1.0 PRELIMINARES
2.0 EXCAVACIONES
5.0 MAMPOSTERIA
8.1.1
DETALLE
#2 = 12.30ml+40.30ml; #3 =
891.98ml+927.0ml+246.0ml+195.57ml+211.47ml+195.57ml+253.91ml+1023.06m
l+29.2ml+74.4ml; #4 =
342.12ml+40ml+60ml+28ml+39.2ml+176.4ml+39.2ml+23.12ml; #5 =
176.4ml+39.2ml+104.16ml+17.36ml+104.16ml+253.92ml+356.08ml; #6 = 89.8ml;
#7 = 17.36ml
Area 7.14m*18.56m (132.52m2), Peso 12.05Kg/m2
7.14m*18.56m 132.518
(1.0*1.0*1.0)*2+(1.10*1.10*1.0)*5+(1.60*1.60*1.0)*2 13.170
(0.30*0.30)*82.53m 7.428
((1.0*1.0*0.15)+(0.15/3.0)*((1.0*1.0)+(0.30*0.30)+(1.0*1.0*0.30*0.
30)^0.5)+(0.30*0.30*0.70))*4 Unidades 1.130
((1.10*1.10*0.15)+(0.15/3.0)*((1.10*1.10)+(0.30*0.30)+(1.10*1.10*
1.630
0.30*0.30)^0.5)+(0.30*0.30*0.70))*5 Unidades
((1.60*1.60*0.15)+(0.15/3.0)*((1.60*1.60)+(0.30*0.30)+(1.60*1.60*
0.30*0.30)^0.5)+(0.30*0.30*0.70))*2 Unidades 1.207
0.30m*0.40m*17.36m 2.083
0.30m*0.45m*17.36m 2.344
0.30m*0.40m*17.36m 2.083
0.30m*0.40m*42.32m 5.078
0.15m*0.25m*5.78m 0.217
7.14m*18.56m*0.112m3/m2 14.84
0.30m*0.30m*89.02m 8.012
0.09m*1.20m*3.0m*2 Unidades+((1.20m*0.50m*0.09m)
+(0.04m*0.50m*2lados)+(0.04m*1.20m*2lados))*2Unidades 0.948
(52.6*0.25)+(4048.16*0.56)+(748.04*1)+(1051.28*1.57)+(89.8*2.26
)+(17.36*3.07) 4934.912
7.14m*18.56*12.05Kg/m2 1596.847
16.023m2+11.9275m2+9.8275m2+3.1675m2+10.29m2+5.733m2+7
.35m2+5.71m2+5.731m2+6.27m2+7.18185m2+16.023m2+11.756m
234.652
2+16.023m2+10.024m2+10.391m2+10.636m2+10.2195m2+20.0856
m2+20.4576m2+19.8252m2
7.14m*18.56m 111.098
22.07ml 22.070
7.96ml 7.960
4 Unidades 4.000
4 Unidades 4.000
1 Unidad 1.000
ITEM: CONCRETO DE 21MPa - 3000 PSI
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Herramienta menor (5.0% M.O) MANUAL GLOBAL $ 5,292.00
Sub-Total $ 5,292.00
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad Valor-Unit.
ARENA M3 $ 55,000.00 0.56 $ 30,800.00
GRAVA M3 $ 65,000.00 1.16 $ 75,400.00
CEMENTO KG $ 420.00 350 $ 147,000.00
AGUA LTS $ 20.00 180 $ 3,600.00
Sub-Total $ 256,800
III. TRANSPORTES
Material Vol-peso ó Cant. Distancia M3-Km Tarifa Valor-Unit.
Sub-Total
IV. MANO DE OBRA
Trabajador Cantidad Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
OFICIAL 1 $ 26,000.00 80% $ 46,800.00 0.60 $ 28,080.00
OBREROS 4 $ 72,000.00 80% $ 129,600.00 0.60 $ 77,760.00
Sub-Total $ 105,840.00
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Herramienta menor (5.0% M.O) MANUAL GLOBAL $ 5,292.00
Sub-Total $ 5,292.00
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad Valor-Unit.
ARENA M3 $ 55,000.00 1.08 $ 59,400.00
CEMENTO KG $ 420.00 450 $ 189,000.00
AGUA LTS $ 20.00 260.00 $ 5,200.00
Sub-Total
$ 253,600
III. TRANSPORTES
Material Vol-peso ó Cant. Distancia M3-Km Tarifa Valor-Unit.
