Sie sind auf Seite 1von 22

Acceptance Testing Procedure

TRẠM:

VIỄN THÔNG:

HỢP ĐỒNG SỐ: 24122013/CO-ZTE

© 2014 ZTE Corporation. All rights reserved.


ZTE CONFIDENTIAL: This document contains proprietary information of ZTE and is not to be
disclosed or used without the prior written permission of ZTE.
Due to update and improvement of ZTE products and technologies, information in this document is
subjected to change without notice.

-2-
ZXDSL 9806H Equipment Test Manual

Statement
Copyright © 2011 ZTE Corporation Any reproduction or distribution of this document
or any portion of this document, in any form by any means, without the prior written
consent of ZTE CORPORATION is prohibited.

All rights reserved.

are registered trade marks of ZTE CORPORATION. The name and identifier
of ZTE products are the proprietary identifier or trade mark. All the names of other
products or companies mentioned in this manual may be the trade marks or commercial
names of their respective owners. No part of permissions or rights may be authorized to
the readers for using any marks appearing in this manual, without the prior written
permission of ZTE Corporation or the third-party proprietor of trade marks or
commercial names.

This product is designed in compliance with the requirements on environmental


protection and personal safety. The storage, use and discarding of this product are
subject to the requirements of the product manual, related contract, or relevant laws
and regulations.

Since the product and technology are subject to updating and upgrading, the
information contained herein may not be in perfect consistency with the products.
Please contact our local office for updating/upgrading information of the products.

For the latest information of this product, visit our website at http://tsm.zte.com.cn.

Preface
This manual is intended as a guide for the commissioning test or acceptance test,
describing the test items to be conducted in detail. Each test item is provided with a
table, which contains the columns Precondition, Procedure, Acceptance criteria, and
Remark.

The manual includes all test items to be performed in the commissioning test record
and the acceptance test record. Each test item has a unique Test No., which corresponds
to that in commissioning/acceptance test record.

III
ZXDSL 9806H Equipment Test Manual

Contents
1 Hardware Inspection ................................................................................................................................. 1 

1.1 ODC Visual Inspection ..................................................................................................................... 1 


1-1-1 ODC Visual Inspection .......................................................................................................... 1 

1.2 ODC Power System Inspection ......................................................................................................... 1 


1-2-1 ODC Power System Inspection ............................................................................................. 1 

1.3 ODC Sensors &Alarms Inspection ................................................................................................... 2 


1-3-1 ODC Sensors &Alarms Inspection ........................................................................................ 2 

1.4 ODC optical signal distribution inspection ....................................................................................... 2 


1-4-1 ODC optical signal distribution inspection............................................................................ 2 

1.5 MxU Equipment check ..................................................................................................................... 3 


1-5-1 MxU Equipment check .......................................................................................................... 3 

2 Installation .................................................................................................................................................. 4 

2.1 Installation ......................................................................................................................................... 4 


2-1-1 Cabinet installation ............................................................................................................... 4 

3 Equipment power-on test........................................................................................................................... 5 

3.1 Cabinet power-on test ....................................................................................................................... 5 


3-1-1 Cabinet power-on test ........................................................................................................... 5 

3.2 MxU equipment power-on test .......................................................................................................... 5 


3-2-1 MxU equipment power-on test ............................................................................................. 5 

4 Service test (depend on the configuration of each site, we can test the line card liked following test
cases)............................................................................................................................................................... 6 

4.1 ADSL service test .............................................................................................................................. 6 


4-1-1 ADSL service test ................................................................................................................. 6 

4.2 FE service test ................................................................................................................................... 6 


4-3-1 FE service test....................................................................................................................... 6 

4.3 POTS service test .............................................................................................................................. 7 


4-4-1 POTS service test ................................................................................................................. 7 

4.4 Triple play service test ...................................................................................................................... 7 


4-6-1 Triple play service test .......................................................................................................... 7 

5 Environment Monitoring test.................................................................................................................... 9 

5.1 Temperature sensor test ..................................................................................................................... 9 

IV
ZXDSL 9806H Equipment Test Manual

5-1-1 Temperature sensor test ......................................................................................................... 9 

5.2 Humidity sensor test.......................................................................................................................... 9 


5-2-1 Humidity sensor test .............................................................................................................. 9 

5.3 Water sensor test.............................................................................................................................. 10 


5-3-1 Water sensor test ................................................................................................................. 10 

5.4 Smoke sensor test ............................................................................................................................ 11 


5-4-1 Smoke sensor test ................................................................................................................ 11 

