Summary of External LPS design details of DAS Island:

The following table shows the summary of design details for External LPS of structures under
scope of work in DAS ISLAND.

External LPS design Details of DAS Island

Demolishing
Existing
of existing
Proposed LPS
Technology Proposal on concrete for Percentage of
S.NO Structure Level of (Available/
Proposed existing LPS ring demolition
protection Not
conductor
Available)
installation
Existing LPS
system
needs to be
totally
1 AQ NFPA 780 Level III Available Required 20
replaced-
Considering
the age of
installation
Existing LPS
system
needs to be
totally
2 BQ building NFPA 780 Level III Available Required 20
replaced-
Considering
the age of
installation
Existing LPS
system
needs to be
totally
3 Al ghazal NFPA 780 Level III Available Required 60
replaced-
Considering
the age of
installation
Not
4 Museum Building IEC 62305 Level IV - Required 40
Available
Not
5 Das tower NFPA 780 Level III - Required 100
Available
Not
6 Oasis club NFPA 780 NO LPS - Not Applicable
Available

Page 2 of 14
External LPS design Details of DAS Island

Demolishing
Existing
of existing
Proposed LPS
Technology Proposal on concrete for Percentage of
S.NO Structure Level of (Available/
Proposed existing LPS ring demolition
protection Not
conductor
Available)
installation
Not
7 Sahil mosque NFPA 780 Level III - Required 20
Available
Existing LPS
system
needs to be
totally
8 Utility Building IEC 62305 Level IV Available Required 60
replaced-
Considering
the age of
installation
Not
9 Al danah IEC 62305 NO LPS - Not Applicable
Available
Existing LPS
system
needs to be
totally
10 CCC substation IEC 62305 Level IV Available Required 60
replaced-
Considering
the age of
installation
Existing LPS
system
needs to be
totally
11 STP SS IEC 62305 Level IV Available Required 100
replaced-
Considering
the age of
installation
Not
12 Alfalah 1 NFC 17 102 Level IV - Required 0
Available
Not
13 R3A,D,E,F,G IEC 62305 NO LPS - Not Applicable 50
Available

Page 3 of 14
External LPS design Details of DAS Island

Demolishing
Existing
of existing
Proposed LPS
Technology Proposal on concrete for Percentage of
S.NO Structure Level of (Available/
Proposed existing LPS ring demolition
protection Not
conductor
Available)
installation
Existing LPS
system
needs to be
totally Required
14 TLQ IEC 62305 Level IV Available 70
replaced-
Considering
the age of
installation
Existing LPS
system
needs to be
totally
15 Das training center NFPA 780 Level III Available Required 100
replaced-
Considering
the age of
installation
Not
16 Hospital NFPA 780 Level III - Required 55
Available
Existing LPS
system
needs to be
Central Amenities totally
17 NFPA 780 Level III Available Required 100
building replaced-
Considering
the age of
installation
Not
18 Admin building NFPA 780 Level III - Required 60
Available
Not
19 Fire station IEC 62305 No LPS - Not Applicable
Available
Fire brigade Not
20 IEC 62305 No LPS - Not Applicable
parking shed Available

Page 4 of 14
External LPS design Details of DAS Island

Demolishing
Existing
of existing
Proposed LPS
Technology Proposal on concrete for Percentage of
S.NO Structure Level of (Available/
Proposed existing LPS ring demolition
protection Not
conductor
Available)
installation
Existing LPS
system
needs to be
totally
21 CCB NFPA 780 Level III Available Required 70
replaced-
Considering
the age of
installation
Existing LPS
system
needs to be
totally
22 Central laundry IEC 62305 Level IV Available Required 0
replaced-
Considering
the age of
installation
Warehouse issuing Not
23 IEC 62305 Level IV - Required 75
section Available
Warehouse Not
24 NFPA 780 Level III - Required 60
metallic Available
Not
25 Garage1 IEC 62305 No LPS - Not Applicable
Available
Not
26 Garage shed 2 IEC 62305 No LPS - Not Applicable
Available
Not
27 Garage shed 3 IEC 62305 No LPS - Not Applicable
Available
Not
28 Garage shed 4 IEC 62305 No LPS - Not Applicable
Available
Transport office Not
29 IEC 62305 No LPS - Not Applicable
building Available
Not
30 Substation F IEC 62305 Level IV - Required 100
Available
31 B-9 IEC 62305 Level IV Available Existing LPS Not Required-
system Earth pits are
needs to be interconnected
totally
replaced-
Considering
the age of

Page 5 of 14
installation

Page 6 of 14
External LPS design Details of DAS Island

Demolishing
Existing
of existing
Proposed LPS
Technology Proposal on concrete for Percentage of
S.NO Structure Level of (Available/
Proposed existing LPS ring demolition
protection Not
conductor
Available)
installation
Not
32 T substation IEC 62305 Level IV - Required 100
Available
Not
33 TE NFC 17 102 Level IV - Required 0
Available
Not
34 E type NFC 17 102 Level IV - Required 0
Available
Not
35 OTS NFC 17 102 Level IV - Required 0
Available
Existing LPS
system
needs to be
Not Required-
totally
36 C&I port control NFPA 780 Level III Available Earth pits are
replaced-
interconnected
Considering
the age of
installation
Existing LPS
system
needs to be
Not Required-
totally
37 C&I guest house NFPA 780 Level III Available Earth pits are
replaced-
interconnected
Considering
the age of
installation
Not
38 NTS NFC 17 102 Level IV - Required 0
Available
Existing LPS
system
needs to be
Not Required-
totally
39 CICPA Admin NFPA 780 Level III Available Earth pits are
replaced-
interconnected
Considering
the age of
installation
Not
40 Al sharq mosque NFPA 780 Level III - Required 30
Available
Not
41 Shops building IEC 62305 No LPS - Not Applicable
Available

