THANE
DISTRICT SCHEDULE OF RATES
2011-2012
SUPERINTENDING ENGINEER
THANE (PW) CIRCLE THANE
All rights reserved, No Part of this publication may
be reproduced, or transmitted, in any form or by
any means, without the prior permission in writing.
District Schedule of Rates 2011-2012 - For Thane District
INDEX
PAGE NO.
SR. NO. CLASSIFICATION OF ITEMS
FROM
1 GENERAL NOTES 1
2 BUILDING WORKS
PAGE NO.
TO
6
14
16
18
23
25
27
28
34
35
40
50
52
55
57
61
67
95
96
118
131
135
140
145
148
152
162
175
180
191
195
200
205
212
214
232
246
251
270
273
274
297
299
300
-
Thane (P.W.) Circle, Thane
(Rates are enforced from 2011to 2012 )
GENERAL NOTES
1 Schedule of Rates prepared for the year 2011-2012 operative from 01/11/2011 is
applicable for Thane District.
2 For the rates in Jail premises, Mental Hospital at Thane, and Corporation areas an
increase of percentage over the normal schedule of rate prescribed for the year 2011-2012
is allowed as follows :-
Note- The increase in rates as above should be applicable only one at a time e.g. if Jail
1 and Mental Hospital premises falls in Corporation area, an increase of only 15% is
to be considered and not 20% (i.e. 5% + 15%).
1
Rates for Bitumen
a) The rates of Bulk bitumen, CRMB & PMB for the items of bitumenious works are based
on the rates prevailing from H.P./B.P. The rates are inclusive of all taxes. Subsequent
increase/decrease, if any, in these rates shall be accounted for in the analysis of items
while framing estimates.
b) While preparing the estimates, the above rates may be treated as basic rates and if any
change is noted, all calculations should be performed accordingly.
c) Vat is included in all material rates as per finance dept. Mantralaya Mumbai 400 032
letter dated 30/9/2006
d) The rates to be entered in schedule 'A' of the tender should be the actual stock issue
rates but should not be less than above rates, difference in issue rates if any may be
added or deducted as per actual rates. The overhead charges also be added or deducted
to the difference in issue rates as per the case may be. Rates for completed items are
based on a minimum initial lead of 5 Km. except bitumen. Actual lead charges for lead
beyond 5 Km. shall be added while framing the estimate. The rates adopted are as per
market rates which includes Sales tax and other taxes.
4 Basic Rates of rubble, Khandkies, metal, Murum, Sand, aggregates, bricks, earth
considered in this schedule are excluding Royalty charges. While preparing the estimates,
the royalty charges shall be added separately in estimate at the rate specified by Govt. of
Maharashtra, Revenue & Forest deptt.
2
Basic Rates of rubble, Khandkies, metal, Murum, Sand, aggregates, bricks, earth
considered in this schedule are excluding Royalty charges. While preparing the estimates,
the royalty charges shall be added separately in estimate at the rate specified by Govt. of
Maharashtra, Revenue & Forest deptt.
5 For cost towards procurement and temprary storage of water for construction purpose,
provision of 1% in the rate analysis is made. In difficult situation where water is not
available in reasonable lead or where water charges are essentially required to be paid to
local authorities etc., the assessment of cost of procurement of water for construction may
be made on factual data. If this cost of procurement of water required for construction is
more than 1%, then for additional cost (i.e. more than 1%) seperate provision should be
made in the estimate and tender papers based on actual rate analysis approved .
6 The completed item rates are inclusive of 1% Labour amenity charges as per Govt. P.W.
Department's circular No. DSR-1090/CR-6453/plan-3 dated 14.7.1993.
7 Quality control testing charges are considered in the rate analysis.are 0.50%
8 Items required for testing of soils, road and building materials, mix designs, Job-mix etc.
the schedule of testing charges of Superintending Engineer, Vigilance and Quality Control
Circle Pune and load test, plate load test etc. the C.S.R. of Maharashtra Engineering
Research Institute (MERI), Nasik shall be adopted.
9 The rates for labour and materials are included in the D.S.R. for the purpose of preparing
rate analysis. The labour rates shown against the completed items are based on minimum
labour wages as per letter dated 04/02/2011 of Labour Commissioner . Whenever the item
splitup in component i.e. labour, material, and machinery executed each seperately it
should be ensured that the rate of completed item does not exceed the concerned item
rate sanctioned in D.S.R.
10 Items required for water supply and sanitary works, which are not included in this D.S.R.
the C.S.R. of Maharashtra Jeevan Pradhikaran in the district is to be adopted.
11 The rates of machinery hire charges shall be as per the machinery use rates of Irrigation
Department issued by the Chief Engineer (Mech), Nasik.
12 The rates for items pertaining to Parks and Gardens, shall be taken from the C.S.R. of
Director of the, Parks and Gardens, Mumbai.
13 While calculating part rate or reduced rate etc., necessary overhead charges, sundries etc.
should be proportionately considered as per rate abstract.
14 References of P.W.D. standard specification,and M.O.R.T. & H. specification Current
Edition are obligatory.
15 This schedule of rates is applicable to all building works , road works, bridges, culverts and
or any civil engineering works carried out by all agencies in areas of Thane District.
16 The Head load is to be considered while preparing detailed rate analysis for inaccessible
area where shifting of materials by head load is necessary.
3
17 The excavation items for building & C.D. works are inclusive of normal manual dewatering .
If pumping is required additional item for dewatering shall be introduced while framing the
estimate, on BHP basis with prior permission of S.E.
18 BUILDING WORKS :-
a) For all completed items initial lead up to 5.00 km. is considered.
b) The floor is designated by the space contained between the virgin slabs of floors.
c) The D.S.R. rates of items are applicable for ground floor and first floor work. For
every addtional floor, percentage increase in rates shall be 1% per floor
The above increase is applicable for items and specification shown below.
Sr.No Specification Item
. 1 Bd.C Structural Steel Work, Tubular trusses.
2 Bd.-F-G-H R.C.C. Mild Steel,Tor Steel reinforcement, Brick Masonry, Stone
Masonary, Hume Pipe Tranks
3 Bd.L External Plastering and Pointing.
4 Bd.M Flooring, Dado, Skirting, Treads (except white glazed, ceramic and
marble tiles)
5 Bd.O External Painting
6 Bd.R Manglore Tiles roof, ridge, ceilings
7 Bd.T Weather sheds, Replacing external window shutters using
scaffolding.
8 Bd.V Soil, waste, Vent and Rain water pipes and mild steel tanks.
d) For the items required to be carried out in the respective floors other than those
mentioned above, the D.S.R. rates of item are applicable for ground & first floor work,. For
every additional floor percentage increased in rates shall be 0.35 % per floor.
Note : The increases in rates as above shall be on DSR item rates only.
e) The percentage increase to be applied for items like water proofing treatment,
storage tank, parapet wall with coping, stair case, Liftroom with slab and water
proofing treatment, plastering, painting to be carried out in the terrace will be at the
rate of floor next below.
f) For Rates of excavation items as per standard specification of Bd-A charges for
additional lift above 1.50 m. shall be added as below.
4
i) Lift above 1.50 mtr. upto 3.00 mtr. Rs. 12.00 /cum.
ii) Lift above 3.00 mtr. upto 4.50 mtr. Rs. 18.00 /cum.
iii) Lift above 4.50 mtr. upto 6.00 mtr. Rs. 23.50 /cum.
For framing the various rates in D.S.R. following leads are considered unless
otherwise specifically mentioned in the items -
a) For items of supplying stone metal, Rubble .- Initial lead 50 meters.
(15cm. to 23cm.)
b) Supplying soft/Hard murum & earth for .- Initial lead 50 meters.
embankment
c) For Bituminious construction works no lead for asphalt is considerd and for
metal/aggregates 5.00 Km.initial lead is considered.
d) For all items of cement concrete, plain or reinforced cement concrete, stone
masonary the initial lead for metal, sand, stone, cement & steel is considered as
5.00 km.
e) For working out items of additional leads more than 5.00 km., the estimate should
be prepared for actual leads by deducting initial lead charges of 5.00 km. for all
completed items.
20 For E.G.S. works like earthwork in embankment, Items following the specifications
mentioned in Rd-13 Page No.194 shall invariably be used while framing the estimate.
21 a) The D.S.R. rates for bridge items are for works in normal conditions of site.
Wherever bridges are to be constructed in special site conditions such as bridge on
creek having tidal effects/in standing water of perennial river, the detailed rate
analysis shall be prepared and the same shall be got approved from the concerned
Superintending Engineer.
b) Rates for excavation for Bridges/C.D. Works/Sakav are considered for initial lift of
1.50 mtr., and charges for additional lift above 1.50 mtr. shall be added as below.
i)Lift above 1.50 mtr. upto 3.00 mtr. Rs. 12.00 / cum
ii) Lift above3.00 mtr. upto 4.50 mtr. Rs. 18.00 / cum
iii Lift above 4.50 mtr. upto 6.00 mtr. Rs. 23.50 / cum
c) The rates of supplying R.C.C. pipes shall be adopted as per MSSIDC rate contract,
plus 10% overhead charges while preparation of estimates.
5
22 NATIONAL HIGHWAY
a) To maintain barricades, light and flag men as necessary at either end of the
construction area and at such intermediate points as directed by the Engineer and
all arrangement for the traffic during construction including maintenance thereof but
excluding initial dressing and/ or extra treatment to shoulders/ verge and
construction of temperory diversion shall be considered incidental to the work and
contractor's responsibility, and no provision for the same is to be made in the
estimate.
b) The quantities required for various finished items of work as specified are inclusive
of permissible wastage hence no separate provision shall be made while framing
the estimate.
c) Reference of M.O.R.T. & H. Standard data book for analysis of Rates is taken for
preparation of National Highway D.S.R.
23 TRANSPORTATION CHARGES :
b) Lead charges are given in the statement C-1 for major items such as lime, murum,
earth, building rubble, sand, stone aggregate, soling stone, concrete blocks, timber,
cement, steel, bulk asphalt, bricks, Roofing tiles, all types of flooring, R.C.C. pipes
etc.
Place : Thane
Dat : 30-10-2011
Executive Engineer,
Road Project Division
Konkan Bhavan, Navi
Mumbai
6
BUILDING WORKS
Bd - A : Excavation
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
1 Excavation for foundation in___ including
removing the excavated materials upto a distance
of 50 metres beyond the building area and lift as
specified, stacking and spreading, necessary
dewatering unless provided elsewhere, preparing
the bed for the foundation and required backfilling,
ramming, watering, shoring and strutting etc.
complete. as directed.
7
Bd - A : Excavation
Rate for the Year
Item
2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
3 Filling in plinth and floors with approved excavated
materials in 15cm to 20cm layers including
watering and compaction etc. complete.
8
Bd - B : Pile Foundation
Rate for the Year
Item
2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
1 Providing M-25 R.C.C. cast in situ bored piles
of--------- using minimum cement quantity at the
rate of 300 Kg. per cum, each of load-capacity as
per design and of specified diameter or as
directed, placed through steel shell sunk to the
required depth through all strata except rock,
excluding provision of reinforcement, including
placing concrete by tremie arrangement,
compaction of concrete and withdrawal of steel
shell etc. complete.
9
xviii) 1050 mm diameter R. M. 5096.00 841.00
Bd - B : Pile Foundation
Rate for the Year
Item
2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
2 Providing M-30 R.C.C. cast in situ bored piles
of--------- each of load-capacity as per design and
of specified diameter or as directed, placed
through steel shell sunk to the required depth
through all strata except rock, excluding provision
of reinforcement, including placing concrete by
tremie arrangement, compaction of concrete and
withdrawal of steel shell etc. complete.
10
xvii) 1000 mm diameter R. M. 4926.00 785.00
xviii) 1050 mm diameter R. M. 5322.00 841.00
Deleted
Bd - B : Pile Foundation
Item
No.& Item
code
Description of Items Delete
Unit
Rate for the Year
2011-2012
Completed Labour
d
Rate Rate
3 Providing & Placing cement concrete M-25 for
R.C.C. cast in situ bored piles using termie
arrangement including compaction, curing etc.
complete.
Deleted
4
Spec. Bd B-4 Page No. 270
d
0.60m. including cleaning reinforcement and
removal of dismantled materials for providing pile
caps etc. complete.
Spec. As directed by Engineer-In-Charge. No. 104.00 -
11
Bd - B : Pile Foundation
Rate for the Year
Item
2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
7 Carrying out load test for 1.5 times the proposed Number 30993.00 -
safe working load on the pile in driven position
upto 400 mm diameter including construction of
test cap, use of accessories and instruments
including providing graphs as per I.S. code or Std.
Specifications and dismantling the cap etc. and
cleaning the site etc. complete.
8 Carrying out load test for 1.5 times the proposed Number 37437.00 -
safe working load on the pile in driven position
above 400 mm to 550 mm diameter including
construction of test cap, use of accessories and
instruments including providing graphs as per I.S.
code or Std. Specifications and dismantling the
cap etc. and cleaning the site etc. complete.
9 Carrying out load test for 1.5 times the proposed Number 45337.00 -
safe working load on the pile in driven position
above 550 mm to 650 mm diameter including
construction of test cap, use of accessories and
instruments including providing graphs as per I.S.
code or Std. Specifications and dismantling the
cap etc. and cleaning the site etc. complete.
10 Carrying out load test for 1.5 times the proposed Number 53605.00 -
safe working load on the pile in driven position
above 650 mm to 750 mm diameter including
construction of test cap, use of accessories and
instruments including providing graphs as per I.S.
code or Std. Specifications and dismantling the
cap etc. and cleaning the site complete.
12
11 Carrying out load test for 1.5 times the proposed Number 66239.00 -
safe working load on the pile in driven position
above 750 mm to 825 mm diameter including
construction of test cap, use of accessories and
instruments including providing graphs as per I.S.
code or Std. Specifications and dismantling the
cap etc. and cleaning the site etc. complete.
Bd - B : Pile Foundation
Rate for the Year
Item
2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
12 Carrying out load test for 1.5 times the proposed Number 74506.00 -
safe working load on the pile in driven position
above 825 mm to 900 mm diameter including
construction of test cap, use of accessories and
instruments including providing graphs as per I.S.
code or Std. Specifications and dismantling the
cap etc. and cleaning the site etc. complete.
