(G) Sewerage Treatment Plant (STP) UNIT Qty

SUB HEAD - I - SEWAGE TREATMENT PLANT:


Design, supplying, installing, testing & commissioning of
Sewage Treatment Plant, the sewage treatement shall be based on MBR
technology. The nature of effluent from domestic sewage from toilets and
kitchen shall be discharge seperately into the STP. Design to take
consideration is as given below :
1.1 Sewage from toilets and kitchen
Daily average flow - 200 Cum / Day
pH : 7.5 – 8.5
TSS: 200-300 mg/lit
BOD5 days: 300 - 450 mg/lit
COD: 600-800 mg/lt
E coli: Present
Color: 50 hazen
Odor: Present
1.2 Sewage /Effluent discharge standard after treatment
pH: 7.0 - 8.0
TSS: < 2 mg/lit
BOD5 days: < 5 mg/lit
COD: <10 mg/lt
Turbidity: <2 mg/lt
E coli: absent (Below detectable level)
Color: <05 hazen
Odor: unobjectionable
1.3 SCHEDULE FOR MECHANICAL ITEMS
Sewage treatment plant shall primarily include ( but not
limited to ) the following items. The contractor shall include all accessories
and allied items of work that are necessary to make a complete plant
functional. The civil works of any nature shall be provided by the owners.
However, the GA drawing of civil work as per their design shall be
provided by the contractor.

CIVIL UNITS
Sewage treatment plant shall include the following Civil
Units : (Client Scope)
- 1 Nos. Bar Screen cum Oil & Grease Chamber
- 1 Nos. Sewage equalization tank/sump
- 1 Nos. Anoix Tank
- 1 Nos. Aeration tank
- 1 Nos. MBR Tank
- 1 Nos. Sludge Holding Tank
- 1 Nos. Treated Water Tank
Complete Mechanical / Electrical Equipment comprising of following:
Overall STP
Daily Capacity KLD - 200
Operationg Hours- 20 Maximum
Normal Flow - 10 CuM / Hr.
Peak Factor - Minimum 2.5
1.4 Bar Screens 1 nos.
Design, manufacture / procurement, supply, installation,
testing and commissionong of bar screen as per following details - 1 Set

MOC - SS 316
Size - 1000 mm X 600 mm
Main Frame - SS Flats, 25 wide x 5 thick min.
Bars - SS round bars 8 mm dia.
Bar Spacing - 10 mm
Welding Process - Argon Welding only
Accessories - Anchor Fasteners for fittings, matching comber with
long handle (SS) for removing floating solids.
1.5 Mechanical Fine Screen 1 nos.
Design, manufacture / procurement, supply, installation,
testing and commissioning of bar screen as per following details - 1 Set

MOC - SS 316
Size - Suitable
Type - Screw Screen, fully automatic
Spacing - 5-6 mm
Welding Process - Argon Welding only
1.6 Mechanical Oil Separator 1 nos.
Design, manufacture / procurement, supply, installation,
testing and commissioning of Mechanical oil separator as per following
details - 1 Nos.
Type - Belt type
Capacity - As per design
Powe Rating - 1.00 HP
1.7 Sewage Transfer Pump in equalization tank 2 nos.
Design, manufacture / procurement, supply, installation,
testing and commissioning of Sewage Transfer Pumps as per following
details
Quantity Required - 1 Set (2 Nos. 1W+1S)
Type - Solid handling submersible sewage pumps veritical
Solid handling capacity - 40 mm minimum
Capacity - 10 Cu M / Hr.
Head - 8-10 mtrs. Minimum
MOC - CI
Accessories:
1. Guide Wire
2. Lifting Chain
3. Matching discharge fittings.
Operation control - Manual & automatic through level
control provided in electric control panel
Power rating - As required
1.8 Air Blower 2 nos.
Design, procurement, supply, installation, testing and
commissioning of Air Blowers as per following details - 1
Set
Type: Twin lobe, positive displacement air blowers designed
for delivering oil free air complete with base frame, anti vibration pads,
coupling pulleys,V - Belt , coupling guard, suction silencer, air filter,
discharge NRV with properly matched TEFC induction motor etc.

Quantity - 1 Set in all (2 Nos. 1W+1S)


