Beruflich Dokumente
Kultur Dokumente
Technical Documentation
2
Safety issues
WARNING
WARNING: One should avoid
creating ignition sources, WARNING: If any safety
like heat, as a result of the elements (like safety
use of the tool with other ropes, safety sheets,
This product could be hazardous if
tools or equipment. plates or washers) were
improperly used. disassembled due to
It must be properly installed and WARNING: The warning maintenance work, do NOT
maintained in order to function properly. plates, signs and labels re-use them. Always replace
Do not weld or alter without Blohm+Voss must be present on the tool. them with new safety
Repair GmbH’s prior authorization. Do not remove the labels. If elements.
If replacement parts are needed, they have they are missing, replacing
to be ordered from Blohm+Voss Repair is mandatory. WARNING: Do never
GmbH. unlatch/open the elevator
WARNING: All warning while a pipe is suspended in
plates, signs and labels the elevator; the pipe will
attached to the equipment be lost!
must be observed.
WARNING: Stay away from
WARNING: Do not use the the elevator. It may open or
tool for any other purpose close without warning.
than suspending tubular
within its specification. WARNING: Stay away from
the elevator in case it is
WARNING: Failure provided with a rotation
to conduct routine system. It may rotate
maintenance could result forward and backward
in equipment damage or without warning.
injury to personnel.
3
Elevator specific warnings
WARNING: Do not close the Serialnumber
elevator manually.
WARNING: Non-approved
exchange of any component,
or use of “non-B+V
components“, will void any
warranty. Especially as
this may affect the correct
functioning of the elevator
and safety devices (closing
signal).
4
5
OF CONTENTS
TABLE OF CONTENTS
TABLE
DESCRIPTION
Limited Warranty 2
Elevator specific warnings 4
General 30
Table of contents 6
Lubrication 30
Daily Inspection 30
DESCRIPTION 9 Locking of screws 30
Grease quality 30
General 10 Bushing Wear Check 31
Main assembly 10 Wear of Equipment 31
INSTALLATION
Elevator body and hydraulic closing system 11 How to check the bushing the correct way 31
Opening and Closing Mechanics 11 Check of results 31
Closing signal unit 11 Maintaining the Closing Signal Valve 32
Technical Data 12 Inspection and Maintenance 32
Couplings 12 Location of Valve 32
Safety equipment 12 Function of Valve 32
Improper / Unsafe Use 12 Inspection categories acc. to API RP 8B 33
General description 33
Frequency 33
OPERATION
COMMISSIONING 15
Periodic inspection 33
Inspection check lists 35
Commissioning VES-CL 250
Check Category I (Ongoing observation) 36
Center latch Elevator 16
Check List Category II (Daily) 36
Scope of supply 16
Check List Category III (every 6 months) 37
Hydraulic Characteristics 16
Check List Category IV (every year) 37
Check and Lubrication 16
Wear data criteria 38
Function Test 17
MAINTENANCE
& INSPECTION
Critical Areas 38
Critical Areas - Hinge area 38
INSTALLATION 19 Critical Areas - Latch area 38
Adjustment procedure Feedback Valve
Lifting and transport 20 (Closing Signal) 39
Installation in the links 20 Trouble shooting 40
Recommended torque: 20 Elevator does not open 40
SIZE COMPONENTS
Connecting the hydraulics to open and close Elevator does not close completely 40
the elevator 21
Schematic hydraulic plan without Feedback 22
Schematic hydraulic plan with Feedback 23 SIZE COMPONENTS 41
Installing and removing the required bushing 24
Bore Codes 42
General 24
DP-Size 18° 42
Removal of the bushings 24
Bore Code 42
