0 Bewertungen0% fanden dieses Dokument nützlich (0 Abstimmungen)
22 Ansichten1 Seite
This document accepts the transfer of responsibility for an elevator from ThyssenKrupp Elevator Pvt. Ltd. to the customer for the Ashirwad Vaibhav building in Kota, India. The elevator was examined according to the order and contract and is now accepted by the customer. A free maintenance period for the elevator is starting and will be valid until a specified future date.
This document accepts the transfer of responsibility for an elevator from ThyssenKrupp Elevator Pvt. Ltd. to the customer for the Ashirwad Vaibhav building in Kota, India. The elevator was examined according to the order and contract and is now accepted by the customer. A free maintenance period for the elevator is starting and will be valid until a specified future date.
This document accepts the transfer of responsibility for an elevator from ThyssenKrupp Elevator Pvt. Ltd. to the customer for the Ashirwad Vaibhav building in Kota, India. The elevator was examined according to the order and contract and is now accepted by the customer. A free maintenance period for the elevator is starting and will be valid until a specified future date.
From (KM) To (KM) Unit Approved/ Not Approved Side Section (MCW/SR) Tcs No: Inspection Time EPC Representetive IE Representetive Location Si: No: Rfi No: Boq No: Inspection Date Description of Work