13 Carrying out load test for 1.5 times the proposed Number 91763.00 -
safe working load on the pile in driven position
above 900 mm diameter including construction of
test cap, use of accessories and instruments
including providing graphs as per I.S. code or Std.
Specifications and dismantling the cap etc. and
cleaning the site etc. complete.
14 Placing cement concrete M-20 for R.C.C. cast in Cubic --- ---
Deleted
situ bored piles using tremie arrangement
including compaction, curing etc. complete. (extra
concrete) (Cement : 7.20 bags per cu.m.)
Metre
15 Empty boring for 325 to 400 mm dia. Bored R.C.C. Running 292.00 -
cast in situ piles including withdrawal of shell, Metre
removal of earth to a distance of 50 metres etc.
complete.
16 Empty boring for 425 to 500 mm dia. Bored R.C.C. Running 322.00 -
cast in situ piles including withdrawal of shell, Metre
removal of earth to a distance of 50 metres etc.
complete.
13
17 Empty boring for 525 to 600 mm dia. Bored R.C.C. Running 335.00 -
cast in situ piles including withdrawal of shell, Metre
removal of earth to a distance of 50 metres etc.
complete.
18 Empty boring for 625 to 700 mm dia. Bored R.C.C. Running 371.00 -
cast in situ piles including withdrawal of shell, Metre
removal of earth to a distance of 50 metres etc.
complete.
Bd - B : Pile Foundation
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
19 Empty boring for 725 to 1050 mm dia. Bored Running 426.00 -
R.C.C. cast in situ piles including withdrawal of Metre
shell, removal of earth to a distance of 50 metres
Deleted
etc. complete.
20 Chipping and dressing of the R.C.C. piles upto 2 Number --- ---
feet (0.60 m.) including cleaning reinforcement and
removal of dismantled materials etc. for providing
Deleted
pile caps etc. complete.
14
Bd - C : Structural Steel Work
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
1 Providing and fabricating structural steel work in
rolled sections like joist, channels, angles, tees
etc. as per detailed design and drawings or as
directed by Engineer-In-Charge. including cutting,
fabricating, hoisting, erecting, fixing in position
making riveted / bolted / welded connections with
connecting plates, braces etc. and including one
coat of anticorrosive paint and over it two coats of
oil painting of approved quality and shade etc.
complete.
15
3 Providing structural steel work in single stanchions
composed of R.S.J. channel etc. with caps bases,
mild steel plates, angle brackets, cleats, gusset
plates, anchor bolts etc. as per detailed design and
drawings or as directed, including cutting
fabrication, hoisting, erecting & fixing in position,
making riveted/bolted/ welded connection and one
coat of anticorrosive paint and over it two coats of
oil painting of approved quality and shade etc.
complete.
16
6 Providing and fixing 50 millimeter diameter heavy
type galvanized iron pipe (IS Std.) gate of
approved drawing with all fixtures and fitting in two
leaves with strong hold fast embedded in cement
concrete block at top and bottom with locking
arrangement including cutting, bending, main
holes and with one coat of primer etc. complete.
17
2 Providing and casting in situ cement concrete ___
of trap metal for steps, including formwork,
compacting, roughening the exposed faces if
special finish is to be provided and curing etc.
complete.
18
5 Providing and casting in situ cement concrete
____ of trap metal for plain or moulded sills,
cornice jambs, block in course or architrares of
required size and shape, including centering,
formwork compacting, roughening the exposed
faces if special finish is to be provided and curing
etc. complete.
19
b) M-25 Cu. M. 4162.00 519.00
c) M-30 Cu. M. 4304.00 519.00
20
Spec. No.:BdF -6 Page No. 300
a) M-20 Cu. M. 5255.00 924.00
b) M-25 Cu. M. 5396.00 927.00
c) M-30 Cu. M. 5534.00 927.00
5 (A) Providing and casting in situ cement concrete ___ of
trap metal for R.C.C. Slabs and landings upto and
inclusive of 15cm thickness as per detailed drawings
and designs, including centering, formwork,
compacting, finishing the surface with C.M. 1:3 of
sufficient minimum thickness to give a smooth and
even surfaceor roughning if special finish is to be
provided and curing etc. complete. (Excluding steel
reinforcement)
21
6 Providing and casting in situ cement concrete
_____ of trap metal for R.C.C. chhajja as per
detailed designs and drawings, including centering,
formwork, compacting, roughening the surface if
special finish is to be provided and curing etc.
complete. (Excluding steel reinforcement)
22
b) M-25 Cu. M. 5518.00 879.00
c) M-30 Cu. M. 5707.00 879.00
23
11 Providing and fixing in position-
M.S./H.Y.S.D./T.M.T. bar reinforcement of various
diameters for R.C.C. pile caps, footings,
foundations, slabs, beams, columns, canopies,
staircases, newels, chajjas, lintels, pardies, coping,
fins, arches, etc. as per detailed designs, drawings
and schedules, including cutting, bending, hooking
the bars, binding with wires or tack welding and
supporting as required etc. complete.
###
###
Bd - G : Brick Masonry
Rate for the Year
Item
2011-2012
No.& Item Description of Items Unit
code
24
Item
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
1 Providing Second class Burnt Brick masonry with
conventional / I.S. type bricks in cement mortar 1:6
in foundations and plinth of inner walls & external
walls, including bailing out water manually, striking
joints on unexposed faces, racking out joints on
exposed faces and watering etc. complete.
###
Bd - G : Brick Masonry
25
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
5 Providing Second class Burnt Brick masonry in
cement mortar 1:6 using flyash bricks in
foundations and plinth of inner walls & external
walls, including bailing out water manually, striking
joints on unexposed faces, racking out joints on
exposed faces and watering etc. complete.
26
Bd - H : Stone Masonry
Rate for the Year
Item
2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
27
Bd - H : Stone Masonry
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
6 Providing coursed rubble masonry 1st sort for pillar
of trap stones in cement mortar 1:6 including
pointing with cement mortar 1:3 scaffolding and
watering etc. complete.
28
Bd - I : Block Masonry
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
1 Providing and laying I.S.. standard cement
concrete hollow block 100 x 200 x 400 mm in
cement mortar 1:6 for superstructure including
raking out joints, when plastering is to be
done/striking joints when no plastering is to be
done, curing and scaffolding etc. complete.
Deleted
block partition in cement mortar 1:4 having mortar
joint 6 mm thick including scaffolding curing etc.
complete.
29
Bd - J : Water Proofing
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
1 Providing and laying damp-proof course 50mm
thick M-20 cement concrete layer and bitumen
using cement with approved water proofing
compound at the rate of 1 kg per 50 kg of cement
etc. complete.
30
Bd - J : Water Proofing
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
31
7 Removing existing water proofing treatment (all
types) from terrace without damages to structure,
leveling and cleaning the surface for providing new
specialized water proofing treatment etc. complete
as directed.
Spec. As directed by Engineer-In-Charge. Cu.m. 105.00 92.00
Bd - J : Water Proofing
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
32
12 Providing water proofing treatment by Polymerized
water proofing compound to the Water tank, W.C..
or toilet ducts in three coats with 7 years
guarantee on court fee stamp paper of Rs.100/-
including materials and labour and including
ponding test etc. complete. (with the permission of
S. E.)
Bd - J : Water Proofing
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
13 Providing and applying Polysafe-EC for external
walls, slopping R.C.C. roofs, in three coats to
avoid water penetration, ultra-violet effects of Sun-
rays, fungus development and to protect the
reinforcement from corrosion in atmospheric
effects. Cleaning the surface of concrete by
brushing with solvent and applying Polysafe-EC
chemical coating with primer and after 24 hour
interval applying 1st coat, and after 24 hour
interval applying second, third & final coat of
approved shade, colour, avoid smoking while
painting including necessary scaffolding etc.
complete. (with the permission of S. E.)
33
14 Providing water proofing treatment as per IS 1346-
1966 to generally inaccessible sloping R.C.C.
terrace slab with bitumen filler in all positions in
five coarse consisting of applying cold bitumen
primer coat at the rate of 2.50 litre/10 sq.m. hot
bitumen layer at the rate of 14.50 kg/ 10 sq.m. and
over the same layer of bitumen feit of type III
grade as per IS 1332-1965 across slope with 10
cm overlap commencing at the lowest level and
again applying hot bitumen coarse at the rate of
14.50 kg/10 sq m. and finally spreading over it grit
at the rate of 14.50 kg / 10 sq.m. including all lifts.
leads and scaffoldings whenever necessary
complete as directed with five year guarantee etc.
complete.
Bd - J : Water Proofing
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
34
Spec. As directed by Enginer in charge Sq. M. 420.00 35.00
1) Traceability of the sealer upto the original
manufacturer for genuiness of the product.
2) The sealer when added to ordinary
Portland cement (OPC) grade 53 should
solidify within 30 seconds.
Bd - J : Water Proofing
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
35
Bd - K : Expansion Joints
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
1 Providing expansion joints in R.C.C. framed
structure (interior columns) with plain premoulded
bituminous filler 25 mm thick, including fixing
C.C.T.W.. battens both faces etc. complete as
directed.
36
2 Providing expansion joints in R.C.C. framed
structure (exterior columns) with plain pre-moulded
bituminous filler 25 mm thick and 3 mm thick
aluminium plate, hold fast, fixing C.C.T.W.. battens
on internal face, finishing etc. complete as
directed.
37
a) in cement mortar 1:3 Sq.M. 79.00 47.00
b) in cement mortar 1:4 Sq.M. 76.00 47.00
38
5 Providing cement plaster 25mm thick in two coat,
in cement mortar 1:4 without neeru finish to
concrete brick or stone surface in all positions
including racking out joints, scaffolding and curing
etc. complete.
###
39
Item
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
8 Providing rough cast cement plaster externally in
two coats with coloured cement finish to concrete /
brick / stone masonry in all positions with base
coat of 12 to 15 mm thick in cement mortar 1:4
mixing approved water proofing compound at the
rate of 1 kg/50kg of cement and over it rough cast
treatment 12 mm thick in proportion 1:11/2:3
including racking out joints, scaffolding and
fourteen days curing etc. complete.
40
Rate for the Year
Item
2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
41
Bd - L : Plastering and Pointing
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
19 Providing sand face plaster externally in two coats
using approved screened sand in all positions,
including preparing the surface, providing base
coat of 15 mm thick in cement mortar 1:4 mixing
approved water proofing compound at the rate of 1
kilogramme / 50 kg of cement, curing the same for
not less than two days, keeping the surface of
base coat rough to receive the sand faced
treatment 8 mm thick in cement mortar 1:4 and
finishing the surface by taking out grains, curing for
14 days, scaffolding etc. complete, using Portland
Pozzolana Cement & Flyash etc. complete.
42
Bd - M : Paving, Flooring and Dado
Rate for the Year
Item
2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
43
b) 55 cm. x 55 cm. Sq. M. 507.00 101.00
44
9 Providing and laying cement concrete flooring
-------- mm thick with cement concrete M-25 laid to
proper line, level and slope in alternate days
including compaction, filling joints marking lines to
give appearance of tiles 30cm x 30cm or other
approved design, finishing smooth (with extra
cement) in approved colour as directed and curing
etc. complete.
45
12 Providing and fixing white glazed tiles of
-----------------------in size and 5 to 6 mm thick for
dado and skirting in required positions on plaster
of cement mortar 1:4 including neat cement float,
including filling joints with white cement slurry,
curing and cleaning etc. complete. (Including all
specials required like round edge titles, corner
cups, etc)
46
15 Providing and laying ceramic tiles of IS Std. and
approved quality 20x20cm. size for dado and
skirting in required position with ready made
adhesive mortar of approved quality in required
position after making the wall portion in level in
plaster of cement mortar 1:4 including joint filling
with white/colour cement slurry, cleaning, curing
etc. complete.
47
Spec. No.:BdM.-15 Page No.387
a) gray cement base Sq. M. 368.00 150.00
b) white cement base Sq. M. 520.00 150.00
48
21 Providing and laying in situ marble mosaic dado
and skirting 6 mm thick with white and coloured
marble chips of size upto with suitable panels on
cement plaster 1:3, 20 mm thick including
aluminium strips for forming panels, rounding of
corners and junctions with flooring and walls,
curing, polishing and cleaning etc. complete.
49
a) Shahabad Sq. M. 545.00 159.00
b) Tandur Sq. M. 522.00 159.00
c) Kota Sq. M. 854.00 159.00
d) Black Kadappa Sq. M. 562.00 101.00
50
27 Providing and laying precast polished chequered
colour cement tiles of size 20 x 32 and 20 mm
thick for treads and riser of steps and staircase
with nosing of treads moulded as per drawing or
as directed on bed of 1:4 cement mortar including
neat cement float, filling joints with cement slurry
mixed with approved shade of pigment to match
the colour of tiles, curing, polishing and cleaning
etc. complete.
51
29(b) Providing sills, jambs and frames of
white/approved colour marble slabs 18 mm thick of
approved quality, vein and colour with machine
polished surface on a bed of cement mortar 1:4
including neat cement float, filling joints with
cement slurry to match the colour of the slabs,
curing polishing and rounding edges, cleaning etc.
complete. (Prior approval of S.E. is necessary)
Deleted
any kind of flooring including clearing etc.
complete
Spec. As directed by Engineer-In-Charge. Sq. M. ---
52
35 Providing wax polishing to floors and
dado,preparing the surface, scaffolding etc.
complete. (S.E.'s prior permission essential.)
Spec. As directed by Engineer-In-Charge. Sq. M. 85.00 27.00
36 Providing and fixing precast heavy duty inter
locked concrete paving block of 60 mm thickness
having a strength of 300 kg/sq.mt.. of approved
quality and shape on a bed of grit / sand of 65mm
thick with C.M.1:4,striking joints, including neat Deteted
cement float filling joints with coloured cement
slurry all labour material and cleaning etc.
complete.
Spec. As directed by Engineer-In-Charge. Sq. M. -- --
Bd - N : Wood Finishes
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
1 Providing and applying boiled linseed oil
in------------ coat to old wood work including
knotting, preparing the surface, scaffolding etc.,
complete as directed.
53
b) Two Coat Sq. M. 15.00 6.00
Bd - N : Wood Finishes
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
7 Providing and applying coal tar in----------- coat on
previously painted wood, including preparing the
surface, scaffolding etc. complete.
