November 2013
Schedule of Exclusions
Subtotal
Preliminaries (Included)
Subtotal
Design Contingency (Excluded)
WT PARTNERSHIP Page : 1
Up % Total
150,000
1,950,000
4,011,675
23,494,600
1,500,000
1,052,577
32,158,852
32,158,852
Excl VAT) 32,158,852
32,158,852
No.
Schedule of Exclusions
Schedule of Exclusions
Site Hoarding
2 Allow for guardhouse and site entry control point. 1.00 No 2,000.00
Demolition
Site Clearance
6 Allow for imported sandfill and compaction to raise site t 2,493.00 m3 15.00
De-watering
Sundries
Site Preparation
Trade : 9 Piling
Test Pile
Mass Piling
2 Allow for 1500mm dia 70m deep bored pile solution below 51.00 No 21,000.00
3 Extra over for additional piles below core areas. 20.00 No 21,000.00
4 Allow for 1200mm dia 45m deep bored pile solution below 14.00 No 9,900.00
Sundries
Piling
Substructure
1 Allow for pile cap and ground slab solution equivalent t 330.00 m2 550.00
2 Ditto but equivalent to 300mm thick to ground slab outsid 3,101.00 m2 102.50
Underground Tanks
5 Subtotal
Superstructure
18 Allow for reinforced concrete upper floors (say) 225mm t 6,213.00 m2 70.00
20 Extra over ramps including kerbs and groove finish. 1.00 Item 21,745.50
21 Provisional allowance for transfer structures to level 4 sla 1.00 Item 675,000.00
22 Allow for reinforced concrete fire stairs including handrai 72.00 m/rise 400.00
23 Subtotal
Roof
24 Allow for reinforced concrete roof slab including waterpr 1,925.00 m2 80.00
26 Allow for canopy including all framing, colorbond sheetin 118.00 m2 150.00
27 Subtotal
28 300mm thick concrete shear wall including all concrete, 126.00 m2 180.00
29 Allow for 200mm thick masonry wall to external elevation 1,778.00 m2 39.00
30 Extra over stone finish to facade. 264.00 m2 80.00
31 Allow for aluminium sunshade louvres including all frami 762.00 m2 180.00
33 Allow for fixed window including all aluminium framing, 27.00 m2 150.00
34 Solid core single external door including all framing, har 3.00 No 700.00
35 Pair of external doors with steel plate cover to plant and 8.00 No 1,000.00
38 Subtotal
Internal Fitout
40 Allow for concrete sealer to car park and technical areas. 8,974.00 m2 6.00
41 Allow for local granite tiled floor finish to lobby areas (s 288.00 m2 70.00
42 Allow for local granite tiled floor finish to office and rec 52.00 m2 70.00
43 100mm thick blockwork including render and paint finish 462.00 m2 32.00
44 200mm thick blockwork including render and paint finish 1,769.00 m2 42.00
45 300mm thick cavity blockwork including render and paint f 46.00 m2 42.00
46 Extra over natural stone cladding finish to lift lobby walls 309.00 m2 120.00
49 Allow for single leaf solid core fire door including framin 21.00 No 650.00
50 Allow for single leaf solid core door including framing, h 25.00 No 500.00
51 Allow for pair of equal doors including framing, hardware 4.00 No 900.00
52 Allow for pair of equal glazed doors including framing, h 15.00 No 1,300.00
54 Allow for render and paint finish to soffit of concrete slab in carpark and technical areas.
55 Allowance for miscellaneous items including concrete whee 1.00 Item 100,000.00
56 Subtotal
Building Services
57 Allow for plumbing and drainage services to podium carp 9,314.00 m2 10.00
63 Subtotal
Podium Carpark
Columns
Upper Floors
4 Allow for reinforced concrete upper floors 175mm thick; 30,592.00 m2 65.00
5 Allow for reinforced concrete upper floors 250mm thick; 1,230.00 m2 85.00
Staircases
7 Allow for reinforced concrete fire stairs including all finis 184.00 m/rise 400.00
