4. A Class 3 pipe is UT thickness checked in 1990 and found to be .385” thick. The pipe
is then checked in 1994 and found to be .300” thick. Original thickness was .432” in
1981. If the required thickness is .182”, Find next thickness inspection interval?
A. 5.6
B. 5
C. 10
D. 2.8
5. Which of the following is not taken into account when thickness for new pipe is
calculated ?
A. Corrosion Allowance
B. Threads
C. other structural loadings
D. API 570 Classification of piping
7. A P-1 (carbon steel) piping system has originally been PWHT’d because of H2S
Service. A flush patch repair weld is required to one section of the pipe due to corrosion.
This repair weld:
A. Must be PWHT’d
B. May be preheated to 300°F per API 570, and no PWHT applied
C. May be “Temper-bead” repaired per API 570
D. Can be stress relieved by peening and interpass heat control
8. The scope of API 570 does not include:
A. Pressure vessels
B. HF Alkyl piping
C. Bulk transfer lines at a dock
D. Fuel gas supply line
10. Which of the following materials should be hydrotested with potable water or steam
condensate: Wrong Question
A. Carbon steel
B. Ferritic Stainless Steel
C. Austenitic Stainless steel
D. Monel
14. To evaluate metal loss in excess of corrosion allowance, fitness for service
assessment may be performed as per
A. API RP580
B. API RP 570
C. API RP 579
D. API RP 574
17. All of the following are temperature measuring/ indicating devices except:
A. a hand held pyrometer
B. portable thermocouple
C. high temperature Ultrasonic instrument
D. Temperature indicating crayons
19. Above grade surveillance of piping system along its path should be carried out:
A. every year
B. every 9 months
C. every 6 months
D. every 3 months
25. The required mill undertolerance on plate is normally – 0.01 inch but some piping is
made from ERW/Seamless process has an undertolerance of ______________.
A. -12.5%
B. +16”, -0”
C. - .01”
D. + 6%
26. A pipe cap is observed to have local thinning. This can be:
A. leaved as it is as it is not significant
B. evaluated to API 579 FFS
C. not serious if it is more than half of required thickness
D. ignored in Class 1 piping
27. Which of the following is not a tool for measuring corrosion of piping:
A. Acoustic emission transducers
B. Ultrasonic instruments
C. Radiography profile
D. Corrosion coupons
28. If the WPS shows a single “Vee” groove is to be used and the PQR was qualified
with a double “Vee” groove:
A. The WPS can be used without re-qualification
B. The WPS must be requalified
C. The PQR must be retested
D. The WPS must be modified to show the correct joint
29. Welded repair of cracks occurring in-service should not be attempted without
consulting the:
A. API Inspector
B. Contractor
C. Piping Engineer
D. Maintenance Foreman
31. Many problems found during in-service inspection of piping systems can be directly
attributable to:
A. Hydrostatic testing
B. Lack of proper new-construction inspection
C. Cold winters
D. Lack of internal inspections
32. An operator notice a pipe off its support, what should be done?
A. Ignore the situation
B. Report the situation to engineering or inspection personnel
C. Keep a record of the situation for future reference
D. Contact maintenance personnel for immediate repair
33. Radiographic profile techniques are preferred over ultrasonic thickness measuring
instruments for pipe diameters of:
A. NPS 1 and over
B. NPS 2 and over
C. NPS 1.5 and over
D. NPS2 and under
34. Vertical supports of piping must be checked if they are filled with water because:
A. they will externally corrode the support
B. they will externally corrode the pipe
C. they will internally corrode the pipe
D. additional stresses are created
36. If a probable corrosion rate cannot be determined from the same or similar service,
estimated data, or other methods, an initial thickness measurement shall be conducted
after no more than _______ of service using NDE thickness measurements.
A. 1000 hours
B. 3 months
C. 2 years
D. 5 years
37. A pipe has the highest potential of resulting in an immediate emergency if a leak
were to occur.