54
a) One Coat Sq. M. 7.00 4.00
b) Two Coat Sq. M. 13.00 7.00
Bd - O : Oil Painting
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
55
1 Providing and applying ____ of lead/zinc base oil
paint/ bituminous paint of approved colour, shade
and quality to new wood work and fibre boards
including preparing the surface, knotting,
scaffolding if necessary excluding primer coat etc.
complete.
Bd - O : Oil Painting
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code
56
Item
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
5 Providing and applying Two coat of synthetic
enamel paint of approved colour and quality to
new and old structural steel work and wood work
in buildings, including scaffolding if necessary and
preparing the surface by solvent degreasing and
de-rusting by manual methods, preparing the
surface (excluding primer coat) etc. complete.
Bd - O : Oil Painting
57
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
9 Providing and applying one coat of seal cement
primer of approved manufacture and shade,
including scaffolding if necessary, cleaning the
surface etc. complete.
58
Bd - P : Colour / White washing & Distempering
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
1 Providing and applying white wash of approved
quality in two coats on old/new plastered or
masonry surfaces & asbestos cement sheets,
including scaffolding and preparing the surface by
brushing and brooming down etc. complete.
59
b) Three coat Sq. M. 44.00 16.00
60
Bd - Q : Wood Work
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
1 Providing and fixing country cut teak wood framed
collar beam / king post / queen post truss with all
iron work, including scaffolding if necessary and
primer coat etc. complete.
61
6 Providing and fixing country cut teak wood
planking ___ mm thick for flooring planed on both
sides, tongued and grooved, including scaffolding
if necessary and one coat of primer etc. complete.
Bd - Q : Wood Work
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
62
11 Providing and fixing country cut teak wood barge
board 22 cm wide and 20 mm thick plain type,
including scaffolding and primer in one coat etc.
complete.
Bd - Q : Wood Work
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
13 Providing and fixing in position P.V.C.. hand rail of
approved quality as per IS Std. make and shade,
as per detailed drawings or as directed by the
Engineer-in-charge, including French polishing etc.
complete.(50mm size)
63
16 Providing and fixing decorative teak plywood
veneer lining 4 mm thick with backing of country
cut teak wood frame work of battens 12 x 25 mm
at 30 cm centre to centre fixed to walls and pillars,
without skirting and cornice as per drawings,
including necessary iron work and finishing the
exposed wood with French polish etc. complete.
Bd - Q : Wood Work
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
64
Bd - R : Roofing and Ceiling
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
1 Providing and fixing Mangalore tiled roofing with
class "AA" tiles , including fixing 50 x 25 mm
horizontal teak wood battens, all iron work and
oiling the battens and securing the last course of
tiles near the eaves with mild steel flats of 40 x 3
mm or 10 mm dia. steel rod and 1.22 mm thick
wire painting the underside of battens including
scaffolding if necessary etc. complete. (excluding
ridge and hip tiles)
65
Spec. No.:BdR.-2. Page No.450 Sq.M. 551.00 45.00
66
7 Providing and fixing 6 mm thick asbestos cement
corrugated (Big size) sheet roofing conforming to
I.S.. 459-1970, including galvanized iron J or L
hook bolts, galvanized iron and bituminous
washers, galvanized iron cramp bolts and nuts and
scaffolding etc. complete.
67
11 Providing and fixing asbestos cement sheet of IS
Std. (60cm top width) & (23 cm bottom width) &
(15cm depth) valley gutters of approved size and
make including drop ends, stop ends necessary
fixtures and fastening the same as per code of
standard practice etc. complete.
68
17 Providing and fixing C.C.T.. wood battens _____
for Mangalore tiled roof work with all iron works,
scaffolding etc. complete.
Spec. As directed by Engineer-In-Charge.
a) 50x25 mm. R.M. 58.00 5.00
b) 25x12 mm. R.M. 22.00 5.00
69
21 Providing and fixing false ceiling of 15 to 20 mm
thick decorative boards of fibre plaster of paris,
including scaffolding if necessary, all architectural
work like mouldings, cornices, curves, domes,
cups as per detailed drawing and three coats of
spray painting to boards etc. complete. (excluding
frame work, runners & mild steel suspenders) (with
the permission of S.E.)
70
Item
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
26 Providing and fixing PVC False Ceiling consisting
of 600mm x 600mm, 3mm thick Plain PVC sheet
used as panel insert in a frame work made using
anodized aluminum Tee section of sizes 1” x1”
(25x25mm, 19 gauge or 1mm thick) in square
pattern of grid sizes of 2’x2’(600x600mm). The
aluminum framework is Supported from the ceiling
with the help of G.I. hook and G.I. wire / 6mm M.S.
rods of required sizes to maintain proper level etc.
The aluminum framework is supported on side wall
with the use of aluminium1”x1” (25x25mm) angles.
Complete as per direction of Engineer-In-charge,
manufacturer’s specification & drawing.
71
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
DOOR FARMES
1 Providing and fixing ______ door frame as per
drawing for second class doors without ventilators,
windows, fanlights etc., including all mouldings,
rebating, holdfast and finishing with one coat of
primer etc. complete.
72
Bd - T : Doors & Windows
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
3 Providing and fixing factory made precast
door/window frames of cement concrete (as per
IS-456-2000) M-40 grade of section 100 x 60 mm
including reinforcement as per I.S.6523 with
polymeric blocks having screw holding capacity of
250 kg. screw, fixed in position of R.C.C. frame as
per requirement and as per specifications without
fan light including holdfasts, carting and erecting in
position and two coats of oil paint etc. complete.
73
Bd - T : Doors & Windows
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
7 Providing and fixing Sintex or equivalent door
frames made out of rigid PVC hollow, section
DWUF-412 of size 38 mm x 32 mm with steel
reinforcement ST-33 of size 14 x 33 mm, machine
cut and welded and tie rod at the bottom including
fixing 100 mm long expandable screws in required
number with wooden plugs fixed in walls as
holdfasts and remaking damaged surface etc.
complete. (For Toilet Blocks & Windows)
74
Bd - T : Doors & Windows
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
10 Providing and fixing of PVC make frame choukhat
having size 53x60 mm. The choukhat will be
attached to the wall with the help of screws. The
choukhat will be filled with solid polymer material in
all voids necessary for fixing the screws etc.
complete.
DOOR SHUTTERS
11 Providing and fixing C.C.T.W. double leaf shutter
for second class fully paneled door without fanlight
adopting sections and sizes as given in the
standard specifications Volume II (1981) or as per
detailed drawing, including Iron oxidized /
alluminium with powder coating fixtures and
fastenings and finishing the wood work with one
coat of primer etc. complete.
75
Bd - T : Doors & Windows
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
76
Bd - T : Doors & Windows
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
15 Providing and fixing C.C.T.W. double leaf shutter
for second class partly paneled partly glazed door
without ventilator adopting sections and sizes as
given in the standard specifications Volume II
(1981) or as per detailed drawing, including Iron
oxidized fixtures / alluminium with powder coating
fixtures and fastenings and finishing the wood
work with one coat of primer etc. complete.
(Without frame)
77
Bd - T : Doors & Windows
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
18 Providing and fixing C.C.T.W. single leaf shutter of
22 mm thick for second class plain planked door
without ventilator adopting sections and sizes as
given in the standard specifications Volume II
(1981) or as per detailed drawings, including Iron
oxidized/ alluminium with powder coating fixtures
and fastenings and finishing the wood work with
one coat of primer etc. complete. (Without frame)
78
21 Providing and fixing C.C.T.W. single swing shutter
part size paneled as per detailed drawings,
including double acting brass spring hinges and
finishing with French polishing etc. complete.
(Without frame)
79
Spec. As directed by Engineer-In-Charge. Sq.M. 434.00 213.00
80
26 Providing and fixing PVC multi leaf door shutter of
approved colour / lamination made out of extruded
rigid PVC hollow section PW2459 shutter frame of
size 24 x 59 mm having double wall construction
as vertical styles, top & bottom rails and middle
lock rails of size 24 x 100 mm and the panel in
PW20200 multi chamber hollow plastic section of
size 20 x 200 joined each other by tongue and
groove interlocking system duty inserted in shutter
frames and all shutter frames, lock rails, styles
reinforced by polymer inserted inside for fixing of
hinges, aldrops, tower bolts and baby latch etc. All
corners should be machine cut joined each other
by metal screw after inserting rigid L bracket PVC
reinforced of size 100 x 200 mm including
synthetic metal / alluminium with powder coating,
fixtures and fastenings remarking , damage
surface etc. complete.
81
27 Providing and fixing PVC Twin paneled single leaf
door shutter of approved colour / lamination made
out of extruded rigid PVC hollow section PW2459
shutter frame of size 24 x 59 mm having double
wall construction as vertical styles, top & bottom
rails and middle lock rails of PW24100H of size 24
x 100 mm and the panel in PW20610 multi
chamber hollow plastic section of size 20 x 610
mm duty inserted in shutter frames, lock rails,
styles reinforced by polymer inserted inside for
fixing of hinges, aldrops, tower bolts and baby
latch etc. All corners should be mitre cut joined
each other by metal screw after inserting rigid L
bracket PVC reinforced of size 100 x 200 mm
including synthetic metal / alluminium with powder
coating, fixtures and fastenings remarking ,
damage surface etc. complete.
83
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
VENTILATORS
33 Providing and fixing C.C.T.W. second class fully
glazed ............. rectangular in shape adopting
sections and sizes as given in Standard
Specifications Volume II (1981) or as per drawing,
including iron oxidized / alluminium with powder
coating, fixtures and fastening and finishing the
wood work with one coat of primer etc. complete.
(Without frame and mild steel bar)
84
Bd - T : Doors & Windows
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
WINDOWS
36 Providing and fixing C.C.T.W. ____ double leaves
second class windows (fully glazed) adopting
sections and sizes as given in standard
specifications Volume II (1981) with plain observed
glass shutters without ventilators/fanlights as per
detailed drawings, including iron oxidized/
alluminium with powder coating fixtures and
fastenings and finishing the wood work with one
coat of primer etc. complete. (Without frame and
mild steel bars)
85
Bd - T : Doors & Windows
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
39 Providing and fixing steel windows of various sizes
as per detailed drawings with hot dip zinc coating
without/with ventilator including fabrication, glazing
with non-acetinic / plain / obscured glass panels of
approved type and quality, all fixtures and
fastening without teak wood boxing,- and
architraves and finishing with one coat of primer
etc. complete. (Sample to be got approved from
Ex. Engineer before use)
86
Bd - T : Doors & Windows
Rate for the Year
Item
2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
specially sleeted screws and fasteners as
approved by the Engineer in charge including
fixing glass 4 mm thick guard bars 12 mm square
bars hold fast, fixing in position, filling gaps all
around window after conveying to alf lifts and
leads etc. complete. (Prior approval from S.E.'s
essential)
87
43 Providing and fixing in position anodized extruded
moulded aluminium fixed glass panel window
having frame made out extruded tubular section of
size 63 x 38mm x 2.00mm thickness (wt. 1.054
kg/Rmt.) mechanically assembled at corners with
glazing, beading of angle 25 x 25 x 1.60mm thick
(wt 0.21 kg/Rmt.) including plain sheet glass
5.5mm thick with rubber gasket and wooden
encasement wherever necessary etc. as per
approved drawing and specification etc. complete
as directed drawing and specification etc.
complete as directed by Engineer in charge.
88
44 (b) Supplying and fixing in position anodized extruded
modular aluminium section Three Track sliding
windows mounted on rectangular frame of size 100 x
50x 2.80mm thick (2.183 kg/Rmt.) made up of three
track drain bottom section of size92 x 31 x 1.1mm thick
(0.911 kg/Rmt.) and top and sides sections of size 92 x
45 x 1.5mm thick (1.284 kg/Rmt.). The shutter should
be of bearing bottom of size 40 x 18 x 1.2mm thick
(0.417 kg/Rmt.) top member of size 40 x 18 x 1.20mm
thick (0.475 kg/Rmt.) Interlocking section size of 43 x
27 x 1.30mm thick (0.558 kg/Rmt.) and handle section
of size 43 x 18 x 1.30mm thick (0.424 kg/Rmt.)
selected quality 5.5mm thick clear glass to be fixed in
shutter with neoprene gasket with approved quality
PVC rollers necessary locks handles PVC lining and
wooden encasement wherever necessary etc. complete
as directed by Engineer in charge.
89
44(c) Supplying and fixing in position anodized extruded
modular aluminium section Four Track sliding
windows mounted on rectangular frame of size 127 x
45x 3.18mm thick (2.834 kg/Rmt.) made up of four
track drain bottom section of size122 x 45 x 1.3mm
thick (1.829 kg/Rmt.) and top and sides sections of size
122 x 31 x 1.1mm thick (1.205 kg/Rmt.). The shutter
should be of bearing bottom of size 40 x 18 x 1.2mm
thick (0.417 kg/Rmt.) top member of size 40 x 18 x
1.20mm thick (0.475 kg/Rmt.) Interlocking section size
of 43 x 27 x 1.30mm thick (0.558 kg/Rmt.) and handle
section of size 43 x 18 x 1.30mm thick (0.424 kg/Rmt.)
selected quality 5.5mm thick clear glass to be fixed in
shutter with neoprene gasket with approved quality
PVC rollers necessary locks handles PVC lining and
wooden encasement wherever necessary etc. complete
as directed by Engineer in charge.
90
46 Providing and fixing 16 mm dia.. mild steel round
bars at 100 mm c/c to windows / ventilators /
fanlights, fixing mild steel flats 40 x 6 mm in frame,
cutting a recess to fit the flat exactly, including
drilling the holes to flats to pass the bars through it
25 mm inside in wooden frame including providing
one central flats of 40 x 6 mm by drilling holes
including one coat of primer etc. complete. (when
bar length exceeds 45 cm and upto 75 cm)
PARTITIONS
49 Providing and fixing partition 4 mm thick Indian
teak veneer on both sides including C.C.T.W.
frame of 70 x 35 mm at 60 cm C/C on both ways,
including finishing with French polishing etc.
complete. (without skirting)
91
Item
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
92
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
54 Providing and fixing partition using 1.84 metre
height and 12mm thick teak wood with both faces
teak veneer bonded with phenol formaldehyde
synthetic resin including C.C.T.W. vertical 70 x 70
mm and top and bottom rail of 70 x 35 mm and
covering batten of 30 x 10 mm at 1.22 metre apart
on both ways or as directed including finishing with
one coat of primer etc. complete.