Sub-Total
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Herramienta menor (5.0% M.O) MANUAL GLOBAL $ 5,292.00
Sub-Total
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad Valor-Unit.
ARENA M3 $ 55,000.00 0.48 $ 26,400.00
GRAVA M3 $ 65,000.00 0.95 $ 61,750.00
CEMENTO KG $ 420.00 300 $ 126,000.00
AGUA LTS $ 20.00 170 $ 3,400.00
Sub-Total
III. TRANSPORTES
Material Vol-peso ó Cant. Distancia M3-Km Tarifa Valor-Unit.
Sub-Total
IV. MANO DE OBRA
Trabajador Cantidad Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
OFICIAL 1 $ 26,000.00 80% $ 46,800.00 0.60 $ 28,080.00
OBREROS 4 $ 72,000.00 80% $ 129,600.00 0.60 $ 77,760.00
Sub-Total
$ 217,550
$ 105,840.00
$ 328,682.0
$ 82,170.5
$ 410,852.5
ITEM: LOCALIZACION Y REPLANTEO
ESPECIFICACIÓN: 1.1.1 UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Herramienta menor (5.0% M.O) MANUAL GLOBAL $ 43.00
Sub-Total $ 43.00
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad Valor-Unit.
Sub-Total
III. TRANSPORTES
Material Vol-peso ó Cant. Distancia M3-Km Tarifa Valor-Unit.
Sub-Total
IV. MANO DE OBRA
Trabajador Cantidad Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
TOPOGRAFO 1 $ 50,000.00 80% $ 90,000.00 180.00 $ 500.00
CADENEROS 2 $ 36,000.00 80% $ 64,800.00 180.00 $ 360.00
Sub-Total $ 860.00
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Herramienta menor (5.0% M.O) MANUAL GLOBAL $ 1,746.00
Sub-Total $ 1,746.00
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad Valor-Unit.
CONCRETO DE 3000 PSI M3 $ 367,932.00 1.0 $ 367,932.0
FORMALETA GLOBAL $ 12,000.00 1.0 $ 12,000.00
Sub-Total $ 379,932
III. TRANSPORTES
Material Vol-peso ó Cant. Distancia M3-Km Tarifa Valor-Unit.
Sub-Total
IV. MANO DE OBRA
Trabajador Cantidad Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
MAESTRO 1 $ 35,000.00 80% $ 63,000.00 0.20 $ 12,600.00
OFICIAL 1 $ 26,000.00 80% $ 46,800.00 0.20 $ 9,360.00
OBREROS 2 $ 36,000.00 80% $ 64,800.00 0.20 $ 12,960.00
Sub-Total $ 34,920.00
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Herramienta menor (5.0% M.O) MANUAL GLOBAL $ 1,571.40
Sub-Total $ 1,571.40
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad Valor-Unit.
CONCRETO DE 3000 PSI M3 $ 367,932.00 1.0 $ 367,932.0
FORMALETA GLOBAL $ 12,000.00 1.0 $ 12,000.00
Sub-Total $ 379,932
III. TRANSPORTES
Material Vol-peso ó Cant. Distancia M3-Km Tarifa Valor-Unit.
Sub-Total
IV. MANO DE OBRA
Trabajador Cantidad Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
MAESTRO 1 $ 35,000.00 80% $ 63,000.00 0.18 $ 11,340.00
OFICIAL 1 $ 26,000.00 80% $ 46,800.00 0.18 $ 8,424.00
OBREROS 2 $ 36,000.00 80% $ 64,800.00 0.18 $ 11,664.00
Sub-Total $ 31,428.00
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Herramienta menor (5.0% M.O) MANUAL GLOBAL $ 26.57
Sub-Total $ 26.57
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad Valor-Unit.
ACERO DE REFUERZO KG $ 2,300.00 1.0 $ 2,300.0
ALAMBRE KG $ 2,900.00 0.1 $ 145.00
Sub-Total $ 2,445
III. TRANSPORTES
Material Vol-peso ó Cant. Distancia M3-Km Tarifa Valor-Unit.
