CHK/UNI/BDP/ATT

CHECKLIST FOR ANTI-TERMITE TREATMENT


Ver.: 0.01 (29-Nov-12)
Project Name: Project No:
Unit No: Contractor:
Quantity (Sqm):
Work / Service Order No:
Start date: End date:
Area | Location:
Latest GFC drawing No’s. referred:
Latest Specification Sheet No’s. referred:

Sl. Checked
Work Description Remarks
No. Yes No
Preliminary Check
1 Mention the following for Anti termite chemical:

a. Brand of chemical:

b. Name of chemical:

c. Concentration of chemical:

d. Date of manufacturing:

e. Date of expiry :
2 Check and confirm that the area to be treated is free from construction debris,
stumps, logs of roots
3 Check for surface preparation of area to be treated
4 Mention the quantity of water mixed with each liter of chemical Attach the
Specification sheet
During Execution

Treatment for pits, trenches and basement excavation


Check the holes are at an interval of 150mm centre to centre to a depth of 75-
5
100 mm using 12- 16 mm diameter rod as per IS 6313-2001

6 Check the treatment done at a rate of 7.5 liter/Sqm (diluted chemical)


7 Check the vertical surface area is treated at the rate of 7.5 liter/Sqm (to be
done around the structural element during refilling)
Treatment at junction of wall and floor
8 Are the channels 30 x 30 mm in size made around the junction of wall and floor
9 Check the hole made to the depth of 150mm at 150mm c/c inside the channel
10 Check the treatment done at a rate of 7.5 liter/Sqm

11 Check the treatment is done layer by layer for the vertical surface

Top surface of plinth filling


12 Check the holes are at an interval of 150mm centre to centre to a depth of 75-
100 mm using 12-16 mm diameter rod as per IS 6313-2001

13
Check the treatment done at a rate of5liter/Sqm (diluted chemical)

Post Execution
14 Check the PCC is laid within the 6 hrs of the treatment done

15 Whether treated area is protected if PCC not laid within 6 hours

Note : Approved Anti-termite chemical is IMIDACLOPRID 30.5% SC

Remarks | corrective action:

Site Engineer QC Engineer Site in-charge