Sie sind auf Seite 1von 1

Job/Contract No : P1001-1B Work Order No : CPI-PO-00123RO Drawing No : D55-04-7688-1

: Ø 5 /2" Extractor Wire Wrap Screen, Supplied Pipe


1
Project Description Procedure No : PO/MIG-OPS/23
17.0 lb/ft, R3, 13Cr-L80, 316L 300 UM, 90LS/90LS : Rev. : 0
BTC Box x Pin, 29.5ft Filter
Location of Test : Workshop PT. Completion Production Indonesia
Applicable Code : AWS D1.1
Customer : PT. Completion Production Indonesia
Jalan Gaharu Lot. 228 - Mukakuning Batam
Lighting Equipment : Spot Light Light intensity : 1000 Lux
Surface Condition : Welded Ground Flush Other ( )
Stage of Exam : After welding After Hydrostatic Other ( After Brushing )
Welding Process : GTAW SMAW Other ( GMAW )
Base Metal Back Chipping Weld Part
Scope of Examination
Edge Prep Repair Weld Other ( )
SKL - SP 2 Spraying Dwell Time : 10 Minutes
Penetrant
Can No : 04362 Expired Date : May 2017 Merk/Type : Magnaflux
SKD-S2 Spraying Dwell Time : 10 Minutes
Developer
Can No : 03786 Expired Date : May 2018 Merk/Type : Magnaflux
SKC-S Removal/Cleaner
Cleaner
Can No : 038532 Expired Date : May 2019 Merk/Type : Magnaflux
Identification :
Part / Welding Position of Judgement Type of
Material Remark
Number Test Accepted Rejected Discontinuity
Box Acc - - S/S
Pipe 13
Pin Acc - - S/S
Box Acc - - S/S
Pipe 01
Pin Acc - - S/S
Box Acc - - S/S
Pipe 51
Pin Acc - - S/S
Box Acc - - S/S
Pipe 50
Pin Acc - - S/S
Box Acc - - S/S
Pipe 04
Pin Acc - - S/S
Box Acc - - S/S
Pipe 07
Pin Acc - - S/S
Sketch of Weld SKETCH ( Identify Discountinuity Listed Above )

Weld Joint Base Pipe 5,5" Penetrant Area

Examined By Reviewed / Witnessed By Authorized Inspector

Djoko Sugiharto .
NDE Level : II Date : Date :
Date : June 10, 2015

Das könnte Ihnen auch gefallen