Sub-Total
IV. MANO DE OBRA
Trabajador Cantidad Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
OFICIAL 1 $ 26,000.00 80% $ 46,800.00 210.00 $ 222.86
OBRERO 2 $ 36,000.00 80% $ 64,800.00 210.00 $ 308.57
Sub-Total $ 531.43
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Herramienta menor (5.0% M.O) MANUAL GLOBAL $ 56.12
Sub-Total $ 56.12
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad Valor-Unit.
VALVULA DE GLOBO 3/4" UNIDAD $ 16,900.00 0.050 $ 845.0
TUBERIA PRESION PVC RDE 21 D: 3/4" ML $ 2,950.00 1.000 $ 2,950.0
VALVULA DE RETENCION 3/4" UNIDAD $ 50,900.00 0.050 $ 2,545.0
CODO DE 90° 3/4" UNIDAD $ 450.00 0.136 $ 61.2
TEE DE 3/4" UNIDAD $ 550.00 0.136 $ 74.8
ABRAZADERAS METALICAS UNIDAD $ 1,500.00 0.600 $ 900.0
SOLDADURA LIQUIDA PARA PVC 1/4 GALON $ 58,900.00 0.020 $ 1,178.0
Sub-Total $ 8,554
III. TRANSPORTES
Material Vol-peso ó Cant. Distancia M3-Km Tarifa Valor-Unit.
Sub-Total
IV. MANO DE OBRA
Trabajador Cantidad Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
MAESTRO 1 $ 35,000.00 80% $ 63,000.00 85.00 $ 741.18
OBRERO 1 $ 18,000.00 80% $ 32,400.00 85.00 $ 381.18
Sub-Total $ 1,122.35
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Herramienta menor (5.0% M.O) MANUAL GLOBAL $ 514.29
Sub-Total
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad Valor-Unit.
Sub-Total
III. TRANSPORTES
Material Vol-peso ó Cant. Distancia M3-Km Tarifa Valor-Unit.
Sub-Total
IV. MANO DE OBRA
Trabajador Cantidad Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
OFICIAL 1 $ 26,000.00 80% $ 46,800.00 14.00 $ 3,342.86
OBREROS 3 $ 54,000.00 80% $ 97,200.00 14.00 $ 6,942.86
Sub-Total
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Herramienta menor (5.0% M.O) MANUAL GLOBAL $ 1,309.50
Sub-Total
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad Valor-Unit.
CONCRETO DE 3000 PSI M3 $ 367,932.00 1.0 $ 367,932.0
FORMALETA GLOBAL $ 12,000.00 1.0 $ 12,000.00
Sub-Total
III. TRANSPORTES
Material Vol-peso ó Cant. Distancia M3-Km Tarifa Valor-Unit.
Sub-Total
IV. MANO DE OBRA
Trabajador Cantidad Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
MAESTRO 1 $ 35,000.00 80% $ 63,000.00 0.15 $ 9,450.00
OFICIAL 1 $ 26,000.00 80% $ 46,800.00 0.15 $ 7,020.00
OBREROS 2 $ 36,000.00 80% $ 64,800.00 0.15 $ 9,720.00
Sub-Total
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Herramienta menor (5.0% M.O) MANUAL GLOBAL $ 1,746.00
Sub-Total
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad Valor-Unit.
CONCRETO DE 3000 PSI M3 $ 367,932.00 1.0 $ 367,932.0
FORMALETA GLOBAL $ 12,000.00 1.0 $ 12,000.00
Sub-Total
III. TRANSPORTES
Material Vol-peso ó Cant. Distancia M3-Km Tarifa Valor-Unit.
Sub-Total
IV. MANO DE OBRA
Trabajador Cantidad Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
MAESTRO 1 $ 35,000.00 80% $ 63,000.00 0.20 $ 12,600.00
OFICIAL 1 $ 26,000.00 80% $ 46,800.00 0.20 $ 9,360.00
OBREROS 2 $ 36,000.00 80% $ 64,800.00 0.20 $ 12,960.00
Sub-Total
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Herramienta menor (5.0% M.O) MANUAL GLOBAL $ 20.79
Soldador de 400 Amp DIA $ 180,000.00 0.0005 $ 90.00
Sub-Total
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad Valor-Unit.
PLACA METALDECK CALIBRE 18 KG $ 13,500.00 1.0 $ 13,500.0
Sub-Total
III. TRANSPORTES
Material Vol-peso ó Cant. Distancia M3-Km Tarifa Valor-Unit.
