IFS USER MANUAL ͣ͟͠͞

PREVENTVE MAINTENANCE
Responsibility MAINTENANCE
Doc.Version V2
Special Note

Condition Based Maintenance


• Maintenance service Programme that are predefined as per the requirement of individual vehicle or a group
of vehicles will be addressed with the scope of this topic.
• Mainly PM programs will be,
 Service Programme – 5000 km
 Service Programme – 10000 km
 Service Programme – 15000 km
 Service Programme – 20000 km
 Service Programme – 25000 km
 Service Programme – 30000 km

Irrespective of the condition these maintenance/services programs are mainly handled through Separate work orders

• Need to create Test points related to the measurements


Path: Service and Maintenance→ Equipment → Functional Object → Functional Object

Page 1 of 11
IFS USER MANUAL ͣ͟͠͞

Preparing PM Plan-Separate Standard Job

Separate standard job can be used as a template to record the basic information of a service job which has to be
practiced as a preventive maintenance job.

Path: Service and Maintenance→ Prevenve Maintenance → Standard Job → Separate Standard Job
1. Open the Separate Standard Job window.
2. Create a new record (F5).
3. Enter an appropriate standard job ID, revision and description, Std Job type from LOV
4. Save the new record (F12).

5. Click the Prepare tab.


6. Enter a work description that describes what the separate standard job is all about. Double-click the field to open
the text editor.
7. If you only want to use the standard job's work description when connecting the standard job to a PM or work
order, select the Use as Standard Text Only check box. This prevents you from defining any operations or
materials, tools and facilities or permits for the standard job.

Page 2 of 11
IFS USER MANUAL ͣ͟͠͞

8. Save the record (F12).

9. Click the Operations tab.


10. Click New, and enter a description of the operation.
Note that you can edit the information once you save it.
11. If a certain maintenance organization and/or craft are to perform the work, you can select it here using the List of
Values (F8).
12. Enter the number of employees and number of hours the operation will require. The time is calculated per person.

Page 3 of 11
IFS USER MANUAL ͣ͟͠͞
13. Save the new operation row (F12).

Note: The Operations tab also contains information about sales parts that are used in IFS/Service Management.
13. Click the Materials tab and create a new record (F5).
15. Select an appropriate part and the planned quantity using the List of Values (F8).Save the new material row
(F12).

16. If need Purchase parts also could be allocated


• Create one more material row, but this time, query for an existing purchase part. Click New, right-click, and then
click LOV from Purchase Part.

Page 4 of 11
IFS USER MANUAL ͣ͟͠͞

17. Enter an appropriate purchase part, and click OK.


18. Enter the planned quantity.
19. Save the new row (F12).
20. Click the Tools and Facilities tab, and create a new record (F5).
21. Select a tool and facility type using List of Values (F8). It's also possible to enter a tool and facility ID using List of
Values (F8).
22. Enter the quantity and planned hours of the tool/facility that will be used for the standard job.
23. Save the new row (F12).

Note: Sometimes you need to link one or more permit types to a separate standard job. You can then link any number of
permit attributes to each permit type. A common permit type is a safety regulation intended to ensure employee safety.
The permits that you link to a standard job are copied to the PM Action or work order when connected as jobs.

Page 5 of 11
IFS USER MANUAL ͣ͟͠͞
24. Click the Permits tab.
25. Click New, and select an appropriate permit type using the List of Values (F8).

26. Save the new row (F12).


27. Sometimes you do not have the appropriate competencies within your own business to perform a certain job. In
this case, you may need to be assisted by external craft. Click the Planning tab, and enter information on cost
types that you want to connect to this separate standard job. Click New (F5).
28. In the Work Order Cost Type list, click External.
29. Optionally, enter a planned quantity for performing this standard job.

Page 6 of 11
IFS USER MANUAL ͣ͟͠͞
30. If you are using IFS/Service Management, you can select a sales part using the List of Values (F8).

31. Save the new planning record (F12).

32. In General tab “set the Maintenance Plan

Page 7 of 11
IFS USER MANUAL ͣ͟͠͞
Consider the format of figure “Start Value” & insert a Valid to date as required

33. In “Criteria tab Add New & set values as per the Test point Parameter

34. Status of the job could Change > RMB.. > Standard Job Status > Active / Obsolute

Page 8 of 11
IFS USER MANUAL ͣ͟͠͞
Now the measurements should be entered periodically

Path: Service & Maintenance→ Preventive Maintenance→ Condion Based→ Measurements

35. RMB And “Generate Work Order

Page 9 of 11
IFS USER MANUAL ͣ͟͠͞

Or

Path: Service & Maintenance→ Preventive Maintenance→ Condion Based→ Condition Generation

• Generate for selected period once

36. See the created Work order in the system

Path: Service & Maintenance→ Work Order Management→ Preparaon→ Acve work orders

Page 10 of 11
IFS USER MANUAL ͣ͟͠͞

37. Then Prepare & Continue the Same Operations till finish the job as Previous
Here After follows the Normal Procedure from Observing to complete the job & Accounting.

Page 11 of 11