93
Bd - T : Doors & Windows
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
57 Providing and fixing in position anodized extruded
aluminium partition having frame made of
aluminium extruded tubular section of size 65 x 40
mm with 12 mm thick three layered flat pressed
teak wood particle board bonded with BWP type
exterior grade phenol formaldehyde synthetic resin
conforming to I.S.12823-1990, laminated on both
sides, fixed with aluminium glazing clips of size 12
x 12mm (conical) as per drawing etc. complete.
(Sample to be got approved from Ex. Engineer
before use)
94
Bd - T : Doors & Windows
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
60 Providing and fixing partition using 1.84m height
and 12mm thick Prelaminated particle board (IS
12823-1990)(BSL) both side decor lamination and
bonded with phenol formaldehyde synthetic resin
confirmed to IS 3087-1985 including CTW vertical
70 x 70 mm and top and bottom rail of 70 x 35 mm
and covering batten of 30 x 10 mm at 1.2m apart
on both ways or as directed including finishing with
one coat of prime coat etc. complete. (Excluding
fixtures & fastening)
95
Bd - T : Doors & Windows
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
64 Providing and fixing 4 mm thick plain A.C.. sheets
(of IS std.) on top of the weather shed including
scaffolding, fixing by means of nuts and bolts or as
directed etc. complete as per detailed drawing
(Brackets of 70 x 45 mm to be paid separately).
96
Spec. As directed by Engineer-In-Charge.
a) 3mm thick Sq.M. 573.00 47.00
b) 5mm thick Sq.M. 1064.00 47.00
97
74 Providing and fixing ______ of 2.54 mm thick (12
gauge) to teak wood frame work as per detailed
drawing or as directed including iron fastenings,
one coat of primer, scaffolding etc. complete.
(Frame work of 70 x 45 mm and covering battens
of 45 x 10 mm to be paid separately)
98
Bd - T : Doors & Windows
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
77 Providing and fixing factory made polyvinyl
chloride (PVC) Door Frame in Prelaminated colour
of the size 50 x 47mmwith a wall thickness of
5mm, made out of extruded 5mm PVC sheet,
miter cut at two corners and joined with 2nos. of
150mmlong brackets of 15mmx15mm M.S. square
tube. The two vertical door profiles are to be
reinforced with 19mmx19mm M.S. Square tube of
19 gauges, EPDM rubber gasket weather seal to
be provided through out the frame. The door frame
shall be fixed to the wall using65/100mm long M.S.
Screws through the frame by using PVC fasteners.
A minimum of 4nos. of screws to be provided for
each vertical member & minimum 2nos. for
horizontal member etc. complete as per
specification and direction of Engineer-in-Charge.
99
78 Providing and fixing 30mm thick FACTORY MADE
SOLID PANEL PVC DOOR SHUTTER consisting
of frame made out of M.S. tubes of 19 gauge
thickness and size of 19mm x 19mm for stiles &
15mm x 15mm for top& bottom rails. M.S. frame
shall have a coat of steel primers of approved
make and manufacture. M.S. frame shall be
covered with 5mm thick heat moulded “Rajshri”
PVC ‘C’ channel of size 30 x 50mm forming stiles,
and 5mm thick, 75mm wide PVC sheets for top
rail, lock rail & bottom rail on either side, and
10mm (5mm x 2) thick, 20mm wide cross PVC
sheet as gap insert for top rail & bottom rail.
Paneling of 5mm thick PVC sheet to be fitted in the
M.S. frame welded / sealed to the stiles & rails with
30mm wide x 5mm thick PVC sheet beading on
either side, and joined together with solvent
cement adhesive etc. An additional 5mm thick
PVC strip of 20mm width is to be stuck on the
interior side of the ‘C’ Channel using PVC solvent
cement adhesive. complete as per drawing
&direction of Engineer-in-charge,
100
79 Providing and fixing 30mm thick FACTORY
MADE BOTH SIDE PRELAM SOLID PANEL
PVCDOOR SHUTTER consisting of frame made
out of M.S. tubes of 19 gauge thickness and size
of 19mm x 19mm for stiles, top& bottom rails. M.S.
frame shall have a coat of steel primers of
approved make and manufacture. M.S. frame
covered with 5mmthick heat moulded “Rajshri”
Prelam PVC ‘C’ channel of size 30mm thickness,
70mm width out of which 50mm shall be flat and
20mm shall be tapered in 450 angle on either side
forming stiles; and 5mm thick, 95mm wide Rajshri
Prelam PVC sheet out of which 75mm shall be
flat and 20mm shall be tapered in 450 on the inner
side to form top and bottom rail and 115mm wide
Rajshri Prelam PVC sheet out of which 75mm
shall be flat and 20mm shall be tapered on both
sides to form lock rail. Top, bottom and lock rail
shall be provided either side of the panel. 10mm
(5mm x 2) thick, 20mm wide cross PVC sheet shall
be provided as gap
101
80 Providing and fixing 35mm thick factory made
Moulded door shutter consisting of solid core
single leaf Flush Door of 30mm thickness, lipped
with 15mm (5mm x 3) thick x 30mm width on one
stiles and top rails & 10mm (5mm x 2) thick x
30mm width on the other stiles & bottom rails. The
inner panel laminated with 2mm thick termite
proof, water proof and fire resistant moulded PVC
Sheet with 2, 4, 6 raised panel design in different
plain colours on one side after routing the Moulded
design on flush door & 2mm plain PVC sheet on
other side using rubber adhesive on flush door
&solvent cement adhesive on the PVC lipping etc.
complete as per direction of Engineer-in-charge,
manufacturer’s specification and drawing.
Bd - U : Iron Work
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code
102
Item
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
1 Providing and fixing mild steel grill work for
windows, ventilators weighing 15.00 kg per Sq.M.
as per drawing, including necessary fixtures,
welding and painting with one coat of anti-
corrosive paint etc. complete.
103
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
1 Providing and laying in trenches--------mm. dia. of
approved Galvanized Iron pipe having embossed
at every meter the ISI mark and name of
manufacturer, having 21.32 mm outer diameter
and 1.504 kilogramme per metre weight with
screwed sockets, joints, and necessary galvanized
iron fittings such as backnuts, elbows, bends, tees,
reducers, enlargers, plugs, etc. including providing
and applying two coats of oil paint with one coat of
primer and necessary excavation and backfilling
complete including removing existing pipe if
necessary & conveying & stacking in P.W.D..
chowky or as directed etc. complete.
A) Medium type.
a) 15mm dia.. (outer dia.. 21.32 mm & weight 1.27 R.M. 143.00 49.00
kg./ Rmt..)
b) 20mm dia.. (outer dia.. 26.90 mm & weight 1.64 R.M. 163.00 49.00
kg./ Rmt..)
c) 25mm dia.. (outer dia.. 33.70 mm & weight 2.52 R.M. 207.00 49.00
kg./ Rmt..)
d) 32mm dia.. (outer dia.42.40 mm & weight 3.24 R.M. 239.00 49.00
kg./ Rmt..)
e) 40mm dia.. (outer dia.. 48.30 mm & weight 3.73 R.M. 291.00 49.00
kg./ Rmt..)
B) Heavy type.
a) 15mm dia.. (outer dia.. 21.32 mm & weight R.M. 182.00 49.00
1.504 kg./ Rmt..)
b) 20mm dia.. (outer dia.. 26.90 mm & weight R.M. 202.00 49.00
1.953 kg./ Rmt..)
c) 25mm dia.. (outer dia.. 33.70 mm & weight R.M. 285.00 49.00
3.058 kg./ Rmt..)
104
Bd - V : Water Supply and Sanitary Fittings
105
c) 25mm dia.. (outer dia.. 33.70 mm & weight 2.52 R.M. 212.00 36.00
kg./ Rmt..)
b) 20mm dia.. (outer dia.. 26.90 mm & weight R.M. 203.00 39.00
1.953 kg./ Rmt..)
c) 25mm dia.. (outer dia.. 33.70 mm & weight R.M. 237.00 39.00
3.058 kg./ Rmt..)
d) 32mm dia.. (outer dia.42.40 mm & weight 3.937 R.M. 293.00 39.00
kg./ Rmt..)
e) 40mm dia.. (outer dia.. 48.30 mm & weight R.M. 311.00 48.00
4.545 kg./ Rmt..)
f) 50mm dia.. (outer dia.. 60.30 mm & weight R.M. 347.00 48.00
6.329kg./ Rmt..)
g) 80mm dia.. (outer dia.. 88.90 mm & weight R.M. 721.00 48.00
10.309 kg./ Rmt..)
106
Bd - V : Water Supply and Sanitary Fittings
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
3 Providing and fixing in position-------------- Ultra
Violet stabilized PVC plumbing pipes of required
standard thickness confirming to I.S.. 4985,
including necessary fittings confirming to I.S..
7834, such as P.V.C.. bends, vees, reducers,
clamps, plugs etc. necessary excavation trench,
refilling, necessary drilling holes in walls / slab, and
making the good the surface etc. complete. (For
10.00 Kg/Sq.cm.. pressure)( including defect
liability period and bond for three years.)
107
B) without brick masonary chamber
i) 15mm. diameter water meter No. 1240.00 97.00
ii) 20mm. diameter water meter No. 1689.00 97.00
iii) 25mm. diameter water meter No. 2112.00 116.00
108
b)20mm. Diameter No. 774.00 26.00
c)25mm. Diameter No. 803.00 26.00
109
Bd - V : Water Supply and Sanitary Fittings
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
12 Providing and fixing 45 cm wide steel ladder of 40
x 6 mm mild steel flat stringers and steps of 18
mm diameter mild steel bar including fixing it in M-
15 cement concrete block 60 x 30 x30cm and
painting the ladder with antirust primer and 2 coats
of oil paint etc. complete.
110
Spec. As directed by Engineer-In-Charge. No. 1098.00 286.00
111
Bd - V : Water Supply and Sanitary Fittings
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
16 Providing and fixing European type white glazed
(of IS Std.) earthenware water closet pan with
Bekelite seat and lid with chromium plated brass
hinges and rubber buffers including UPVC and
soil/vent pipe upto the outside face of wall, 10 litre
enamelled low level flushing cistern with fittings,
pipe and stop tap brackets for fixing cistern 32 mm
dia. UPVC flush pipe with fittings and clamps, 20
mm dia. UPVC overflow pipe, mosquito proof
couplings, G.I. chain and pulley, cutting and
making good to the walls and floors, testing etc.
complete. (Prior approval of sample and brand by
Ex.Engineer is necessary before use.)
112
17 Providing and fixing European type white glazed
(as per IS Std.) earthenware water closet pan with
Bekelite seat and lid with chromium plated brass
hinges and rubber buffers including UPVC,
soil/vent pipes upto outside face of-the walls, 10
litre fibre low level tank flushing cistern with fittings,
pipes and stop tap, brackets for fixing the cistern
32 mm dia. UPVC flush pipe with fittings and
clamps, 20 mm dia. UPVC overflow pipe with
mosquito proof coupling galvanised iron chain and
pulley painting of the cistern and exposed pipes
and cutting and making good to the wall and floor,
testing etc. complete. (Prior approval of sample
and brand by Ex.Engineer is necessary be fore
use.)
113
19 Providing and fixing European type white glazed
(as per IS Std.) earthernware coupled closet with
syphonic trap with syphonic low level 10 litres
White Glazed cistern with black bakelite seat and
lid with chromium plated brass hinges including
uPVC soil and white glazed vent pipe upto the
outside face of the wall including 100 mm- dia.
uPVC plug bend, inlet pipe, stop tap etc. all fittings,
cutting and making good to the walls and floor,
testing etc. complete. (Prior approval of sample
and brand by Ex.Engineer is necessary before
use.)
114
20 Providing and fixing "Anglo Indian type" white
glazed (as per IS Std.) earthenware water closet
pan with bekelite seat and lead with chromium
plated brass hinges including UPVC soil and vent
pipe upto the outside face of the wall and 100 mm
dia. UPVC plug bend, 10 litre UPVC low level
flushing cistern, 32 mm dia. UPVC flush pipe with
fittings and clamps,20 mm dia. UPVC over flow
pipe with mosquito proof coupling, G.I.chain and
pulley painting of cistern and exposed pipe and
cutting and making good to the walls and floor,
testing etc. complete. (Prior approval of sample
and brand, by Ex. Engineer is necessary before
use.)
116
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
26 Providing and fixing of approved quality and make
group of two white glazed earthenware lipped flat
back type urinal with Fibre/UPVC 5 litres capacity
flushing cistern with fittings, inlet pipe with stop
tap, brackets for fixing the cistern, 32 mm.
diameter UPVC flush pipe with fittings etc.
complete.
117
Bd - V : Water Supply and Sanitary Fittings
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
118
32 Providing and fixing 10 cm dia.uPVC Nahani Trap
fixed with UPVC grating, UPVC plug bend and
piece of UPVC pipe upto plug bend, scaffolding
etc. complete.
Spec. No.:BdV.-32 Page No.567 No. 338.00 149.00
Bd - V : Water Supply and Sanitary Fittings
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
119
Bd - V : Water Supply and Sanitary Fittings
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
36 Providing and fixing ___ diameter asbestos
cement Rain Water Pipes including rain water
receiving recess, caste iron grating, necessary
asbestos cement fittings such as bends, shoes,
pipes on walls over mild steel bracket m.s. flat of
40mm.wide and 3mm. thick,necessary
scaffolding,supported on ground by cement
concrete M-15 block of 0.30m x 0.30m x0.30m or
laying in ground including necessary excavation,
filling the trenches,filling joints with cement morte
1:2, painting the exposed faces with two coats of
paint etc.complete (including removing the existing
pipe if necessary and conveying and stacking in
P.W.D.chowky or as directed.)
120
Spec. No.:BdV.-35 Page No.570
a) 75 mm. R.M. 329.00 116.00
b) 100 mm. R.M. 371.00 116.00
121
40 Providing and fixing ____ centrifugally spun cast
iron soil / vent / waste pipe with necessary fixtures
and fittings such as bends, tees, single junction,
double junction, slotted vent, offsets,over mild
steel bracket m.s. flat of 40mm.wide and 3mm.
thick on walls or laying in the ground including
excavation, refilling trench, filling joints with
cement mortar
122
42 Providing and fixing ___ UPVC vent / waste
water / waste water & soil pipe conforming to I.S. -
13592, and I.S. - 4985 to withstand continous
internal hydraulic pressure of 4 kg/cm2 including
necessary fittings, such as bends, tees, single
junctions, double junctions and joining with rubber
rings and lubricants, over mild steel bracket m.s.
flat of 40mm.wide and 3mm. thick on walls or
laying in ground including necessary excavation,
laying, refilling the trench testing etc. complete.