Sub-Total
IV. MANO DE OBRA
Trabajador Cantidad Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
OBRERO 1 $ 18,000.00 80% $ 32,400.00 210.00 $ 154.29
SOLDADOR 1 $ 30,500.00 80% $ 54,900.00 210.00 $ 261.43
Sub-Total
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Herramienta menor (5.0% M.O) MANUAL GLOBAL $ 56.12
Sub-Total
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad Valor-Unit.
TUBERIA SANITARIA D=3.0" ML $ 5,983.33 1.000 $ 5,983.3
YE SANITARIO DE 45° REDUCCION 3X2 UNIDAD $ 7,800.00 0.628 $ 4,898.4
SOLDADURA LIQUIDA 1/4 GALON $ 58,900.00 0.020 $ 1,178.0
Sub-Total
III. TRANSPORTES
Material Vol-peso ó Cant. Distancia M3-Km Tarifa Valor-Unit.
Sub-Total
IV. MANO DE OBRA
Trabajador Cantidad Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
MAESTRO 1 $ 35,000.00 80% $ 63,000.00 85.00 $ 741.18
OBRERO 1 $ 18,000.00 80% $ 32,400.00 85.00 $ 381.18
Sub-Total
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento
Herramienta menor (5.0% M.O) MANUAL GLOBAL
$ 514.29
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad
CONCRETO DE 3000 PSI M3 $ 367,932.00 1.0
III. TRANSPORTES
Material Vol-peso ó Cant. Distancia M3-Km Tarifa
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento
Herramienta menor (5.0% M.O) MANUAL GLOBAL
$ 1,309.50
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad
CONCRETO DE 3000 PSI M3 $ 367,932.00 1.0
$ 379,932
III. TRANSPORTES
Material Vol-peso ó Cant. Distancia M3-Km Tarifa
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento
Herramienta menor (5.0% M.O) MANUAL GLOBAL
$ 1,746.00
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad
CONCRETO DE 3000 PSI M3 $ 367,932.00 1.0
FORMALETA GLOBAL $ 12,000.00 1.0
$ 379,932
III. TRANSPORTES
Material Vol-peso ó Cant. Distancia M3-Km Tarifa
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento
Herramienta menor (5.0% M.O) MANUAL GLOBAL
$ 110.79
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad
LADRILLO COMUN KG $ 500.00 43.0
$ 13,500
III. TRANSPORTES
Material Vol-peso ó Cant. Distancia M3-Km Tarifa
IV. MANO DE OBRA
Trabajador Cantidad Jornal Prestaciones Jornal Total Rendimiento
OBRERO 1 $ 18,000.00 80% $ 32,400.00 210.00
$ 415.71
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento
Herramienta menor (5.0% M.O) MANUAL GLOBAL
$ 56.12
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad
TUBERIA PRESION D=3/4" ML $ 5,983.33 1.500
$ 12,060
III. TRANSPORTES
Material Vol-peso ó Cant. Distancia M3-Km Tarifa
$ 1,122.35
I. EQUIPO
Valor-Unit. Descripción Tipo Tarifa/Hora
$ 873.00 Herramienta menor (5.0% M.O) MANUAL GLOBAL
Sub-Total $ 873.00
II. MATERIALES EN OBRA
Valor-Unit. Descripción Unidad Precio-Unit.
$ 367,932.0 CONCRETO DE 3000 PSI M3 $ 367,932.00
$ 12,000.00 FORMALETA GLOBAL $ 12,000.00
Sub-Total $ 379,932
III. TRANSPORTES
Valor-Unit. Material Vol-peso ó Cant. Distancia M3-Km
Sub-Total
IV. MANO DE OBRA
Valor-Unit. Trabajador Cantidad Jornal Prestaciones Jornal Total
$ 6,300.00 MAESTRO 1 $ 35,000.00 80% $ 63,000.00
$ 4,680.00 OFICIAL 1 $ 26,000.00 80% $ 46,800.00
$ 6,480.00 OBREROS 2 $ 36,000.00 80% $ 64,800.00
Sub-Total $ 17,460.00
I. EQUIPO
Valor-Unit. Descripción Tipo Tarifa/Hora
$ 1,047.60 Herramienta menor (5.0% M.O) MANUAL GLOBAL
Sub-Total $ 1,047.60
II. MATERIALES EN OBRA
Valor-Unit. Descripción Unidad Precio-Unit.