A. Class3
B. Class 2
C. Class 1
D. Owner/user designated system
38. A standard hydrostatic test is to be run after an alteration on a piping system. The
piping has a stress value of 20 ksi at the test temperature and 17 ksi at design
temperature. The design pressure is 720 psi. What is the calculated test pressure?
A. 1080 psi
B. 918 psi
C. 1270 psi
D. 792 psi
39. After radiography of a piping girth weld, a white image of a “B” is noticed on the
radiograph. This is probably caused by:
A. Backscatter
B. A welders I.D. stamp indented in the metal
C. A lead reference mark
D. An artifact of the film
41. The two primary NDE methods referenced by API 570 for thickness examinations
are:
A. RT, AET
B. ET, UT
C. MT, UT
D. UT, RT
42. In a piping circuit, which of the following does not routinely have thickness
measurements taken?
A. Valves
B. Straight Run Pipe
C. Fittings
D. Dead legs
43. A leak test of a buried piping system should be maintained for a minimum of
_______ hours. After ________ hours the system pressure should be noted, and the
system should be re-pressurized if required.
A. 4, 4
B. 8, 8
C. 8, 4
D. 4, 8
45. A pipe is UT inspected in 1978 and found to be .370” thick. The pipe is next
inspected in 1982 and found to be .300” thick. The pipe is next inspected in 1990 and
found to be .200” thick. The pipe is then inspected in 1997 and found to be .180” thick. If
the piping required thickness is .135”, when should the next UT thickness inspection be
conducted?
A. 4.5
B. 2.25
C. 5
D. 10
46. Sulphidation Corrosion is usually in the form of:
A. Uniform thinning
B. Localized thinning
C. Cracking
D. Phase Transformation
48. CUI for carbon steel must be investigated for piping systems operating between
_________ which may have had moisture ingress.
A. 200 - 250°F
B. 250 - 600°F
C. -4 to 120°C
D. 65 to 204°C
50. Which of the following should not be considered an alteration per API 570.
A. Replacement of a 6” nozzle with a 6” nozzle (both reinforced)
B. Replacement of an un-reinforced 6” nozzle with a 12” reinforced nozzle
C. Replacement of a 12” reinforced nozzle with an 18” reinforced nozzle
D. All of the above should be considered alterations
51. When determining the corrosion rate, the formulas from API 570 may be used or:
A. Published data on piping system in comparable service
B. Owner/user's experience
C. Budget restraints
D. Both A and B
52. A 1/4” leg fillet weld will have a throat dimension of:
A. .250”
B. .176”
C. .190”
D. .35”
55. The exposed surface of a weld on the side from which the welding was done is called
the weld -------
A. Cap
B. toe
C. face
D. root
59. Which of the following welding documents must be certified by the manufacturer, per
ASME IX?
A. WPS
B. PQR
C. PQR and WPQ
D. None of the above
60. The signature mark of particular failure is a ‘clam shell’ or ‘beach marks’. Which is
the possible failure of the material
A. Thermal fatigue
B. Vibration induced fatigue
C. Stress corrosion cracking
D. Mechanical fatigue
61. The difference between an “examination” and an “inspection” per B31.3 is:
A. One is QC, the other is NDE
B. One is QA, the other is hydrotesting
C. One is QC- done by the examiner, one is QA-done by the Inspector
D. One is required, the other is optional
62. when welding is conducted , ___________ electrode(s) from each lot or package of
alloy weld rod should be positively identified.
A. 100%
B. 50%
C. one electrode
D. random
63. By definition, a piping circuit is a section of piping that has all points exposed to an
environment of similar corrosivity and of similar ________ and _________.
A. Design conditions and operations
B. Design conditions and construction materials
C. Materials and flow characteristics
D. Operating parameters and piping specifications
65. When a welder has not welded with a process during a period of will expire
A. 3 months or more
B. 6 months or more
C. 9 months or more
D. 12 months or more