Material
Tank Bottom & Roof Plate Shop Fabrication Physical Progress Received
at Shop
GA Quantity
Item Description Man hour Weighting 5%
Drawing (KG)
1 DWG-01 GA Drawing Tank Bottom 5320 250 0.179 100%
2 DWG-02 GA Drawing Tank Roof 2769 200 0.143 100%
Material
Tank Shell Plate Shop Fabrication Physical Progress Received
at Shop
GA Quantity
Item Description Man hour Weighting 5%
Drawing (KG)
1 DWG-03 GA Drawing Shell Plates 5850 350 0.250 100%
Material
Tank Accessories and Fittings Shop Fabrication Physical Progress Received
at Shop
GA Quantity
Item Description Man hour Weighting 5%
Drawing (KG)
1 DWG-04 GA Drawing Tank Platform and Handr 680 130 0.093 100%
2 DWG-05 GA Drawing Spiral Stairways 520 120 0.086 100%
3 DWG-06 GA Drawing Rolling Ladder & Rails 670 125 0.089 100%
4 DWG-07 GA Drawing Tank Internal Accessorie 550 125 0.089 100%
5 DWG-08 GA Drawing Shell and Roof Nozzles 160 100 0.071 100%
Developed by Toolbox4Planning
Learn more at http://www.toolboxforplanning.com
Progress Status Sheet-External Floating Tank Shop Fabrication
Shop
Marking ,
Blasting &
Cutting/ Final Shop Delivery at
Primer
Weld Edge Inspection site
Coating (If
Finishing
required)
Individual Overall
25% 50% 15% 5% Blank
Progress Progress
100% 100% 100% 100% 100% 17.9%
100% 100% 100% 100% 100% 14.3%
Shop Marking,
Blasting & Cutting/
Final Shop Delivery at
Primer Shaping &
Inspection site
Coating (If Weld Edge
required) Finishing
Individual Overall
15% 60% 15% 5% Blank
Progress Progress
100% 100% 100% 100% 100% 25.0%
Welding Blasting
Full Weld Final Delivery
Preparation Painting/
Done Inspection at site
Complete Galvanised
Individual Overall
35% 35% 15% 5% 5%
Progress Progress
100% 100% 100% 100% 100% 100% 9.3%
100% 100% 100% 100% 100% 100% 8.6%
100% 100% 100% 100% 100% 100% 8.9%
100% 100% 100% 100% 100% 100% 8.9%
100% 100% 100% 100% 100% 100% 7.1%
100.0%
Developed by Toolbox4Planning
Learn more at http://www.toolboxforplanning.com
GA
Assembly
Item Drawing Description Drawing Member Type
Drawing
No
GA
Assembly
Item Drawing Description Drawing Member Type
Drawing
No
GA
Assembly Member/Fitting
Item Drawing Description Drawing
Drawing Type
No
Tank Bottom & Roof Plate Shop Fabrication Progress Summary by Quantity
GA
Material Received
Item Drawing Description Drawing Weight (Kg)
at Shop
No
GA
Material Received
Item Drawing Description Drawing Weight (Kg)
at Shop
No
Developed by Toolbox4Planning
Learn more at http://www.toolboxforplanning.com
Progress Updating Section- Bottom Plates & Roof Plates
Fabrication Material Shop Blasting & Marking ,
Final Shop
Member No Weight (Kg) Finished Received Primer Coating Cutting/Weld
Inspection
Date at Shop (If required) Edge Finishing
Developed by Toolbox4Planning
Shop Learn more at http://www.toolboxforplanning.com
Marking ,
Blasting &
Cutting/ Weld Final Shop Delivery at
Primer
Edge Inspection site
Coating (If
Finishing
required)
100% 100% 100% 100%
100% 100% 100% 100%
Shop Marking,
Blasting & Cutting/
Final Shop Delivery at
Primer Shaping &
Inspection site
Coating (If Weld Edge
required) Finishing
100% 100% 100% 100%
Welding Blasting