Installation of the bushing 24
For Drill Collar with Zip Groove 42
Installation Checklist VES-CL Elevator 25
For Drill Collar without Zip Groove 42
Hydraulic Connections 25
SPARE PARTS
DRAWINGS &
Tubing 42
Function test 25
6
OF CONTENTS
TABLE
DESCRIPTION
DRAWINGS & SPARE PARTS 43
COMMISSIONING
PN: 612901-T Conversion Kit from manuall to hydraulic operation for VES-CL 250
(without Feedback) 49
PN: 612901-TF Conversion Kit from manual to hydraulic operation for VES-CL 250
(c/w Feedback) 50
Instructions to convert manual Elevators into hydraulic operation 52
PN: 612926-T Hydraulic Assembly for VES-CL 250 (without Feedback) 55
PN: 612926-TF Hydraulic Assembly for VES-CL 250 (c/w Feedback) 57
PN: 612926-TF Hydraulic Hose Assembly for VES-CL 250 59
INSTALLATION
PN: 612997 Part List Set Hydraulic Hose Assembly VES CL-250 60
PN: 612997-1 Part List Set Hydraulic Hose Assembly VES CL-250 with Feedback 60
PN: 612916-T Hydraulic cylinder 61
PN: 612916-1-T Hydraulic cylinder 61
PN: 612913-TF Elevator control manifold with feedback 62
PN: 775088-TF Directional Poppet Valve 63
Spare Parts for One-Year Operation 64
PN: 612900-Y-RSP Parts List 64
PN: 612901-T-RSP Conversion Kit from manual to hydraulic operation
OPERATIONS
(without Feedback) 64
PN: 612901-TF-RSP Conversion Kit from manuell to hydraulic operation (c/w Feedback) 65
PN: 612926-T-RSP Hydraulic Assembly for VES-CL 250 (without Feedback) 66
PN: 612926-TF-RSP Hydraulic Assembly for VES-CL 250 (c/w Feedback) 66
MAINTENANCE
& INSPECTION
SIZE COMPONENTS
SAPRE PARTS
DRAWINGS &
7
8
DESCRIPTION
DESCRIPTION
9
1. DESCRIPTION
DESCRIPTION
General
The Blohm+Voss 250 tons VES-
CL 250 Elevator is designed with
strength and safety factors in
accordance with API Section 8C
- Regulations and will be used
for handling long, heavy strings
drill pipe.
Main assembly
The Elevator 612900-Y-H-T
consist of the following main 1
assemblies: 2
1. Elevator body with a latch
2. Bushing system
3. Opening and closing
mechanism
Warning
...
10
DESCRIPTION
The Elevator 612900-Y-H-TF
3 consist of the following main
assemblies:
1. Elevator body with Latch
2. Bushing system
3. Opening and closing
mechanics
4. Closing signal unit
Bushing System
Exchangeable bushings
allow to run the elevator
for different tubular and
sizes, see chapter „Size
Components“.
11
DESCRIPTION
Technical Data
VES-CL 250 Center Latch Elevator
Working pressure Min 130 bar (1,885 Psi),
Maximum allowed pressure 210 bar (3045 Psi)
Required Flow rate Min 6,6 Gpm (25 l/m)
Max 25 Gpm (94 l/m)
Temperature working range ambient - 20° C to + 40° C
- 4° F to 104° F
Load Capacity 250 sh tons
Part number 612900-Y-H-T (without closing signal)
612900-Y-H-TF (with closing signal)
API test load 375 sh tons
Pipe Diameter Range min 2-3/8”
max 5”
Weight 280 kg (617 Lbs)
Elevator Links 2.1/4” up to 3.1/2”
Couplings
Screw couplings male and female with
connecting thread NPT – 3/8“ inner
thread.
All hydraulic connections have a
bushing and a plug.
Safety equipment
Closing signal
When the latch is completely closed,
line “C” triggers a hydraulic pressure
signal of approximately 100 bar as a
feedback signal, indicating elevator
closed.
Identification
The identification area clearly identifies
the Elevator (manufacturer, type,
material, part number, serial number,
date of manufacture). It is important
to keep this information ready for the
purpose of service and repair work.
12
13
DESCRIPTION
14
DESCRIPTION
COMMISSIONING
15
COMMISIONINGS
COMMISIONING
2. COMMISSIONING
OK o Check crew is aware of all danger regarding handling the B+V tool.
