03-August 2017
Outline
• Commission’s orders on spinning reserves
• Frequency profile of different systems and India
• Primary Control
• Secondary control through Automatic Generation
Control (AGC)
– Details of pilot project by POSOCO and NTPC
– Further steps
• Commercial mechanism for plants under AGC
• Further directions required from Hon’ble
Commission
2
Commission’s orders
• Central Electricity Regulatory Commission (Ancillary Services
Operations) Regulations, 2015
– 13th August 2015
– http://cercind.gov.in/2015/regulation/Noti13.pdf
– Implemented from: 12th April 2016
• Report of the Committee on Spinning Reserves
– 17th September 2015
– http://www.cercind.gov.in/2015/orders/Annexure-
%20SpinningReseves.pdf
• Roadmap to operationalise Reserves in the country
– 13th October 2015
– http://cercind.gov.in/2015/orders/SO_11.pdf
3
Roadmap to operationalise Reserves in the country
- Salient points
• Philosophy recommended to be adopted
– Operation at constant frequency target of 50.0 Hz
– with constant area interchange
• For AGC, power plants and Load Dispatch Centres (LDCs)
– necessary software and communication infrastructure
– Automated control signals from LDC to the generator
• AGC to be operationalized wef 1st April 2017
6
Year: 2016
Source: Derived from http://fnetpublic.utk.edu/ 7
Frequency profile of Continental Europe
Deterministic frequency deviations – root causes and proposals for potential solutions
--------------------------------------------------------------------------------------------------
A joint EURELECTRIC – ENTSO-E response paper
8
Typical frequency profile for Eastern Interconnection, US
9
Sample Daily Frequency Profile of India
10
Frequency Profile
Frequency Profile
12
Frequency Variation Index (FVI) over the years
13
Frequency Profile
14
Frequency Profile
Maximum Frequency
15
Frequency Profile
Average Frequency ~ 50 Hz.
16
Frequency Profile
Minimum Frequency
17
Frequency Profile
18
Frequency as per global standards in India
• Load and RE forecasting
– Decentralized at State level
• Unit commitment and Scheduling
– Decentralized
– Move from 15-minutes to 5-minute scheduling (SAMAST)
• Load following resources
– Decentralized
• Fast/slow tertiary response
– Centralized through Ancillary Services at ISTS level
• Secondary response
– Automatic Generation Control (AGC) at regional level
• Primary control
– Decentralized
19
Hz Kudankulam 1000 MW tripping event
Jan-15 Feb-17
50.08
50.07 Hz
49.93
49.88 Hz
49.91 Hz
49.88
49.85 Hz
49.83
1 501 1001 1501 2001 2501 3001 3501 4001
• Frequency Response Characteristics (FRC) has increased from
6000 MW/Hz in early 2015 to over 9000 MW/Hz in Mar 2017
21
CERC Terms and Conditions of Tariff
Regulations, 2014
“ the rate of return of a new project shall be reduced by 1% for such period as
may be decided by the Commission, if the generating station or transmission
system is found to be declared under commercial operation without
commissioning of any of the Restricted Governor Mode Operation (RGMO)/
Free Governor Mode Operation (FGMO), data telemetry, communication
system up to load dispatch centre or protection system:
as and when any of the above requirements are found lacking in a generating
station based on the report submitted by the respective RLDC, RoE shall be
reduced by 1% for the period for which the deficiency continues “
22
Secondary control through
Automatic Generation Control (AGC)
23
Automatic Generation Control
fundamentals
• Scheduled interchange
• Tie line telemetry (MW)
• Actual unit generation (MW)
• Frequency (Actual & Desired)
• Economic Dispatch program (ED) data
AGC control Modes
The following AGC control modes are provided
to allow AGC to be operated under various
system operational conditions
– Tie Line Bias Control (TLBC)
– Constant Frequency Control (CFC)
– Constant Net Inter-change Control (CNI)
– Tie Line Bias Control Plus Time error correction.
– The control mode is selected by the dispatcher via buttons located
on the operator panel of each console.
Automatic Generation Control Interfaces
Automatic Generation
•Island Data
•Estimated Unit & Line MW
Control
State
Estimato • Unit Connection Status • ACE Calculation
• Setpoint/ • Unit Control Status • Unit Control Mode
r Pulse • Unit Output • Unit Basepoint
Control • Unit Limits • Unit Ramp Schedules
Commands
• Unit Ramp Rates
• System frequency
• System Time Error
• Tie Line Flows
19
Secondary Control through AGC
• Pilot at NTPC Dadri Stg-II (2 x 490 MW)
– Dadri Stage II power plant is located near Delhi.
– Easy to visit and monitor the field level implementation process.