8 Allow for reinforced concrete fire stairs including all finis 50.00 m/rise 400.00
9 Subtotal
Roof
10 Allow for reinforced concrete flat slab (say) 200mm thic 1,223.00 m2 80.00
14 Allow for 1200mm high parapet wall including all excavat 602.00 m 60.00
15 Allow for 1200mm high glass balustrade with timber hand 103.00 m 150.00
17 Provisional allowance for swimming pool including all water 1.00 Item 65,000.00
18 Allow for additional strengthening to slab areas support 1.00 Item 35,000.00
19 Subtotal
External Walls
20 100mm thick blockwork wall including render and paint fin 685.00 m2 20.00
21 200mm thick blockwork wall including render and paint fin 8,126.00 m2 31.00
22 300mm thick blockwork wall including render and paint fin 337.00 m2 31.00
23 200mm thick water tank walls including all concrete, rein 186.00 m2 130.00
24 300mm thick core wall including all concrete, reinforceme 7,179.00 m2 160.00
25 450mm thick core wall including all concrete, reinforceme 1,715.00 m2 230.00
26 1200mm high blockwork parapet wall including render and 1,813.00 m 46.80
External Windows
27 Full height glazed wall including framing and fixtures. 565.00 m2 200.00
28 Allow for fixed window system including framing and fix 4,249.00 m2 150.00
29 Allow for 2000 x 3300mm high composite glass unit includin 4.00 No 1,650.00
30 Allow for 2500 x 3300mm high composite glass unit includin 46.00 No 2,062.50
31 Allow for 3000 x 3300mm high composite glass unit includin 2.00 No 2,475.00
32 Allow for 4000 x 3300mm high composite glass unit includin 4.00 No 3,000.00
33 Allow for 5000 x 3300mm high composite glass unit includin 146.00 No 4,125.00
34 Allow for louvres including framing, finish and all necess 1,372.00 m2 150.00
External Doors
35 900mm wide solid core door including all framing, hardwa 9.00 No 500.00
36 1400mm wide pair of equal doors including all framing, h 1.00 No 1,000.00
37 1000mm wide solid core fire door including all framing, h 4.00 No 700.00
38 600mm high glass balustrade including stainless steel fra 227.00 m 150.00
39 1100mm high glass balustrade including stainless steel fra 1,566.00 m 250.00
40 Subtotal
Internal walls
45 300mm thick core wall including all concrete, reinforce 4,715.00 m2 150.00
46 450mm thick core wall including all concrete, reinforce 2,103.00 m2 220.00
47 950mm wide plasterboard partition wall including stud fram 7.00 m2 190.00
48 1000mm wide plasterboard partition wall including stud fra 7.00 m2 190.00
49 1200mm wide plasterboard partition wall including stud fra 8.00 m2 190.00
50 1600mm wide plasterboard partition wall including stud fra 6.00 m2 190.00
51 2250mm wide plasterboard partition wall including stud fra 253.00 m2 190.00
Internal Screens
52 2100mm high toilet cubicle including framing, single doo 17.00 m 315.00
54 1000 x 2400mm high tempered glass shower screen compri 20.00 No 600.00
55 1200 x 2400mm high tempered glass shower screen compri 112.00 No 700.00
56 1500 x 2400mm high tempered glass shower screen compri 93.00 No 820.00
57 1800 x 2400mm high tempered glass shower screen compri 23.00 No 1,000.00
58 2300 x 2400mm high tempered glass shower screen compri 1.00 No 1,200.00
Apartment Entry Doors
59 900mm wide single solid core fire rated door including fr 107.00 No 1,000.00
60 1400mm wide pair of unequal solid core fire doors includ 142.00 No 1,500.00
Internal Doors
61 800mm wide single solid core door including framing, har 913.00 No 450.00
62 900mm wide single solid core door including framing, har 522.00 No 500.00