Prior to use of the Blohm+Voss Elevator following checks must be carried out :
Scope of supply
Hydraulic Characteristics
OK o Operating pressure 130 bar / 1885 PSI
16
Function Test
COMMISIONINGS
OK Check required bushings are installed before first use
OK o Check all bushing segments are of same size and serial number
OK o Pick up a pipe
OK o Check feedback signal is given when the elevator is closed and latched
17
18
COMMISIONINGS
INSTALLATION
INSTALLATION
19
3. INSTALLATION
Recommended torque:
For above mentioned bolts and nuts,
use 399 Lbf-Ft / 542 Nm
T P
Elevator Control
at Top Drive
A B C
SERVICE LOOP
B V supply
C
B
VES CL elevator
A
20
Connecting the hydraulics to open and close the elevator
The elevator 612900-Y-H-T has two
connections on the rear (A, B).
The elevator 612900-Y-H-TF has three
connections on the rear (A, B and C).
Connection A:
The hydraulic pressure at connection “A“
opens the elevator
Connection B:
The hydraulic pressure at connection “B“
closes the elevator
Connection C:
When the elevator is completely closed
INSTALLATION
via connection “B”, connection C applies
hydraulic pressure, depending on the
pressure in “B”.
B
WARNING:Before connecting the
hydraulic power equipment to the
A elevator, clean all the couplings
carefully.
C
21
Schematic hydraulic plan without Feedback
Elevator closed
Elevator Cylinder
E1 E2
closed
open
B A
C
E
INSTALLATION
F D
Latch closed
Latch Cylinder
L2 L1
22
Schematic hydraulic plan with Feedback
Elevator closed
Elevator Cylinder
E1 E2
closed
signal
open
C B A
L
C
INSTALLATION
E
F D
Latch closed
Latch Cylinder
L2 L1
a
P R
Feedback Valve
23
Installing and removing the required bushing
General
A bushing consists of two segments in
the elevator body . The body and the
latch must be open in order to equip the
elevator with the required bushing.
Handling of bushings
24
Installation Checklist VES-CL Elevator
OK o Make sure the required bushings are installed before first use
OK o Make sure the bushings are fixated with the screws & lock wired
Hydraulic Connections
INSTALLATION
OK Make sure QD`s are clean
OK o Make sure the controls are connected to the Hydraulic Power Supply
Function test
OK o Close elevator
OK o Open elevator
25
26
INSTALLATION
OPERATIONS
OPERATIONS
27
4. OPERATIONS
WARNING: Do not touch the VES-CL Elevator, unless hydraulic power is disconnected.
WARNING: Never open the elevator when the pipe load is still suspended by the elevator.
WARNING: Observe the elevator continuously while closing to check if the elevator is properly
closed. The CL-250 Elevator PN 612900-Y-H-T is WITHOUT closing signal, therefore extra caution
needs to be taken to ensure that the elevator is properly closed BEFORE picking up any load.
Safety
• Make sure that ALL hydraulic lines are isolated (disconnected) before any work is
carried out on the VES-CL Elevator.
• It is recommended to have the VES-CL Elevator operated by the driller.
• The VES-CL Elevator is activated with a remote control valve, which may be actuated by hand
or foot depending on the type of valve and/or HMI-interface.
• The driller (and or the floor man) must coordinate operation of the elevator and slips/spider so
one tool is engaged around the tubular before the other is disengaged. Thus, one or both tools
continuously suspend the tubular during all stages of pipe handling operations.
28
MAINTENANCE
MAINTENANCE
& INSPECTION & INSPECTION
29
5. MAINTENANCE AND INSPECTION
General
WARNING: For service and maintenance
activities, make sure that no hydraulic
pressure exists on the elevator and that
the connecting lines are disconnected.
Lubrication
The elevator needs to be lubricated
regularly on the following points. Use a
grease gun:
Grease point 1 on the elevator
Grease points:
Daily Inspection
The Function of the Feedbacksignal has
to be checked daily.
Locking of screws Grease point 2+3 on the elevator
All screws are normally secured by
mechanical bolt lock or with a lock wire.
Grease quality
MAINTENANCE
& INSPECTION
30
Bushing Wear Check
1.
