Sie sind auf Seite 1von 2

5/19/2020 How to calculate the wastage of steel and concrete in construction - Quora

Search for questions, people, and topics Sign In


Sign in to Quora with Google
Quora uses cookies to improve your experience. Read more

abhishek gupta
itsmeabhishekgupta33@gmail.com
Building Materials Steel Concrete and Cement (building material) Construction Related Questions
Abhishek Gupta
How do I calculate the wastage of steel and concrete in What is allowable steel wastage according to IS
abhishekgupta995775@gmail.com

construction? 1200 code?


1 more account
What is the wastage allowance for steel
construction?
4 Answers
Is there an I.S. code available for allowable
wastage of materials used in the construction of
Santosh Kulkarni, Enjoying 41st year in Construction residential projects in India?
Answered Jun 20, 2019 · Author has 490 answers and 4.7m answer views
How do I calculate steel in construction?
Good question.
How can we avoid steel wastage in our
There are two distinct aspects of the issue. construction site?

1.Calculation of the wastage of various materials during the estimation stage. Can I use steel pieces (like wastage of steel
industries) partially in concrete?
(Pre -construction)

Usually, 5% of wastage is considered on the quantity of cement whereas for the


Rebars around 2.5% wastage is quite appropriate to consider.

2.Determining the actual wastage of cement and Rebars in the entire construction.

(Post construction).

This is a very comprehensive exercise and needs to be administered properly . The exercise
is called as reconciliation.

Hope you have some clarity on the issue.

Thank you so much for the A2A.


20.5k views · View 32 Upvoters

Related Questions More Answers Below

What is allowable steel wastage according to IS 1200 code?

What is the wastage allowance for steel construction?

Is there an I.S. code available for allowable wastage of materials used in the construction of
residential projects in India?

How do I calculate steel in construction?

How can we avoid steel wastage in our construction site?

Krishna, former Associate


Answered Nov 18, 2018 · Author has 94 answers and 650.7k answer views

Maximum 5% of total quantity of steel or concrete or any other building material is


considered as wastage, Yes there are many methods to reduce the wastage. Proper
planning and execution as per schedules plays an important role in reducing the wastage
of materials.

Some wastages from materials can also be reused . Broken pieces of bricks can be used to
fill the sunken slab
4k views · View 1 Upvoter · View Sharers

Sumair Talha, Structural Engineer (2018-present)


Answered Jul 2, 2019

Cement: No wastage allowance is recommended towards the quantity of cement used in


works, as the wastage is already included in the input and in major works bulk quantities
are used.

Steel: 2.5% wastage of steel is allowed for gates and allied structures. For RCC works the
wastage is 2.5% for reinforcement rods above 36mm dia. and 5% for rods below 36mm
dia. including overlaps, if they are not welded.

https://www.quora.com/How-do-I-calculate-the-wastage-of-steel-and-concrete-in-construction 1/2
5/19/2020 How to calculate the wastage of steel and concrete in construction - Quora
If welding is adopted for the reinforcement rods even for below 36mm dia, 2.5% of
Search for questions, people, and topics
wastage is recommended. Sign In
Sign in to Quora with Google
1.8k views

abhishek gupta
Niton Biswas, studied Civil Engineering at The New Horizons Institute Of itsmeabhishekgupta33@gmail.com
Technology, Durgapur
Answered Feb 28, 2018
Abhishek Gupta
Usually5% of the total weight, But you should consider the dimension and total quantity abhishekgupta995775@gmail.com
which relates the wastage. then to put the persentage accordingly.
1 more account
2.3k views

Related Questions

What is allowable steel wastage according to IS 1200 code?

What is the wastage allowance for steel construction?

Is there an I.S. code available for allowable wastage of materials used in the construction of
residential projects in India?

How do I calculate steel in construction?

How can we avoid steel wastage in our construction site?

Can I use steel pieces (like wastage of steel industries) partially in concrete?

How do we measure the wastage in a construction site?

How much quantity of steel required for 1m3 concrete?

What should the quantity of steel in concrete be?

In concrete quantity (volume) calculations, is it needed to consider the steel volume? If so,
how?

What is the difference between RCC and PCC?

How do I know about the steel in concrete after concreting?

How can we deduct steel in concrete?

How do I calculate the quantity of steel needed for 1 cum of concrete?

What is the difference between PPC and RCC in civil engineering?