123
Spec. No.:BdV.-41 Page No.573
a) 150 mm.diameter R.M. 351.00 55.00
b) 225 mm. diameter R.M. 399.00 56.00
c) 300 mm. diameter R.M. 447.00 59.00
46 Providing and constructing Brick Masonry
Inspection chamber _____ and 45 to 90 cm in
depth including 1:4:8 cement concrete foundation,
1:2:4 cement concrete channels, brick masonry,
plastering from inside and outside as required in
cement mortar 1:3 and airtight RCC lid with frame
fixed in cement concrete 1:2:4, curing etc.
complete.
124
49 Providing soak pit of size 120 x 120 x 120 cm
including excavating and filling with brick bats.
charcoal as per drawing etc. complete.
Spec. No.:BdV.-46 Page No.576 No. 737.00 224.00
125
55 Providing Mirror of approved Indian quality; copper
plated with 100 mm thick plywood backing and
fixed in the masonry etc. complete as directed.
126
60 Conveying, hoisting and fixing the HDPE tanks at
the terrace with all lead and lift and making
necessary connections including fixing ladder as
per Municipal Corporation requirement etc.
complete.
Spec. As directed by Engineer-In-Charge.
a) up to 5000 litre capacity Litre 1.00 1.00
b) Above 5000 litre capacity Litre 2.00 1.00
61 Cleaning the Septic Tank upto 1.50 Cubic Meter
capacity or equivalent etc. complete
Spec. As directed by Engineer-In-Charge. No. 922.00 803.00
Add for extra one cubical capacity of Septic tank
above 1.50 Cubic Meter Capacity etc. complete.
Spec. As directed by Engineer-In-Charge. Cum. 192.00 186.00
62 Providing and fixing 2.5 m long Hume pipe septic
Tank with pipe and cap including necessary
excavation and laying etc.complete.
Spec. No.:BdV.-45 Page No.575
a) 900 mm.diameter No. 7445.00 362.00
b) 1200 mm. Diameter No. 11581.00 725.00
Bd - W :Miscellaneous
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
1 Providing and applying two coat of anticorrosive
polymer "Rust-remover"of approved quality coating
to the steel surface by exposing the reinforcement,
removing dust, only residue and existing paint if
any thorughly and washing the surface with water
etc.complete as directed.
127
3 Providing and applying ________ polymer
polysafe plastone or approved polymer based
cement mortar 1:3 with river screened sand in all
positions by using approved polymer chemical (as
per IS std.) specifications and finishing the surface
smooth, curing etc. complete as directed.
Bd - W :Miscellaneous
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
4 Providing Pre-constructional Anti termite treatment
by treating the bottom surface and the sides of
excavation in soil with the plinth beams at the rate
of 3 litres of emulsion concentrate of one percent
concentration of chlorpyrifos 20% F.C.( i.e. by
diluting 5 ltr. of chlorpyrifos 20% EC with 95 ltr. of
water) ISI approved conforming as per I.S. 8944 &
I.S. 6313 (Part II 1981) and spraying by high
volume sprayer per square metre surface area
with ten years guarantee bond etc.complete.
128
5 Providing exhaustive Anti termite treatment to the
wooden frames by drilling 6 mm holes at four
corners or as directed on one side at downward
angle of 45 degree at junction of wood work and
masonry and in between as instructed by Engineer
as per requirement at the rate of 60 millimeter of
chlorpyrifos 20% EC as per I.S. 6313 (Part III) of
1981.and filling with putty,with two years
guarantee bond etc. complete.
Bd - W :Miscellaneous
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
7 Providing exhaustive Antitermite treatment to the
sides of flooring by injecting one percent of
chlorpyrifos 20% EC as per IS 6313 (Part III) of
1981at the rate of 50 millimeter per hole of 6 mm
diameter drilled at a distance of 30 cms centre to
centre or more as per requirement and sealing the
same with proper filling, with two years garentee
bond etc. complete.
129
8 Providing exhaustive Antitermite treatment around
the periphery by excavating trenches of 20 cms.
width and exposing the side of columns and plinth
beams upto a depth of 300 mm by injecting one
percent of chlorpyrifos 20% EC as per I.S. 6313
(Part III) of 1981,at the rate of 2.25 litres per
running metre or more as per requirement with two
years guarantee bond etc.complete.
130
14 Dismantling G.I. and A.C. sheet roofing including
purlins and rafters etc. including sorting out
serviceable and unserviceable material and
stacking the same as and where directed in the
compound, including scaffolding etc. complete.
Bd - W :Miscellaneous
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
131
20 Dismantling flat wooden or A.C. sheet ceiling with
frame work including stacking the materials as
directed with all lifts and initial lead of 50 mt.etc.
complete.
Bd - W :Miscellaneous
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
25 Dismantling doors and windows with frames and
stacking the materials as directed with all lifts and
initial lead of 50 mt.etc. complete.
132
Spec. No.:BdW.-8 Page No.587 No. 64.00 59.00
Bd - W :Miscellaneous
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
133
32 Dismantling teak wood panelled / partly / glazed /
veneer partitions carefully without damaging the
frame or panels and stacking the same as and
where directed complete.
Bd - W :Miscellaneous
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code
134
Item
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
39 Dismantling iron pipe railing having wooden R.C.C.
or cement concrete or iron posts and stacking the
materials as directed etc. complete.
Spec. No.:BdW.-8 Page No.587 R.M. 5.00 5.00
40 Scraping old paint from steel and other metal
surface with flame, cleaning and making the
surface even and scaffolding etc. complete.
Spec. No.:BdW.-8 Page No.587 Sq.M. 29.00 22.00
Bd - W :Miscellaneous
135
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
46 Removing urinal pans or wash hand basins with
frame, including disconnecting the sanitary and
water supply connections, removing the same
carefully and stacking the serviceable materials as
and where directed including throwing the
unserviceable materials out-side. etc. complete.
136
Bd - W :Miscellaneous
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
51 Dismantling R.C.C. concrete work including
breaking concrete by chiselling, wedging etc.
including cutting the reinforcement, stacking the
serviceable materials and the debris separately
upto a distance of 50 metre or spreading the
debris as directed etc. complete.
137
Spec. No.:BdW.-8 Page No.587 Sq.M. 21.00 19.00
Bd - W :Miscellaneous
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
138
Bd - W :Miscellaneous
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
62 Providing and erecting chain link fencing 1.6 M.
height with G.I.chain link of size 50 x 50 mm 8
guage thick and fixed 75 mm above Ground level
vertical M.S. Angle of 40 x 40 x 6 mm size
embedded in C.C.M-15 block of size 45 x 45 x 67
cms at 1.75 M. c/c with iron bar 16 mm dia as hold
fast including welding link with angle frame at 30
cm c/c nuts and bolts and horizontal M.S. angles
at top and bottom of 25 x 25x 5 mm size and
vertical M.S. flat 35 x 5 mm and 25 x 5 mm
horizontal including cross support of 40 x 40 x 6
mm angles both sides at every corner or bends
embedded in C.C.M-15 block of size 45 x 45 x 67
cms including 3 coats of oil painting etc.complete.
(Prior permission of S.E.'s is necessary )
139
Bd - W :Miscellaneous
Rate for the Year
Item 2011-2012
No.& Item Description of Items Unit
code Completed Labour
Rate Rate
64 Providing and fixing PVC sheet Wall Paneling of
thickness 5mm consisting of panels having size
1220mm x 2440 mm stuck on inner frame work of
50mm wide strips of 5mm thick PVC sheet. The
strips should have in their center a grove of
6mmwidth and 1mm depth for sinking the head of
the screw used to fix the strips to the wall vertically
at an equal interval of 10”between two PVC strips.
The PVC strips shall be fixed to the wall using
65mm long M.S. screws through the groove in the
strip by using PVC fasteners. The distance
between two screws shall not be more than
200mm. A groove of 2mm may be left at the joint
of two panels for aesthetic looks. The exact size of
the panel and correspondingly of the grid may vary
depending on the size of the wall. Optionally a
strips of 5mm thick PVC sheet of width 75mm
feathered at the edges shall be stuck at the places
where two panels are joined, using solvent
cement.& As directed by Engineer-in-charge.
140
ROAD WORKS
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
ROAD EARTH WORK
1 Cutting down trees--------- including trunks and
branches and stacking the materials neatly within a
lead of 50m. as directed etc. complete.
132
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
c) hard rock by wedging chiselling or line drilling Cu.M. 610.00
4 Excavation catch / side water gutters _______ to
the specified section including stacking the
Deleted
excavated stuff in a regular bund if necessary and
disposing off unsuitable or excess stuff as directed
upto 50 mtr.
133
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
a) static roller Cu.M. 34.00
b) vibratory roller Cu.M. 44.00
134
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
11 Providing earth work in embankment with approved
materials obtained from Departmental land or other
sources specified by Engineer in charge ) upto lead
of 50m including all lifts, laying in layers of 20 to
30cm. thickness, breaking clods, dressing to the
required lines, curves, grade & section, normal
watering and compaction with power roller etc.
complete.
135
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
136
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
Spec. No.:Rd. 24 Page No. 203 Cu.M. 60.00
137
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
Spec. No.:Rd.35 Page No.209
i) static roller Sq.M. 11.00
ii) vibratory roller Sq.M. 13.00
25 Compacting the size metal (150 mm loose) layer
upto 2.00m width with ______ roller, including
necessary labour, materials and artificial watering
etc. complete.
138
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
d) 12 mm Cu.M. 562.00
e) 10 mm Cu.M. 562.00
f) 6 mm Cu.M. 397.00
139
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
36 Providing dry Trap rubble stone pitching 23 cm thick Sq.M. 110.00
as directed etc. complete.
Spec. No.:Rd.73 Page No.246
37 Providing dry Trap rubble stone masonry with Cu.M. 515.00
headers etc. complete.
Spec. No.:Rd.74 Page No.247
140
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
41 Compacting 50 mm thick full grout surface with
power roller including labour, use of plant etc.
complete (Controlling Item.)
Spec. No.:Rd.44 Page No.220 Sq.M. 5.00
141
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
46 Providing 20 mm thick bituminous premix carpet of
60/70 grade of bitumen including supplying all
materials, preparing and cleaning the base, heating
bitumen mixing hot bitumen and chips, laying the
carpet layer and compacting etc. complete.(using
Bulk Asphalt.)
142
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
50 Providing single coat surface dressing on _______
road surface including supplying all
materials,cleaning the road surface,heating and
applying bitumen,spreading chips,use of tools,plant
and equipments and rolling with static roller
etc.complete. (using bulk asphalt 60/70 grade)
143
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
55 Rolling two coat bituminous surface dressing with a
power roller including labour use of plant etc.
complete (controlling item)
Spec. No.:Rd.56 Page No. 231 Sq.M. 5.30
56 Providing bituminous Liquid seal coat to B.T.
surface including, supplying all materials with all
leads, preparing existing road surface, heating &
applying bitumen, spreading chips, rolling etc.
complete. ( using bulk asphalt 60/70 grade @ rate
of 0.98 kg / square metre)
144
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
60 Providing and laying 75 milimeter thick Bituminous
Bound Macadam road surface ........ supplying all
materials, preparing the existing road
surface,spreading 40 mm stone metal layer,heating
and spraying bitumen,spreading 12 mm size
chips,compacting with power roller/vibratory roller
etc.complete.( using 60/70 grade of bitumen )
A) Static Roller
3.30% Bitumen contain
i) 60/70 grade of bitumen Cu.M. 3945.00
145
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
B) Vibratory Roller
3.30% Bitumen contain
i) 60/70 grade of bitumen Cu.M. 4416.00
C) Sensor Paver
with 3.3% Bitumen contain &30/40 grade of Cu.M. 4565.00
bitumen
RD - ROAD PAINTING
62 Providing and laying of hot applied Yellow / White
thermoplastic compound 2.5mm thick,traffic lane
edge/centre lines strips 10cm. wide, including
reflectorising glass beads @250 gms.per sqm
area,thickness of 2.5mm is exclusive of surface
applied glass beads as per IRC:35. The finished
surface to be level,uniform and free from streaks
and holes etc.complete with 3 years guarantee.
Spec-No.-MoRT&H-803.
146
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
Spec-No.-MoRT&H-
803.
a) Yellow Sqm 838.00
b) White Sqm 880.00
Spec-No.-MoRT&H-803.
a) new R.M. 6.30
b) old R.M. 5.20
Spec-No.-MoRT&H-803.
a) old Sq.M. 51.00
b) new Sq.M. 101.00
66 Painting 5th K.M. stone with approved enamel paint
in two coats and lettering including cleaning surface
etc. complete.
Spec. As directed by Engineer-In-Charge. No. 211.00
67 Painting Ordinary K.M. stone with approved enamel
paint in two coats and lettering including cleaning
surface etc. complete.
Spec. As directed by Engineer-In-Charge. No. 172.00
68 Painting Two Hundred Meter stone with approved
enamel paint in two coats and lettering including
cleaning surface etc. complete.
147
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
Spec. As directed by Engineer-In-Charge. No. 67.00
69 Painting Boundary stones with approved enamel
paint in two coats and lettering including cleaning
surface etc. complete.
Spec. As directed by Engineer-In-Charge. No. 34.00
Deleted
surface, adding required quantity of metal,
murum,watering,ramming etc.complete.
Spec. As directed by Engineer-In-Charge. Sq.M.
148
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
75 Breaking and removing the existing cement
concrete pavement to full width, depth including
lean concrete, cutting dowel bars, breaking the
removed cement concrete slab pieces into 50 to 80
mm size, spreading the layer, watering and
consolidation with power roller etc. complete. (IInd
layer not to be more than 75mm)
RD - ROAD FURNITURE
77 Providing R.C.C.(M-15) 5th kilometre stone of
standard design as per IRC:8-1980,fixing in
C.C.M15, including painting and printing
etc.complete.
