Daya Saing Infrastruktur Indonesia
Dibandingkan Negara Lain
Indeks Daya Saing Global
Indonesia (GCI)
YEAR RANK
2010 – 2011 44
2011 – 2012 46
2012 – 2013 50
2013 – 2014 38
2014 – 2015 34
2015 – 2016 37
2016 – 2017 41
INDEX DAYA SAING INFRASTRUKTUR
2017 – 2018 36 (2ND PILLAR) INDONESIA
2018 – 2019 45
6
Why BIM
McLeamy Curve
BIM Aids Process, But Further
Promise Lies in Interoperability
https://thebimhub.com/2015/06/22/bim-
aids-process-but-further-promise-lies-in-
inter/#.XZr-UkYzaUk
7
8
SEJARAH BIM
(Building Information Modelling)
9
DEFINISI BIM
(Building Information Modelling)
Building Information Modelling (BIM) is a digital representation of physical and functional characteristics of a facility. A BIM is a
shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle; defined as
existing from earliest conception to demolition.
B I M → B E T T E R I N F O R M AT I O N M AN A G E M E N T
Sumber: "Frequently Asked Questions About the National BIM Standard-United States - National BIM Standard - United States". Nationalbimstandard.org.
Archived from the original on 16 October 2014. Retrieved 17 October 2014.
10
KARAKTERISTIK BIM
(Building Information Modelling)
3
Prinsip BIM terletak pada proses
pembuatan model dan data secara
bersamaan dan dikolaborasikan antar
pada pelaku sejak proses perencanaan,
Sumber: Panduan Adopsi BIM dalam Organisasi, Tim BIM PUPR. 2018
perancangan, fabrikasi hingga
pembangunan dan pemeliharaan
11
TINGKAT IMPLEMENTASI
(Maturity Level)
Level 0 Level 1
• 2D CAD untuk • 2D dan 3D
penggambaran pada Pekerjaan
dan desain
dokumentasi konseptual.
(drafting).
Level 3 Level 2
• Sistem BIM • Sudah bekerja
sudah dengan sistem
terintegrasi. BIM.
Sumber: Panduan Adopsi BIM dalam Organisasi, Tim BIM PUPR. 2018; UK BIM Roadmap
12
IMPLEMENTASI BIM DALAM KONSTRUKSI
Information obtained from BIM based on the functions
Structure Time Cost Energy O&M
3D
4D 5D 6D 7D
3D Building data &
Information Project Schedule & Work Breakdown Energy analysis Building Life Cycles
Project Scope Phasing Structures BIM as built data
Green Building Element
Prefabrication Just in Time schedule Conceptual Cost Planning
Green Building certification BIM cost operation&
Structural Detailing Installation schedule Quantity Take off Tracking Maintenance
Object Specification Payment Approval Trade Verification Green Building Point BIM Digital lease planning
Field layout & civil data Last Planner schedule Value Engineering tracking.
K3 Konstruksi Critical Point Prebarication
PRE DESIGN SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENT CONSTRUCTION STAGE AS BUILT
PERMASALAHAN PERMASALAHAN
MASA LALU DAN SAAT INI YANG AKAN DATANG
15
TEROBOSAN UNTUK MEMPERCEPAT PEMBANGUNAN INFRASTRUKTUR
Pendanaan Inovatif
Kepemimpinan
16
ROADMAP INDUSTRI KONSTRUKSI 4.0
KOLABORASI
1. Standar kolektif dan kolaborasi industri konstruksi INDUSTRI
2. Implementasi Virtual Design dan Lean Construction KONSTRUKSI 4.0
(VDC)
3. Implementasi Building Information Modelling (BIM) (3D
s.d. 7D)
DIGITALISASI
1. Perizinan (e-submission)
2. E-procurement
3. E-monitoring & e- supervisi
4. Pasar digital sektor konstruksi (library data)
INTEGRASI
1. Implementasi Cloud Construction
ADOPSI Management
1. Adopsi BIM oleh seluruh 2. Integrasi sistem proses konstruksi
Stakeholders (perizinan, claim, commisioning,
2. Standar BIM Nasional (SNI) handover, dll)
3. Standar kurikulum dan kompetensi
BIM untuk universitas dan profesi
17
LAMPIRAN IV PERATURAN MENTERI PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR 22/PRT/M/2018
TENTANG PEDOMAN PEMBANGUNAN BANGUNAN GEDUNG NEGARA
KEGIATAN DAN TUGAS PENYEDIA JASA KONSTRUKSI A. PENYEDIA JASA PERENCANAAN KONSTRUKSI no. 13
18
BIM SUCCESS STORY DI INDONESIA
(Building Information Modelling)
Aceh:
Manado:
Bendungan Rukoh
Jalan Tol Manado- Bitung
Deli Serdang:
Bendungan Lau Simeimei Maluku:
Batam: Bendungan Way APu
Masjid Agung Kota Batam
Jayapura:
Aquatic PON 2020
Volley Field
Istora Papua
Kalimantan Selatan:
Bandara Syamsudin Noor
Padang:
Pengendali Banjir Kuranji Bandung:
Rumah Sakit Khusus Ibu & Anak Kendari:
Banten: Jembatan teluk Kendari
Lampung:
Runway 3A Soetta Kabupaten Wajo:
Bendungan Margatiga
Bendung D.I. Gilireng
Bendungan Way Sekampung
Solo, Jawa Tengah:
Stadion Manahan Solo
NTB:
Bandara Adi Sumarmo
Purworejo: Bendungan Gilimas
Ciamis: Bendungan Bener NTT:
DKI Jakarta: Bendungan Leuwikeris
Gedung Bappenas Wonogiri: Karangayar: Bendungan Temef
Subang: Bendungan Jlantah
Apartemen Pasar Rumput Waduk Pidekso Kabupaten Sampang:
Dermaga Patimban DIY:
Jembatan Penghubung Pulau 2A Pengendali Banjir Kali Kemuning
Proyek Jakarta - Cikampek Selatan Proyek Tol Cimanggis-Cibitung-Cilincing Kantor OJK Solo & Yogyakarta 19
BIM Level 1 by Wijaya Karya
TERIMA KASIH
BIM Level 2 by Adhi Karya
TERIMA KASIH
31
32
33
34
35
36
37
38
39
KESIMPULAN
• Stay UPDATE dan KUASAI IT, trend kedepan berbasis Internet of Things (IoT)
seperti Robotics dan Otomasi (Konstruksi Digital)
40
PERAN IMTSI/HMS (?)
Pelatihan
Pengabdian Masyarakat
41