Full Weld Final
Preparation Painting/ Delivery at site
Done Inspection
Complete Galvanised
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
Progress Calculation Section
Shop Marking,
Delivery at Material Blasting & Cutting/ Weld Final Shop Delivery at
site Received Primer Edge Inspection site
Coating Finishing
13-Jan-13 450 450 450 450 450
13-Jan-13 450 450 450 450 450
13-Jan-13 450 450 450 450 450
13-Jan-13 450 450 450 450 450
13-Jan-13 450 450 450 450 450
14-Jan-13 400 400 400 400 400
14-Jan-13 400 400 400 400 400
14-Jan-13 400 400 400 400 400
14-Jan-13 400 400 400 400 400
14-Jan-13 400 400 400 400 400
15-Jan-13 350 350 350 350 350
15-Jan-13 200 200 200 200 200
15-Jan-13 200 200 200 200 200
15-Jan-13 320 320 320 320 320
16-Jan-13 450 450 450 450 450
16-Jan-13 450 450 450 450 450
16-Jan-13 459 459 459 459 459
16-Jan-13 380 380 380 380 380
16-Jan-13 380 380 380 380 380
16-Jan-13 380 380 380 380 380
16-Jan-13 90 90 90 90 90
16-Jan-13 90 90 90 90 90
16-Jan-13 90 90 90 90 90
Marking,
Shop
Cutting/
Delivery at Material Blasting & Final Shop Delivery at
Shaping &
site Received Primer Inspection site
Weld Edge
Coating
Finishing
17-Jan-13 450 450 450 450 450
17-Jan-13 450 450 450 450 450
17-Jan-13 450 450 450 450 450
17-Jan-13 450 450 450 450 450
17-Jan-13 450 450 450 450 450
17-Jan-13 450 450 450 450 450
17-Jan-13 450 450 450 450 450
17-Jan-13 450 450 450 450 450
17-Jan-13 450 450 450 450 450
17-Jan-13 450 450 450 450 450
18-Jan-13 450 450 450 450 450
18-Jan-13 450 450 450 450 450
18-Jan-13 450 450 450 450 450
Welding
Material Blasting
Final Preparatio Full Weld Final Delivery at
Delivery at site Received Painting/Gal
Inspection n Done Inspection site
at Shop vanised
Complete
25-Jan-13 26-Jan-13 70 70 70 70 70 70
25-Jan-13 26-Jan-13 70 70 70 70 70 70
25-Jan-13 26-Jan-13 50 50 50 50 50 50
25-Jan-13 26-Jan-13 50 50 50 50 50 50
25-Jan-13 26-Jan-13 70 70 70 70 70 70
25-Jan-13 26-Jan-13 70 70 70 70 70 70
25-Jan-13 26-Jan-13 100 100 100 100 100 100
25-Jan-13 26-Jan-13 100 100 100 100 100 100
25-Jan-13 26-Jan-13 50 50 50 50 50 50
25-Jan-13 26-Jan-13 50 50 50 50 50 50
30-Jan-13 31-Jan-13 140 140 140 140 140 140
30-Jan-13 31-Jan-13 140 140 140 140 140 140
30-Jan-13 31-Jan-13 140 140 140 140 140 140
30-Jan-13 31-Jan-13 50 50 50 50 50 50
30-Jan-13 31-Jan-13 50 50 50 50 50 50
3-Feb-13 4-Feb-13 250 250 250 250 250 250
3-Feb-13 4-Feb-13 70 70 70 70 70 70
3-Feb-13 4-Feb-13 70 70 70 70 70 70
3-Feb-13 4-Feb-13 280 280 280 280 280 280
7-Feb-13 8-Feb-13 70 70 70 70 70 70
7-Feb-13 8-Feb-13 70 70 70 70 70 70
7-Feb-13 8-Feb-13 70 70 70 70 70 70
7-Feb-13 8-Feb-13 70 70 70 70 70 70
7-Feb-13 8-Feb-13 70 70 70 70 70 70
7-Feb-13 8-Feb-13 200 200 200 200 200 200
7-Feb-13 8-Feb-13 90 90 90 90 90 90
7-Feb-13 8-Feb-13 70 70 70 70 70 70
www.toolboxforplanning.com
Annular Plate
Rectangular Plate
Sketch Plate
Handrail
Ladder
Vertical Bracing
Horizontal Bracing
Column
Staircase/way
Shell-1st Course
Shell-2nd Course
Shell-3rd Course
Shell-4th Course
Shell-5th Course
Center Deck Plate
Rail Track
Pontoon Plate
Pontoon Stiffener
Pontoon Leg
Center Deck Leg
Gauge Pole
Shell Nozzles
Roof Nozzles