Capacity - 200 M³/Hr.
Discharge Head - 5000 MMWC
RPM - Not more than 1400
Power rating - Approx. 7.5 HP
1.9 Sludge Transfer Pumps 2 nos.
Design, procurement, supply, installation, testing and
commissioning of Sludge Handling Pumps ( One set of two pumps at MBR
Tank as per following details
Type: Centrifugal monoblock self priming solid handling
horizontal non submersible pumps within built motor, base frame and anti
vibration pads. - 1 Set
Quantity - 1 Set in all (2 Nos. 1W+1S)
Discharge - 5 M³/Hr.
Head - 10 MWC
Solid handling capacity - 7 mm minimum
Power rating - approx. 1.00 HP
MOC - C.I.
Accessories Required with sludge handling pumps
1.1 MBR Reactor with Suction Pump (Module) 1 set
Supply, installation, testing and commissioning of MBR
reactor modules suitable for treatment of 200 KLD capacity including
connections, hangers, suction pumps and their connections etc complete in
all respect.
System should comprise of the following units:
a. Flow Transmitter, half drum punched whole screen of self
cleaning type.
b. MBR module immersed type with permeate capacity or
inflow capacity of 200 KLD.The membranes shall be a proven design of a
membrane manufacturer engaged in the production of membrane of this
type. Membranes shall allow product water (permeate) to be drawn through
from the outside surface of the membrane to the inside. The maximum
pore size of the membrane shall be 0.04 micron. At least 30 lmh flux @ 25O
C shall be considered to arrive at total membrane area required to treat
specified wastewater quantity
The membrane manufacturer should offer minimum 2 years
full replacement warranty and additional 5 years on pro rate basis
Membranes shall be physically strong enough to
withstand the operating conditions associated with continuous
operation in an aerated tank of mixed liquor at concentrations of up to
12,000 mg/L. The membranes, membrane modules, and membrane
cassettes shall be by one
manufacturer. The membrane modules shall be constructed
such that the membranes are held vertically and bonded firmly. The
membrane modules shall also be attached to a common base to avoid lateral
movement of the membrane modules during operation.

The material used for the manufacturing of the membrane


fibers shall be Polyvinylidene Fluoride (PVDF) . Membrane Shall be
Reinforced with outer diameter of fiber 1.9mm & inner diameter 0.8 mm
with a membrane module surface area of 28sqm. The materials used to hold
hollow membrane
fibers in place shall be chemically resistant to high concentrations of
chlorine (minimum 100 mg/L and
maximum 5,000 mg/L) for up to 24 hours, and low pH
(range 2 to 3) and high pH wash solutions (range 10 to 11) for up to 24
hours, respectively. Membranes shall be capable of regular backwashing
with and without cleaning chemicals to minimize pore fouling.

Membranes shall be capable of regular backwashing with


and without cleaning chemicals to minimize pore fouling. At least 30 lmh
flux @ 25O C shall be considered to arrive at total membrane area required
to treat specified wastewater quantity
c. Permeate pump with 100% stand by arrangemnt.
Permeate Suction Pump
Type: Horizontal monoblock pumps with CI inlet outlet
casing, CI stage casing and CI impellers complete with motor suitable
for operation at 415+ 5 % volts, 3 phase, 50
Hz supply, complete with base frame and anti vibration pads as required.

Quantity - 1 Set in all (2 Nos. 1W+1S)


Discharge - 10 M³ /Hr.
Head - 10-12 m
Power rating - As required
Accessories Required with the pumps
d. Flow meter at outlet of permate pump
e. TMP monitoring equipment
f. Complete cleaning system for membranes with automated
mode.Clean-In-Place System: The membranes shall be cleaned ―in-place‖
without removal from the membrane tank. The system shall consist of a
chemical feed pump (if required) and storage tank (if required) and
include all interior piping, valving, and in-tank piping and supports.
Membranes shall be capable of regular backwashing with and without
cleaning chemicals to minimize pore fouling

g. Air Blower for membranes with 100% standby


Air Blower
Design, procurement, supply, installation, testing and
commissionong of Air Blowers as per following details
Type: Twin lobe, positive displacement air blowers designed
for delivering oil free air complete with base frame, anti vibration pads,
coupling pulleys,V - Belt , coupling guard, suction silencer, air filter,
discharge NRV with properly matched TEFC induction motor etc.

Quantity - 1 Set in all (2 Nos. 1W+1S)


Capacity - 100 M³/Hr.
Discharge Head - 5000 MMWC
RPM - Not more than 1400
Power rating - Approx. 5.0 HP
h. Automation of complete plant from raw effluent pump to permeate pump
out put with proper flow control
i) Chain pulley arrangment for replacing the memberane
including 5 years replace ment gurantee against any type of malfunctioning.

j) MOC:- PVDF, Out to in fibre, shall be title - 22 validation


and test certificate - 1 Set
1.11 Air Distribution Grids 1 lot.
Supply, installation, testing and commissioning of MS Air
Distribution Grids as per requirement in equalisation tank, Anoxic tanks,
Aeration tank, MBR tank and sludge holding tanks with proper
arrangements for installation in tank base, efficient flow of air and
arrangements as required for fixing of air diffusers and connection with
inlet air line. - 1 Lot

