Document S.S.

SUBSOIL PIPE (shallow installation, e.g: field, golf course)

Depending on the serviceability level of the network required and the level of
maintenance capability the designer can opt for the construction details as
depicted below:

Standard Bedding

Type 1: (Stadium field)

top soil varies

sand
backfill 150mm min
single size
aggregate
initial backfill
HDPE
perforated haunching
corrugated
pipe bedding 50mm
OD+300mm

Type 2: (soggy after rainstorm tolerable)

top
varies
soil

sand
backfill 150mm min

geotextile
membrane
filter initial backfill

HDPE haunching
perforated
corrugated
pipe
bedding OD+300mm 50mm
Method of Statement

1. Trenching- excavate trench to recommended width, pipe alignment and


invert.
2. Lay bedding with specified material and level.
3. Lay HDPE double wall pipe and place haunching material ensuring gap
between pipe and bedding is filled up haunching material.
4. Place initial backfill and compact
5. Backfill trench with selected material.
Document S.S.2

SUBSOIL (Deeper, e.g: retaining wall)

Method of Statement

1. Trenching- excavate trench to recommended width, pipe alignment and


invert.
2. Lay bedding with specified material and level.
3. Lay HDPE double wall pipe and place haunching material ensuring gap
between pipe and bedding is filled up haunching material.
4. Place initial backfill and compact
5. Backfill trench with selected material.
6. Shoring/sheet piling to be provided if necessary.

top soil varies

sand
backfill 150mm min
single size
aggregate
initial backfill
HDPE
perforated haunching
corrugated
pipe bedding 50mm
OD+300mm
Document C.P.1

CABLE PIPE INSTALLATION

Method of Statement

1. Trenching- excavate trench to recommended width, pipe alignment and


invert.
2. Lay bedding with specified material and level.
3. Lay HDPE double wall pipe and place haunching material ensuring gap
between pipe and bedding is filled up haunching material.
4. Place initial backfill and compact
5. Backfill trench with selected material.

sand backfill 150mm min

initial backfill
HDPE
perforated haunching
corrugated
pipe bedding 50mm
OD+300mm
Standard Bedding
Method of Installation

Important to strap the sealant ring to the pipe.


Clean the internal wall of fittings and external wall of pipe
Applying lubricant
Push the pipe
Document S.P.1

SEWER INSTALLATION

Method of Statement

1. Trenching- excavate trench to recommended width, pipe alignment and


invert.
2. Lay bedding with specified material and level.
3. Lay HDPE double wall pipe and place haunching material ensuring gap
between pipe and bedding is filled up haunching material.
4. Place initial backfill and compact
5. Backfill trench with selected material.
6. Shoring/sheet piling to be provided if necessary.

top soil varies

sand
backfill 150mm min
single size
aggregate
initial backfill
HDPE
perforated haunching
corrugated
pipe bedding 50mm
OD+300mm