NCR ATM Hardware and Software

Configuration Check list

ATM site: ___________________________________ ATM Type:


__________________________

I hereby confirm that, I have done software Maintenance as per the below requirement.

No Actions to be performed Respons Remark


. e
1 Did you take EJ back up from Desktop or EJ data
Folder before formatting the Machine?

2 Did you Put the backup according to the procedure?

3 Did the EJ configuration is detail?

4 Did you Restore the previously taken backup EJ


Logs folder after formatting the ATM?

5 Did the ATM have a Picture Camera?

6 If No.4 is 5.1 Did the camera taken image


yes, properly?

5.2 Did the new camera application


working after formatting the ATM?

7 If No.4 1. Did you take the Backup?


is Yes,
2. Did the images backups are restored,
on C: ISUITE/Icam/Icam/Permit?

8 Did UAWS configuration is done properly and


confirmed from center?

9 Did the EJ Scheduler is configured properly?

10 Did the ATM Smart UPS properly working?

11 Did the card reader fix is applied on the registry?

12 Did you install Symantec Antivirus properly and


Symantec Antivirus is enabled?

13 If the ATM is non-Forex ATM

 Did you Disable Journal printer Module?

 Did you remove data and power cable from


journal printer?

 Did you reboot the machine?


 On Configuration Make sure the Journal
printer is disabled or not?

14 Did you Check the cassette configuration is the


same by contacting Center supports? (ATM and
Switch side).

15 Access key :
 Did you insert Access key to the ATMs?
 Did the check sum of the Access key is
correct?

16 Graphics file update:


 Did you install screen files and media files on
the ATM?
 Did you change the video file on Media folder?
 Did you copied Graphics files and places
them on the ATM Hard drive at the
following path:
C:\Program Files\NCR APTRA\Advance
NDC\Media
17 Configure TCP/IP connection :
 Insert the Host IP and port on ATM TCP IP
configuration menu.
 Confirm the correct ATM IP address is
inserted at the switch.
 Ensure that TCP/IP connectivity is
established with center with the correct
port address.
18 Did the ATM is Operational? If not please justify.

Field Engineer: __________________________________________

Signature: _____________________________________
Date: _______________________________________