63 1100mm wide pair of equal solid core doors including fra 2.00 No 700.00
64 1400mm wide pair of equal solid core doors including fra 168.00 No 900.00
65 1500mm wide pair of equal solid core doors including fra 48.00 No 1,050.00
Glazed Doors
66 800mm wide glazed door including framing, hardware and 97.00 No 700.00
67 850mm wide glazed door including framing, hardware and 2.00 No 800.00
68 900mm wide glazed door including framing, hardware and 9.00 No 850.00
Fire Doors
71 900mm wide single solid core fire rated door including fr 54.00 No 1,000.00
72 1000mm wide single solid core fire rated door including f 114.00 No 1,200.00
73 1200mm wide pair of equal solid core fire rated doors inc 8.00 No 1,300.00
Wall Finishes
76 Render and paint finish to inside face of external walls. 9,280.00 m2 8.00
77 Plasterboard and paint finish to inside face of external wal 6,186.00 m2 20.00
78 Allow for ceramic tile to bathroom walls including water 1,665.00 m2 49.00
79 Allow for natural stone cladding to lift lobby (supply rat 2,675.00 m2 120.00
Floor Finishes
86 Allow for homogenous tiled finish to maids room (supply 324.00 m2 32.00
87 Allow for homogenous tiled finish to kitchens (supply rat 2,247.00 m2 35.00
88 Allow for homogenous tiled finish to dining and living ar 7,203.00 m2 35.00
89 Allow for homogenous tiled finish to corridors and public 1,569.00 m2 35.00
90 Allow for natural stone tiled finish to lift lobbies (supply 1,029.00 m2 120.00
91 Allow for carpet finish including underlay to card room, 93.00 m2 60.00
93 Allow for floor finish to gym, multi function and kids play 228.00 m2 80.00
95 Allow for waterproofing and screed finish to MEP rooms. 329.00 m2 19.00
Ceiling Finishes
101 Allow for render and paint finish to recreational faciliti 881.00 m2 10.00
103 Subtotal
Joinery
104 Allow for built in robes including all framing, shelving a 1,180.00 m 150.00
105 Allow for local stone kitchen benchtop unit and overhead 1,051.00 m 550.00
106 Allow for local stone kitchen benchtop and all underbench 369.00 m 350.00
108 Allow for bathroom vanity unit including framing, shelvi 755.00 m 230.00
109 Allow for reception counter to entrance lobby. 1.00 Item 1,500.00
Bathroom Fixtures
115 Allow for shower enclosure and shower head and tapware 24.00 No 700.00
Mirror
121 Allow for mirrors to bathrooms (700 wide x 750mm high) 348.00 m2 35.00
Signage
122 Allow for staturory, directional and architectural signage. 1.00 Item 50,000.00
123 Subtotal
Mechanical Services
Fire Services
126 Allow for wet fire services. 31,905.00 m2 15.00
Electrical Services
129 Subtotal
Sundries
134 Allowance for enhancements to ground floor lift lobbies. 3.00 No 50,000.00
136 Allow for design development and features not yet shown 1.00 Item 10,000.00
137 Subtotal
142 Subtotal
Apartment Tower
Lift Services
Lift Services
Trade : 13 External Works and Landscaping
LEVEL 1
External Works
1 Allow for 300mm thick ground slab; including detailed ex 1,497.00 m2 180.00
Perimeter Wall
4 Allow for 2400mm high perimeter wall including all excavat 267.00 m 110.00
Outbuildings
8 Allow for guardhouse building including all structural ele 1.00 Item 15,000.00
9 Allow for vaporizer and regulator valve room including all 1.00 Item 10,000.00
Underground Tanks
10 Allow for below ground fuel transfer pump room including a 11.00 m2 200.00
11 Allow for below ground fuel tank including all piling, exc 15.00 m2 200.00
12 Allow for below ground LPG bulk chamber including all pil 21.00 m2 400.00
