PROPOSED RESIDENTIAL BUILDING FOR MR. N S ALAUDEEN, ERODE @ TAMIL NADU
SUMMARY OF PRICES
SL.N SECTIONS Rs. AMOUNT
O MAIN BUILDING
TOTAL AMOUNT
(Rupees Sixty Lakhs Nine Thousand Nine Hundred and Fifty Four only)
Iportal Engineering Consultancy LLP 2/16
@ TAMIL NADU
AMOUNT
COMPOUND WALL
7,291.00
21,300.00
18,750.00
105,760.00
65,610.00
17,496.00
236,207.00
6,009,954.00
ty Four only)
SI. BOQ DESCRIPTION OF THE WORK UNIT QTY RATE
NO CODE
EXE-01 Earthwork excavation in all types of soil for Footing, Raft, RC wall
foundations, Lift pits, Trenches, etc. stacking the excavated earth &
disposable material where ever indicated in site, excluding back filling but
including filling depressions and loose pockets wherever necessary including
watering, consolidating etc., complete. Rate to include disposing of excess
earth within the site and spreading in layers to required levels, shoring,
bailing out water, etc. complete. Contractor shall get aquinted with site
conditions and soil report and submit method statement for dewatering
and getting the surface reasonably dry for laying PCC. Note:Authorised
working space shall be considered as per IS 1200
EXE-02 Back filling in plinths, for sides of foundation, trenches, liftpits, area
developement else where as directed including breaking clods, watering and
consolidating in 150mm thick layers, compacting each layer with vibratory
compactor and at inaccessible places with wooden/steel rammers to
achieve 90 to 95% proctor density at optimum moisture content, all leads
and lifts, bailing/ pumping out water to keep site dry while backfilling
cost shall include conveyance of all materials, labour, ,hire and fuel
charges for tools and plants and other incidental charges etc.complete
as per detailed specification.
EXE-03 Disposing surplus excavated soils/debris of all types outside the site upto a
lead of 5 KM including cost of labour, cost of equipment and machinery,
loading and unloading, transportation, all other incidental charges at
all leads and lifts etc. complete. The work shall be carried out as per the
directions of the Engineer-In-Charge.
PCC-01 Providing & laying 3" thick DAMP PROOF COURSE with cement concrete
1:2:4(1cement:2coarse sand:4graded stone aggregate 12.5mm nominal
size) including mixing of waterproofing admixture of Sika/Fosroc/MC
Bauchemie/Roffe or equivalent as per manufacturers specifications
etc., complete for SSM toping
PCC-02 Providing and laying P.C.C 1:4:8 of specified thickness wherever specified
using river sand, 40mm and downsize metal including sub grade preparation,
levelling, compacting, all leads and lifts, rough finishing if required at the
top surface with necessary curing and shuttering etc. complete at all
levels.
a. In Foundation
CFT 160.00 110.00
b. In below floor
CFT 517.00 110.00
PCC-03 Providing and laying Screed concrete in 1:2:4 with 20mm and down graded
stone aggregates wherever to required thickness, slope and trowel finished
smooth as directed including levelling, compacting, all leads and lifts
with necessary curing and shuttering etc. complete at all levels.
a. 50mm Average thickness for Toilets above sunken CFT 20.00 151.00
b. 75mm average thickness for Sill /coping for Window,Parapet etc., CFT 56.00 151.00
(Design mix shall be as approved by the consultants. W/C ratio shall be as per
consultants recommendation)- GRADE OF CONCRETE FOR ALL MEMBERS - M20
Note: Rate shall be included under propping with steel jack until upper roof
slab concreting & desuttering etc., complete
FRM-01 Providing, fabricating and erecting form work for all RCC works at places
wherever needed / specified as per drawing including striking /
deshuttering with steel / marine ply board with adjustable steel
props to full height and with sufficient bracing etc. complete. Cost to include
sealing the joints with heavy duty brown self adhesive tape, applying mould
releasing agents (Rebol from Fosroc or equivalent) aligning to line and
levels including M S Ties, PVC spacer etc.Complete & as directed at all levels.
Shuttering below the shrinkage strip at every level shall be retained in place
without disturbing for a time as specified by the structural engineer.
a. Footing/Raft
SFT 420.00 26.00
h. Lintel,Chajja,Loft etc.
SFT 435.00 26.00
RST-01 Fabricating & Placing Reinforcement Steel of High Yield Strength Deformed
(HYSD) bars of various diameters of grade Fe 415 conforming to IS codes
& make ISPAT or SAIL or VIZAG or TATA including straightening, cutting,
bending, hooking, lapping and/or welding wherever required as directed,
placing in position, tieing with 18G black annealed binding wire double fold,
cost of binding wire and anchoring to the adjoining members wherever
necessary, all laps and wastages etc. complete as per structural drawings.
