Beruflich Dokumente
Kultur Dokumente
We will update and maintain this document when possible to present the best available
information.
Note Reference(s)
276707.1
759329.1
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained – EDD No
Constrained – ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Daily Allocation to Maintain Safety Stock
Level
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained – EDD No
Constrained – ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Excess and Safety Stock by Demand Class
+ No:
Allocate such supply or demand to OTHER.
Note Reference(s) 250289.1
Bug Reference(s)
Document References(s) -1
Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained – EDD No
Constrained – ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Flush All Items for Simulation
Note Reference(s)
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained – EDD No
Constrained – ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Ignore Safety Stock calculation inside Time
Fence
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained – EDD No
Constrained – ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Include Safety Stocks in Priority Based
Pegging
Note Reference(s)
Name: MSC_MAKE_SS_TRANSIENT
User Name: "MSC: Make Safety Stock Transient"
Application: Advanced Supply Chain Planning
Purpose: Profile is set to yes then safety stock is
treated as transient.
Default Behavior: If the value is not set then it will be
treated as NO
Values: This is YES/NO profile and should be
defined at site level In the Application field, choose
"Advanced Supply Chain Planning".
SQL validation
SQL= "select meaning
\"MSC_MAKE_SS_TRANSIENT \",
lookup_code
into :visible_option_value,:profile_option_value
from fnd_lookups where lookup_type = 'YES_NO'"
COLUMN="\"MSC_MAKE_SS_TRANSIENT \"(4)"
1431837.1
Bug Reference(s)
Document References(s) -1
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained – EDD No
Constrained – ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Maximum Percentage variation in safety stock
values
376451.1
276707.1
559867.1
Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained – EDD No
Constrained – ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Minimum Percentage variation in safety stock
values
Bug Reference(s)
Document References(s) -1
-1
-1
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained – EDD No
Constrained – ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Inventory Safety Targets
Package
Bug Reference(s)
Document References(s) Oracle Advanced Planning Command Center User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Rapid Planning Safety Stock Lead Time
Method
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Respect Minimum Remaining Shelf Life Days
Note Reference(s)
1132403.1
• Yes
• No
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Safety Stock Project
Oracle Advanced Supply Chain Planning assigns the project specified for all
safety stock demands which originate from non-MRP planned safety stock.
When safety stock requirements are specified in Oracle Inventory for specific
projects, the profile option value is not honored.
The list of values for this profile option is restricted to projects specified in
Oracle Projects. This profile option is enabled at project/seiban level, not at
the task level.
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained – EDD No
Constrained – ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Safety stock change interval (Days)
759329.1
Bug Reference(s)
Document References(s) -1
-1
-1
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained – EDD No
Constrained – ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Service Level Category Set
Valid Values.
• Item - SPP will consider the safety stock level for each item
(for which safety stock is prescribed)
• Prime (Default) - the safety stock for the entire prime will be
considered as the safety stock level and the existing supply
for the various members of the prime will be considered
while trying to maintain the safety stock level.
Example:
Consider this supersession session chain: A3 -] A4 [-] A5 [-] A6 -] A7 [-] A8
Assume safety stock for each item = 100 units for a give period.
If the profile option = 'Item', then consider the safety stock level for each item
to be 100 units and use only native supply to maintain this level. There will be
no substitution recommended by planning and safety stock violation
exceptions will be raised for each item.
If the profile = 'Prime', then planning determines that A3, A6 and A8 are the
primes in this supersession chain then planning will use the following levels:
SS target for A3=100 units, and planning will only use supply of A3 to
maintain this level. SS target for A6=300 units, and planning will use supplies
of A4, A5 and A6 to maintain this level. SS target for A8=200 units, and
planning will use supplies of A7 and A8 to maintain this level.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints – Not Optimized No
Enforce Constraints – Optimized No
Disable Constraints – Not Optimized No
Disable Constraints – Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Smoothing method to calculate Safety stock
within Change interval
• Maximum
Values:
1 - No
3 - Yes
Note Reference(s) 276707.1
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained – EDD No
Constrained – ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Inventory Level % of Safety Stock
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles MSO: Target Inventory Level % of Safety Stock
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained – EDD No
Constrained – ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Number of LP Phases for Safety Stock
Calculation
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained – EDD Yes
Constrained – ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Supply Reschedule Window Size for Safety
Stock Pegging
You can use this profile option to specify the number of days a specific
supply can satisfy safety stock demand.
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles MSO: Maximum Inventory Level % of Safety Stock
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained – EDD No
Constrained – ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Safety Lead Time
Default Value - No
Note Reference(s)
872475.1
1068297.1
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained – EDD Yes
Constrained – ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSR: Safety Stock Holding Strategy