$ 367,932.0 CONCRETO DE 3000 PSI M3 $ 367,932.00
$ 12,000.00 FORMALETA GLOBAL $ 12,000.00
Sub-Total $ 379,932
III. TRANSPORTES
Valor-Unit. Material Vol-peso ó Cant. Distancia M3-Km
Sub-Total
IV. MANO DE OBRA
Valor-Unit. Trabajador Cantidad Jornal Prestaciones Jornal Total
$ 7,560.00 MAESTRO 1 $ 35,000.00 80% $ 63,000.00
$ 5,616.00 OFICIAL 1 $ 26,000.00 80% $ 46,800.00
$ 7,776.00 OBREROS 2 $ 36,000.00 80% $ 64,800.00
Sub-Total $ 20,952.00
I. EQUIPO
Valor-Unit. Descripción Tipo Tarifa/Hora
$ 6,984.00 Herramienta menor (5.0% M.O) MANUAL GLOBAL
Sub-Total $ 6,984.00
II. MATERIALES EN OBRA
Valor-Unit. Descripción Unidad Precio-Unit.
$ 367,932.0 CONCRETO DE 3000 PSI M3 $ 367,932.00
$ 12,000.00 FORMALETA GLOBAL $ 12,000.00
Sub-Total $ 379,932
III. TRANSPORTES
Valor-Unit. Material Vol-peso ó Cant. Distancia M3-Km
Sub-Total
IV. MANO DE OBRA
Valor-Unit. Trabajador Cantidad Jornal Prestaciones Jornal Total
$ 50,400.00 MAESTRO 1 $ 35,000.00 80% $ 63,000.00
$ 37,440.00 OFICIAL 1 $ 26,000.00 80% $ 46,800.00
$ 51,840.00 OBREROS 2 $ 36,000.00 80% $ 64,800.00
Sub-Total $ 139,680.00
I. EQUIPO
Valor-Unit. Descripción Tipo Tarifa/Hora
$ 7.71 Herramienta menor (5.0% M.O) MANUAL GLOBAL
Sub-Total $ 7.71
II. MATERIALES EN OBRA
Valor-Unit. Descripción Unidad Precio-Unit.
$ 21,500.0 PERLIN 160mmx60mm e: 1.50mm ML $ 10,650.0
$ 9,118.30 SOLDADURA MIG KG $ 5,100.0
Sub-Total $ 30,618 PINTURA ANTICORROSIVA GALON $ 43,200.0
Valor-Unit.
III. TRANSPORTES
Material Vol-peso ó Cant. Distancia M3-Km
Sub-Total
Valor-Unit.
$ 154.29
IV. MANO DE OBRA
Trabajador Cantidad Jornal Prestaciones Jornal Total
Sub-Total $ 154.29 OFICIAL 1 $ 26,000 80% $ 46,800.00
OBRERO 3 $ 54,000 80% $ 97,200.00
al Costo Directo $ 30,780.3
Valor Total
$ 3,078.03 Total Costo Directo
$ 3,078.03 V. COSTOS INDIRECTOS
$ 1,539.02 Descripción
Sub-Total $ 7,695.1 Administración
Imprevistos
proximado al peso $ 38,475.4 Utilidad
E LABORATORIO, INC. ACCES. Y GRIFERIA ITEM: INSTALACION DE P. SANITARIO DE DRENAJE PARA REGADERA DE LABORATO
UNIDAD: UN ESPECIFICACIÓN: 7.1.4
I. EQUIPO
Valor-Unit. Descripción Tipo Tarifa/Hora
$ 95.40 Herramienta menor (5.0% M.O) MANUAL GLOBAL
Sub-Total $ 95.40
II. MATERIALES EN OBRA
Valor-Unit. Descripción Unidad Precio-Unit.
$ 8,975.0 TUBERIA SANITARIA D=2" ML $ 4,966.67
$ 900.0 ABRAZADERAS METALICAS UNIDAD $ 1,500.00
$ 1,178.0 SOLDADURA LIQUIDA 1/4 GALON $ 58,900.00
$ 15,500.0 SIFON 2" UNIDAD $ 4,700.00
REJILLA 3"X2" UNIDAD $ 5,100.00
Sub-Total $ 26,553
III. TRANSPORTES
Valor-Unit. Material Vol-peso ó Cant. Distancia M3-Km
Sub-Total
IV. MANO DE OBRA
Valor-Unit. Trabajador Cantidad Jornal Prestaciones Jornal Total
$ 1,260.00 MAESTRO 1 $ 35,000.00 80% $ 63,000.00
$ 648.00 OBRERO 1 $ 18,000.00 80% $ 32,400.00
Sub-Total $ 1,908.00
I. EQUIPO
Rendimiento Valor-Unit. Descripción Tipo
$ 1,309.50 Herramienta menor (5.0% M.O) MANUAL
Sub-Total $ 1,309.50
II. MATERIALES EN OBRA
Cantidad Valor-Unit. Descripción Unidad
1.0 $ 367,932.0 CONCRETO DE 3000 PSI M3
1.0 $ 12,000.00 FORMALETA GLOBAL
Sub-Total $ 379,932
III. TRANSPORTES
Tarifa Valor-Unit. Material Vol-peso ó Cant. Distancia
Sub-Total
IV. MANO DE OBRA
Rendimiento Valor-Unit. Trabajador Cantidad Jornal Prestaciones
0.15 $ 9,450.00 MAESTRO 1 $ 35,000.00 80%
0.15 $ 7,020.00 OFICIAL 1 $ 26,000.00 80%
0.15 $ 9,720.00 OBREROS 2 $ 36,000.00 80%
Sub-Total $ 26,190.00
I. EQUIPO
Rendimiento Valor-Unit. Descripción Tipo
$ 1,047.60 Herramienta menor (5.0% M.O) MANUAL
Sub-Total $ 1,047.60
II. MATERIALES EN OBRA
Cantidad Valor-Unit. Descripción Unidad
1.0 $ 367,932.0 CONCRETO DE 3000 PSI M3
1.0 $ 12,000.00 FORMALETA GLOBAL
Sub-Total $ 379,932
III. TRANSPORTES
Tarifa Valor-Unit. Material Vol-peso ó Cant. Distancia
Sub-Total
IV. MANO DE OBRA
Rendimiento Valor-Unit. Trabajador Cantidad Jornal Prestaciones
0.12 $ 7,560.00 MAESTRO 1 $ 35,000.00 80%
0.12 $ 5,616.00 OFICIAL 1 $ 26,000.00 80%
0.12 $ 7,776.00 OBREROS 2 $ 36,000.00 80%
Sub-Total $ 20,952.00
I. EQUIPO
Rendimiento Valor-Unit. Descripción Tipo
$ 873.00 Herramienta menor (5.0% M.O) MANUAL
Sub-Total $ 873.00
II. MATERIALES EN OBRA
Cantidad Valor-Unit. Descripción Unidad
1.0 $ 367,932.0 CONCRETO DE 3000 PSI M3
1.0 $ 12,000.00 FORMALETA GLOBAL
Sub-Total $ 379,932
III. TRANSPORTES
Tarifa Valor-Unit. Material Vol-peso ó Cant. Distancia
Sub-Total
IV. MANO DE OBRA
Rendimiento Valor-Unit. Trabajador Cantidad Jornal Prestaciones
0.10 $ 6,300.00 MAESTRO 1 $ 35,000.00 80%
0.10 $ 4,680.00 OFICIAL 1 $ 26,000.00 80%
0.10 $ 6,480.00 OBREROS 2 $ 36,000.00 80%
Sub-Total $ 17,460.00
I. EQUIPO
Rendimiento Valor-Unit. Descripción Tipo
$ 1,200.00 Herramienta menor (5.0% M.O) MANUAL
Sub-Total $ 1,200.00
II. MATERIALES EN OBRA
Cantidad Valor-Unit. Descripción Unidad
2.00 $ 21,300.00 TEJA TERMOACUSTICA M2
III. TRANSPORTES
Sub-Total $ 23,715 Material Vol-peso ó Cant. Distancia
Tarifa Valor-Unit.
I. EQUIPO
Rendimiento Valor-Unit. Descripción Tipo
$ 95.40 Herramienta menor (5.0% M.O) MANUAL
Sub-Total $ 95.40
II. MATERIALES EN OBRA
Cantidad Valor-Unit. Descripción Unidad
1.500 $ 7,450.0 TAPA DE CONCRETO DE 3000 PSI M3
0.600 $ 900.0 FORMALETA GLOBAL
0.020 $ 1,178.0 ACERO DE REFUERZO TAPA KG
1.000 $ 4,700.0 LADRILLO COMUN UNIDAD
1.000 $ 5,100.0
Tarifa Valor-Unit.
