Sie sind auf Seite 1von 1

WOODCREEK SCHOOL, KAMITI ROAD

COST ESTIMATES

Item Description Unit Quantity Rate (Kshs.) Amount (Kshs.)

AUTOMATIC ARM BARRIERS WITH TYRE


A
SPIKES

Supply, Install, Connect, Automatic spike vehicle


barrier, 6m round barrier arm, Electrically operated
(220VAC power required),complete with power
1 No. 2 1,400,000.00 2,800,000
supply (10m range), Cabinet of powder coated
3Cr12 stainless steel including access remote
control automatic system, Loop detector

Supply, Install, Connect, convex reflective sturdy


surveillance mirror 600mm dia in poly carbonate
100% aluminum mirror foil treated with anti-graffit
product with hexagonal layer reflexes for dipped
2 lights, mounted with rugged polymer frame No. 1 50,000.00 50,000
featured with a white edging strip and red short
light reflectors, including hot dipped galvanized
fitting with adjustable ball joint complete as
directed by the Engineer.

Supply, Install, Connect, Infrared beam


3 transmitter, receiver and No. 2 36,000.00 72,000
receiver mounting post

Supply, Install, Connect, Traffic robot (red and


4 green) c/w switching controller - LED type (220V) No. 2 96,000.00 192,000
complete with mounting pole

2.0kVA Online Double-Conversion UPS, rack


mount 3U, LCD, Unity Power Factor (VA=W) with
5 No. 1 220,000.00 220,000
Power Factor Correction (PFC) system, 3-years
warranty on UPS, 2-years warranty on batteries

Allow for Data provision and Power supply to the


6 Sum 1 50,000.00 50,000
Automatic Boom Barrier System

7 Allow for associated civil works Sum 1 50,000.00 50,000

8 Testing and Commissioning Sum 1 50,000.00 50,000

Shop Drawings, Material Submittal, Operation


9 Sum 1 5,000.00 5,000
& Maintenance Manuals

10 Maintainance for 1 year Sum 1 100,000.00 100,000

Sub-Total Exclusive VAT 3,589,000

TOTAL (inclusive VAT) 4,163,240.00

sue 1 1 10/8/2019