Personal Information
Training Courses
1
Summary of Capabilities
1. Execution of wide range of site electrical and control works such as (cable laying,
wiring, terminations, energizing, testing, etc).
3. Attend the progress and technical meeting with client and consultant to discuss both of
technical and progress issues.
4. Prepare electrical work method statement for client review and approval.
5. Prepare electrical and instrumentation material take off and procurement schedule.
6. Review vendor’s materials, instruments and equipments submittals and assess if it meet
the project and client specifications and contract requirements.
7. Partial and final testing and commissioning for all electrical power and control systems
including energize the equipments.
8. Perform all quality control inspection duties related assuring that the work was done as
specified then handing over the work to client and consultants.
9. Prepare assessment documentation of the commissioning process to be as a quick
reference in operation and maintenance phase as part of client requirements.
10. Fulfill all my job duties in environment of respecting all safety precautions related with
construction industry, prepare the work permits and submitting to client for approval with
all attached site risk hazard assessment, PPE for my work crew, all tools and machines will
be used and risk response plan in case of hazard such as (shut down, evacuation plan and
fire fighting).
Employment Record
2
1- May 2010 to Date Qatar Electro Mechanical Group Almana LLC – Qatar
3
Project Value : 8,000,000 US $
Client : Qatalum / Qatar Petroleum
Main Contractor : SNC Lavalin
Scope of Work : Laying of 23 Km power and control cables will
all associated termination, connection and testing, cable ladders, cable
trays, conduits earthing for all plant equipment, installation of the junction
boxes, motor local isolators, distribution transformers and switchgear,
MCC panels, control panels and local control rooms.
- Manpower under my supervision: 3 supervisor + 22 electricians + 18
technicians
IV. New Desalination and Power Generation Plat at Ras Abu Fontas RAF A1
4
VI. Wakra Staff and Labor Camp Facilities
Project Value : 2,200,000 US $
Client : Al Jaber Engineering L.L.C.
Scope of Work : Installation of MCC panels. Lighting and power outlet
network and systems, fire alarm and synchronization panel for control
generators.
- Manpower under my supervision: 2 supervisor + 32 electricians