Wear of Equipment Check of results
Normal wear of bushings and elevator
ears caused by usage will eventually 1. Using the GOOD gauge: If the gauge
reduce the load capacity of elevators. sits directly on the bushing without
The existence of cracks or the showing any clearance between gauge and
appearance of defects can indicate bushing, the bushing is OK.
severe deterioration and even failures. 2. If the gauge shows space between the
Prompt attention is required either gauge and the bushing, you have to check
to remove the elevator from service with the second gauge.
immediately or to undertake appropriate 3. Using the BAD 15° gauge: If the gauge
repair. shows any clearance between gauge and
A wear condition in its early stages is bushing, the bushing is OK.
common. Frequently, it results in a tool 4. If the gauge sits directly on the bushing
joint sticking to the elevator. without showing any space between gauge
Elevators showing hammer marks and bushing, take the elevator out of
around the top of the bore should be service.
closely examined to determine whether 1.
it is the elevator, the tool joint or both
are faulty. WARNING: If the taper is less than 15°
take the elevator out of service or
exchange the bushing.
If the taper is between 18° and 15°,
reduce the elevators load capacity to
90%. Never use the elevator without a
To indentify the conditions of the 18° bushing. 2.
Elevator taper gauges are available for
all B+V Elevators (P/N 600018). A set
MAINTENANCE
& INSPECTION
of gauges consists of an 18° gauge
(GOOD) and a 15° gauge (BAD)
31
Maintaining the Closing Signal Valve
(Elevator model 612900-Y-H-TF only)
Inspection and Maintenance Function of Valve
An inspection is recommended at least When the elevator is fully closed and
on a daily basis (Cat II). Depending on latched, the valve is actuated. Therefore
operational factors (operating time, load hydraulic pressure passes through and
cycles, environment etc.) inspection pressurizes line “C” (Elevator closed
frequency can be increased. signal). The signal indicates the operator
that the elevator is properly closed and
1. Ensure the elevator is pressureless
latched.
and the hydraulic lines are isolated
2. Prior to inspection, all foreign
material such as dirt, paint, grease,
oil, scale etc. shall be removed from
the valve by a suitable method.
3. The equipment shall be inspected by
a qualified person
4. Check for visible damage at the
valve, its single parts and fixations
screws
5. Check for loose items
6. Check the fixation screws which
keeps the valve in the correct
position. The screws needs to be
thight and the securing elements
(wire, lock washers, tab washers etc)
need to be free of damage
7. Check if the red actuation roller at
the valve can be moved easily by
MAINTENANCE
& INSPECTION
Position
Location of Valve of valve
Warning
32
Inspection categories acc. to API RP 8B
General description
Category I
This category involves observing the equipment during operation for indications of inadequate performance.
When in use, equipment shall be visually inspected on a daily basis for cracks, loose fits or connections, elongation of part,
and other signs of wear, corrosion or overloading. Any parts found to show cracks, excessive wear, etc., shall be removed from
service for further examination.
The equipment shall be visually inspected by a person knowledgeable in that equipment and its function.
Category II
This is Category I inspection plus further inspection for corrosion, deformation, loose or missing components, deterioration,
proper lubrication, visible external cracks, and adjustment.
Category II may involve some disassembly to access specific components and to identify wear that exceeds the allowable
tolerances.
Category III
This is Category II inspection plus further inspection, which should include NDT of critical areas and may involve some
disassembly to access specific components and to identify wear that exceeds the allowable tolerances.
Prior to inspection, all foreign material such as dirt, paint, grease, oil, scale, etc. shall be removed from the concerned parts by
a suitable method (e.g. paint-stripping, steam-cleaning, grit-blasting)
Category IV
This is Category III inspection plus further inspection for which the equipment is disassembled to the extent necessary to
conduct NDT of all primary-load-carrying components.
Equipment shall be:
• disassembled in a suitable-equipped facility to the extent necessary to permit full inspection of all primary-load-carrying
components and other components that are critical to the equipment.
• inspected for excessive wear, cracks, flaws and deformation.
Procedure
MAINTENANCE
& INSPECTION
• Corrections shall be made in accordance with the manufacturer’s recommendations.
