SJVN Ltd Arun-3 HEP Part-2 Employer’s Requirements

PART-2

SECTION- V EMPLOYER’s REQUIREMENTS

Section V.1 Project Profile & Drawings

Section V.2 Scope of Works

Section V.3 Planning, Design, Engineering & General Requirements(PDE)

Section V.4 Civil Work Requirements

Section V.5 Hydro-Mechanical Work Requirements

Section V.6 Electro-Mechanical Work Requirement

Section-V.2 Scope of Works EPC/Turnkey Basis (Dec 2019, Ver1.0) Page 1


SJVN Ltd Arun-3 HEP Part-2 Employer’s Requirements

SECTION- V EMPLOYER’s REQUIREMENTS

Section V.2 Scope of Works

Section-V.2 Scope of Works EPC/Turnkey Basis (Dec 2019, Ver1.0) Page 2


SJVN Ltd Arun-3 HEP Part-2 Employer’s Requirements

Table of Contents
Sr. No. CONTENTS Page No.

1 General

2 Civil Works

3 Electro-Mechanical & Hydro-Mechanical works

3.1 Electro-Mechanical Equipment

3.2 Hydro-Mechanical Steel Structure

Appendix- D1 Scope for Planning, Design and Engineering Services

Appendix-CW1 Scope of Civil Works

Appendix-EM1 Scope of EM Works (Supply)

Appendix-HM1 Scope of HM Works (Supply)

Appendix-EM/HM-1 Scope of Services for EM/HM Works

Section-V.2 Scope of Works EPC/Turnkey Basis (Dec 2019, Ver1.0) Page 3


SJVN Ltd Arun-3 HEP Part-2 Employer’s Requirements

SCOPE OF WORKS
1. GENERAL:
The main works to be executed for the Arun-3 Hydro Electric Project 900MW (4x225MW) on
EPC/Turnkey basis (Project as a whole), according to the General Layout, include, but not
restricted to the following elements:

2. Civil Works

(Civil works scope to be elaborated)

3. Electro-Mechanical and Hydro-Mechanical Works


The Electro-Mechanical and Hydro-Mechanical works to be supplied under this contract are as set
out below. The works under this contract includes, but not limited to, the following list:

3.1 Electro-Mechanical woks:

3.2 Hydro –Mechanical works:

(Hydro-Mechanical works to be elaborated)

Any other Work/equipment required for meeting the functional requirements of the Plant are within
the scope of this proposal;

The detail scope of works for each services/works envisaged in the Contract is provided in the
following Appendices viz.

1. Appendix- D-I Detailed scope of Planning, Design & Engineering services.


2. Appendix- D-II Supply of Drawings, Reports etc.
3. Appendix-CW 1 Scope of Works - Civil Works
4. Appendix EM-1 Scope of Works – EM (Supply)
5. Appendix HM-1 Scope of Works - HM (Supply)
6. Appendix EM/HM-1 Scope of Works – EM/HM (Services, Erections etc.)

Section-V.2 Scope of Works EPC/Turnkey Basis (Dec 2019, Ver1.0) Page 4