5.5 Door alarm test ................................................................................................................................ 12 


5-5-1 Door alarm test .................................................................................................................... 12 

6 Additional Test .......................................................................................................................................... 13 

6.1 ADSL2+ Rate and distance Test...................................................................................................... 13 


ADSL2+ Rate and distance Test ................................................................................................... 13 

6.2 Triple play QOS Test ....................................................................................................................... 14 


Triple play QOS Test ..................................................................................................................... 14 

6.3 VPN service Test ............................................................................................................................. 15 


VPN service Test ........................................................................................................................... 15 

7 Note: .......................................................................................................................................................... 17 


Test Equipment.............................................................................................................................. 17 
Test Networking ............................................................................................................................ 17 

V
ZXDSL 9806H Equipment Test Manual

1 Hardware Inspection
1.1 ODC Visual Inspection

Test No. and Test Item


1-1-1 ODC Visual Inspection
Preconditions:
Cabinet is unpacked and lay on the ground.

Test procedure:
1. Check and Verify the Overall ODC appearance
2. Check and Verify the Overall ODC dimension
3. Check and Verify the System Equipment Compartment
4. Check and Verify the Battery Compartment
5. Check and Verify the MDF Compartment
6. Check and Verify the heat exchanging system& ventilation holes
7. Check and Verify the main door lock and the handle system

Acceptance standards:
All the checked part is normal and no destroy/damage.

Test result:
OK NOK NA Viễn thông …………. ZTE Corporation

Comments:

1.2 ODC Power System Inspection

Test No. and Test Item


1-2-1 ODC Power System Inspection
Preconditions:
Cabinet is unpacked and lay on the ground.

Test procedure:
1. Check and Verify the AC cables entry to cabinet
2. Check and Verify the AC circuit breaker
3. Check and Verify the Lightning and surge protectors
4. Check and Verify DC power distribution
5. Check and Verify the DC breaker or fuses
6. Check and Verify the cable entry for the grounding
7. Check and Verify MDF/Equipment earth bar

1
ZXDSL 9806H Equipment Test Manual

Acceptance standards:
All the checked part is normal and no destroy/damage.
All the cables are connected firmly.
Test result:
OK NOK NA Viễn thông ………………. ZTE Corporation

Comments:

1.3 ODC Sensors &Alarms Inspection

Test No. and Test Item


1-3-1 ODC Sensors &Alarms Inspection
Preconditions:
Cabinet is unpacked and lay on the ground.

Test procedure:
1. Check and Verify the door sensors
2. Check and Verify the smoke detector
3. Check and Verify the temperature & humidity sensors
4. Check and Verify flooding Sensor.
5. Check and Verify MDF Alarms part.
Acceptance standards:
All the checked part is normal and no destroy/damage.
All the sensors are fixed firmly.

Test result:
OK NOK NA Viễn thông ………………. ZTE Corporation

Comments:

1.4 ODC optical signal distribution inspection

Test No. and Test Item


1-4-1 ODC optical signal distribution inspection
Preconditions:
Cabinet is unpacked and lay on the ground.

Test procedure:
1. Check and Verify the entry holes for cables
2. Check and Verify the copper cables entry(holes)to cabinet
3. Check and Verify if all jumper fields are located at the front and facing the door

2
ZXDSL 9806H Equipment Test Manual

Acceptance standards:
All the checked part is normal and no destroy/damage.
All the cable connection are normal and firmly.

Test result:
OK NOK NA Viễn thông ………………. ZTE Corporation

Comments:

1.5 MxU Equipment check

Test No. and Test Item


1-5-1 MxU Equipment check
Preconditions:
Cabinet is unpacked and lay on the ground.

Test procedure:
Check and verify MxU equipment hardware appearance
Acceptance standards:
All the checked part is normal and no destroy/damage.
MxU is installed properly and firmly.

Test result:
OK NOK NA Viễn thông ………………. ZTE Corporation

Comments:

3
ZXDSL 9806H Equipment Test Manual

2 Installation
2.1 Installation

Test No. and Test Item


2-1-1 Cabinet installation
Preconditions:
Installation site preparation finished and it is ready for installation.
Cabinet is ready for installation.

Test procedure:
Following standard installation procedure, install the cabinet appropriately.

Acceptance standards:
The cabinet can be installed successfully and the cabinet is fixed firmly.

Test result:
OK NOK NA Viễn thông ………………. ZTE Corporation

Comments:

4
ZXDSL 9806H Equipment Test Manual

3 Equipment power-on test


3.1 Cabinet power-on test

Test No. and Test Item


3-1-1 Cabinet power-on test
Preconditions:
Cabinet is installed appropriately. And it is ready for running.