Sub-Total $ 1,908.00
V. COSTOS INDIRECTOS
Total Costo Directo $ 21,331.4 Descripción
Administración
Porcentaje Valor Total Imprevistos
10% $ 2,133.14 Utilidad
10% $ 2,133.14
5% $ 1,066.57
Sub-Total $ 5,332.9 Precio unitario total apr
I. EQUIPO
Tarifa/Hora Rendimiento Valor-Unit. Descripción
GLOBAL $ 1,047.60 Herramienta menor (5.0% M.O)
Sub-Total $ 1,047.60
II. MATERIALES EN OBRA
Precio-Unit. Cantidad Valor-Unit. Descripción
$ 367,932.00 1.0 $ 367,932.0 CONCRETO DE 3000 PSI
$ 12,000.00 1.0 $ 12,000.00 FORMALETA
Sub-Total $ 379,932
III. TRANSPORTES
M3-Km Tarifa Valor-Unit. Material Vol-peso ó Cant.
Sub-Total
IV. MANO DE OBRA
Jornal Total Rendimiento Valor-Unit. Trabajador Cantidad Jornal
$ 63,000.00 0.12 $ 7,560.00 MAESTRO 1 $ 35,000.00
$ 46,800.00 0.12 $ 5,616.00 OFICIAL 1 $ 26,000.00
$ 64,800.00 0.12 $ 7,776.00 OBREROS 2 $ 36,000.00
Sub-Total $ 20,952.00
ETO DE 3000 PSI ITEM: CONCRETO VIGAS VP3 CONCRETO DE 3000 PSI
UNIDAD: M3 ESPECIFICACIÓN: 3.2.0
I. EQUIPO
Tarifa/Hora Rendimiento Valor-Unit. Descripción
GLOBAL $ 873.00 Herramienta menor (5.0% M.O)
Sub-Total $ 873.00
II. MATERIALES EN OBRA
Precio-Unit. Cantidad Valor-Unit. Descripción
$ 367,932.00 1.0 $ 367,932.0 CONCRETO DE 3000 PSI
$ 12,000.00 1.0 $ 12,000.00 FORMALETA
Sub-Total $ 379,932
III. TRANSPORTES
M3-Km Tarifa Valor-Unit. Material Vol-peso ó Cant.
Sub-Total
IV. MANO DE OBRA
Jornal Total Rendimiento Valor-Unit. Trabajador Cantidad Jornal
$ 63,000.00 0.10 $ 6,300.00 MAESTRO 1 $ 35,000.00
$ 46,800.00 0.10 $ 4,680.00 OFICIAL 1 $ 26,000.00
$ 64,800.00 0.10 $ 6,480.00 OBREROS 2 $ 36,000.00
Sub-Total $ 17,460.00
Sub-Total $ 4,365.00
Sub-Total
UNIDAD: M2
Sub-Total $ 440.00
Sub-Total $ 8,800.00
UNIDAD: UN
Sub-Total $ 2,385.00
Sub-Total $ 69,272
M3-Km Tarifa Valor-Unit.
Sub-Total
Sub-Total $ 47,700.00
Sub-Total $ 873.00
Sub-Total
Sub-Total
COSTO DIRECTO
ADMINISTRACION (10%)
IMPREVISTOS (10%)
UTILIDAD (5%)
VALOR TOTAL
VALOR TOTAL
$ 119,664.12
$ 142,236.00
$ 2,958,192.94
$ 460,397.60
$ 655,148.51
$ 480,705.86
$ 153,099.77
$ 1,617,095.62
$ 472,671.56
$ 837,303.91
$ 933,373.85
$ 837,303.91
$ 2,097,030.82
$ 90,297.62
$ 7,815,769.85
$ 3,190,819.53
$ 447,073.96
$ 14,819,541.94
$ 22,398,170.52
$ 7,222,666.65
$ 7,262,899.20
$ 2,473,710.75
$ 214,795.626
$ 105,376.077
$ 114,225.580
$ 85,325.620
$ 119,356.776
$ 78,124,254.144
$ 7,812,425.41
$ 7,812,425.41
$ 3,906,212.71
$ 97,655,317.680