 20 566.077
Summary
With Project
13-0002 Re-Entry Completion TECBM#P05-CX 19, 20 587.452
Summary
With Project
13-0003 Re-Entry Completion TECBM#P06-CX 19, 20 582.402
Summary
With Project
13-0004 Re-Entry Completion TECBM#P07-CX 19, 20 573.902
Summary
With Project
13-0005 Re-Entry Completion TECBM#P09-CX 19, 20 590.002
Summary
With Project
13-0006 Surface Facilities TECBM#P04-CX 500.000
23, 24 Summary
Indonesia Singapore (Head Office)
T +62 21 29400133 F +62 21 29400132 T +65 6508 9840 F +65 6294 6904
Sovereign Plaza, 19th Floor 152 Beach Road, #19-01/04 The Gateway East
Jl. TB. Simatupang Kav. 36 Singapore 189721
South Jakarta 12430 INDONESIA
dartenergy.com.au

AFE SURVEY TYPE PROJECT NAME SCHEDULE BUDGET NOTE


With Project
13-0007 Surface Facilities TECBM#P05-CX 500.000
23, 24 Summary
With Project
13-0008 Surface Facilities TECBM#P06-CX 500.000
23, 24 Summary
With Project
13-0009 Surface Facilities TECBM#P07-CX 500.000
23, 24 Summary
With Project
13-0010 Surface Facilities TECBM#P09-CX 500.000
23, 24 Summary
Technical Services With Project
13-0011 G & G Study 18E 500.750
from Abroad Summary
14.40 With Project
13-0012 G & G Study Isotope Analysis 18E
0 Summary

Demikian surat ini, atas perhatian dan dukungan We would like to say thank you for your attention and
Konsorsium WK GMB Tanjung Enim, kami ucapkan support.
banyak terima kasih.

Hormat kami,
Dart Energy (Tanjung Enim) Pte. Ltd.

Robert Nikijuluw
General Manager
PM/da