Material Description Cost Unit Amount

Deform Bar 16mm 293 150pcs


Deform Bar 12mm 168 200pcs
Deform Bar 10mm 120 300pcs
Cement 210 600bag
CHB #5 10.50 2000pcs
Tie Wire #16 70 5rolls
Mix Nails - 1lot
Phenolic Plywood 1/2 750 20pcs
Good Lumber 2x2x12 180 40pcs
Good Lumber 2x3x12 270 200pcs
Steel Deck 500/meter 78.75sqm
Angle Bar ¼ 2x2 620 10pcs
Angle bar 3/16 1 ½ x 1 ½ 330
10pcs
C- Purlins 1.5 2x3 440 15pcs
Welding Rod 100 10kls
Roofing (Rib Type Long Span with Gutter) - 1lot
Metal Stud Framing 120 80pcs
HardieFlex 480 50pcs
Metal Furring 90 150pcs
Carry Channel 90 100pcs
Wall Angle 40 50pcs
Blind Rivet 250 10boxes
Flush Door 3000/set 7sets
Harwood Door (Mahogany) 5000/set 6sets
Window(Super White Reflective Glass) 4000/set 8sets
Wall Glass with Window (Super White 4000/set 3sets
Reflective Glass)
Skim Coat 450 20bags
Phelp Dodge #14 2,350 2boxes
Phelp Dodge #12 3,350 2boxes
Phelp Dodge #10 5,200 1box
Junction Box 80 100
Conduit 90 50
8 Branches Panel Board 5,000/set 3sets
PVC Pipe #3 NELTEX 800 10pcs
PVC Pipe #4 NELTEX 1458 10pcs
PVC Pipe Elbow#3 70 15
PVC Pipe Elbow#4 80 15
PVC Pipe #1/2 NELTEX 80 10
Total Material Cost - -

Total Cost