149
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
80 Providing R.C.C.(M-15) Boundary stone of standard
design as per IRC:25-1967,fixing in c.c.M15,
including finishing and lettering but excluding
painting etc.complete.
150
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
83 Providing and fixing informatory sign boards in
square and rectangular shape of any size made out
of 16 Gauge (1.6mm) thick Mild Steel sheet painted
with one coat of zinc chromate stoveing primer and
two coats of green stove enamel paint on front side
and grey stove enamel on back side and border
message/symbols etc. with cutout of white retro
reflective sheeting of engineering grade, including
M.S. angle frame of size 35 x 35 x 3 MM and two
M.S. angle iron post of size 65 x 65 x6MM , 3.65
metre long properly crossed brace with angle iron of
size 50 x 50 x 5MM duly painted with alternate
black and white bands of 25cm width including
G.I.fixtures, fixing the board in 1:4:8 concrete block
of size 60 x 60 x 75 cm including tranportation
etc.complete. (The work to be executed with prior
approval of Superintending Engineer.)
151
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
Spec. IRC-67of 2001
i) Size 90 cm Triangle No. 3548.00
ii) Size 60 cm Triangle No. 3115.00
152
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
86 Providing & fixing Road junction / Information sign
boards of size _____ prepared fibre reinforced plate
4.0 milimetre thick on frame of 40 x 40 mm angle
with support of 40 mm m.s. patti of 6.00 mm thick
for strengthening including bonded with blue
retroreflective sheeting of Engineering grade having
preasure sensitive/heat activated adhesive
retroreflective with as per directed colour with
retroreflective symbols, letter, numbers, arrows with
two m.s. angle post of 65 x 65 x 6 mm size and
3.65 metre long in one pieces with out joint inflow at
bottom and drilled on top with bracing of 40 x 40 x 5
mm m.s. angle and painting with white and black
border of 25 mm., fixing boards on post with
including transporation fixing in 1:4:8 cement
concrete block of 60 x 60 x 75 cm. size at site etc.
complete. (The work to be executed with prior
approval of Superintending Engineer.)
153
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
Spec. As directed by Engineer-In-Charge. Cum. 31.00
Spec-No.-MoRT&H-401. Cum. -
154
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
90 Providing and laying Pavement Quality Concrete of
M-40 grade (cast in situ) of trap metal including
providing 125 micron thick impermeable plastic
sheet membrane over the surface to be
covered,coarse and fine aggregates of specified
gradation using minimum cement content of 350
kg/cum., approved admixtures, mixing as per the
design mix to the specified workability, providing
necessary side forms, rails and guidewires,
transporting the mix with transit mixers and laying
and spreading within fixed form by mechanical
auger and compacting with plate vibrator and
minimum ten needle vibrators,curing with approved
resin based aluminised reflective curing compound
and covering with moist hessian or ponding and
sprinkling of water for a minimum
Spec-No.-MoRT&H-602.
a) without flyash. Cum. 5210.00
155
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
156
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
94 Providing and laying Techfab India TFI-..... CE
market needel punched and mechanically bonded
non woven geotexile indigenously manufactured
from high quality polypropylene staple fibres
(continuous filament will not be accepted)on the
prepared subgrade for separate cum filtration cum
drainage application with necessary overlaps as per
drawing(as per IRS:SP:59-2002)
157
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
96 Providing and laying Techfab India -Techgrid
TGU-....CE Marked knitted and PVC coated
Polyester Uniaxial Geogrid –Techgrid indigenously
manufactured from selected high tenacity polyester
yarn with high molecular weight (> 25000 g/mol),
and low carboxyl end group (<30 mm mol /Kg)
(extruded PP geogrid & Polyester strip & Geostrip,
steel strips not allowed & not accepted )with
granular fill as per design prepared by technical
provider of reinfoced earth wall and slope. The
reinforced earth wall and slope should have 100%
coverage of 5m width knitted and pVC coated
Polyester geogrid.(Coating of Geogrid/Reinforcing
geosynthetic material with LDPE, Latex, Bitumen
and any other coating will not be allowed and will
not be accepted) for reinforced soil wall and
reinfoced slope application.
158
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
98 Providing and inserting TFI-TechDrain 100mm x
4mm indigenously manufactured Prefabricated
Vertical Drain with Polypropylene Core and
wrapped with Non-Woven Geotextile in the very soft
clay for quick consolidation.
159
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
101 Providing and laying a fiber glass geogrid of
Techfab India manufactured from high quality glass
fiber strands and coated with polymer modified
bitumen as reinforcement to asphalt overlay flexible
pavements and asphlt over distressed rigid PCC
pavements ( as per IRC SP 59-2002 & MORTH
section-700)
160
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
a) RE Wall Height 1 to 4 meter Per 3328.00
sqmt of
wall
facia
b) RE Wall Height 4 to 6 meter Per 3668.00
sqmt of
wall
facia
c) RE Wall Height 6 to 8 meter Per 3884.00
sqmt of
wall
facia
d) RE Wall Height 8 to 10 meter Per 4549.00
sqmt of
wall
facia
e) RE Wall Height 10 to 12 meter Per 5417.00
sqmt of
wall
facia
f) RE Wall Height 12 to 14 meter Per 5966.00
sqmt of
wall
facia
161
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
103 Construction of 50 mm Thick penetration macadam
over prepared Base by providing a layer of
compactedof 40 mm nominal size of 50% crushed
coarse aggregate and 50% hand broken using
chips spreader with alternate applications of
bituminous binder and key aggregates and rolling
with a smooth wheeled power roller 8-10 tonne
capacity to achieve the desired degree of
compaction (Bitumen of penetration grade S-35 to
S-90 @2kg/sq.m bitumen shall be treated with
approved antistripping agent as per manufacturers
recommendations. )
Spec. No.:As directed by Engineer-In-Charge. Sq.M. 147.00
162
Rd - Road Work
Item Rate for the Year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
105 Construction of 75 mm Thick penetration macadam
over prepared Base by providing a layer of
compactedof 40 mm nominal size of 50% crushed
coarse aggregate and 50% hand broken using
chips spreader with alternate applications of
bituminous binder and key aggregates and rolling
with a smooth wheeled power roller 8-10 tonne
capacity to achieve the desired degree of
compaction (Bitumen of penetration grade S-35 to
S-90 @2.5 kg/sq.m bitumen shall be treated with
approved antistripping agent as per manufacturers
recommendations. )
163
Rate for the Year
2011-2012
Labour
Rate
380.00
512.00
567.00
625.00
685.00
753.00
87.00
106.00
122.00
233.00
376.00
164
Rate for the Year
2011-2012
Labour
Rate
534.00
eted
-
-
-
-
-
---
19.00
165
Rate for the Year
2011-2012
Labour
Rate
21.00
21.00
21.00
21.00
21.00
75.00
76.00
76.00
76.00
166
Rate for the Year
2011-2012
Labour
Rate
76.00
76.00
76.00
76.00
76.00
65.00
167
Rate for the Year
2011-2012
Labour
Rate
27.00
33.00
122.00
129.00
137.00
144.00
122.00
129.00
137.00
144.00
49.00
168
Rate for the Year
2011-2012
Labour
Rate
42.00
63.00
70.00
22.00
37.00
4.00
4.00
7.00
10.00
5.00
169
Rate for the Year
2011-2012
Labour
Rate
4.00
4.00
4.00
4.00
4.00
4.00
20.00
1.00
1.00
170
Rate for the Year
2011-2012
Labour
Rate
1.00
1.00
1.00
1.00
20.00
20.00
20.00
20.00
20.00
20.00
4.40
8.00
2.30
171
Rate for the Year
2011-2012
Labour
Rate
36.00
126.00
14.00
20.00
9.00
172
Rate for the Year
2011-2012
Labour
Rate
1.00
23.00
10.00
1.10
20.00
173
Rate for the Year
2011-2012
Labour
Rate
17.00
8.40
0.50
21.00
21.00
174
Rate for the Year
2011-2012
Labour
Rate
17.00
17.00
###
7.50
0.40
17.00
8.00
175
Rate for the Year
2011-2012
Labour
Rate
1.00
7.40
7.40
0.60
6.40
7.40
176
Rate for the Year
2011-2012
Labour
Rate
30.00
29.00
25.00
177
Rate for the Year
2011-2012
Labour
Rate
28.00
28.00
-
-
178
Rate for the Year
2011-2012
Labour
Rate
-
-
3.00
3.00
27.00
39.00
49.00
49.00
179
Rate for the Year
2011-2012
Labour
Rate
29.00
15.00
-
-
-
-
12.00
5.50
eted 4.00
eted ---
180
Rate for the Year
2011-2012
Labour
Rate
258.00
4.20
302.00
186.00
65.00
181
Rate for the Year
2011-2012
Labour
Rate
65.00
40.00
-
-
--
-
-
182
Rate for the Year
2011-2012
Labour
Rate
183
Rate for the Year
2011-2012
Labour
Rate
-
-
-
-
-
184
Rate for the Year
2011-2012
Labour
Rate
-
-
-
-
185
Rate for the Year
2011-2012
Labour
Rate
11.00
450.00
186
Rate for the Year
2011-2012
Labour
Rate
542.00
542.00
187
Rate for the Year
2011-2012
Labour
Rate
425.00
425.00
425.00
425.00
112.00
112.00
112.00
112.00
24.00
24.00
24.00
188
Rate for the Year
2011-2012
Labour
Rate
24.00
24.00
24.00
24.00
24.00
189
Rate for the Year
2011-2012
Labour
Rate
24.00
24.00
24.00
24.00
190
Rate for the Year
2011-2012
Labour
Rate
27.00
30.00
48.00
96.00
144.00
48.00
96.00
144.00
191
Rate for the Year
2011-2012
Labour
Rate
24.00
24.00
192
Rate for the Year
2011-2012
Labour
Rate
193
Rate for the Year
2011-2012
Labour
Rate
1.00
1.00
194
Rate for the Year
2011-2012
Labour
Rate
1.00
1.00
195
BRIDGE WORKS
BRIDGE WORKS
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
BR-FOUNDATION
163
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
3(A) Dewatering for ---(a/b/c/d/e)--- in---(i/ii/iii)---
including diversion of stream providing
cofferdam, bunds etc. as may be necessary for
foundation and other parts of work and bailing
out and / or pumping out water below the actual
initial natural water level during execution of all
items of construction as required ( from start of
that particular component till completion of
bridge ) including all leads and lifts etc.
Complete Note: All items of construction
i.e.excavation, bedding,( soling & PCC ) and
concreting of that structure upto natural water
level.
164
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
e) Toe Wall, Apron Cu.M. 254.00 28.00
165
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
b)PCCM-30 Cu.M. 3594.00 40.00
5 Providing uncoursed rubble trap / graninte /
quartize / gneiss stone masonry in cement
mortar 1:5 for foundation of piers, abutments,
wings etc complete including bailing out water
striking joints and watering complete.
166
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
d)PCCM-25 Cu.M. 4185.00 305.00
e)PCCM-30 Cu.M. 4253.00 305.00
Spec.No. MoRT&H-1200
a) 4 m dia well No. 37566.00 9349.00
b) 6 m dia well No. 49609.00 9349.00
c) 8 m dia well No. 69256.00 9349.00
d) 10 m dia well No. 87101.00 9349.00
10 Providing fabricating, launching, floating and
grounding in position steel curbs for wells with
necessary steel bracings and steel cutting
edges as shown in the detailed drawings etc.
Complete as directed by Engineer in charge.
167
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
13 Providing steel anchor dowell bar including
drilling holes of 75mm dia.(one no.) in rock
placing the dowell in position and effectively
grouting the hole 32 mm dia anchor steel rod
including taking out the removable M.S. Pipe.
Spec. - As directed by Engineer-In-Charge. R.M. 951.00 76.00
168
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
Spec. No. BR-12 Page No.112,MoRT&H-
1200,1500&1700
169
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
19 Providing and laying in situ --------
trap/granite/quartizite/ gneiss metal for the
bottom plugs of wells in the dry or under water
including compation by vibrating and curing
wherever necessary etc complete
Spec. No. BR-17 Page No.120,MoRT&H-
1200,1500&1700.
170
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
22 Providing and laying in situ ------- of trap/granite /
quartzite / gniess metal for reinforced cement
concrete well / pile caps including necessary
formwork compaction by vibrating finishing and
curing etc. complete. (Excluding
reinforcement)
171
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
3. For 15 m. to 20 m.depth 60% extra over basic rate.
4. For 20 m.to 25 m.depth 100% extra over basic rate.
5. For 25 m. to 30 m.depth 220% extra over basic rate.
6. For 30 m. to 35 m.depth 390% extra over basic rate.
7. For 35 m. to 40 m.depth 690% extra over basic rate.
8. For 40 m. to 45 m.depth 1100% over basic rate.
Spec. No. BR-14 Page No.113,MoRT&H-sec.1200
Deleted
approved size for appron etc. complete as
directed by Engineer in Charge.
Spec.No.BR-57 Page No.151,MoRT&H-2503 Cu.m.
Deleted
26 Chiselling in hard strata like boulders and soft
rocks including removing and stacking the loose
material and disposing the unserviceable
materials as directed etc. complete.
172
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
a) 450 mm dia R.M. - -
b) 475 mm dia R.M. - -
c) 500 mm dia R.M. - -
d) 525 mm dia R.M. - -
e) 550 mm dia R.M. - -
f) 600 mm dia R.M. - -
g) 625 mm dia R.M. - -
h) 650 mm dia R.M. - -
I) 750 mm dia R.M. - -
j) 800 mm dia R.M. - -
k) 825 mm dia R.M. - -
l) 900 mm dia R.M. - -
n) 975 mm dia R.M. - -
m) 1000 mm dia R.M. - -
o) 1050 mm dia R.M. - -
p) 1100 mm dia R.M. - -
q) 1200 mm dia R.M. - -
r) 1500 mm dia R.M. - -
173
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
f) 600 mm dia R.M. 2242.00 432.00
g) 625 mm dia R.M. 2342.00 443.00
h) 650 mm dia R.M. 2544.00 465.00
I) 750 mm dia R.M. 2996.00 541.00
j) 800 mm dia R.M. 3252.00 585.00
k) 825 mm dia R.M. 3398.00 608.00
l) 900 mm dia R.M. 4310.00 678.00
n) 975 mm dia R.M. 4663.00 758.00
m) 1000 mm dia R.M. 5097.00 784.00
o) 1050 mm dia R.M. 5605.00 839.00
p) 1100 mm dia R.M. 6238.00 840.00
q) 1200 mm dia R.M. 7387.00 1027.00
r) 1500 mm dia R.M. 10670.00 1473.00
28 Providing M-35 R.C.C. cast in situ bored piles
each of load capacity as per design and of
specified diametre or as directed, placed
through steel shell sunk to the required depth
through all strata except rock, excluding
provision of reinforcement including placing
concrete by tremie arrangement compaction of
concrete and withdrawal of steel shell etc.
complete.