Rate also to include cost of all materials, cost of labour, cost of
equipment and machinery, loading and unloading, transportation, all
other incidental charges and work at all leads and lifts etc. complete.
SST-01 Providing, fabricating and fixing in position Window Grills at all levels
with Semi-decorative MS grill work made out of 12mm MS square bars
and 19mm x6mm MS flats as per design weighing approx. 15 kg/sqm with
necessary screw lugs inserts, spot welding and buffing etc., all as detailed in
drawing and as directed.
SST-04 Providing and fixing MS Grill Door for staircase entrance at First
Floor including Painting etc. complete SFT 25.00 250.00
SST-05 Providing fabricating and welding structural steel Trellies work for
staircase at First Floor including Painting etc. complete SFT 132.00 200.00
G MSR-00 MASONRY
MSR-01 Providing and constructing 230mm thick brick masonry in CM 1:6 using
approved quality table moulded bricks of minimum 50kg / Sq.cm
including raking, curing, scaffolding and staging, lead and lift, in all
situations such as walls / pillasters / pillars / stub supports etc.
complete as per drawing and as directed at all levels and heights
MSR-02 Providing and constructing 115mm thick brick masonry in CM 1:4. Cost to
include necessary 1:2:4 concrete bands 75mm depth at every 5th course
with nominal reinforcement of 8mm dia steel 2nos including fabrication,
shuttering, scaffolding and staging,compacting, raking, curing, all
lead and lift etc. complete as per drawing and as directed at all levels and
heights
H JNR-00 JOINERIES
JNR-01 Providing & fixing in position Teak Wood frame Door with Machine Finished I
class Sal Wood frame of 21/2"X5" fixed to the masonry/Column with MS
clamp/Anchor fastener grouted with M20 grade concrete after anti termite
coat at wall face of frame with 32mm thick OST shutter with 1mm thick
approved shade laminate finish with 6mm thick TW edge lipping including
enamel paint finish on frame &shutter edge over a coat of primer & polish
finish on TW face of shutter including all hardwares & fixtures like SS hinges,SS
Tower Bolts,Doorset Locks,SS Handles, SS Stoppers (SS fixtures shall taken
Rs.150/Sft) etc., complete
JNR-03 Supplying,Providing & Fixing Honne Wood Glass Shutter Open able and fixed
Windows with Machine Finished I class Padok Wood frame of 3"X5" projecting
out by 1/4" from Plastered wall surfaces shall be fixed with heavy duty MS
clamp grouted to masonry with M20 concrete with shutter shall be in 11/2"x3"
PW frame with 6mm toughened siant gobain series tinted glass to be held in
place with 1/2"X1/2"TW Beading etc.,all as per Architect details & drawing etc
to complete. The Rate shall be include of Melamine polish for both Frame &
Shutters and all hardwares & fixtures like SS hinges,SS tower bolt,SS
lock/hook,SS handle (SS fixtures shall be taken @ Rs. 75/Sft) etc complete
SUB TOTAL-JOINERIES
PLS-02 Prepare the surface and provide 15mm thick plastering on Internal
walls, columns, beams, etc., in cement mortar 1:6 finishing to line
and level with lime rendering, rounding off all corners wherever
required, finished smooth to required profile at all levels and lifts,
hydrating the lime 24 hours before starting of work including GI plaster
mesh for joints, scaffolding, curing etc, complete at all levels and heights.
PLS-04 Providing 15 mm thick sponge finish plastering in duct and lift shaft one coat
in CM 1:4 at all levels SFT RO
PLS-05 Cement plastering as rough plaster 20 mm thick for all cladding, dadoing, in
C.M 1:6, including providing & removing scaffolding, curing, hacking etc.,
complete. With all lead and lift as directed by engineer incharge.
