Beruflich Dokumente
Kultur Dokumente
4. Cargo Operation
1) How do when receive a instruction of loading the non-
experienced cargo.
2) Documents of Bill of Lading, LOI (Letter of Indemnity),
Notice of Readiness, when having cargo discrepancy, etc.
3) Check the Stowage/Loading/Discharging planning
- Compatibility charts
- Precaution to handle the Static Cargo
- High, Overfill alarm system
- Stability and damage stability calculation
Master 2/3
5. 9) ISPS Code;
- Various records of general or confidential information
- Drills required every 3 months, USCG strongly suggest
to carry out every month (we have 11 items)
- Locking the entrance doors at restricted areas
- How do you ready the DoS (Declaration of Security)?
- Explain Master’s Overriding Authority in ISPS Code.
10) Maintenance on board;
- Making maintenance the schedule and report to the
company together with works done
- Do not painting over the rusts
- Greasing is very important on moving machineries,
how do you making the greasing schedule?
11) Ballast management, especially USA/Australia waters
12) Explain your management for Cost Saving on board.
13) Double check the Work/Rest hours record
6. Smoking / Drinking
Overall Appraisal :
Dated :
Interviewed By : Interviewed By :