03 IL-YANG shall indemnify and hold Clause 11.4 At the same time, IL-YANG
harmless the purchaser (POPULAR) should indemnify if the root cause
against any loss and damage resulting of the problem is related with the
from manufacturing deficiencies in the ready-to-fill (RTF) final bulk,
ready to fill bulk vaccine. within 30 days of the receipt of
the product.
04 Purchaser (POPULAR) shall conduct Clause 16 POPULAR shall compare the
analysis and tests, as may be necessary actual quantity of the Product
and inform IL-YANG within thirty received to the order quantity and
days of receipt of the ready to fill bulk notify to IL-YANG immediately
vaccine of any testing deficiencies or upon the receipt of the Product in
variation in the test results with respect case of a shortage. POPULAR
to the specifications and COA of ready shall conduct full chemical and
to fill bulk vaccine provided by IL- physical analysis and/or National
YANG Inspection (if necessary) of the
Product within thirty (30) days
from release of the products by
Bureau of Custom in the
Territory.
05 Supplier (IL-YANG) will provide Clause 7.4 IL-YANG will send Reference
reference standards required for the Standard in adequate quantity to
analysis of ready to fill bulk and perform the quality control test
finished product for finished product as well as
Bulk materials also.