Spec.No.BR-21,P-124,MoRT&H-
1100,1600,&1700
174
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
j) 800 mm dia R.M. 3274.00 585.00
k) 825 mm dia R.M. 3423.00 608.00
l) 900 mm dia R.M. 4335.00 678.00
m) 975 mm dia R.M. 4687.00 758.00
n) 1000 mm dia R.M. 5121.00 784.00
o) 1050 mm dia R.M. 5630.00 839.00
p) 1100 mm dia R.M. 6263.00 899.00
q) 1200 mm dia R.M. 7411.00 1027.00
r) 1500 mm dia R.M. 10695.00 1027.00
175
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
BR-SUB-STRUCTURES
32 Providing & laying in situ_______ cement
concrete of trap/granite/quartzite/ gneiss metal
for cast in citu piers, abutment, returns, wings
etc. including provision of "V" shaped false
176
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
33 Providing coursed rubble trap / granite /
quartzite / gneiss stone masonry in cement
mortar __ for abutment, return, wings, head
walls etc. with khandki facing and pointing with
cement mortar 1:3 for all khandki faces and
rubble facing with struck joints for rubble
backing including scaffolding, bailing out water
and watering masonary etc. complete.
177
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
II) Using Batching plant,transit mixer and
concrete pump.(RMC)
a)RCCM-20 Cu.M. 4302.00 41.00
b)RCCM-25 Cu.M. 4414.00 39.00
c)RCCM-30 Cu.M. 4805.00 41.00
d)RCCM-35 Cu.M. 4674.00 39.00
178
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
36 Providing and laying in situ controlled -------of
trap/granite /quartzite/gniess metal for
R.C.C.caps over piers and abutments including
necessary sacffolding,formwork, compacting by
vibrating,finishing and curing etc. complete
(excluding reinforcement)
179
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
38 Providing and laying in situ--------of
trap/granite/quartzite/ gniess metal for reinforced
cement concrete block below the bearing
including necessary scaffolding, formwork,
compaction by vibrating, finishing and curing
etc. complete (excluding reinforcement)
180
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
43 Supplying, fitting and fixing in position true to
line and level POT-PTFE Polytetra Flura
Deleted
Ethylear bearing suitable for biaxial movement
as per drawing and BS: 5400 Sections 9.1 & 9.2
181
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
BR-38 Spec. No. BR-38 Page No.135,MoRT&H-
1500,1600&1700
I) Using Concrete Mixer
a)RCCM-20 Cu.M. 5110.00 946.00
b)RCCM-25 Cu.M. 5264.00 946.00
c)RCCM-30 Cu.M. 5509.00 946.00
d)RCCM-35 Cu.M. 5592.00 946.00
e)PSCM-40 Cu.M. 6689.00 946.00
182
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
d)RCCM-35 Cu.M. 5592.00 946.00
e)PSCM-40 Cu.M. 6694.00 946.00
f)PSCM-45 Cu.M.
g)PSCM-50 Cu.M.
183
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
d)RCCM-35 Cu.M. 5484.00 928.00
e)PSCM-40 Cu.M. 7260.00 928.00
184
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
52 Providing & fixing in position expansion joint with
----- bituminous pad as per detailed drawing etc.
complete
Spec. No. BR-43 Page No.138
a) 18 mm. Thick Sq.M. 1149.00 198.00
b) 25 mm. Thick Sq.M. 1427.00 198.00
c) 37 mm. Thick Sq.M. 1506.00 198.00
53 Providing and Fixing single strip modular type
expasion joint material inclusive of edge beams
and elastometic strip seal along with indigenous
fabricated anchorage system for fixing the deck
for movement of +/- 35mm (total 70mm) as per
MORT&H specification under supervision of
specilised manufacturer.
185
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
56 Providing vent holes in the slab and wearing
course with iron grill at the top and galvanised
iron pipe at bottom as per drawing.
Spec. No. BR-48 Page No.142 No. 349.00 39.00
57 Providing galvanised iron 100 mm diameter
water spout as per drawing (length of water
spouts 600 mm)
Spec. No. BR-55 Page No.150 No. 462.00 39.00
58 Providing and laying in situ cement concrete of
trap metal for haunch filling including
compacting curing etc. complete.
Spec. No. BR-45 Page No.139
a)M-10 Cu.M. 2917.00 291.00
b)M-15 Cu.M. 3028.00 291.00
59 Providing trap rubble filling over haunches and
arches including hand packing etc. complete
Spec. No. BR-46 Page No.140 Cu.M. 503.00 194.00
60 Providing and laying in position 90 cm thick
flexible stone mat as per standard drawing
consisting of 45cm.thick trap rubble
soling,22.50cm. thick over size metal layor of
100mm to 150mm metal, 11.30cm thick layor of
80mm to 100mm over size metal,and 11.20cm.
thick layor of 40mm size metal with blindage of
hard murum for rubble soling & over size, soft
murum for size metal layor,consolidation 15 cm
to 23 cm soling, consolidation of 80 mm to
100mm, 100mm to 150mm over size metal in
two layers and consolidation of 40mm size metal
layers in single layer with watering etc.
complete. (including lead of 50 mt)
186
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
61 Providing and laying in situ cement concrete of
trap / granite / quartzite/ gniess metal including
compacting, finishing, curing and filling in joints
with bitumen complete for approach slab
(excluding reinforcement)
Spec.No.BR47Page No.140,MoRT&H-
1500,1600,1700& 2704
a)M-20 Cu.M. 3714.00 306.00
b)M-25 Cu.M. 4059.00 306.00
c)M-30 Cu.M. 4207.00 306.00
d)M-35 Cu.M. 4282.00 306.00
e)M-40 Cu.M. 4359.00 306.00
62 Providing R.C.C.parapet with (15x 60cm)--------
cement concrete of trap/ granite / quartzite /
gneiss metal,cast in situ precast panels as per
the detailed drawing including reinforcement,
scaffolding , centering, formwok, compating,
finishing and curing etc. complete.
Deleted
precast panels as per the detailed drawing
including reinforcement, scaffolding,centering,
formwok,compating, finishing and curing
etc.complete.
a)M-15 R.M. - -
b)M-20 R.M. - -
c)M-25 R.M. - -
d)M-30 R.M. - -
187
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
e)M-35 R.M. - -
f)M-40 R.M. - -
Deleted
b)M-25 R.M. - -
c)M-30 R.M. - -
d)M-35 R.M. - -
e)M-40 R.M. - -
188
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
67 Providing and fixing 25 mm thick marble tablet
of size and description as per detailed drawings
inclduing engraving the description,filling the
lead, moulded marble 1:2 cement mortar border
etc.complete.
189
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
71 Providing and laying epoxy concrete using
epoxy fine sand, course sand and trap metal in
suitable proportion by weight including weighing,
mixing placing inclusive of celaning the surface
by wire, brush, sand balsting for applying the
tackcoat of epoxy as directed and giving
minimum 3 days compressive strength of 525
Kg/cm2 and maximum epoxy consumption of
214 Kg/m3 of concrete including necessary
formwork with all materials, labour, centering
equipment etc complete as directed.
Deleted
including cleaning by sand blasting, brushing,
cost of the materials, machinery equipment,
scaffolding labour etc complete as directed.
Deleted
strutting of cracked in surfacs including cleaning
by sand blasting, brushing cost of the materials,
machinery equipment, scaffolding labour etc
complete as directed.
Deleted
75 Providing and applying epoxy paint to
superstructure including scaffolding etc
complete.
Spec. No. As directed by Engineer-in Charge Sq.M. - -
190
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
76 Providing and applying Polymer Polysafe E.C.
(P.No.567)synthetic elastomeric coating cum
paint, ready to use for bridge structure in saline
as to avoid salt penitration from marine
environmet & U.V effects of sunrays, fungus
developments and to protect the reinforcement
from marine atmoshpere effects in three coats
including scaffolding, sand blasting, cleaing the
surface of concrete, brushing steel
reinforcement and applying polymer coating with
Primer, First coat and Second coat at an interval
of 24 hours of approved shade and colour.( But
not to applied on oil, Grease, Tar & Moisture of
surface Note:-Prior approval of S.E. is required.)
Deleted
and in box return including compaction etc.
complete.
Spec. No. As directed by Engineer-in Charge Cu.M.
78 Providing rubble mound of selected trap rubble
each rubble stone not less than 60 Kgt. for
abutments, foundation including machinery and
compaction laying in layer as per detailing
drawing and specification
Spec. - As directed by Engineer-In-Charge. Cu.M.
Deleted
shoring and strutting as necessary and
disposing of excavted stuff
Spec. No. As directed by Engineer-in Charge Cu.M.
191
BR
Item Rate for the year 2011-
No.& 2012
Description of items Unit
Item Completed Labour
code Rate Rate
80 Providing and applying anticorrisive treatment
for MS & TOR steel reinforcement as per
cement polymer composite coating (CPCC)
method developed by CECRI including cleaning
the bar by means of any established mechanical
or manual method for removing the rust and
deletious matter, applying rapid setting primer
and cement polymer sealing coat of approved
and licensed by CECRI including redoing the
process if damaged occur during handling,
stacking etc. complete as directed by the
Engineer in charge. (with prior approval of S.E.
is essential.)
192
C.D. WORKS
C.D. WORK
Rate for the year
Item No.& 2011-2012
Description of Items Unit
Item code Completed Labour
Rate Rate
1 Providing rubble filling of trap/granite/quartzite
gneiss stones of approved quality in foundation
including hand packing filling gravel of sand in
the voids etc. complete.
Spec.No.CD-1,P-159 Cu. M. 430.00 127.00
2 Providing and laying in situ cement concrete of
___ proporation with trap metal in foundations
including necesary compacting and curing etc.,
complete. (including formwork)
Spec.No.CD-3,P-160
a) 1:5:10 Cu. M. 2235.00 433.00
b) 1:4:8 Cu. M. 2520.00 433.00
c) M-10 Cu. M. 2899.00 433.00
d) M-15 Cu. M. 3007.00 433.00
192
C.D. WORK
Rate for the year
Item No.& 2011-2012
Description of Items Unit
Item code Completed Labour
Rate Rate
5 Providing uncoursed rubble masonry trap stone
in cement mortar 1:6 for head walls including
striking joints of the non exposed faces and
pointing the exposed faces with cement mortar
1:3 including scaffolding and watering masonry
etc. complete. Including bailing out water
manually.
Deleted
faces and pointing the exposed faces with
cement mortar 1:3 including scaffolding and
watering masonry etc. complete. Including
bailing out water manually.
Spec.No.CD-6,P-162 Cu. M. - -
7 Providing & laying in situ cement concrete of
trap/granite/quartzite/ gneiss metal for cast in
citu head walls for causeway & C.D.Works with
compaction by vibrating & curing complete
including form work centering (excluding
dewatering by means of pump and including
bailling out water).
Spec.No.CD-7,P162
193
C.D. WORK
Rate for the year
Item No.& 2011-2012
Description of Items Unit
Item code Completed Labour
Rate Rate
A) NP-2 for V.R.& O.D.R.
I) Diameter 450 mm R.M. - 129.00
ii) Diameter 600 mm R.M. - 158.00
iii) Diameter 750 mm R.M. - 208.00
iv) Diameter 900 mm R.M. - 226.00
v) Diameter 1000 mm R.M. - 266.00
vi) Diameter 1200 mm R.M. - 284.00
B) NP-3 for M.D.R. & S.H.
I) Diameter 600 mm R.M. - 224.00
ii) Diameter 750 mm R.M. - 248.00
iii) Diameter 900 mm R.M. - 323.00
iv) Diameter 1000 mm R.M. - 386.00
v) Diameter 1200 mm R.M. - 401.00
C) NP-4 for MSH&NH
I) Diameter 600 mm R.M. - 238.00
ii) Diameter 750 mm R.M. - 270.00
iii) Diameter 900 mm R.M. - 347.00
iv) Diameter 1000 mm R.M. - 410.00
v) Diameter 1200 mm R.M. - 440.00
194
C.D. WORK
Rate for the year
Item No.& 2011-2012
Description of Items Unit
Item code Completed Labour
Rate Rate
11 Providing and laying in situ 1:4:8 cement
concrete of trap metal for haunch filling
including formworks compacting, curing and
scaffolding etc. complete.
Spec.No.CD-13,P-167 Cu. M. 2392.00 343.00
12 Providing seclected hard murum filling including
laying in layers of 15 to 20 cm. watering and
compacting etc. complete.
195
BORING
BORING
Item Rate for the year 2011-
No.& 2012
Description of Items Unit
Item Completed Labour
code Rate Rate
1 Taking trial bores for detailed investigations
with 75mm/100mm/150 diameter boring in
overburden, hard murum, boulders including all
materials such as temporary casing pipes &
accessories, grease,steel balls,drill rods,core
lifter, reaming shells,core barrels,diamonds
drills,air houses,water awivels etc.and other
such materials as required,including conveying
such materials and machinery to site of
works.collected and preserving the loose
samples in glass or plastic jar,collection and
preservation of undisturbed samples,water
samples,wash samples as directed at site of
work and conveying the same to the head
quarter of concerned office as directed
etc.complete.