Test procedure:
Power on cabinet; check every component’s running status, including EPS, power unit (if any), fans (if any).

Acceptance standards:
All of the cabinet components are running normally.

Test result:
OK NOK NA Viễn thông ………………. ZTE Corporation

Comments:

3.2 MxU equipment power-on test

Test No. and Test Item


3-2-1 MxU equipment power-on test
Preconditions:
The cabinet is power on and running normally.

Test procedure:
Power on MxU equipment, and check every cards running status.
Check fans running status.

Acceptance standards:
All the cards are running normally.
The fans are running normally.

Test result:
OK NOK NA Viễn thông ………………. ZTE Corporation

Comments:

5
ZXDSL 9806H Equipment Test Manual

4 Service test (depend on the


configuration of each site, we can test
the line card liked following test cases)
4.1 ADSL service test

Test No. and Test Item


4-1-1 ADSL service test
Preconditions:
1. The networking of the equipment is performed according to Fig 1 Networking Diagram in Section 7.
2. The equipment has been commissioned. The equipment at the uplink network side is normal

Test procedure:
1. Connect ADSL modem to ADSL card by user cable, active/de-active ADSL modem.
2. Establish the PVC channel between the ADSL user board and Modem. The VPI/VCI value at the port side
interconnected with the Modem is corresponding to the VPI/VCI value of PVC in the Modem. The user can access
the Internet normally

Acceptance standards:
1. The modem can be active or de-active normally.
2. In procedure 2, if the network side is normal, the user can access the Internet normally

Test result:
OK NOK NA Viễn thông ………………. ZTE Corporation

Comments:

4.2 FE service test

Test No. and Test Item


4-3-1 FE service test
Preconditions:
1. The networking of the equipment is performed according to Fig 1 Networking Diagram in Section 7.
2. The equipment has been commissioned. The equipment at the uplink network side is normal

Test procedure:
1. Connect LAN switch to FE card by FE cable(copper or fiber), and connect PC to LAN switch.
2. The PC user access internet by PPPOE via LAN switch.
Acceptance standards:
The FE user can access internet successfully.

6
ZXDSL 9806H Equipment Test Manual

Test result:
OK NOK NA Viễn thông ………………. ZTE Corporation

Comments:

4.3 POTS service test

Test No. and Test Item


4-4-1 POTS service test
Preconditions:
1. The networking of the equipment is performed according to Fig 1 Networking Diagram in Section 7.
2. The equipment has been commissioned. The equipment at the uplink network side is normal

Test procedure:
1. Setup the H248/SIP connection between MxU and call control equipment (SS/IMS)
2. Connect telephone to VOIP card by user cable
3. Pick up telephone, check dial-tone.
4. Dial another telephone number, check ring back tone.
5. Make a call with another POTS user, check the call service. Receive a call, check the ring tone, and receive call
service.
6. Pick up the phone again, and dial a busy number, check the busy tone.
Acceptance standards:
1. The H248/SIP connection can be setup normally.
2. The dial tone is normal.
3. The ring back tone is normal.
4. The voice service in the call is normal.
5. The ring tong is normal.
6. The busy tone is normal.

Test result:
OK NOK NA Viễn thông ………………. ZTE Corporation

Comments:

4.4 Triple play service test

Test No. and Test Item


4-6-1 Triple play service test

7
ZXDSL 9806H Equipment Test Manual

Preconditions:
1. The networking of the equipment is performed according to Fig 1 Networking Diagram in Section 7.
2. The equipment has been commissioned. The equipment at the uplink network side is normal

Test procedure:
Connect the test equipments according to the above environment. Where Modem is ADSL2+ modem or VDSL2+ modem
which supports PVC binding to Ethernet port.
On the MxU, configure two VLAN: VLAN1 for IPTV service, VLAN2 for internet service. Create two PVC for the DSL
port: PVC1 and PVC2. Add the uplink port to VLAN1-VLAN2, add PVC1 to VLAN1, PVC2 to VLAN2, And configure
multicast service channel.
On the Modem, bind the Ethernet port which connect STB to PVC1, bind the Ethernet port which connect PC to PVC2.
On the MxU, configure two services to two different priority queue, for example, IPTV to QUEUE2, internet to
QUEUE1, where priority: QUEUE2> QUEUE1.
Make a call from the phone and keep talking, at the same time demand IPTV (HD channel) program from the STB and
download big size file (above 1G bytes) from Internet ( some websites in Viet Nam) on the PC.
Make a call from the phone and keep talking, then demand IPTV (HD channel) program from the STB and keep
watching, at the same time download big size file (above 1G bytes) from Internet on the PC.
Acceptance standards:
, hen demand and watch IPTV program from the STB and download big size file from Internet on the PC, the phone
service should not be affected.
, when download big size file from Internet on the PC, the phone service and IPTV service should not be affected.

Note: for FE user, only test Internet+IPTV service.


Test result:
OK NOK NA Viễn thông ………………. ZTE Corporation

Comments:

8
ZXDSL 9806H Equipment Test Manual

5 Environment Monitoring test


5.1 Temperature sensor test

Test No. and Test Item


5-1-1 Temperature sensor test
Preconditions:
The equipment is commissioned and the networking is performed according to following diagram:

Test procedure:
Check cabinet temperature value from NMS client.
Make temperature alarm. And view temperature alarm from NMS client.

Acceptance standards:
Can get the temperature value from NMS client.
The NMS client can receive the temperature alarm.

Test result:
OK NOK NA Viễn thông ………………. ZTE Corporation

Comments:

5.2 Humidity sensor test

Test No. and Test Item


5-2-1 Humidity sensor test

9
ZXDSL 9806H Equipment Test Manual

Preconditions:
The equipment is commissioned and the networking is performed according to following diagram:

Test procedure:
Check cabinet humidity value from NMS client.
Make humidity alarm. And view humidity alarm from NMS client.

Acceptance standards:
Can get the humidity value from NMS client.
The NMS client can receive the humidity alarm.

Test result:
OK NOK NA Viễn thông ………………. ZTE Corporation

Comments:

5.3 Water sensor test

Test No. and Test Item


5-3-1 Water sensor test
Preconditions:
The equipment is commissioned and the networking is performed according to following diagram:

10
ZXDSL 9806H Equipment Test Manual

Test procedure:
View the water alarm when the water sensor is soaked in the water.

Acceptance standards:
The NMS client can get the water alarm successfully.

Test result:
OK NOK NA Viễn thông ………………. ZTE Corporation

Comments:

5.4 Smoke sensor test

Test No. and Test Item


5-4-1 Smoke sensor test
Preconditions:
The equipment is commissioned and the networking is performed according to following diagram:

Test procedure:
View the smoke alarm when there is smoke around smoke sensor.

Acceptance standards:
The NMS client can get the smoke alarm successfully.

Test result:
OK NOK NA Viễn thông ………………. ZTE Corporation

Comments:

11
ZXDSL 9806H Equipment Test Manual

5.5 Door alarm test

Test No. and Test Item


5-5-1 Door alarm test
Preconditions:
The equipment is commissioned and the networking is performed according to following diagram:

Test procedure:
Observe the alarm when door is opened or closed.

Acceptance standards:
The NMS client can get the door open alarm successfully. And after the door is closed, the door open alarm is
disappeared.

Test result:
OK NOK NA Viễn thông ………………. ZTE Corporation

Comments:

12
ZXDSL 9806H Equipment Test Manual

6 Additional Test
6.1 ADSL2+ Rate and distance Test

Test No. and Test Item


ADSL2+ Rate and distance Test
Preconditions:
1. The networking of the equipment is performed according to Fig 1 Networking Diagram in Section 7.
2. The equipment has been commissioned. The equipment at the uplink network side is normal

Test procedure:
1. Connect ADSL modem to ADSL card by user cable, active/de-active ADSL modem.
2. Configure adsl profile to fast mode, no rate limit and apply to the tested port.
3. Check the ADSL port bit rate at distance 1km 1.5km 3km 5km.
4. Use FTP client to download file from internal and external network sit and record the download rate.(*)
Notes:
(*) For the download rate, we can use FTP client to download from FTP server the client can show the download rate,
The test cable diameter is 0.4mm
Acceptance standards:
1. The modem can be active or de-active normally.
2. In procedure 3, internet and IPTV (SD and HD) service can reach to 1.5km distance and internet service can reach
to 5km.
3. the download speed of user just can reach 80% of warranty rate for internal network and 60% of warranty rate for
external network

Row Distances (km) 1 1.5 3 5


A Warranty Rate (Mbps) 20 15 5 1
B Test Rate for Internal server (Mbps)
C Test Rate for External server (Mbps)
D Internal Ratio (b/a)
E External Ratio (c/a)
Result OK/ OK/ OK/ OK/
NOK NOK NOK NOK

