Beruflich Dokumente
Kultur Dokumente
km 58.603 to
km 58.853 (existing Chainage Km 59.420 to Km 59.650), from Design Chainage Km 61.630 to Km 63.950 (existing Chainage Km 62.630 to
Km 65.000) and new construction of 2-lane with paved shoulders Chamba Bypass of design length 2.035 Km including 440 m long tunnel
on EPC Mode under improvement to NH Connectivity to Chardham in the State of Uttarakhand.