SLOPE SINK

UP

PLANTERS PLANTERS

RAMP -UP

RAMP -UP RAMP-DN

UP

GROUND FLOOR PLAN FOR CEILING

DESIGNATION DESCRIPTION DESIGN REINFORCEMENT THICKNESS


CONTINOUS BAR CUT BAR
S-1 SUSPENDED SLAB TWO-WAY SLAB D10 @ 0.15 mm D 10 @ 0.15 mm, O.C., B.W ( top and bottom 150 mm
bars as seen from plan)

SOF SLAB ON FILL D10 @ 0.50mm, O.C., B.W

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ARGY EMBER G. TORRES
CORDILLERA ADMINISTRATIVE REGION ENGINEER I
Repair/Maintenance of DPWH Building
(Main Building) AS SHOWN PREPARED:
ABRA DISTRICT ENGINEERING OFFICE ZONE 7, BANGUED, ABRA SOCORRO LITO S. BENEDITO ARLON DON G. BARBERO EDWIN T. BRINGAS JOSELITO T. ARAO
BANGUED, ABRA ENGINEER II OIC - CHIEF, MAINTENANCE SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
JUN MICHAEL A. VELASCO
ENGINEER II DATE: DATE: DATE: DATE: