ITEM SCOPE UNIT BASELINE MIN.

SELLING WORKS INCLUDED REMARKS


(M, L&T, E) BUYING COST COST (EX-VAT)
(EX-VAT) REBARS
Rebar (Building Structural Ground to 10F) L&T, E kg. 4.40 10.00

Rebar (Building Structural 11F to 20F) L&T, E kg. 4.50 10.00 Cutting, Bending, Tying, Welding, Coupling, etc.

FORMWORKS
Formworks - Footings, Columns sq.m 220.00 250.00 Scaffolding, Shoring, Formworks

Formworks - Tie Beams, Beam on Grade, Slab sq.m 220.00 250.00 Scaffolding, Shoring, Formworks
on Grade
Formworks - Suspended Beams sq.m 220.00 250.00 Scaffolding, Shoring, Formworks

Formworks - Suspended Slab sq.m 220.00 250.00 Scaffolding, Shoring, Formworks

Formworks - Retaining/Continuous Wall sq.m 220.00 250.00 Scaffolding, Shoring, Formworks

Formworks - Stairs & Landing sq.m 220.00 250.00 Scaffolding, Shoring, Formworks

CONCRETING - JOBMIX
Job Mix - Lean Concrete cu.m Mixing, Pouring, Vibrating, Surface Finishing

Job Mix - RC Pouring - Footing, Tie Beam, cu.m Mixing, Pouring, Vibrating, Surface Finishing
Beam on Grade, Slab on Grade
Job Mix - RC Pouring - Column, Suspended cu.m Mixing, Pouring, Vibrating, Surface Finishing
Slabs, Girders, Beams, Walls
CONCRETE POURING - READYMIX
Ready Mix - Lean Concrete Pouring & Road cu.m Pouring, Vibrating, Surface Finishing
Concreting
Ready Mix - RC Pouring - Footing, Tie Beam, cu.m Pouring, Vibrating, Surface Finishing
Beam on Grade, Slab on Grade
PumpCrete - RC Pouring - Column, Suspended cu.m Pouring, Vibrating, Surface Finishing
Slabs, Girders, Beams, Walls
MASONRY WORKS
CHB Laying 4" L&T, E sq.m 100.00 125.00

CHB Laying 5" L&T, E sq.m 125.00 150.00


CHB Laying, Mortar, Rebar

Page 1 of 36
ITEM SCOPE UNIT BASELINE MIN. SELLING WORKS INCLUDED REMARKS
(M, L&T, E) BUYING COST COST (EX-VAT) CHB Laying, Mortar, Rebar
CHB Laying 6" L&T, E sq.m (EX-VAT)
150.00 175.00

CHB Plastering - Joints Only L&T, E sq.m 50.00 90.00

CHB Plastering - Rough Finish L&T, E sq.m 90.00 130.00


Mortar Mixing & Application, Surface Finishing
CHB Plastering - Smooth Finish L&T, E sq.m 100.00 140.00

Stiffener Beam/Column/Zocalo L&T, E l.m 115.00 Concrete, Rebar, Tiewire, Forms

TRUSSES
Steel Trusses (Single, 2"x2" Angle Bar) L&T, E sq.m 200.00 720.00 Trusses & Purlins Installation + Primer

Steel Trusses (Double, 2"x2" Angle Bar) L&T, E sq.m 300.00 960.00 Trusses & Purlins Installation + Primer

Steel Trusses (G.I. Pipe) L&T, E sq.m Trusses & Purlins (Pipe Bending is Excluded)

ROOF
Metal Roofing (on Steel Frames) - ALL IN L&T, E sq.m 70.00 100.00 Roof Installation, Ridge Roll, Gutter, Flashing,
Sealant
Metal Roofing (on Steel Frames) L&T, E sq.m 40.00 70.00 Roof Installation

Non Metal Roofing L&T, E sq.m Installation, Tekscrew, Sealing

Gutters, Ridge Rolls & Flashing L&T, E l.m Fabrication, Installation, Rivets, Downspout, Sealing

FLOOR FINISH
Plain Cement sq.m

Colored Cement sq.m

Pebble Washout sq.m

Granulithic sq.m

Marble Tile sq.m

Page 2 of 36
ITEM SCOPE UNIT BASELINE MIN. SELLING WORKS INCLUDED REMARKS
(M, L&T, E) BUYING COST COST (EX-VAT)
Vinyl sq.m (EX-VAT)

Unglazed sq.m

Asphalt sq.m

TILES & CLADDING


Floor Tiles 10cm x 10cm (4"x4") sq.m 350.00 Surface Preparation & Leveling, Application of Tile Computed according to the Total Face Area to be
Adhesives, Placement of Tiles, Grouting, Cleaning Tiled.
Floor Tiles 15cm x 15cm (6"x6") sq.m 300.00 before
Surfaceturn-over.
Preparation & Leveling, Application of Tile Computed according to the Total Face Area to be
Adhesives, Placement of Tiles, Grouting, Cleaning Tiled.
Floor Tiles 30cm x 30cm (12"x12") sq.m 300.00 before
Surfaceturn-over.
Preparation & Leveling, Application of Tile Computed according to the Total Face Area to be
Adhesives, Placement of Tiles, Grouting, Cleaning Tiled.
Floor Tiles 40cm x 40cm (16"x16") sq.m 250.00 before
Surfaceturn-over.
Preparation & Leveling, Application of Tile Computed according to the Total Face Area to be
Adhesives, Placement of Tiles, Grouting, Cleaning Tiled.
Floor Tiles 60cm x 60cm (24"x24") sq.m 200.00 350.00 before
Surfaceturn-over.
Preparation & Leveling, Application of Tile Computed according to the Total Face Area to be
Adhesives, Placement of Tiles, Grouting, Cleaning Tiled.
Wall Tiles sq.m before turn-over.

Wall Cladding sq.m

Column Cladding sq.m

Stair Tiles sq.m

CEILING
Plywood Ceiling on Wooden Frame sq.m Framing & Ceiling Installation

Fiber-Cement Board Ceiling sq.m Framing & Ceiling Installation

Acoustic Tile with Plywood Backing sq.m Framing & Ceiling Installation

Concealed Acoustic Tile with Aluminum T- sq.m Framing & Ceiling Installation
Runners
Spandrel sq.m

PVC Ceiling sq.m

Page 3 of 36
ITEM SCOPE UNIT BASELINE MIN. SELLING WORKS INCLUDED REMARKS
(M, L&T, E) BUYING COST COST (EX-VAT)
(EX-VAT) DRY WALL
Ficem Drywall on Metal Frame sq.m Framing & Wall Face Installation

Gypsum Drywall on Metal Frame sq.m Framing & Wall Face Installation

Single Wall Plywood on Wooden Frame sq.m Framing & Wall Face Installation

Double Wall Plywood on Wooden Frame sq.m Framing & Wall Face Installation

Wooden Louver sq.m Framing & Wall Face Installation

Cyclone Wire Partition sq.m Framing & Wall Face Installation

GLASS & ALUMINUM


Labor & Materials: Glass & Aluminum M, L&T, E sq.m Fabrication to Installation Per Square Meter of Face Area to be Fabricated
& Installed.
DOORS & WINDOWS
Fabrication: Wooden Flush Door pc

Installation: Door (Wooden, Plastic, Steel) pc Installation of Jamb, Hinge, Door, Knob, Lock,
Stopper, Wall Repair, Cleaning
PAINT
Fence Painting M, L&T, E sq.m 80.00 150.00 Surface Preparation, Painting, Cleaning Per Square Meter of Face Area to be Painted.

Building Paint - ALL IN M, L&T, E sq.m 150.00 300.00 Surface Preparation, Painting, Cleaning Per Square Meter of Face Area to be Painted.

Floor Rubberized

ELECTRICAL
Lighting & Power Outlet L&T, E hole 200.00 Roughing-ins, Wires, Junctions, Intallations, etc. Per Lighiting & Power Outlet (Switches are not
counted)
Service Entrance L&T, E unit 3,500.00 Installation & Commisioning Service Entrance + 1 Free Panel Board (MDP)

Extra Panel Board (LPB, etc.) - Small Panels L&T, E set 1,000.00 Installation & Commisioning
Only
PLUMBING
Plumbing Lot pc Computed as the total fitting + plumbing fixtures
(Switches are not counted)

Page 4 of 36
ITEM SCOPE UNIT BASELINE MIN. SELLING WORKS INCLUDED REMARKS
(M, L&T, E) BUYING COST COST (EX-VAT)
Water Closet set (EX-VAT) Surface Preparation & Leveling, Application of Tile Computed according to the Total Face Area to be
Adhesives, Placement of Tiles, Grouting, Cleaning Tiled.
Lavatory set before
Surfaceturn-over.
Preparation & Leveling, Application of Tile Computed according to the Total Face Area to be
Adhesives, Placement of Tiles, Grouting, Cleaning Tiled.
before turn-over.

Page 5 of 36
ITEM SCOPE UNIT BASELINE MIN. SELLING THEORETICAL RECENT WORKS INCLUDED
(M, L&T, E) BUYING COST COST (EX-VAT) REFERENCE REFERENCE
(EX-VAT) DEMOLITION
Deconstruction sq.m -

Demolition - RC Flooring (Manual) cu.m 3,833.33

TEMPORARY FACILITY
Temporary Fence: Blue Sack l.m -

Temporary Fence: Tin Sheets l.m -

EARTHWORKS
Excavation (Manual) cu.m 383.33

Backfill (Manual) cu.m 133.72

Compaction (Tamper) sq.m 35.00

ROAD PCCP

Page 6 of 36
REMARKS

Computed according to the Total Floor Area of


building to be Deconstructed.
Computed according to the Total Floor Area of
building to be Deconstructed.

Page 7 of 36
ITEM SCOPE UNIT BASELINE MIN. SELLING WORKS INCLUDED REMARKS
(M, L&T, E) BUYING COST COST (EX-VAT)
(EX-VAT) TEMPORARY FACILITY
Temporary Fence: Blue Sack l.m

Temporary Fence: Tin Sheets l.m

Page 8 of 36
Skilled Labor TOTAL
ITEM (m-hrs/unit) (m-hrs/unit) (m-hrs/unit)
Demolition
Deconstruction -
Demolition - RC Flooring (Manual) 26.67 26.67 53.33
Temporary Facility
Temporary Fence: Blue Sack -
Temporary Fence: Tin Sheets -
Site Development
Excavation (Manual) - 5.93 5.93
Backfill (Manual) - 2.07 2.07
Gravel Bedding (Manual) - 2.77 2.77
Compaction (Tamper) - - -
Riprap 4.00 4.00 8.00
Rebars
Rebar Installation - 0.08 0.08
Formworks
Formworks - Footings, Columns 1.25 1.25 2.50
Formworks - Tie Beams, Beam on Grade, Slab on Grade 1.40 1.40 2.80
Formworks - Suspended Beams 1.67 1.67 3.34
Formworks - Suspended Slab 1.55 1.55 3.10
Formworks - Retaining/Continuous Wall 1.20 1.20 2.40
Formworks - Stairs & Landing 1.24 1.24 2.48
Concreting - Jobmix
Job Mix - Lean Concrete Pouring & Road Concreting 6.67 6.67 13.33
Job Mix - RC Pouring - Footing, Tie Beam, Beam on Grade, Slab on G 9.52 9.52 19.05
Job Mix - RC Pouring - Column, Suspended Slabs, Girders, Beams, Wa 16.00 16.00 32.00
Concreting -Readymix
Ready Mix - Lean Concrete Pouring & Road Concreting 0.80 0.80 1.60
Ready Mix - RC Pouring - Footing, Tie Beam, Beam on Grade, Slab o 3.01 3.01 6.02
PumpCrete - RC Pouring - Column, Suspended Slabs, Girders, Beams, 1.78 1.78 3.56
Masonry Works
CHB Laying 4" 1.00 1.00 2.00
CHB Laying 5" 1.11 1.11 2.22
CHB Laying 6" 1.25 1.25 2.50
CHB Plastering - Joints Only 0.24 0.24 0.48
CHB Plastering - Rough Finish 1.00 1.00 2.00
CHB Plastering - Smooth Finish 1.20 1.20 2.40
Trusses
-
Roof
Metal Roofing on Steel Frames 0.48 0.48 0.97
Non Metal Roofing 0.54 0.54 1.08
Gutters, Ridge Rolls & Flashing 1.97 1.97 3.94
Floor Finishes
Plain Cement 0.67 0.67 1.33
Colored Cement 0.70 0.70 1.40
Pebble Washout 1.43 1.43 2.86
Granulithic 1.43 1.43 2.86
Marble Tile 1.43 1.43 2.86
Vinyl 2.34 2.34 4.67
Unglazed 2.00 2.00 4.00
Asphalt 0.84 0.84 1.67
Tiles & Cladding
Floor Tiles 10cm x 10cm (4"x4") 8.00 8.00 16.00
Floor Tiles 15cm x 15cm (6"x6") 4.94 4.94 9.88
Floor Tiles 30cm x 30cm (12"x12") 3.09 3.09 6.17
Floor Tiles 40cm x 40cm (16"x16") 1.93 1.93 3.86
Floor Tiles 60cm x 60cm (24"x24") 1.21 1.21 2.41
Wall Tiles -
Wall Cladding -
Column Cladding -
Stair Tiles -
Ceiling
Plywood Ceiling on Wooden Frame 0.92 0.92 1.84
Fiber-Cement Board Ceiling 0.92 0.92 1.84
Acoustic Tile with Plywood Backing 1.54 1.54 3.08
Concealed Acoustic Tile with Aluminum T-Runners 1.54 1.54 3.08
Spandrel -
PVC Ceiling -
Dry Wall
Ficem Drywall on Metal Frame -
Gypsum Drywall on Metal Frame -
Single Wall Plywood on Wooden Frame 1.24 1.24 2.48
Double Wall Plywood on Wooden Frame 1.69 1.69 3.38
Wooden Louver 1.69 1.69 3.38
Cyclone Wire Partition 0.13 0.13 0.25
Glass & Aluminum
Labor & Materials: Glass & Aluminum -
Doors & Windows
Fabrication: Wooden Flush Door 8.00 8.00 16.00
Installation: Door (Wooden, Plastic, Steel) 5.33 5.33 10.67
Paint
Labor & Materials: Paint Lot

Wall Smooth
Ceiling Smooth
Ceiling -
Floor Rubberized

Electrical
Electrical Lot -
Plumbing
Plumbing Lot -
Water Closet 16.00 16.00 32.00
Lavatory 12.00 12.00 24.00
UNIT COST UNIT

- sq.m
3,833.33 cu.m

- l.m
- l.m

383.33 cu.m
133.72 cu.m
179.18 cu.m
35.00 cu.m
575.00 cu.m

5.18 kg.

179.69 sq.m
201.25 sq.m
240.06 sq.m
222.81 sq.m
172.50 sq.m
178.25 sq.m

958.33 cu.m
1,369.05 cu.m
2,300.00 cu.m

115.00 cu.m
432.33 cu.m
255.56 cu.m

143.75 sq.m
159.72 sq.m
179.69 sq.m
34.23 sq.m
143.75 sq.m
172.50 sq.m

69.63 sq.m
77.37 sq.m
282.97 l.m

95.59 sq.m
100.63 sq.m
205.56 sq.m
205.56 sq.m
205.56 sq.m
335.66 sq.m
287.50 sq.m
120.03 sq.m

1,150.00 sq.m
709.88 sq.m
443.67 sq.m
277.30 sq.m
173.31 sq.m
- sq.m
- sq.m
- sq.m
- sq.m

132.30 sq.m
132.30 sq.m
221.27 sq.m
221.27 sq.m
- sq.m
- sq.m

- sq.m
- sq.m
177.94 sq.m
242.93 sq.m
242.93 sq.m
18.26 sq.m

- sq.m

1,150.00 pc
766.67 pc

80.00 sq.m

150.00 pc

pc
2,300.00 set
1,725.00 set
WORKS INCLUDED

Placement of Lean Concrete, Placement of Boulders, Mixing & Application of Concrete Grouting.

Cutting, Bending, Tying, Welding, Coupling, etc.

Scaffolding, Shoring, Formworks


Scaffolding, Shoring, Formworks
Scaffolding, Shoring, Formworks
Scaffolding, Shoring, Formworks
Scaffolding, Shoring, Formworks
Scaffolding, Shoring, Formworks

Mixing, Pouring, Vibrating, Surface Finishing


Mixing, Pouring, Vibrating, Surface Finishing
Mixing, Pouring, Vibrating, Surface Finishing

Pouring, Vibrating, Surface Finishing


Pouring, Vibrating, Surface Finishing
Pouring, Vibrating, Surface Finishing

CHB Laying, Mortar Mixing & Application, Rebar


CHB Laying, Mortar Mixing & Application, Rebar
CHB Laying, Mortar Mixing & Application, Rebar
Mortar Mixing & Application, Surface Finishing
Mortar Mixing & Application, Surface Finishing
Mortar Mixing & Application, Surface Finishing

Installation, Tekscrew, Sealing


Installation, Tekscrew, Sealing
Fabrication, Installation, Rivets, Downspout, Sealing
Surface Preparation & Leveling, Application of Tile Adhesives, Placement of Tiles, Grouting, Cleaning before turn-over.
Surface Preparation & Leveling, Application of Tile Adhesives, Placement of Tiles, Grouting, Cleaning before turn-over.
Surface Preparation & Leveling, Application of Tile Adhesives, Placement of Tiles, Grouting, Cleaning before turn-over.
Surface Preparation & Leveling, Application of Tile Adhesives, Placement of Tiles, Grouting, Cleaning before turn-over.
Surface Preparation & Leveling, Application of Tile Adhesives, Placement of Tiles, Grouting, Cleaning before turn-over.

Framing & Ceiling Installation


Framing & Ceiling Installation
Framing & Ceiling Installation
Framing & Ceiling Installation

Framing & Wall Face Installation


Framing & Wall Face Installation
Framing & Wall Face Installation
Framing & Wall Face Installation
Framing & Wall Face Installation
Framing & Wall Face Installation

Fabrication to Installation

Installation of Jamb, Hinge, Door, Knob, Lock, Stopper, Wall Repair, Cleaning

Surface Preparation, Painting, Cleaning

Surface Preparation & Leveling, Application of Tile Adhesives, Placement of Tiles, Grouting, Cleaning before turn-over.
Surface Preparation & Leveling, Application of Tile Adhesives, Placement of Tiles, Grouting, Cleaning before turn-over.
REMARKS

Computed according to the Total Floor Area of building to be Deconstructed.


Computed according to the Total Floor Area of building to be Deconstructed.

Computed according to the Total Volume of boulders to be used.


Computed according to the Total Face Area to be Tiled.
Computed according to the Total Face Area to be Tiled.
Computed according to the Total Face Area to be Tiled.
Computed according to the Total Face Area to be Tiled.
Computed according to the Total Face Area to be Tiled.

Computed according to the Total Face Area to be Fabricated & Installed.

Computed according to the Total Face Area to be Painted.

Computed as the total outlet + lighting fixture (Switches are not counted)

Computed as the total fitting + plumbing fixtures (Switches are not counted)
Computed according to the Total Face Area to be Tiled.
Computed according to the Total Face Area to be Tiled.
DIRECT LABOR CONTACTOR'S
OCM
& EQUIPMENT PROFIT
ITEM
A = as per DUPA B = 12% of (A) C = 8% of (A)

DEMOLITION

Demolition & Disposal - PCCP (0.15m thick) 107.62 12.91 8.61

Demolition & Disposal - Reinforced Concrete 4,960.83 595.30 396.87

- -

EARTHWORKS

Excavation & Disposal (Common Soil) 121.60 14.59 9.73

Excavation - Foundation (Common Soil) 260.28 31.23 20.82

Excavation - Pipe Culvert & Drain (Common Soil) 260.28 31.23 20.82

Backfilling & Compaction - Foundation 378.77 45.45 30.30

Embankment / Road Fill


96.51 11.58 7.72
(Earth Filling & Compaction)

Subgrade Preparation
16.09 1.93 1.29
(Correction & Compaction)

Subbase Preparation
96.51 11.58 7.72
(Installation, Correction, Compaction)

CONCRETING - JOBMIX

PCCP - 0.15m thick


314.36 37.72 25.15
(formworks, dowel, concrete pouring, finishing, curing)
CONCRETING - READY MIX

PCCP - 0.15m thick


- -
(formworks, dowel, concrete pouring, finishing, curing)

Concrete Railing - DPWH Standard


1,026.59 123.19 82.13
(formworks, rebars, concreting, finishing, curing)

REINFORCING STEEL

Reinforcing Steel Works 6.97 0.84 0.56

BOX CULVERT

Concreting (Ready Mix)


253.03 30.36 20.24
20.68 Mpa, Class A, 28 Days

Lean Concrete (Job Mix)


777.32 93.28 62.19
Class B, 16.5 Mpa

PAINT

Paint 12.63 1.52 1.01

Pipe Culverts (910mm, Class II, RCPC) 912.45 109.49 73.00

Manholes (910mm dia., CHB) 8,576.02 1,029.12 686.08


Stone Masonry 677.27 81.27 54.18

Concrete Curb (Precast) 88.83 10.66 7.11

Concrete Gutter (Precast) 88.83 10.66 7.11

Sidewalk (Job Mix) 177.87 21.34 14.23

Traffic Management 24,556.80 2,946.82 1,964.54


TERAVERA
VAT DUPA COST
UNIT COST LIMIT
UNIT
D = 5% of (A+B+C) E = A+B+C+D F = 54% of E

6.46 135.60 73.22 sq.m

297.65 6,250.65 3,375.35 cu.m

- - -

7.30 153.22 82.74 cu.m

15.62 327.95 177.09 cu.m

15.62 327.95 177.09 cu.m

22.73 477.25 257.72 cu.m

5.79 121.60 65.67 cu.m

0.97 20.27 10.95 sq.m

5.79 121.60 65.67 cu.m

18.86 396.09 213.89 sq.m


- - - sq.m

61.60 1,293.50 698.49 l.m

0.42 8.78 4.74 kg

15.18 318.82 172.16 cu.m.

46.64 979.42 528.89 cu.m.

0.76 15.91 8.59 sq.m.

54.75 1,149.69 620.83 l.m.

514.56 10,805.79 5,835.12 ea.


40.64 853.36 460.81 ea.

5.33 111.93 60.44 ea.

5.33 111.93 60.44 ea.

10.67 224.12 121.02 ea.

1,473.41 30,941.57 16,708.45 mo.


SCOPE

Labor, Tools & Equipment (jack hammer), Heavy Equipment (backhoe, breaker, dump truck), Fees &
Consumables (tipping fee, passway, fuel, electricity, etc),

Labor, Tools & Equipment (cutting outfit, grinder, jack hammer), Heavy Equipment (backhoe, breaker, dump
truck), Fees & Consumables (tipping fee, passway, oxy-acetelene, cutting disks, fuel, electricity, etc),

Labor, Tools & Equipment, Heavy Equipment (backhoe, dump truck), Fees & Consumables (tipping fee, passway,
fuel, electricity, etc),

Labor, Tools & Equipment, Heavy Equipment, Consumables

Labor, Tools & Equipment, Heavy Equipment, Consumables

Labor, Tools & Equipment, Heavy Equipment, Consumables

Labor, Tools & Equipment, Heavy Equipment, Consumables

Labor, Tools & Equipment, Heavy Equipment, Consumables

Labor, Tools & Equipment, Heavy Equipment, Consumables

Labor, Tools & Equipment, Heavy Equipment, Consumables


Labor, Tools & Equipment, Heavy Equipment, Consumables

Labor, Tools & Equipment, Heavy Equipment, Consumables

Labor, Tools & Equipment, Heavy Equipment, Consumables


Labor includes installation and removal of formworks

Labor, Tools & Equipment, Heavy Equipment, Consumables

Labor, Tools & Equipment

Labor, Tools & Equipment, Heavy Equipment, Consumables

Labor, Tools & Equipment, Heavy Equipment, Consumables


Labor, Tools & Equipment, Heavy Equipment, Consumables

Labor, Tools & Equipment, Heavy Equipment, Consumables

Labor, Tools & Equipment, Heavy Equipment, Consumables

Labor, Tools & Equipment, Heavy Equipment, Consumables

Labor - 2 Traffic Aides


DPWH TERMINOLOGY USED

Removal of Actual Structures/Obstruction

Surplus Common Excavation

Structure Excavation

Pipe Culvert & Drain Excavation

Foundation Fill

Embankment

Subgrade Preparation

Agreagate Sub-base
(Volume is computed in bank)
Weight is computed as per plan
ITEM UNIT COST UNIT

STRUCTURAL
Rebar works 4.40 kg
MASONRY WORKS
CHB Laying 170.00 sq.m
ARCHITECTURAL
CHB Plastering (Interior Walls) - Smooth Finish 140.00 sq.m
OTHER NOTES

+10centavos every 10 floors

vatable, (verify thickness), 2.8m wall height, includes hauling from alemac/elevator, barracks to be paid by subcon - P35/man/day

vatable, 2.8m wall height, includes hauling from alemac/elevator, barracks to be paid by subcon - P35/man/day
SOURCE

Engr. Christopher Patrick Calalang @ Datem - High Rise Project

Engr. Clifford Nunez, Condominium Project @ Mandaluyong Area

Engr. Clifford Nunez, Condominium Project @ Mandaluyong Area


Labor Rates
Daily Hourly
Skilled 550.00 68.75
Laborer 450.00 56.25

Mark-up 15%
TERMS & CONDITIONS
TERMS & CONDITIONS
Subcontractors must be evaluated and accredited according to their specialty.
Sub-Contracts with an estimated amount exceeding P300,000 must have quotations from at least three specialty subcontracto
Labor-only-Sub-Contracts must have a maximum down payment of P40,000 or 5% of subcontract price only, whichever is lowe
Labor&Material-Sub-Contracts must have a maximum down payment of P40,000 or 5% of the labor price of the subcontract p
All materials to be used on Labor&Material-Sub-Contracts must be supplied by Teravera Corporation. The cost of materials su
Tools & Light Equipment to be used on all Sub-Contracts must be supplied by the sub-contractor. However, the sub-contracto
Sub-Contracts shall have a weekly progress bill scheme, with an amount payable of no greater than the amount of accomplish
Safety
Performance Bond
Retention
Warranty Bond

Includes all Labor, Tools & Equipment, Heavy Equipment, Consumables , Utilities
Measurements are computed as per plan
The cost of lease shall be deducted to the amount payable per progress bill.
Other notes
plastering - P140 per square meter - smooth finish, 2.8m height - interior wall - vatable, mandaluyong
barracks P35/head per day
including hauling from alimac

chb laying - P170/square

Das könnte Ihnen auch gefallen