MOC - MS
All flanged for connections.
Sockets for fixing of diffusers
1.12 Coarse/Fine bubble type Diffusers 1 lot.
Supply, installation, testing and commissioning of disc &
tubular type non clog high efficiency fine and coarse bubble diffusers in
Aeration tank, MBR Tank,equalisation tank and sludge holding tank to
evenly and efficiently maintain the liquid therein in agitated condition to
prevent settling of suspended solids. - 1 Lot
Type - Disc Type and Tubular Type
MOC - EPDM
Discharge Capacity - Minimum 5 M³/Hr. each diffuser
Size - 3 " dia or 6" dia
1.13 Supply, installation, testing and commissioning of Filter
Press of Suitable Capacity with CI frame, PP plates complete with
filter cloth complete with interconnecting piping and poly dosing system.
(Capacity 0-6 LPH and size of filter press = 18" X 18" X 18 No of plates) -
1 Set
1 nos.
a Supply, installation, testing & commissioning of positive
displacement type screw slurry pump with MS casing, SS- strator with
internal rubber lining, gland packing seal, solid handling capacity upto 7 to
10% of the effective percentage of sludge and direct drive with motor.
2 nos.
Sludge Feed Pump
Capacity : 1 m3/hr
Head : 40 mtrs. (1W+ 1S) - 1 Set
b Providing and fixing all interconnecting piping (as described
below) and isolation control valves for making the system complete. The
piping material shall be MS 'C' class. 1 job
MS epoxy: Submerged air piping
MS Epoxy : Air piping & pumped effluent riser (non- submerged)
MS epoxy : Pumped effluent (submerged) & tank
overflow pipe line - 1 Set
GI (Heavy) : Interconnecting pipe line after delivery
header of pump/ filter
1.14 Supply and installation of following instrument for the auto operation of
System and saftey of MBR modules. 1 job.
a Electro-magnetic flow meter at the sewage inlet and outlet of membrane
suction pump of suitable size. - 1 Nos.
b pH Meter at membrane suction pump outlet for measurement
of pH. - 1 Nos.
c Pressure switch for pressure alarm high and low, flow switch
for flow alarm high and low. - 1 Set
d Online turbidity meter for checking the health of membrane at the outlet of
membrane suction pump. - 1 Set
e Online rotameter for checking the air flow to the MBR
module. - 1 Set
Complete STP work as mentioned above 1 job
Total
MR Amount
Total of Sub Head - I

Sub Head - II - Electrical Installation for STP


1.15 Supplying, installing, testing, commissioning of electrical
items motor control panel for all the pumps & equipments.
Design, fabrication, assembling, wiring, supply, installation, 1 no.
testing and commissioning of motor control centre fabricated out of 14
gauge CRCA sheet steel. Cable gland plates shall be provided on top as
well as at the bottom of the panels. Panels shall be treated with all
anticorrosive process before painting as per specifications with 2 coats
of red oxide primer and final approved shade of powder coated paint. 2
Nos. earthling terminals shall be provided for 3 phase, 4 wire, 50 Hz supply
system. Panel should be complete with Isolation push button for every
equipment and auto manual selection switches including cable, cable trays,
rubber mat & control wiring complete in all respect.

One No. 100 amps TP incoming MCCB complete with the


following:
i. 0-415 volts 96x96 square mm voltmeter with selector
switch and fuses .
1 SET
ii. 0-100 amps 96x96 square mm ammeter with 100 /5 amps
ratio CT's and selector switch
1 SET
iii. Phase indicating lamps with toggle switches.
iv. Indication lamps for ON/TRIP status of motors.
Aluminium bus bar sleeves type, rated at 200 amps for three
phase & neutral.
OUTGOING FEEDERS / STARTERS
Complete for all the STP equipments as described above
including 100 Amps incomer for panel for pumps.
Spares TP MCB's - 2 Nos.
Control Panel as described above.
Notes:
All switch gear / panels shall be suitable for 25 KA rating.
All outgoing will have 96 sq mm size ammeter & CT
All starter units for pumps to be provided with 3 level liquid
level contactor.
All outgoing starter units to have `ON'/`OFF' Status of
pump.
All pumps to be provided with Auto / Manual selector
switch.
All pumps to be provided with over load relay.
One no. of single phase preventer in incoming of panel.
Necessary cable alleys space for cabling of all pumps,
internal wiring and earthing of all equipment shall also be included. All
switch gears / control gears shall be motor duty rating.
1.16 Cable , Cable Tray and its support 1 lot.
a) Cable
Type - Copper Armoured 3 core
Capacity - As per the control panel and machines to
connected.
b) Cable Tray
Qty - As required
Type - Slotted GI
c) Cable Tray Support
Quantity - As per site requirment of approved quality.
Total
MR Amount
Total of Sub Head - II
RATE AMUNT MAKE
34000 34000 GN

195000 195000 GN

55000 55000 GN

75000 150000 XYLEM

235000 470000 AKASH


64000 128000 KIRLOSKAR

2150000 2150000 DEERFOS


AKASH
290000 290000

65000 65000

155000 155000

75000 150000 ROTO


450000 450000

85000
85000

KRANTI

4377000

590000

590000 GN
75000 75000 AS PER MAKE LIST

665000

5042000