• Prior to inspection, all foreign material such as dirt, paint, grease, oil, scale, etc. shall be removed from the concerned parts
by a suitable method (e.g. paint-stripping, steam-cleaning, grit-blasting)
Frequency
Periodic inspection
The recommended schedule for inspection of all kind of Elevators and bushings are as follows:
Ongoing Inspection category I
Daily: Inspection category II
Every 6 months: Inspection category III
Every 1 year: Inspection category IV
The recommended frequencies apply for equipment in use during the specified period.
33
34
MAINTENANCE
& INSPECTION
Inspection check lists
TYPE OF EQUIPMENT
SERIAL NUMBER
PART NUMBER
SUPERVISOR
DATE OF INSPECTION
INSPECTION CATEGORY
PLACE OF INSPECTION
MAINTENANCE
& INSPECTION
35
Check Category I (Ongoing observation)
Observe during operation for inadequate performance
CHECK FOR THE FOLLOWING GENERAL ISSUES (but not limited to):
DESCRIPTION CHECKED SIGNATURE
1 Complete front page of check list for the records OK
2 Check for correct size of elevator or bushings OK
3 Check correct function elevator feed back signal OK
4 Check state of lubrication OK
5 Check functioning of elevator as a whole OK
Remarks
CHECK FOR LOOSE ITEMS, ESPECIALLY FOR (but not limited to):
DESCRIPTION CHECKED SIGNATURE
1 Hinge pins, bolts and retainers OK
2 Fixation of bushing segments OK
3 Screws, bolts, nuts, washers, retainers, springs and lock wire OK
4 Link block screws (check and tighten with 399 LBs.Ft / 542 Nm) OK
5 Check completeness and condition of warning plates and labels OK
Remarks
CHECK FOR CRACKS, ELONGATION, DAMAGE AND CORROSION, ESPECIALLY FOR (but not limited to):
DESCRIPTION CHECKED SIGNATURE
1 Elevator Body and Door OK
2 Hing pins, bolts, nuts OK
3 Bushing Segments OK
MAINTENANCE
& INSPECTION
HYDRAULIC
DESCRIPTION CHECKED SIGNATURE
1 Check for loose fittings, pipes, valves OK
2 Check for hydraulic leaks (hoses, valves and cylinders) OK
3 Check condition of hydraulic couplings and connection hoses OK
4 Check for correct functioning of the Elevator Closing Signal OK
Remarks
_________________________________ _______________________________
SUPERVISOR DATE
36
Check List Category III (every 6 months)
GENERAL
DESCRIPTION CHECKED SIGNATURE
1 Carry out an Category II inspection OK
2 NDT (MPI) critical areas. Some disassembly may be needed to do so OK
3 Check parts for wear according to allowable tolerances. OK
Remarks
GENERAL
DESCRIPTION CHECKED SIGNATURE
1 Carry out an Category III inspection OK
2 NDT (MPI) critical areas and load bearing components. Strip elevator to do so OK
3 Replace all hydraulic hoses and fittings OK
4 Check condition of hydraulic valves and replace if necessary OK
Remarks
MAINTENANCE
& INSPECTION
_________________________________ ________________________
SUPERVISOR DATE
37
Wear data criteria
Body Hinge Pin
Dimension dia. new: 64,85
Bore dia. new max: 65,074
Bore dia. worn max: 65,524
Critical Areas
MAINTENANCE
& INSPECTION
Critical Areas - Latch ear and nose Critical Areas - Latch area
38
Adjustment procedure Feedback
Valve (Closing Signal)
In case the elevator does not give a proper
closing signal, the feedback valve may be
in need of readjustment. To check if this
is the case, close the elevator. When the
elevator is fully closed, move down the
valve roller manually. If a closing signal
occurs, the valve has to be readjusted. If
no closing signal occurs, it is possible the
valve is damaged or defect and has to be
replaced.
