Sie sind auf Seite 1von 1

F-D F-C F-B F-A F-1 F-2 F-3 F-4 F-5 F-6 F-7 F-8 F-9 -

-
MULTI-LEVEL CARPARK STAGE 1:
EX. OWNER PAVILION BUILDING
UNDER CONSTRUCTION
-
1. CONSTRUCT THE CONCRETE PORTAL ACCORDING TO CONTRACT DRAWINGS
WITH RECESS OF 2 NOS. OF VERTICAL HOLES AT 32mm DIAMETER AS SHOWN.
2. CONSTRUCT THE PLINTHS AND INSTALL THE NECESSARY BRIDGE BEARINGS TO
ENSURE THE FOOTBRIDGE SEGMENT IS TEMPORARILY FIXED AT DESIGNED
ELEVATION.

2/F
EX. ROOF

+13.400

EX. GROUND +6.00

- 1st BD SUBMISSION EW RL WS DEC 2019

STAGE 1

F-D F-C F-B F-A F-1 F-2 F-3 F-4 F-5 F-6 F-7 F-8 F-9

MULTI-LEVEL CARPARK
UNDER CONSTRUCTION STAGE 2:
EX. OWNER PAVILION BUILDING

1. LIFT THE 1ST SEGMENT OF THE FOOTBRIDGE BY MOBILE CRANE TO THE


1000 DESIGNED ELEVATION AND TEMPORARY HOLD AT DESIGNED POSITION AND
ELEVATION BY PLINTHS AND BRIDGE BEARINGS.
2. INSTALL THE TEMPORARY STRESSING ROD SYSTEM WITH SUFFICIENT
PRELOADING AXIAL FORCE TO ENSURE ADEQUATE FACTOR OF SAFETY FOR THE
TEMPORARY HOLDING OF THE 1ST SEGMENT IN TERMS OF STABILITY AND
STRUCTURAL CAPACITY.

2/F
EX. ROOF

+13.400

6
DD205

EX. GROUND +6.00

SHATIN RACE COURSE, MME AND


CAR PARK REDEVELOPMENT, N.T.

STAGE 2

F-D F-C F-B F-A F-1 F-2 F-3 F-4 F-5 F-6 F-7 F-8 F-9
FOOTBRIDGE -
STAGE 3: CONSTRUCTION SEQUENCE
MULTI-LEVEL CARPARK
ON-SITE FULL
EX. OWNER PAVILION BUILDING PENETRATION
BUTT WELD
UNDER CONSTRUCTION

1. LIFT AND INSTALL THE 2ND SEGMENT OF THE FOOTBRIDGE TO THE DESIGNED
(SHEET 1 OF 1)
ELEVATION.
2. CONNECT THE 1ST AND 2ND SEGMENTS BY MEANS OF FULL PENETRATION BUTT
WELDS. EW DEC 2019
3. CARRY OUT NECESSARY INSPECTION (ULTRASONIC TEST, MAGNETIC PARTICLE RL DEC 2019
INSPECTION AND VISUAL INSPECTION, ETC) TO VERIFY THE INTEGRITY OF THE WS DEC 2019
SPLICES BEFORE REMOVAL OF TEMPORARY STRESSING ROD SYSTEM.
4. REMOVE ANY TEMPORARY SYSTEM HOLDING THE FOOTBRIDGE. 5149308 DEC 2019
5. FILL THE 32mm DIAMETER RECESSES WITH NON-SHRINK GROUT. THE
NON-SHRINK GROUT SHALL ATTAIN MIN. 45Mpa AT ITS 28-DAYS COMPRESSIVE STR-C160367-STRC-SK001
2/F
EX. ROOF
STRENGTH.
6. INSTALL THE REMAINING PARTS OF THE FOOTBRIDGE PER CONTRACTOR 1:100 A1
+13.400 PROPOSAL.

STR-C160367-STRC-SK001 -
6
DD205

EX. GROUND +6.00

STAGE 3 Buildings Department

NOTE:
1. THE CONTRACTOR SHALL SUBMIT DETAILED METHOD STATEMENT WITH DESIGN CHECK TO PROPOSED SYSTEM REGARDING THE ERECTION WORKS AND APPROVED BY THE ARCHITECT AT LEAST
1 MONTH PRIOR OF ACTUAL COMMENCEMENT OF SUCH WORKS. THE LOCATION OF SPLICES SHALL BE APPROVED BY THE ARCHITECT.
2. THE CONTRACTOR SHALL PROPOSE AT ITS SATISFACTION TO THE ARCHITECT THE PORTION PREFABRICATED WORKS BEFORE LIFTING WORKS.
3. THE CONTRACTOR IS PERMITTED TO PROPOSE AND SUBMIT ALTERNATIVE METHOD OF ERECTION TO THE SATISFACTION OF THE ARCHITECT. REQUIREMENTS PLEASE REFERS TO NOTE 1.

C:\Users\kwok4172\OneDrive Corp\OneDrive - Atkins Ltd\Desktop\Work Folder\New folder (92)\STR-C160367-STRC-SK001.dwg ISO full bleed A1 (841.00 x 594.00 MM) 1:1000 20200610 9:31 AM

Das könnte Ihnen auch gefallen