Page 7 of 14
External LPS design Details of DAS Island

Demolishing
Existing
of existing
Proposed LPS
Technology Proposal on concrete for Percentage of
S.NO Structure Level of (Available/
Proposed existing LPS ring demolition
protection Not
conductor
Available)
installation
Electrical Not
42 IEC 62305 No LPS - Not Applicable
workshop Available
Mechanical Not
43 IEC 62305 No LPS - Not Applicable
workshop Available
Not
44 Civil workshop IEC 62305 No LPS - Not Applicable
Available
Central workshop Not
45 IEC 62305 No LPS - Not Applicable
supervisor office Available
Mechanical
Not
46 workshop Central IEC 62305 No LPS - Not Applicable
Available
WS
Chemical
Not
47 workshop Central IEC 62305 No LPS - Not Applicable
Available
WS
Not
48 Store 3 IEC 62305 No LPS - Not Applicable
Available
Analyser room Not
49 IEC 62305 No LPS - Not Applicable
Central WS Available
Control and
Not
50 instrumentation IEC 62305 No LPS - Not Applicable
Available
WS
Not
51 Fire block 90 NFC 17 102 Level IV - Required
Available
Existing LPS
system
needs to be
Not Required-
totally
52 LCB for GTG NFPA 780 Level III Available Earth pits are
replaced-
interconnected
Considering
the age of
installation
Existing LPS
system
needs to be
Not Required-
totally
53 PDAS NFPA 780 Level III Available Earth pits are
replaced-
interconnected
Considering
the age of
installation

Page 8 of 14
Page 9 of 14
External LPS design Details of DAS Island

Demolishing
Existing
of existing
Proposed LPS
Technology Proposal on concrete for Percentage of
S.NO Structure Level of (Available/
Proposed existing LPS ring demolition
protection Not
conductor
Available)
installation
Not
54 Telecom building IEC 62305 Level IV - Required 40
Available
API
Level IV Not
55 Fuel Station 545+NFC 17 - Required 20
(NFC) Available
102
Not
56 Water treatment IEC 62305 No LPS - Not Applicable
Available

Portable water Not


57 API 545 NA - Required 0
Tanks Available

API
All Tanks in Tank Level IV Not
58 545+NFC 17 - Required Membrane
farm area (NFC) Available
102
Existing LPS
system
needs to be
totally
59 New UCR NFPA 780 Level III Available Required 100
replaced-
Considering
the age of
installation
Not
60 Old UCR NFPA 780 Level III - Required 100
Available
Existing LPS
system
needs to be
Not Required-
totally
61 ABS 2 IEC 62305 Level IV Available Earth pits are 100
replaced-
interconnected
Considering
the age of
installation
Not
62 Boiler 9 IEC 62305 Level IV - Required 100
Available
Not
63 Boiler 7 n 6 similar IEC 62305 Level IV - Required 100
Available
Not
64 Boiler 3,4,5 similar IEC 62305 Level IV - Required 100
Available
65 Boiler 8 mcc IEC 62305 Level IV Not - Required 100

Page 10 of 14
Available

Page 11 of 14
External LPS design Details of DAS Island

Demolishing
Existing
of existing
Proposed LPS
Technology Proposal on concrete for Percentage of
S.NO Structure Level of (Available/
Proposed existing LPS ring demolition
protection Not
conductor
Available)
installation
Adma power Not
66 NFPA 780 Level III - Required 100
station Available
Existing LPS
system
needs to be
totally
67 CTU plant IEC 62305 Level IV Available Required 100
replaced-
Considering
the age of
installation
Existing LPS
system
needs to be
totally
68 CTU LER NFPA 780 Level III Available Required 60
replaced-
Considering
the age of
installation
Not
69 CTU outstation NFPA 780 No LPS - Not Applicable
Available
Zakum striper Not
70 IEC 62305 Level IV - Required 100
column Available
API
Level IV Not
71 Zakum Spheroid 545+NFC 17 - Required 0
(NFC) Available
102
Not
72 Zakum LER NFPA 780 Level III - Required 100
Available
Umm shaif stripper Not
73 IEC 62305 Level IV - Required 100
column Available
API
Umm Shaif Level IV Not
74 545+NFC 17 - Required 0
Spheroid (NFC) Available
102
Umm Al Saif Plant Not
75 NFPA 780 Level III - Required 100
LER Available
Umm Al Saif Plant Not
76 NFPA 780 Level III - Required 100
Outstation Available
Banduq Stripper Not
77 IEC 62305 Level IV - Required 100
column Available

Page 12 of 14
Not
78 Banduq plant IEC 62305 Level IV - Required 100
Available

Page 13 of 14
External LPS design Details of DAS Island

Demolishing
Existing
of existing
Proposed LPS
Technology Proposal on concrete for Percentage of
S.NO Structure Level of (Available/
Proposed existing LPS ring demolition
protection Not
conductor
Available)
installation
Not
79 All flares IEC 62305 Level IV - Required 0
Available
Not
80 AB substation IEC 62305 Level IV - Required 0
Available
Not
81 AA substation IEC 62305 Level IV - Required 100
Available
Not
82 Fire station IEC 62305 No LPS - Not Applicable 75
Available
Existing LPS
system
needs to be
Not Required-
Airport terminal totally
83 NFPA 780 Level III Available Earth pits are
building replaced-
interconnected
Considering
the age of
installation
Existing LPS
system
needs to be
Not Required-
Hanger and totally
84 IEC 62305 Level IV Available Earth pits are
support building replaced-
interconnected
Considering
the age of
installation

Page 14 of 14