MAINTENANCE
& INSPECTION
• if there is still no signal, move the valve
a bit higher and check again, repeat till
33 the closing signal works
36 33 35 32 29 30
39
Trouble shooting
Elevator does not open
• Check hydraulic connections for
damages
• Check hydraulic pressure and flow rate
• Check function and adjustment of
control valve
• Check function of closing signal unit
Elevator does not close
completely
• Check hydraulic connections for
damages
• Check hydraulic pressure and flow rate
• Check function and adjustment of
control valve
• Check hydraulic cylinders for wear and
damages
• Check Latch and Latch Lock Springs for
damages
MAINTENANCE
& INSPECTION
40
SIZE COMPONENTS
SIZE COMPONENTS
41
5. SIZE COMPONENTS
Bore Codes
DP-Size 18° Bore Code
2.7/8” IU 102
2.7/8” EU 103
3.1/2” IU 104
3.1/2” EU 105
4” IU 106
4” EU 107
4.1/2” IU+IEU 107
4.1/2” EU 109
5” IEU 109
Tubing
2.3/8” P 129
2.3/8” U 130
2.7/8” P 131
2.7/8” U 132
3.1/2 P 133
3.1/2 U 134
4P 135
4U 136
SiIZE COMPONENTS
4.1/2” 137
4.1/2” 138
42
DRAWINGS
& SPARE PARTS
DRAWINGS
2
360
787
1
Warning
...
865
PN: 612900-Y-H-T Parts List Elevator VES-CL-250 hydraulic operated without Feedback
& SPARE PARTS
DRAWINGS
44
PN: 612900-Y-H-TF Elevator VES-CL-250 hydraulic operated with
Feedback
328
2
360
806
1
GREASE
DAILY
Warning
...
865
PN: 612900-Y-H-TF Parts List Elevator VES-CL-250 hydraulic operated with Feedback
& SPARE PARTS
45
PN: 612900-Y B+V Type VES-CL 250 Center Latch Elevator
14 6
15
16
328
12
17
8 4 2 9 5 3
11 10 18 27
24
23
22
322
21
20
17
26
750
25 1
19
18
GREASE
DAILY
27
& SPARE PARTS
DRAWINGS
615
680
46
PN: 612900-Y Parts List B+V Type VES-CL 250 Center Latch Elevator
47
PN: 612543 Latch Lock Assembly
1
4
2 3
48
PN: 612901-T Conversion Kit from manuall to hydraulic operation for
VES-CL 250 (without Feedback)
View A
328
3 15 16 4
View A
3
19
View B
5
17
1
18
24
9
24
10
12 11
6
21
22 23
& SPARE PARTS
Warning
...
DRAWINGS
20 12 13 14 7
49
PN: 612901-TF Conversion Kit from manual to hydraulic operation for
VES-CL 250 (c/w Feedback)
328
View A
3
19
View B
5
50
17
1
18
160
38 9
38
12
10
11
8
GREASE
6
DAILY
21
View C
Warning
...
20 12 13 14 7
28 27
& SPARE PARTS
DRAWINGS
50
adjust the Latch Actuator
28
34
33
31
36 33 35 32 29 30
& SPARE PARTS
DRAWINGS
51
Instructions to convert manual Elevators into hydraulic operation
View B
10
Use B+V welding template for installation.
PN 613956-T
178
2. Close the Elevator. 155
3. Attach welding template to Item 2 and 3.
4. Level Top or underside of Elevator and
welding template horizontally.
