DOCUMENT NO DATE

PROJECT: #REF! #REF!


#REF!
DESIGNED CHECKED SHEET
TITLE: #REF!
#REF! #REF! OF

Loads from Crane to Crane brackets due to Self Weight of crane for 220kV GIS Hall (DEAD LOAD)
Self Wt of crane acting at the centre = 4 T
The crane is supported by a total of four wheels, two wheels on either side
C/C distance between two wheels = 1.8 m
Maximum load on each wheel = 1 T i.e 4/2/2

For calculating maximum load over the crane bracket considered the maximum span of 3.825 m and loaded as shown

Therefore maximum load on bracket = 1.529 T


1T 1T
1.8 m

T
3.825 m
(Considering maximum C/C of brackets =3.825 m) 1.5
Moment transfer To brackets from crane T
Loads on the Bracket
Concentrated Load on Bracket,P = 15.3 kN P
Eccentricity on brackets along grid,e = 0.75 M M
Concentrated Moment,M = 15.3 x 0.75
= 11.5 kN-m

e
DOCUMENT NO DATE
PROJECT: #REF! #REF!
#REF!
DESIGNED CHECKED SHEET
TITLE: #REF!
#REF! #REF! OF

Loads from Crane to Crane brackets due to crane capacity and Hoist weight for 220kV GIS Hall (LIVE LOAD)
Span of crane = 10.77 m
crane capacity = 5 T
Hoist weight = 0.45 T
crane capacity + Hoist weight after accounting for 30 % impact
(5+0.45)*1.3 = 7.085 T 7.09 T
Maximum hook approach to the support = 1 m 1m

C/C distance between two wheels = 1.8 m


10.77 m
Maximum load on each wheel = 3.214 T 6.427 T
(Load placed to produce maximum reaction at the wheels)
For calculating maximum load over the crane bracket considered the maximum span of 3.825 m and loaded as shown

Therefore maximum load on bracket = 4.916 T


3.214 T 3.214 T
1.8 m

T
3.825 m
(Considering maximum C/C of brackets =3.825 m) 4.9
Moment transfer To brackets from crane T
Loads on the Bracket
Concentrated Load on Bracket,P = 49.2 kN P
Eccentricity on brackets along grid,e = 0.75 M M
Concentrated Moment,M = 49.2 x 0.75
= 36.9 kN-m
Horizontal surge of 10 % of bracket load = 4.92 kN
Concentrated Moment due to = 5 x 0.75
Horizontal surge = 3.69 kN-m e