Certificate
PERFORMANCE TESTING
RECORO REVIEW POINT is a recordinS operation in the operation / production cycle marked by
the Al/Customer/TPl. Record of inspedion is maintained and will be made available to
Al/Customerf[Pl for review during next HOIo/WITNESS stage lnspedion,es applicable-
HOLD POINT is defined asa verificatjon ofthe operation bythe requestinS authority
Al,Customer/TPl.Further processinS is prohibited until acceptance of the operation &
ii+ttt
9h- TPI. THIRO PARTY INSPECTION
1 Performance testing will be carried out using Vfo panel. 154894 is used lor performance testint-Air Flow vs Pressure & Power
2 1SO14694 i3 uied lor vibration level acceptance. l3.8mm/s pk-pk for rigld mounting, 5.1mm/i pk-pk for flexible mountint).
Vlbratlon is measured at sgurce of orlgln l.e. on bearin8s fgr belt driven / cgupled driven blowers and on motor for dlrect drlven blgwers.
3 Bearlng temperatre rlse upto 50 Deg.C, is acceptable.
4 Sound Power level limlt wlll be as mentioned ln approved GA. { 2.3 dBA electrlcal nolse and shop floor noise i5 tenerally observed ln addltlon to
blower nolse). Sound Power level will be measured in lnlet and outlet closed condltlon.
5 Final painting is Seherally done after inspectlon and after recelpt ofdispatch clearance to avold handllng damage to palnting.
5 lncaseofquantitymorethanoneforsamebiower,performancetestingwillbedoneforoneblowerandmechanlcalruitestfgrrertgf
the blowers,
7 For fans with motor ratinS above 100 HP ( 75 Xw ) , the performance test wlll be conducted under derated condition - under lgw RPM
& fan curve ( at desi8n speed ) will be arrlved ai perlan lawr ror RPM correctlon.
8 power aeadlngs can not be compared for test under deaated conditlgn ( due to voltage varlatlon ) and
theoretlcal power curve wlll be consldered for reference.