Project : Central park Date : 26.11.

2019
Architects : DSP Architects.
MEP Consultants : GODREJ & BOYCE MFG. CO. LTD - GBCS.

Pressurisation of Lift well (Estarn Heights)


1 Calculation of air quantity leakage through open lift well door
Total No. of door 20
Door Area(mXm) 1.2 2.1
Area of each door 2.52 m²
Air velocity(m/s) 0.75 m/s As Per EN 12101-6-2005
Q(Flow) With 5% extra 2.0 m3 /s Safety factor
2 Calculation of air quantity leakage through lift well doors and cracks on other floors
Perimeter of Door(m) 6.6
Assumed Crake length 8 meter As Per EN 12101-6-2005
0.06
leakage area (m2) (As per ASHRAE handbook 0.065)
Total no. of leakaged door 19
Total Leakage area(m2) 1.14
Differential pressure(Pa) 50

Q (Flow) (m3 /s) (0.827 X Total Leakage areaX (Differential pressure)^.5)


6.7 Q= Kf *Al*(DP) 1/2
CFM required for Lift well Pressurisation(m3/s) of a lift 8.7
Pressurization Fan Capacity (CFM) 22579

Q = Flow Rate (cfm)


Kf = Coefficient, 0.827
Al = Flow Area, ft2
DP = Pressure Diff.