Road Area A L max ΔZ
tion
(m2) (m) (m)
Main road Pavement 113.730 17.000 0.8
Common road between catchment APavement
and B 90.000 15.297 0.3
Common road between catchment APavement
and C 90.000 15.297 0.3
Common road between catchment BPavement
and D 90.000 15.297 0.3
Common road between catchment BPavement
and C 90.000 15.297 1.0
Northernmost common road Pavement 90.000 15.297 1.0
Southernmost common road Pavement 90.000 15.297 1.0
Sav N Tov C i
(min) (mm/h)
0.04706 0.02 1.78440 0.8 3.4
0.01961 0.02 2.08648 0.8 3.3
0.01961 0.02 2.08648 0.8 3.3
0.01961 0.02 2.08648 0.8 3.3
0.06537 0.02 1.57231 0.8 3.45
0.06537 0.02 1.57231 0.8 3.45
0.06537 0.02 1.57231 0.8 3.45
Sav N Tov C i
(min) (mm/h)
0.01288 0.305 5.98819 0.4 2.4
0.01176 0.21 5.36156 0.55 2.5
A Q
A Q
5% 3.2
5% 1.9
S tov in min
5% 1.8
2% 2.1
2% 2.1
2% 2.1
7% 1.6
7% 1.6
7% 1.6
Drain Outlet node No of inlets
Catchment E
A-B B 1 of type 1, 11 of type 6 and the flow from catchment E
C-D D 6 of type 6
Catchment F
E-R R 7 of type 1, 8 of type 7 and catchment F
Catchment C
G-H H 4 of type 2, 6 of type 5 and flow from catchment C
I-J J 3 of type 2 and 5 of type 5
Catchment B
K-J J 2 of type 4 and the flow from catchment B
J Total discharge at node J
L-M M 3 of type 4
M Total discharge at node M
Catchment D
M-N N 1 of type 5 and flow from catchment D
Catchment A
O-Q Q 2 of type 3 and flow from catchment A
P-Q Q 2 of type 3
Q Total discharge at node Q
Q-R R 6 of type 7
R Total discharge at node R
H Total discharge at node H
N Total discharge at node N
S Total discharge at node S
T Total discharge at node T
U Total discharge at node U
Discharge at node l/s Pipe to be designed
0.09408
1.08808 A-B
0.486 C-D
0.071344
1.440344 E-R
2.370816
3.168816 G-H
0.639 I-J
1.88552
2.04152 J-M
2.68052
0.234 L-M
2.91452
0.700672
3.696192 M-N
2.340128
2.496128 O-Q
0.156 P-Q
2.652128
3.138128 Q-R
4.578472 R-H
7.747288 H-N
14.358 N-T
1.57408 S-T
15.93208
15.93208 T-U