CIVIL UNITS
Sewage treatment plant shall include the following Civil
Units : (Client Scope)
- 1 Nos. Bar Screen cum Oil & Grease Chamber
- 1 Nos. Sewage equalization tank/sump
- 1 Nos. Anoix Tank
- 1 Nos. Aeration tank
- 1 Nos. MBR Tank
- 1 Nos. Sludge Holding Tank
- 1 Nos. Treated Water Tank
Complete Mechanical / Electrical Equipment comprising of following:
Overall STP
Daily Capacity KLD - 200
Operationg Hours- 20 Maximum
Normal Flow - 10 CuM / Hr.
Peak Factor - Minimum 2.5
1.4 Bar Screens 1 nos.
Design, manufacture / procurement, supply, installation,
testing and commissionong of bar screen as per following details - 1 Set
MOC - SS 316
Size - 1000 mm X 600 mm
Main Frame - SS Flats, 25 wide x 5 thick min.
Bars - SS round bars 8 mm dia.
Bar Spacing - 10 mm
Welding Process - Argon Welding only
Accessories - Anchor Fasteners for fittings, matching comber with
long handle (SS) for removing floating solids.
1.5 Mechanical Fine Screen 1 nos.
Design, manufacture / procurement, supply, installation,
testing and commissioning of bar screen as per following details - 1 Set
MOC - SS 316
Size - Suitable
Type - Screw Screen, fully automatic
Spacing - 5-6 mm
Welding Process - Argon Welding only
1.6 Mechanical Oil Separator 1 nos.
Design, manufacture / procurement, supply, installation,
testing and commissioning of Mechanical oil separator as per following
details - 1 Nos.
Type - Belt type
Capacity - As per design
Powe Rating - 1.00 HP
1.7 Sewage Transfer Pump in equalization tank 2 nos.
Design, manufacture / procurement, supply, installation,
testing and commissioning of Sewage Transfer Pumps as per following
details
Quantity Required - 1 Set (2 Nos. 1W+1S)
Type - Solid handling submersible sewage pumps veritical
Solid handling capacity - 40 mm minimum
Capacity - 10 Cu M / Hr.
Head - 8-10 mtrs. Minimum
MOC - CI
Accessories:
1. Guide Wire
2. Lifting Chain
3. Matching discharge fittings.
Operation control - Manual & automatic through level
control provided in electric control panel
Power rating - As required
1.8 Air Blower 2 nos.
Design, procurement, supply, installation, testing and
commissioning of Air Blowers as per following details - 1
Set
Type: Twin lobe, positive displacement air blowers designed
for delivering oil free air complete with base frame, anti vibration pads,
coupling pulleys,V - Belt , coupling guard, suction silencer, air filter,
discharge NRV with properly matched TEFC induction motor etc.
MOC - MS
All flanged for connections.
Sockets for fixing of diffusers
1.12 Coarse/Fine bubble type Diffusers 1 lot.
Supply, installation, testing and commissioning of disc &
tubular type non clog high efficiency fine and coarse bubble diffusers in
Aeration tank, MBR Tank,equalisation tank and sludge holding tank to
evenly and efficiently maintain the liquid therein in agitated condition to
prevent settling of suspended solids. - 1 Lot
Type - Disc Type and Tubular Type
MOC - EPDM
Discharge Capacity - Minimum 5 M³/Hr. each diffuser
Size - 3 " dia or 6" dia
1.13 Supply, installation, testing and commissioning of Filter
Press of Suitable Capacity with CI frame, PP plates complete with
filter cloth complete with interconnecting piping and poly dosing system.
(Capacity 0-6 LPH and size of filter press = 18" X 18" X 18 No of plates) -
1 Set
1 nos.
a Supply, installation, testing & commissioning of positive
displacement type screw slurry pump with MS casing, SS- strator with
internal rubber lining, gland packing seal, solid handling capacity upto 7 to
10% of the effective percentage of sludge and direct drive with motor.
2 nos.
Sludge Feed Pump
Capacity : 1 m3/hr
Head : 40 mtrs. (1W+ 1S) - 1 Set
b Providing and fixing all interconnecting piping (as described
below) and isolation control valves for making the system complete. The
piping material shall be MS 'C' class. 1 job
MS epoxy: Submerged air piping
MS Epoxy : Air piping & pumped effluent riser (non- submerged)
MS epoxy : Pumped effluent (submerged) & tank
overflow pipe line - 1 Set
GI (Heavy) : Interconnecting pipe line after delivery
header of pump/ filter
1.14 Supply and installation of following instrument for the auto operation of
System and saftey of MBR modules. 1 job.
a Electro-magnetic flow meter at the sewage inlet and outlet of membrane
suction pump of suitable size. - 1 Nos.
b pH Meter at membrane suction pump outlet for measurement
of pH. - 1 Nos.
c Pressure switch for pressure alarm high and low, flow switch
for flow alarm high and low. - 1 Set
d Online turbidity meter for checking the health of membrane at the outlet of
membrane suction pump. - 1 Set
e Online rotameter for checking the air flow to the MBR
module. - 1 Set
Complete STP work as mentioned above 1 job
Total
MR Amount
Total of Sub Head - I
195000 195000 GN
55000 55000 GN
65000 65000
155000 155000
85000
85000
KRANTI
4377000
590000
590000 GN
75000 75000 AS PER MAKE LIST
665000
5042000