CORING TEST RECORD

Location: Embankment/Bocaue Elevation of top: +2.1


Column: T2-1c Elevation of Bottom: -17.9
Diameter: 1.8 m Grouting Length: 20m

Trial Jet Grout Completion Date: February 11, 2020


Coring Start Date: March 2, 2020 Curing days: 20 days

March 02,2020

Time Depth Recover Picture Bit and Remarks


Diameter

SB/ NQ Cement
10:45- 0- 50 cm Gravel and
11:13 0.50 m Grout

11:20- 0.50 NQ Cement


11:50 -1 m 50 cm Grout with
some small
gravel

13:10- 1 50 cm NQ Cement
13:25 -1.5 m grout

13:30- 1.5 50 cm NQ Cement


13:45 -2m Grout with
big gravel
13:52- 2-3 m 100 cm NQ Cement
14:43 grout

NQ Cement
15:15- 3-4 m 100 cm grout
15:37