Beruflich Dokumente
Kultur Dokumente
2. Inactive Site. Your comments are noted, The site was closed
temporarily due to delay in the arrival of
materials. We are expected to resume the work
within 3/6/2020. Further we will ensure that the
appointed Security Guard will always be at Site
Entrance
3. Absence the consultant’s signature. As per your instruction, we will make sure that
the Consultant Inspects and signs the
construction site hygiene measures on daily basis
and displayed at site entrance. Please find
attached the Signed Copy.