– High variable cost of the order of 325 paise/kWh
– Economical to keep Spinning Reserves as little opportunity cost
• Subsequent pilots could be explored in each region
– Simhadri-II in Southern Region
– NP Kunta Solar
– Wind project
• Detailed procedure would be submitted by POSOCO
28
Project progress
• A team from POSOCO, POWERGRID and M/s Siemens
– visited NTPC Dadri on 6th May 2016
– to explore the ground level requirements with NTPC
• Execution of AGC pilot project as per technical
specifications through limited tender
– Invited bids on 21st October 2016 from the four SCADA vendors
• M/s ALSTOM
• M/s OSI
• M/s Siemens
• M/s ABB
• Bids opened on 30th Nov 2016
• Letter of Award (LOA) issued to M/s Siemens on 18th Jan’17
and accepted by Siemens on 25th Jan ’17
• CERC Petition filed by POSOCO for payment mechanism on
3rd April 2017
– Hearing by CERC scheduled on 18th July 2017 29
Technical Specifications
30
Area Control Error (ACE) formula
• ACE = A * (Ia - Is) + 10 * Bf * (50 - Fa)
A = 0 or 1; 0 -> for adopting ‘only Frequency control
mode’ and 1 -> for adopting ‘Tie Line Bias mode’ (user
entry)
Ia = Actual net interchange (negative value for import)
Is= Scheduled net interchange (negative value for
import)
Bf = Frequency Bias Coefficient in MW/0.1 Hz
(positive value, user entry)
Fa = Actual System Frequency
31
ACE and AGC set point
• Spikes in ACE data are present for different
reasons.
– By design, AGC cannot handle large changes in ACE
– Pilot AGC shall clamp ACE exceeding +/- 800 MW to +/-
800 MW
32
Draft Rules for the CLU Algorithm at NTPC
• Receive Unit Status, Present Schedule and DeltaP signal and
number of mills.
34
1. Factoring AGC signals while evaluating deviations
35
2. Compensate for the Extra Energy spent/saved
• The AGC energy account will be available every week
• For AGC MWh generated during a block,
– payment @ variable charges to Dadri from the NR DSM pool
• For AGC MWh reduced during a time block
– Dadri pays @variable charges to the NR DSM pool
36
3. Incentivize for the ‘secondary regulation’ services
• For AGC MWh in each time block (+ve or –ve)
– 50 paise/kWh mark up payable to NTPC Dadri from NR DSM pool
37
Inputs needed for Accounting
(Main and Standby)
• MW Delta P signals every 10 seconds at NTPC Dadri
(Main)
Delta P = PAGCsetpoint – Pschedule
Integrated into MWh values for 15 minutes and 5 minutes
38
Regulation accuracy of the solar plant demonstration
exceeded accuracy of conventional resources
Regulation Up Accuracy
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
Steam Pump Hydro Combined Limited Gas Solar PV Solar PV Solar PV
Turbine Turbine Cycle Energy Turbine (Middle of (Sunset) (Sunrise)
Storage the Day)
Source: CAISO Blue bars taken from the ISO’s informational submittal to FERC on the performance of resources
providing regulation services between January 1, 2015 and March 31, 2016
Page 39
CERC approval is needed on the following
• Go ahead for the pilot project for NTPC Dadri Stage-II (2 x 490 MW) to
receive AGC signals from NLDC and regulate to the extent of 50 MW
up/down to start with and with provision to go up later.
40
Automatic Generation Control (AGC)
Pilot Project
Implementation Philosophy
Region considered as an Area for secondary control
ACE = (Ia - Is) + 10 * Bf * (Fa - 50)
NORTHERN
REGION
NORTH-
EASTERN
REGION
New
Data Flow in AGC Project
AGC console at
NTPC
AGC Local/Remote
AGC On/OFF Unit Load Set Point Factor
AGC Set point Actual Generation
Scaled ACE Circuit Breaker Status
Back-up
NLDC AGC System at AGC RTU
ICCP IEC 104 Protocol
SCADA NLDC at NTPC
NR-IR Schedule AGC Set point
NR-IR Actual
Frequency AGC Local/Remote
Unit Load Set Point DeltaP
Actual Generation
Circuit Breaker Status
NTPC DCS
Control block diagram at NLDC
Unit Load Set
Point schedule
total from unit
5 &6
PI controller and
ACE Plant Set Point
Limiters
Setpoint
ICCP of NLDC
SCADA SCADA &
AGC Database
Database in the
in the IMM IFS before sending
IMM
towards NTPC RTU
Unit DCS
Inputs from the two unit DCS:
ULSP of the generator for the
present time block and B1, B2 Unit 2
breaker status Unit 1
P Schedule (main)
Max Load Set
point
NTPC
Unit Capability
Min Load Set
point
Actual generation following the Unit 5 taken into Dadri Stg-II total
Unit 6 taken Mock Test
ULSP schedule before AGC AGC Remote at Plant actual
into AGC finished at
correction 1814 hrs generation
Remote at 1910 hrs
AGC in local mode Total Plant following the
1741 hrs under AGC AGC Set point
AGC Correction +ve = Reg Up ACE +ve = NR Surplus
AGC Correction -ve = Reg Down ACE –ve = NR Deficit
Variation of AGC correction (Delta P) wrt NR Scaled Area Control Error
AGC Correction Restricted to +/- 50 MW (Maximum Spinning Reserve utilization from NTPC Dadri Stg-II)
AGC ON/OFF
tested for 4
minutes from
1847 to 1851 hrs