328
4
& SPARE PARTS
DRAWINGS
52
PN 612901-T Part list
Pos. Qty Part no. Description
1 1 612915-T Right Hand Cylinder Bearing;TYPE T
2 1 612920-T Left Hand Bearing;TYPE T
3 1 612917-T Rear Cylinder Bearing;TYPE T
4 1 612914-T Control Manifolt Mount;TYPE T
5 1 612926-T Hydraulic Assembly for VES CL-250;TYPE T
6 2 612919-T Elevator Cylinder Protection;TYPE T
7 1 613918 Latch Actuator
8 3 612922-T Hitch Pin with swivel Handle
9 4 612980 Capscrew Hex
10 4 612975 Washer
11 4 612976 Hex. Nut
12 5 622515 Safety Spring
13 1 612972 Capscrew
14 1 612977 Hex. Nut Jam
15 3 612979 Capscrew
16 3 612974 Lock Washer Helicoil Spring
17 2 612978 Capscrew
18 2 612973 Washer
19 0.5 752306 5-Link Chain
20 1 671638 Warning sign Blohm + Voss
21 2 671641 Warning sign “squeeze danger”
22 1 612544 Extended Safety Latch Lock Pin
23 1 612509 Latch Pin Securing Ring
24 2 613979 Warning sign Link Block bolts
25 0 613956-T Welding Template VES-CL 250 / 350 (optional)
53
Part list PN 612901-TF
Pos. Qty Part no. Description
1 1 612915-T Right Hand Cylinder Bearing;TYPE T
2 1 612920-T Left Hand Bearing;TYPE T
3 1 612917-T Rear Cylinder Bearing;TYPE T
4 1 612914-T Control Manifold Mount;TYPE T
5 1 612926-TF Hydraulic Assembly for CL-250 with;Feedba
6 2 612919-T Elevator Cylinder Protection;TYPE T
7 1 613918 Latch Actuator
8 3 612922-T Hitch Pin with swivel Handle
9 4 612980 Capscrew Hex
10 4 612975 Washer
11 4 612976 Hex. Nut
12 5 622515 Safety Spring
13 1 612972 Capscrew
14 1 612977 Hex. Nut Jam
15 3 612979 Capscrew
16 3 612974 Lock Washer Helicoil Spring
17 2 612978 Capscrew
18 2 612973 Washer
19 0.5 752306 5-Link Chain
20 1 671638 Warning sign Blohm + Voss
21 2 671641 Warning sign “squeeze danger”
22 1 612544 Extended Safety Latch Lock Pin
23 1 612509 Latch Pin Securing Ring
24 2 645028 Screw
25 2 645059 Washer
26 1 612918-1 Signal Plate
27 1 613919 Protection cover
28 2 612559 Screw
29 1 735854 Washer
30 1 735846 Nut
31 1 725446 Bolt
32 1 613917 Valve support
33 6 613783 Washer with TAP
34 4 612528 Screw
35 2 753056 Screw
36 2 612496 Washer
37 0 613956-T Welding Template VES-CL 250 / 350 (optional)
38 2 613979 Warning sign Link Block bolts
& SPARE PARTS
DRAWINGS
54
PN: 612926-T Hydraulic Assembly for VES-CL 250 (without Feedback)
11 10
14
7 13 10
10 12
12
1.5
6 5 3 5 14 13
5
7 L 8
K
E J 10 11
6
F 15
N B
A 8 1.5
1.1 M
5 H
5 G C
6
4 D
1 T
1 3- 6
29
61
1.3
1.2 PN
1.4
3 9
2.1
55
PN: 612926-T Part List
Pos. Qty Part no. Description
1 1 612997 Set Hydraulic Hose Assembly VES CL-250
2 1 612916-T Hydraulic cylinder;TYPE T
2.1 1 612916-1-T Hydraulic cylinder (Latch);TYPE T
3 1 612913-TF Elevator control malifold;with feedback
4 1 612948-T Sequence Valve SCCA-LAN
5 3 612985-T Blind screw;
6 4 612987 Straight Connection
7 2 612983 Adapter
8 2 612986 Swiveling Screw Fitting
9 4 612981 Adapter adjustable
10 4 612984 Adapter NPT-JIC
11 2 612995 Dust Protection Coupler
12 2 612996 Dust Protection Nipple
13 2 612988 Quick Coupling Coupler
14 2 612989 Quick Coupling Nipple
15 1 613978 Blind Screw T162A
& SPARE PARTS
DRAWINGS