13
ZXDSL 9806H Equipment Test Manual

Note:
- Warranty Rate (Mbps): Maximum rate can be provide via ADSL line at a specific distance.
- Test Rate for Internal server (Mbps): To use FTP client to download file from inernal or external server, and
record the download speed. The client shows the download speed
- Test Rate for External server (Mbps): To use FTP client to download file from inernal or external server, and
record the download speed. The client shows the download speed
- Internal Ratio (%): Expected result >=80%
- External Ratio (%): Expected result >=60%

Test result:
OK NOK NA Viễn thông ………………. ZTE Corporation

Comments:

6.2 Triple play QOS Test

Test No. and Test Item


Triple play QOS Test
Preconditions:
1. The networking of the equipment is performed according to Fig 1 Networking Diagram in Section 7.
2. The equipment has been commissioned. The equipment at the uplink network side is normal

Test procedure:
1. Connect ADSL modem to ADSL card by user cable, active/de-active ADSL modem.
2. Configure three different VLAN and PVC for triple play services:
for VOIP: use VLAN1 and PVC1, set priority to 7
for HSI: use VLAN2 and PVC2, set priority to 0
for IPTV: use VLAN3 and PVC3, set priority to 5
3. Run the triple play service:
for VOIP service : use phone to make a phone from IMS server and keep talk.
for IPTV service: use STB to get HD IPTV program. The program bandwidth about 8M
For HSI service: use PC to download file from FTP server
4. Limit the port rate to 15M and check triple play services
5. Limit the port rate to 10M and check the triple play services
6. Limit the port rate to 3M and check the triple play services
Acceptance standards:
1. The modem can be active or de-active normally.
2. In procedure 4, VOIP、IPTV and HSI services work normally
3. In procedure 5, VOIP、IPTV services work normally, but HSI service had been affect
4. In procedure 5, VOIP service work normally, but IPTV and HSI service had been affect

14
ZXDSL 9806H Equipment Test Manual

Test result:
OK NOK NA Viễn thông ………………. ZTE Corporation

Comments:

6.3 VPN service Test

Test No. and Test Item


VPN service Test
Preconditions:
1. The networking of the equipment is performed according to Fig 2 Networking Diagram in Section 7.
2. The equipment has been commissioned. The equipment at the uplink network side is normal

Test procedure:
1. Connect ADSL modem to ADSL card by user cable, active/de-active ADSL modem.
2. Configure adsl line profile to fast mode
3. Use traffic generator to send packet and record the packet loss ratio, delay and jitter. (CPE1 pings CPE2 : CPE1-
MxU-CPE2 )

Acceptance standards:
1. The modem can be active or de-active normally.
2. In procedure 2,the packet loss ration below 2x7.6x10-5 ,delay below 2x9ms and jitter below 2x4ms .
Note: For loop length < 1km, the test rate is around 1Mbps/20Mbps for upstream and downstream
Test result:
OK NOK NA Viễn thông ………………. ZTE Corporation

Comments:

6.4 ADSL2+ compatibility Test

Test No. and Test Item


6.5 ADSL2+ compatibility Test
Preconditions:
1. The networking of the equipment is performed according to Fig 1 Networking Diagram in Section 7.
2. The equipment has been commissioned. The equipment at the uplink network side is normal

15
ZXDSL 9806H Equipment Test Manual

Test procedure:
1. Connect ADSL modem to ADSL card by user cable, active/de-active ADSL modem.
2. Configure adsl profile to fast mode, no rate limit and apply to the tested port.
3. Check the bit rate for downstream and upstream
4. Change modem to TP-LINK (T8817) and Planet, Huawei, Goldtel types
5. Check the bit rate for downstream and upstream again.

Acceptance standards:
1. The modem can be active or de-active normally.
2. In procedure 3,5, all modem can work ok.

Test result:
OK NOK NA Viễn thông ………………. ZTE Corporation

Comments:

16
ZXDSL 9806H Equipment Test Manual

7 Note:
Test Equipment
No. Name Quantity Configurations
1 Cabinet 1 set The server and INTERNET are connected.
2 MxU 1 set Support link aggregation
3 CPE Several Include ADSL/ADSL2+ /VDSL2, LAN switch.
4 PC Several Used for service simulation, FTP or streaming
5 POTS phone 4 set Used for VOIP function test.
6 STB 1 set Used for triple-play test
7 TV 1 set Used for triple-play test
8 Voltage meter 1 set Measure the power voltage

Test Networking

Fig.1 Networking Diagram of Acceptance Test

17
ZXDSL 9806H Equipment Test Manual

Fig.2 Networking Diagram of Acceptance Test

18