13 Allow for column bumper and fence to LPG bulk chamber 14.00 m 50.00
14 Allow for 1.5m deep underground tank including all piling 180.00 m2 250.00
15 Allow for 3m deep underground transfer water tank includi 150.00 m2 300.00
16 Subtotal
Softscape
17 Allow for landscaped areas including grassed areas, plant 134.00 m2 40.00
LEVEL 4
External Works
23 Allow for rubber mat flooring including all underlay and a 385.00 m2 50.00
24 Allow for timber decking to outdoor areas including all fr 782.00 m2 140.00
Perimeter Wall
26 600mm high blockwork parapet wall including render and p 227.00 m 23.40
27 600mm high glass balustrade including stainless steel fra 227.00 m 150.00
Pools
28 Provisional allowance for swimming pool including all water 495.00 m2 550.00
29 Provisional allowance for jacuzzi including all fittings and 1.00 No 15,000.00
WT PARTNERSHIP Page : 1 of
VIETNAM
Job Description
Mark Amount
Up %
Total :
Total :
17,280.00
2,000.00
500.00
50,000.00
9,972.00
37,395.00
25,000.00
7,853.00
Total : 150,000.00
300,000.00
###
420,000.00
138,600.00
20,400.00
Total : ###
181,500.00
317,852.50
75,000.00
50,000.00
624,352.50
20,700.00
84,525.00
13,700.00
19,818.00
22,248.00
35,451.00
273.60
3,078.00
16,200.00
567.00
398,678.70
57,060.00
434,910.00
130,473.00
21,745.50
675,000.00
28,800.00
###
154,000.00
49,400.00
17,700.00
221,100.00
22,680.00
69,342.00
21,120.00
137,160.00
14,240.00
4,050.00
2,100.00
8,000.00
5,250.00
6,510.00
290,452.00
3,590.00
53,844.00
20,160.00
3,640.00
14,784.00
74,298.00
1,932.00
37,080.00
5,730.00
13,700.00
13,650.00
12,500.00
3,600.00
19,500.00
9,520.00
EXCL
100,000.00
387,528.00
93,140.00
46,570.00
167,652.00
167,652.00
EXCL
50,000.00
525,014.00
Total : ###
N/A
N/A
N/A
###
104,550.00
620,529.00
73,600.00
20,000.00
###
97,840.00
24,460.00
14,880.00
6,960.00
36,120.00
15,450.00
10,000.00
65,000.00
35,000.00
305,710.00
13,700.00
251,906.00
10,447.00
24,180.00
###
394,450.00
84,848.40
113,000.00
637,350.00
6,600.00
94,875.00
4,950.00
12,000.00
602,250.00
205,800.00
4,500.00
1,000.00
2,800.00
34,050.00
391,500.00
###
339,804.00
154,146.00
201,158.00
92.00
707,250.00
462,660.00
1,330.00
1,330.00
1,520.00
1,140.00
48,070.00
5,355.00
40,800.00
12,000.00
78,400.00
76,260.00
23,000.00
1,200.00
107,000.00
213,000.00
410,850.00
261,000.00
1,400.00
151,200.00
50,400.00
67,900.00
1,600.00
7,650.00
2,000.00
2,400.00
54,000.00
136,800.00
10,400.00
109,088.00
###
74,240.00
123,720.00
81,585.00
321,000.00
130,000.00
150,000.00
85,701.00
94,815.00
47,292.00
461,625.00
10,368.00
78,645.00
252,105.00
54,915.00
123,480.00
5,580.00
23,079.00
18,240.00
480.00
6,251.00
518.00
17,490.00
52,245.00
491,675.40
8,172.00
8,810.00
100,000.00
###
177,000.00
578,050.00
129,150.00
5,400.00
173,650.00
1,500.00
12,000.00
339,000.00
231,700.00
214,200.00
46,000.00
16,800.00
22,600.00
16,950.00
14,125.00
11,300.00
8,475.00
12,180.00
50,000.00
###
861,435.00
###
478,575.00
319,050.00
###
###
25,000.00
21,150.00
36,500.00
51,200.00
150,000.00
50,000.00
10,000.00
343,850.00
58,400.00
116,800.00
131,400.00
166,600.00
473,200.00
Total : ###
###
Total : ###
269,460.00
7,485.00
13,560.00
29,370.00
1,000.00
4,500.00
6,000.00
15,000.00
10,000.00
2,200.00
3,000.00
8,400.00
700.00
45,000.00
45,000.00
129,300.00
5,360.00
40,500.00
4,000.00
1,600.00
13,600.00
1,750.00
19,250.00
109,480.00
9,750.00
5,311.80
34,050.00
272,250.00
15,000.00
30,000.00
20,000.00
10,000.00
Total : ###
1 3/30/2015
Date of Printing:
Global Estimating System (32 Bit) - J