Phalaborwa - ZBS Upgrade Project

JOB CARD
Company

Area

Job Card Date


Activity Description
Job Card No.
Exact Location:

Hours HIRA Ref


Act. Plan Plan Budget Today's Time % Work SWP
DFL Men Spent to Name/s Start Time
No. Start Finish Hrs Hrs Finish Complete Complete
Date No.

Remarks: Recommendation/s:

Sup.Signed off: Foreman Signed off:


SAFE WORK PROCEDURE
COMPANY:

REV. No.

TYPE OF WORK : OPERATING CASE 580 WITH HYDRAULIC HAMMER DATE:

RESULT OF EQUIPMENT OR CONTROLS JOB


STEP WHAT CAN CAUSE CAUSE, eg. EYE PPE TO BE (TESTS, CHECKS, OBSERVATION
Critical Activities COMMENTS
NO. INJURY / ILLNESS/ INJURY, LEG USED FOR PERMITS,
YES NO
DAMAGE LACERATION PREVENTION AUTHORISATION)
Bad condition of
machine, hydraulic Injuries & property Use of pre-use
1 Examine Case before use pipe leaks damage checklist
Injuries & property Obtain site
2 Site clearance Cables, pipes damage clearance
Injuries & property
3 Extend outriggers & level machine Unstable machine damage Operator

Injuries & property Operate controls


4 Test controls Damaged controls damage and check operation
Place hammer at right angles to Injuries & property
5 concrete / rock Incorrect operation damage Operator
Leg & body
6 Demarcate open excavations Open excavation injuries Supervisor
After job has been completed sign Use TLB record
7 log book Unauthorised use Unauthorised use book
Phalaborwa - ZBS Upgrade Project
SAFE WORK PROCEDURE
COMPANY: S & D Consortium

REV. No. 0

TYPE OF WORK : SITE HUT ERECTION (PREFAB OFFICE) DATE: 5-Jun-01

RESULT OF EQUIPMENT OR CONTROLS JOB


WHAT CAN CAUSE CAUSE, eg. EYE PPE TO BE (TESTS, CHECKS, OBSERVATION
STEP NO. Critical Activities COMMENTS
INJURY / ILLNESS/ INJURY, LEG USED FOR PERMITS,
YES NO
DAMAGE LACERATION PREVENTION AUTHORISATION)
Be aware of
Fall through/from Bruising, fractures All PPE as per weak areas of
10 Position roof gable halves roof or fatality step 1 roof
Be aware of
Secure roof beam at apex Fall through/from Bruising, fractures All PPE as per weak areas of
11 between gables roof or fatality step 1 roof
Slide in roof panels from R.H. Be aware of
side of gable. Lock panels to Fall through/from Bruising, fractures All PPE as per weak areas of
12 wall. roof or fatality step 1 roof Make sure panels lock
Be aware of
Fall through/from Bruising, fractures All PPE as per weak areas of
Interlock panels roof or fatality step 1 roof
Be aware of
Fall through/from Bruising, fractures All PPE as per weak areas of
13 Install ridging via clamps roof or fatality step 1 roof

1. Activities to be listed according to type of work highlighted


2. Changes and/or recommendations to be noted depending on hazards in and/or around area of work
3. Employees to be informed of procedure and signed off in proof of training
4. Procedure to be attached to HIRA and Job Card completed for specific task