UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO: 1/24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
1. Visit to site during
preliminaries work 179.90 - 1 site - 1 day
supervisor

2 technical
staff
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO: 2/24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
2. Excavate existing trees
and vegetation on site. 207.60 Excavator 1 Site 5 days
capacity 3/4 Supervisor

-Lorry 6 General
Labors
-Bulldozer
1 bulldozer
-Chainsaw operator
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO: 3/24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
3. Cement store
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO: 4/24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
4. Shed for bar bending and
similar work
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO: 5/24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
5. Store for other building
materials.
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO: 6/24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
6. Shall provide at his. own
cost a complete first aid
kit which shall be kept
and properly maintained
in the Contractor's Site
office.
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO:7 /24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
7. Provide all necessary
warning signs and lamps
for the whole period of
the Works is in hand, and
dismantle and remove on
completion
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO: 8/24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
8. Dumping rubbish, spoil
and unused materials to
prevent the mosquito
breeding.
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO:9 /24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
9. Installation of hoarding
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO: 10/24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
10. Provide and erect ia
signboard painted and
lettered in Bahasa
Malaysia
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO:11 /24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
11. The Contractor shall be
responsible for keeping
the whole of the Works
well drained and free
from all water.
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO:12 /24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
12. Every hole into or
through which a person
may fall shall be guarded
by an effective barrier to
prevent falls
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO: 13/24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
13. Install safety nets to
prevent or catch falling of
persons or objects.
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO: 14/24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
14. The Contractor is to
provide adequate power
supplies for temporary
lighting, execution of the
Works
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO: 15/24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
15. Site office and site
meeting for the use of the
PEJABAT
PEMBANGUNAN
PERSEKUTUAN
NEGERI PERAK
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO: 16/24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
16. Clearing, cleaning and
making good completion.
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO: 17/24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
17. The Contractor shall
provide to the S.O. four
(4) sets of As-Built
drawing
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO:18 /24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
18. Safety Helmets - 8 Nos.

Wellington Boot – 8 Nos.


Pair
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO:19 /24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
19. The contractor shall
provide one (1) new
digital camera not less
than 12 mega pixel.
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO: 20/24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
20. The Contractor shall
provide two (2) no’s of I
Pad 16GB
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO: 21/24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
21.
Progress photographs of
the Works at monthly
interval S.O. all titled and
dated.
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO: /24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
5.
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO: /24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
5.
UNION SIX CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT: CADANGAN MEMBINA MASJID BARU DI BANDAR UNIVERSITI, SERI ISKANDAR, PERAK.
PREPARED BY: SHARIFAH NUR ATIQAH DATE: 08/11/2019
ELEMENT: PRELIMINARIES PAGE NO: /24

NO TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOL LABOUR
5.
UNION SIX CONSTRUCTION SDN. BHD.
UNION SIX CONSTRUCTION SDN. BHD.
UNION SIX CONSTRUCTION SDN. BHD.
UNION SIX CONSTRUCTION SDN. BHD.