Note: All flooring item shall be inclusive of providing & removing POP
protection with polythene sheet & Non porus coating etc., complete
FLR-01 Providing & laying of approved quality/colour/size of Marble flooring laid over
20mm tk CM 1:4 base mortor Bed Jointed with White cement slurry @
4.4kg/Sqm & joints to be filled using white cement mixed with matching
colour oxide & cleaning etc all as per drawing, specifications & as directed,the
rate shall be include of rubbing,polishing,non porus coating etc to
complete(Basic price of Marble Rs.120/Sft)(The rate shall be inclusive of
inlay,border,band,groove etc.,)-In Living, dining & Kitchen
FLR-02 Do-do the same of above but for 3" high Skirting with Marble etc.,
complete(edge to chamfered or Half nosing to be done as per Architectural
detail)
RFT 307.00 90.00
FLR- Do-do the same of above but for 4" high Vitrified tile skirting with CM 1:3 etc.,
06 complete RFT 223.00 55.00
a. In G.Floor utility & First floor balcony (Basic Price of Ceramic tile
Rs.50/Sft) SFT 210.00 90.00
FLR- Do-do the same of above but for 4" high Ceramic tile skirting with CM 1:3 etc.,
08 complete
FLR-10 Providing and laying of approved quality of cement tile flooring ,laid over
20mm tk CM(1:4) base mortar bed jointed with cement slurry @ 3.3 Kg/Sqm
with water proof admixture & sapcer joints ,pointing using white cement
mixed with matching colour oxide and Cleaning etc.,, all as per drawing,
specifications and as directed(Basic price of tile Rs.50/Sft)
FLR-12 Providing & Laying Flagging Course with 4" thick PCC 1:2:4 & Finished top with
20mm thick CM 1:3 plaster of smooth finish including thread lining, curing,
cost of labour & material atc., complete
FLR-13 Providing and fixing Slate cladding to Parking wall with 20mm thick back
mortar in CM 1:4 inlcuding pointing with Match colour tile grout, curing, final
wash etc. complete
SFT 400.00 160.00
K PNT-00 PAINTING
PNT-01 Providing & painting 2 or more coats of Acrylic emulsion paint of approved
colour & shade for ceilings over one coat of primer & putty including necessary
centering, scaffolding, cleaning of paint stains where ever necessary including
curing etc,complete with all lead & lift as directed by the engineer incharge
at all levels
PNT-02 Providing & painting two or more coats of Acrylic Emulsion paint of approved
colour & shade to internal surfaces over one coat of primer including
necessary centering, scaffolding,cleaning of paint stains where ever necessary
including curing etc,complete with all lead & lift as directed by the engineer
incharge.at all levels
PNT-03 Providing & painting 2 or more coats of Exterior Acrylic Emulsion Paint(Dulux
Weather shield)of approved colour & shade to external surfaces over one coat
of primer including necessary centering,scaffolding, cleaning of paint stains
where ever necessary including curing etc,complete with all lead and lift as
directed by the engineer in charge at all levels
SUB TOTAL-PAINTING
L WTP-00 WATERPROOFING
Sub contractor to be approved by Client/ Architect/Consultants/ Project
NOTE Managers
WTP-01 TOILETS
Providing waterproofing for the Toilets by chemical method as
follows:Brushing,cleaning & hacking the surface area to provide Brush
bond/ equivalent in 2 layers one after the other with 1mm tk as per
manufacturers' specification.The cost to include 2coats of waterproofing
plaster done with 12mm agg fixing in CM1:4 with waterproofing
admixture mixing with rough finished to required slope with an avg tk of
30mm with a minimum guarantee period of 10yrs.
WTP-02 TERRACE
Providing waterproofing for Terrace as per the specifications listed below with
a minimum guarantee period of 10yrs.
Provide Brick Bat Coba Water Proofing to the terrace by surface method
of average thickness 110mm with water proof admixture as per
manufacturer's(Fosroc/Equivalent) specification with a minimum
guarantee period of 10 years. Cost to include application of cement slurry
with water proofing compound over the surface, laying of brick bat coba to
necessary gradient and joints filled with CM 1:3 with water proofing
compound, providing joint less waterproof plastering with CM 1:4 and
water proofing compound, finished smooth and impression marking of size
300x300 Square with 3mm rod. Treatment shall continue along parapet for
300mm height in shape of round wata, curing etc., Cost to include the
treatment along parapet and no extra 'measurements shall be accounted
for the same (only Plan area shall be accounted). Brickbats shall be
soaked 24 hours in soaking tank before using the same for
waterproofing & only Seived river sand shall be used
SUB TOTAL-WATERPROOFING
N MSL-00 MISCELLANEOUS
MSL-01 Providing & Constructing UNDER GROUND SUMP of capacity 6000 lts at a
suitable location which includes,(1)Excavation for sump,(2) PCC 1:4:8 for
base(3) RCC for base in M20 grade concrete with 20mm & down size
aggregates, river sand & approved water proofing material,(4)side walls shall
be of 150mm thick M20 grade concrete walls which are plastered smooth with
CM1:3 along with approved waterproofing compound, (5) Top slab shall be of
RCC slab of M20 grade concrete with nominal steel reinforcement of
8mm@8"c/c with a provision for a cast iron heavy duty manhole of size
2'0"X2'0",(6) Collection sump in base slab shall be provided,(7) Heavy duty PVC
rungs @ 300mm c/c etc.,complete all as per specifications & as directed by
the Architect & the Engineer-in-charge.