56
PN: 612926-TF Hydraulic Assembly for VES-CL 250 (c/w Feedback)
17 15
19 10
18 11
16 14
13
15
12
1.5 10
10
12
7 13
8 6 1.5 14
L 5 8 11
K
7 E 10
J
6 F 25
1.6 N B
6 1.5
A 8
M
3 H
5 C
5 G
6
1.1 D
T F
1 3- 4 6
29
61
1.2 PN 1.3
1.4
3 9
2.1
20
1.7
9
22
21
22
57
PN: 612926-TF Part List
Pos. Qty Part no. Description
1 1 612997-1 Set Hydraulic Hose Assembly VES CL-250
2 1 612916-T Hydraulic cylinder;TYPE T
2.1 1 612916-1-T Hydraulic cylinder (Latch);TYPE T
3 1 612913-TF Elevator control manifold; with feedback
4 1 612948-T Sequence Valve SCCA-LAN
5 3 612985-T Blind screw
6 7 612987 Straight Connection
7 2 612983 Adapter 45°
8 3 612986 Swiveling Screw Fitting
9 3 612981 90° Adapter adjustable
10 4 612984 Adapter NPT-JIC
11 2 612995 Dust Protection Coupler
12 2 612996 Dust Protection Nipple
13 2 612988 Quick Coupling Coupler
14 2 612989 Quick Coupling Nipple
15 2 613992 Adapter
16 1 613996 Dust Protection Nipple
17 1 613995 Dust Protection Coupler
18 1 613994 Quick Coupling Nipple
19 1 613993 Quick Coupling Coupler
20 1 613982 Male Stud Branch Tee
21 1 775088-TF Directional Poppet Valve
22 2 612986 Swiveling Screw Fitting
25 1 612952-T Check Valve for Type T
& SPARE PARTS
DRAWINGS
58
PN: 612926-TF Hydraulic Hose Assembly for VES-CL 250
5
L
K
E J
F
6 N B
A 5
M
H
G C
D
F
-T
9 13
6 12
2 PN 3
4
3
59
PN: 612997 Part List Set Hydraulic Hose Assembly VES CL-250
PN: 612997-1 Part List Set Hydraulic Hose Assembly VES CL-250 with
Feedback
60
PN: 612916-T Hydraulic cylinder
342.9
ø35
612916-T
50
1/4 -18 NPT
550
p = 210bar
max Piston / Piston Rod
Stroke = 205mm ø 40 / ø25,4 mm
342.9
ø35
612916-1-T
50
p = 210bar
max Piston / Piston Rod
Stroke = 177mm ø 40 / ø25,4 mm
& SPARE PARTS
DRAWINGS
61
PN: 612913-TF Elevator control manifold with feedback
C
A
B
J
K G
E
D
F
N
L
H
M
& SPARE PARTS
DRAWINGS
62
PN: 775088-TF Directional Poppet Valve
2x
7/16-20 UNF
4x
1/4-20 UNC
63
Spare Parts for One-Year Operation
PN: 612900-Y-RSP Parts List
Pos. Qty Part. No. Description
7 1 612506 Latch Spring
8 1 612507 Latch Lock Spring
9 1 612508 Latch Pin Securing Ring
10 1 612509 Latch Pin Securing Ring
12 1 612511 Hinge Pin Securing Ring
14 2 613623-1 Screw
15 2 752338 Castle Nut
16 2 752339 Cotter Pin
17 2 612514 Link Block Bolt Assy.
18 3 612515 Grease Nipple
20 4 612554 Screw
21 1 612556 Parallel Key
22 1 612557 Screw
23 1 612558 Securing Plate
24 2 671638 Warning sign Blohm + Voss
25 1 671921 Label Patent Number
26 2 613903 Bowl Fitting Handle
27 2 671642 Sticker “GREASE DAILY”
25 1m 755127 Safety Rope
64
PN: 612901-TF-RSP Conversion Kit from manuell to hydraulic operation
(c/w Feedback)
65
PN: 612926-T-RSP Hydraulic Assembly for VES-CL 250 (without
Feedback)
Pos. Qty Part No. Description
1 1 612997 Set Hydraulic Hose Assembly VES CL-250
2 1 612916-T Hydraulic cylinder;TYPE T
2.1 1 612916-1-T Hydraulic cylinder (Latch);TYPE T
4 1 612948-T Sequence Valve SCCA-LAN
11 2 612995 Dust Protection Coupler
12 2 612996 Dust Protection Nipple
13 2 612988 Quick Coupling Coupler
14 2 612989 Quick Coupling Nipple
66
67
DRAWINGS