Sie sind auf Seite 1von 1

[April-16] UNIT-IV

[EIRME-843]
7. Explain in detail the steps involved in building the house of quality 12
Integrated Dual Degree (B.Tech.+M.Tech.) Examination
OR
Mechanical Engineering 8. A manufacturer who makes speedometer cable easing for cars know
VIII SEMESTER that the shrinkage of the casings can be a problem. Ideally, the
TOTAL QUALITY MANAGEMENT shrinkage must be zero. When the shrinkage exceeds 15% about 50%
(Effective from the admitted batch 2012–13) of the customers complain. When the customers does complain, the
Time: 3 Hours Max.Marks: 60 average cost of replacing the casing is ` 80.00 (i) establish the quality
--------------------------------------------------------------------------------------------- loss function (ii) the rework cost at the end of production line is ` 8.00
Instructions: Each Unit carries 12 marks.
per piece. What is the realistic production tolerance of the shrinkage?
Answer all units choosing one question from each unit.
All parts of the unit must be answered in one place only.
(iii) in the data below, material A and B have different shrinkage
Figures in the right hand margin indicate marks allotted. properties for both materials cost the same which of them is the better
------------------------------------------------------------------------------------------------------ materials. 12
Material Data
UNIT-I A 0.28 0.24 0.33 0.3 0.18 0.26 0.24 0.33
1. a) What are the benefits of Complementing TQM? 6 B 0.08 0.12 0.07 0.03 0.09 0.06 0.05 0.03
b) Discuss about the concept of quality thinking 6
UNIT-V
OR
9. a) What are the Management’s responsibility in ISO? 6
2. List down the various variable charts and their formulae 12
b) Explain the process of internal auditing in ISO 6
UNIT-II
OR
3. Explain six basic concepts of TQM 12
10. a) Explain the process of implementation of ISO 9000 to a
OR manufacturing organization 6
4. Explain the barriers to TQM implantation 12 b) Discuss the various quality costs associated in process industries 6

UNIT-III [08/VIII S/316]


5. Explain in detail the steps involved in the construction of process
decision program chart utility with an example and its applications 12
OR
6. a) Define benchmarking. What are the advantages of bench marking 6
b) List the steps involved in the bench marking process 6

Das könnte Ihnen auch gefallen