SUB TOTAL-MISCELLANEOUS
AMOUNT IN
FIGURES
20152.50
9120.00
10800.00
5600.00
9280.00
54952.50
9240.00
17600.00
56870.00
3020.00
8456.00
95186.00
5688.00
53940.00
48032.00
34875.00
19520.00
75400.00
143202.00
93090.00
473747.00
10920.00
7020.00
49894.00
49530.00
51532.00
56706.00
9906.00
11310.00
246818.00
651420.00
651420.00
71060.00
25050.00
9693.00
52000.00
6250.00
26400.00
190453.00
402535.00
136320.00
538855.00
70400.00
82800.00
31800.00
182400.00
367400.00
77460.00
155940.00
212355.00
20580.00
466335.00
197780.00
27630.00
73500.00
10200.00
124960.00
12265.00
18900.00
19600.00
7794.90
65535.00
12750.00
31050.00
10200.00
16500.00
64000.00
692664.90
30984.00
62376.00
56628.00
149988.00
10215.00
69000.00
79215.00
120000.00
50000.00
800333.49
970333.49
PROPOSED RESIDENTIAL BUILDING FOR MR. N S ALAUDEEN, ERODE @ TAMIL NADU
BILL OF QUANTITY
COMPOUND WALL
SI. BOQ
NO CODE
DESCRIPTION OF THE WORK UNIT
EXE-01 Earthwork excavation in all types of soil for Footing, Raft, RC wall
foundations, Lift pits, Trenches, etc. stacking the excavated earth & disposable
material where ever indicated in site, excluding back filling but including filling depressions
and loose pockets wherever necessary including watering, consolidating etc., complete.
Rate to include disposing of excess earth within the site and spreading in layers to
required levels, shoring, bailing out water, etc. complete. Contractor shall get
aquinted with site conditions and soil report and submit method statement for dewatering
and getting the surface reasonably dry for laying PCC. Note:Authorised working space shall
be considered as per IS 1200
EXE-02 Back filling in plinths, for sides of foundation, trenches, liftpits, area developement
else where as directed including breaking clods, watering and consolidating in 150mm thick
layers, compacting each layer with vibratory compactor and at inaccessible places with
wooden/steel rammers to achieve 90 to 95% proctor density at optimum moisture content,
all leads and lifts, bailing/ pumping out water to keep site dry while backfilling cost
shall include conveyance of all materials, labour, ,hire and fuel charges for tools and plants
and other incidental charges etc.complete as per detailed specification.
PCC-01 Providing & laying 3" thick DAMP PROOF COURSE with cement concrete
1:2:4(1cement:2coarse sand:4graded stone aggregate 12.5mm nominal size) including
mixing of water proofing admixture of Sika/Fosroc/MC Bauchemie/Roffe or
equivalent as per manufacturers specifications etc., complete for SSM toping including
necessary shuttering etc.,
CFT
AMIL NADU
AMOUNT IN
FIGURES
QTY RATE
RO
RO
7291.00
PCC-02 Providing and laying P.C.C 1:4:8 of specified thickness wherever specified using river
sand, 40mm and downsize metal including sub grade preparation, levelling, compacting, all
leads and lifts, rough finishing if required at the top surface with necessary curing and
shuttering etc. complete at all levels.
a. In Foundation
CFT
E MSR-00 MASONRY
MSR-01 Providing and constructing granite size stone masonry for Foundation and / or Basement upto
ground / plinth level of any and varying thicknesses and profiles using stones hammer
dressed in courses not less than 20 cms high with bond stones at 2M apart in each
course in CM 1:6 including providing and removing necessary scaffolding & staging
wherever required, watering, curing etc., complete including the cost of all materials, cost
of labour, cost of equipment and machinery, all lead and lift, loading and unloading,
transportation, and all other incidental charges etc., complete as per design and
specification. The stonework shall be constructed to receive plastering on both sides. The
work shall be carried out as per the directions of the Engineer in charge.
CFT
MSR-02 Providing and constructing 115mm thick brick masonry in CM 1:4. Cost to include
necessary 1:2:4 concrete bands 75mm depth at every 5th course with nominal
reinforcement of 8mm dia steel 2nos including fabrication, shuttering, scaffolding
and staging,compacting, raking, curing, all lead and lift etc. complete as per drawing and
as directed at all levels and heights
SFT
SUB TOTAL-MASONRY
SFT
G PNT-00 PAINTING
PNT-01 Providing & painting two or more coats of Acrylic Emulsion paint of approved colour & shade
to internal surfaces over one coat of primer with 2 coat of ready made putty + 2nd coat of
primer including necessary centering, scaffolding,cleaning of paint stains where ever
necessary including curing etc,complete with all lead & lift as directed by the engineer
incharge.at all levels
SFT
SUB TOTAL-PAINTING
AMOUNT IN
FIGURES
QTY RATE
21300.00
18750.00
105760.00
1458.00 45.00 65610.00
65610.00
17496.00