PROJECT :
OWNER :
NOTES:-
OWNERS
CONSULTANT:
BOP CONTRACTOR :
DOC. TITLE: Single Line Flow Diagram for instrument air system of AHP
NTPC DRG NO: 9661-162-PVM-L-006
Kindly provide air receiver Please be noted that air receiver is required for
for 2x100% capacity to dampening any pressure fluctuation before
maintain required pressure supplying air to required points in case of
at all locations. reciprocating compressors only. IAC pertaining
to SCCL project is a screw type compressor &
compressed air discharge from screw type IAC is
continuous. In our system, total FAD at absolute
Please be informed that stop
pressure requirement considering simultaneous
male connector is already
operation of BA disposal & FA disposal (worst
provided for all the pneumatic
case scenario) is 808.48 cu.m/h, refer approved
operated valves which is actually
As per note indicated at doc no 9661-162-PVM-U-019. Whereas we have
an isolation valve used in
tender drg-Instrument air line provided 900 cu.m/h capacity IAC. Please also be
compressed air system for
isolation valve for each ash noted that hydraulic cylinders for pneumatic
isolation purpose. Kindly refer
1. intake valves, segregation operated gate/valves are designed to operate at 5
‘TYP PN. CYLINDER
valves & all pneumatically to 6 kg/sq.cm (g) of air pressure. Whereas
OPERATED VALVE
actuated valves shall be discharge pressure of IAC is 8 kg/sq.cm (g). So in
CONNECTION DETAIL’. The
provided actual scenario there will not be any requirement
same was discussed in detail
of storage of compressed air in IAC system.
during TCM dated 5th to 7th
Please be informed that requirement of air
August, 2014 at Kolkata office
receiver at different locations i.e. ESP area, FA
& accepted by NTPC.
silo area, HCSD silo area etc are not asked in
NIT. However total 8 nos of IAC receiver i.e. 4
nos at the compressor discharge (capacity 3cum),
2 nos at ESP areas (capacity 1cum), 1 no at FA
silo area (capacity 1cum) & 1 no at HCSD silo
area (capacity 1cum) are provided which are
more than adequate.
Page 1 of 5
RESPONSE SHEET
DOC. TITLE: Single Line Flow Diagram for instrument air system of AHP
NTPC DRG NO: 9661-162-PVM-L-006
Kindly provide PG in each Please be informed that all equipments for Fly
line as per operational ash Vacuum Removal System is fully automatic,
requirement for facilitating with intermittent and cyclic operation through
to check pressure drop in PLC. Manual intervention in ESP operation is
each line while operation strictly not recommended. So manual checking of
Kindly provide as per tender
2. Incorporated each pass of ESP IA pressure in ESP area is not required & that is
drg-TE,TG,PI,PTX2
why pressure gauge in individual header is not
provided. PG at individual header in ESP area is
not also asked in NIT. However one no PG is
provided at the header to a particular ESP area
which is more than adequate.
As per tender drg 2 nos PT, 1 Please justify the capacity Kindly refer our reply against your comment at sl
no TE with TT, 1 no PG, 1 selection. It should be no 1.
3. Incorporated
no TG to be provided in preferably 2 cu.m
header
Page 2 of 5
RESPONSE SHEET
DOC. TITLE: Single Line Flow Diagram for instrument air system of AHP
NTPC DRG NO: 9661-162-PVM-L-006
Page 3 of 5
RESPONSE SHEET
DOC. TITLE: Single Line Flow Diagram for instrument air system of AHP
NTPC DRG NO: 9661-162-PVM-L-006
Page 4 of 5
RESPONSE SHEET
DOC. TITLE: Single Line Flow Diagram for instrument air system of AHP
NTPC DRG NO: 9661-162-PVM-L-006
Page 5 of 5