196
BORING
Item Rate for the year 2011-
No.& 2012
Description of Items Unit
Item Completed Labour
code Rate Rate
2 Taking trial bores for detailed investigations in
following catagory strat including all materials
such as temporary casing pipes & accessories,
grease,steel balls,diamonds bits HX/NX/BX/AX
type as per requirements,drill rods, core
lifter,reaming shells,core barrels impregnated
daimond bits,air houses,water swivels etc.&
other such materials as required including
conveying such materials asnd machinery to
site works,collecting & preserving the loose
samples in a glass or plastic jar collection of
water samples wash samples core samples as
directed , preserving samples in plastic /glass
jars,serially numering cores samples,
preseserving core samples properly in core
197
BORING
Item Rate for the year 2011-
No.& 2012
Description of Items Unit
Item Completed Labour
code Rate Rate
3 Taking trial bores for detailed investigations in
following catagory strat including all materials
such as temporary casing pipes & accessories,
grease,steel balls,diamonds bits HX/NX/BX/AX
type as per requirements,drill rods, core lifter,
reaming shells,core barrels impregnated
daimond bits,air houses,water swivels etc.&
other such materials as required including
conveying such materials and machinery to site
works,collecting & preserving the loose
samples in a glass or plastic jar collection of
water samples wash samples core samples as
directed , preserving samples in plastic /glass
jars,serially numering cores samples,
preseserving core samples properly in core
boxes at site of work, preparation and
submission of bore logs with soils & rocks
classification, conveying samples to
headquarter of concerned office as directed etc
complete.
In Other rock
a) With rotary diamond drilling machine by R.M. 3260.00 105.00
using HX bit (Core size 86 mm)
198
BORING
Item Rate for the year 2011-
No.& 2012
Description of Items Unit
Item Completed Labour
code Rate Rate
199
BORING
Item Rate for the year 2011-
No.& 2012
Description of Items Unit
Item Completed Labour
code Rate Rate
9 Conducting standard pentration test on soil,
sand by split spoon sample for--a/b/c--diameter
bore hole including labour & material etc.
complete.(Equipment and materials is to be
supplied by Department free of cost).
TRIAXIAL
i) Unconsilated Undrained per test 1320.00 -
ii) Consolited Undrained per test 1430.00 -
iii) Consolited Drained per test 1540.00 -
iv) Consilidation per test 1430.00 -
v) Direct Shear Test per test 1265.00 -
200
BORING
Item Rate for the year 2011-
No.& 2012
Description of Items Unit
Item Completed Labour
code Rate Rate
iii) California Bearing Ratio (Lab CBR) per test 1430.00 -
Permeability
i) Constant Head Method per test 990.00 -
ii) Falling Head Method per test 990.00 -
iii) Free Swell Index per test 440.00 -
iv) Swelling Pressure per test 1430.00 -
201
SURVEY WORKS
SURVEY WORK (Dept. Agency)
Survey-D
Item Rate for the year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
1 Ground reconnaissance survey of road alignment in
plain area including fixing reference pegs wherever
necessary and with th help of simple survey
instruments .
Spec. - As directed by Engineer-In-Charge. Km. -
2 Ground reconnaissance survey of road alignment in
hilly and inaccessible area including fixing reference
pegs wherever necessary and with th help of simple
survey instruments .
201
Survey-D
Item Rate for the year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
202
Survey-D
Item Rate for the year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
12 Taking purely fly level to carry out kilometre Bench
Mark, etc.complete
Spec. - As directed by Engineer-In-Charge. Km. 162.00
13 Providing and fixing chaniage, appexes, Bench
Mark stone of size 17 x 22 x 60 cm.in cement
concrete 1:4:8 block of size 45 x 45 x 60 cm.
including excavation, conveyance etc.complete.
203
Survey-D
Item Rate for the year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
204
Survey-D
Item Rate for the year
No.& 2011-2012
Description of Items Unit
Item Completed
code Rate
24 Complete survey of medium stream having
catchment area upto 1 square mile including
longitudinal section and cross section for bridge and
approaches etc.complete
Spec. - As directed by Engineer-In-Charge. No. 1800.00
205
URVEY WORK (Dept. Agency)
Survey-D
Rate for the year
2011-2012
Labour
Rate
596.00
876.00
1048.00
1258.00
2306.00
206
Survey-D
Rate for the year
2011-2012
Labour
Rate
2516.00
2306.00
916.00
218.00
218.00
184.00
207
Survey-D
Rate for the year
2011-2012
Labour
Rate
111.00
79.00
38.00
362.00
930.00
3296.00
1223.00
208
Survey-D
Rate for the year
2011-2012
Labour
Rate
10987.00
9157.00
21975.00
2014.00
3986.00
209
Survey-D
Rate for the year
2011-2012
Labour
Rate
1649.00
1649.00
1098.00
2564.00
1649.00
210
SURVEY WORK (Private Agencies)
Survey-P
Item Rate for the year
No.& 2011-2012
Description of Items Unit
Item Completed Labour
code Rate Rate
1 Reconnaissance survey including study of survey
sheets, maps etc. for alignment including three
dimensional of apexes,chain and compass or cross
staff survey,fixing pegs, fixing apex stones of size
0.15 x 0.15 x 0.60 cm in 1:2:4 cement concrete at
every apex point and 200 m. and preparation of
alignment plan with all types of compliance, if
required from department etc. complete.
As directed by Engineer-In-Charge.
206
Survey-P
Item Rate for the year
No.& 2011-2012
Description of Items Unit
Item Completed Labour
code Rate Rate
207
Survey-P
Item Rate for the year
No.& 2011-2012
Description of Items Unit
Item Completed Labour
code Rate Rate
10 Preparing detailed estimate of C.D.Works with fine
typed copies in proper file, including taking out L-
section of road,preparing catchment area plan by
traverse method, taking one trial pit of size 1.0 x
1.0 x 1.5 mtr. with all types of compliance,if
required from department etc.complete.
As directed by Engineer-In-Charge.
a) excluding taking trial pit. Job 3245.00 -
b) including taking trial pit. Job 3866.00 -
As directed by Engineer-In-Charge.
As directed by Engineer-In-Charge.
a) excluding chain and compass survey. Sq.Km. 20675.00 -
b) including chain and compass survey. Sq.Km. 24243.00 -
208
Survey-P
Item Rate for the year
No.& 2011-2012
Description of Items Unit
Item Completed Labour
code Rate Rate
13 Preparing plans and estimates of minor bridge with
the help of approved detailed survey data given by
the competent authority, including typing in 5
copies, ammonia prints, site plan, other drawings
with colouring of plans, proper filling, indexing and
paging,with all types of compliacne, if required
from department etc.complete.
As directed by Engineer-In-Charge.
a) excluding taking trial pit. Job 29707.00 -
b) including taking trial pit. Job 39051.00 -
209
Survey-P
Item Rate for the year
No.& 2011-2012
Description of Items Unit
Item Completed Labour
code Rate Rate
As directed by Engineer-In-Charge.
a) excluding taking trial pit. Job 11364.00 -
b) including taking trial pit. Job 13929.00 -
210
Survey-P
Item Rate for the year
No.& 2011-2012
Description of Items Unit
Item Completed Labour
code Rate Rate
18 Conversion of Taluka map and cutting in to
standard A size sheet for scanning,scanning of A
size sheets of maps by sending to Advanced
Scanning center at Mumbai with courier,editing of
scanned images including Scaling,Positioning and
Speckling,raster to Vector conversion of images
using RTOV legal softwares,stitching of converted
images by way of GCP into single Vector drawing
AUTOCAD vcr.12 legal software, Layering of
211
Survey-P
Item Rate for the year
No.& 2011-2012
Description of Items Unit
Item Completed Labour
code Rate Rate
20 For text of villages in deonagari font extra work
would be follows including inserting text in
deonagari font at proper locations for village
names, roads and important place etc.,Trial plot for
making corrections on A1/A2 size multi colour
plotter in foot scale on white paper,ploting of
drawing on high quality colour plotter as final
output etc.complete
212
VIDEOGRAPHY
VIDEOGRAPHY
Item Rate for the year
No.& 2011-2012
Description of Items Unit
Item
code Completed
Rate
1 Providing & carrying out video cassettee hour
shooting of roads,bridges,buildings,other
structures and programmes, including preliminary
survey, still shots moving shooting, transportation
of all equipments, persons required for shooting,
lighting arrangement as may be necessary,
editing, mixing, titling, lettering, sounding including
cost of two coloured cassette (C.D) of approved
quality etc. complete
213
VIDEOGRAPHY
Item Rate for the year
No.& 2011-2012
Description of Items Unit
Item
code Completed
Rate
iii)a Extra copies 5" x 7" Size 1 each 29.00
214
VIDEOGRAPHY
Item Rate for the year
No.& 2011-2012
Description of Items Unit
Item
code Completed
Rate
v) A4 ( 285 X 196mm ) 1 each 312.00
215
VIDEOGRAPHY
Rate for the year
2011-2012
Labour
Rate
-
-
-
-
-
-
-
-
216
VIDEOGRAPHY
Rate for the year
2011-2012
Labour
Rate
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
217
VIDEOGRAPHY
Rate for the year
2011-2012
Labour
Rate
-
218
NATIONAL HIGHWAY
ROAD WORKS
Road Work
CHAPTER - 1
SITE CLEARANCE AND DISMANTLING
Completed
Reference to Rate For
MORT&H the year
Sr.
Specification Description Unit 2011-12
No.
Cl. 4th
Revision.
a) BY MANUAL MEANS
i) In area of light jungle Hector 27944.00
ii) In area of thorney jungle Hector 37234.00
b) BY MECHANIC MEANS
i) In area of light jungle Hector 15091.00
ii) In area of thorney jungle Hector 15091.00
a) BY MANUAL MEANS
(a) Lime /cement concrete
215
Completed
Reference to Rate For
MORT&H the year
Sr.
Specification Description Unit 2011-12
No.
Cl. 4th
Revision.
216
Completed
Reference to Rate For
MORT&H the year
Sr.
Specification Description Unit 2011-12
No.
Cl. 4th
Revision.
217
Road Work
CHAPTER - 2
EARTH WORK
Reference to Completed
MORT&H Rate For the
Sr. year 2011-12
Specification Description Unit
No.
Cl. 4th
Revision.
1 301 Excavation for the roadway in soil using cu.m.
manual means including dressing section to
the required grade, camber, side slopes and
loading in a truck and carrying of cut earth to
embankment site with all lifts and lead upto
1000 metre and spreading for embankment
or stacking, disposing as directed by
Engineer in charge.
218
Reference to Completed
MORT&H Rate For the
Sr. year 2011-12
Specification Description Unit
No.
Cl. 4th
Revision.
4 301 Excavation for the roadway in hard cum. 534.00
rock(blasting prohibited) with including
loading in tippers and disposal within all lifts
and lead upto 1000 metre, dressing section
by wedging, chiseling or line drilling, in
accordance with requirements of lines,
grades and cross section, spreading for
embankment or stacking as directed by
Engineer in charge.
219
Reference to Completed
MORT&H Rate For the
Sr. year 2011-12
Specification Description Unit
No.
Cl. 4th
Revision.
7 305 Construction of embankment with approved Cubic
materials deposited at site from roadway meter.
cutting and excavation from drain and
foundation of other structure including all lifts
and lead up to 15m. laying in layers of
250mm thick loose, breaking cloads dressing
to the required line, curves, grade section,
watering the earth to O.M.C.and compacting
to meet requirements as per specification cl.
305-2 table 300-2
220
Road Work
CHAPTER - 3
SUB BASES, BASES (NON-BITUMINOUS) AND SHOULDERS
Completed
Reference to Rate For
MORT&H the year
Sr.
Specification Description Unit 2011-12
No.
Cl. 4th
Revision.
a) By manual means
i) Grading - I 90mm to 45mm Cum. 767.00
ii) Grading - II 63mm to 45mm Cum. 924.00
221
Completed
Reference to Rate For
MORT&H the year
Sr.
Specification Description Unit 2011-12
No.
Cl. 4th
Revision.
222
Completed
Reference to Rate For
MORT&H the year
Sr.
Specification Description Unit 2011-12
No.
Cl. 4th
Revision.
223
Road Work
CHAPTER -4
BITUMINOUS CONSTRUCTION
Completed
Reference to Rate For
MORT&H the year
Sr.
Specification Description Unit 2011-12
No.
Cl. 4th
Revision.
224
Completed
Reference to Rate For
MORT&H the year
Sr.
Specification Description Unit 2011-12
No.
Cl. 4th
Revision.
225
Completed
Reference to Rate For
MORT&H the year
Sr.
Specification Description Unit 2011-12
No.
Cl. 4th
Revision.
6 507 Providing and laying hot mix hot laid Dence Cum. 6095.00
Bituminous Macadm 50/75mm compacted
thickness with 4.25 % bitumen content by
weight of total mix on prepared surface with
specified graded crusher aggregates for the
base/binding course including loading of
aggregates with F.E.Loader, heating of stone
aggregates and bitumen and mixing, in
modern drum mix type of hot mix plant
transporting the hot mix to work site laying
the mixed material with sensor paver finisher
to the required grade, level and camber,
rolling by power roller and vibratory roller to
achieve the desired density
(Grade of Bitumen should be 60/70)
226
Completed
Reference to Rate For
MORT&H the year
Sr.
Specification Description Unit 2011-12
No.
Cl. 4th
Revision.
227
Completed
Reference to Rate For
MORT&H the year
Sr.
Specification Description Unit 2011-12
No.
Cl. 4th
Revision.
228
ROAD WORK
CHAPTER - 5
PIPE CULVERTS
Reference to
Completed
MORT&H
Sr. Rate For
Specification Description Unit
No. the year
Cl. 4th
2011-12
Revision.
229
ROAD WORKS
CHAPTER - 6
TRAFFIC AND TRANSPORTATION
Reference to
Completed
MORT&H
Sr. Rate For
Specification Description Unit
No. the year
Cl. 4th
2011-12
Revision.
a) On New Work
I) Over 10 cm in width (White and Yellow) 76.00
ii) Upto 10 cm in width 81.00
230
b) On Old Work
I) Over 10 cm in width (White and Yellow) 62.00
ii) Upto 10 cm in width 67.00
9 801 a) Providing and fixing letters from reflective per letter 2.00
tape of approved quality of standard width per cm.
height
231
ROAD WORK
CHAPTER - 7
ROAD SIGN BOARDS
Reference to
MORT&H Completed
Sr.
Specification Description Unit Rate For the
No.
Cl. 4th year 2011-12
Revision.
232
NATIONAL HIGHWAY
BRIDGE WORKS
Bridge Work
CHAPTER - 1
EARTHWORK
Reference to
MORT&H
Sr.
Specification Description Unit
No.
Cl. 4th
Revision.
1 304 Earth work in excavation in soil for Cum.
foundation of structures as per drawing and
technical specification, including setting out,
construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing of
sides and bottom, backfilling with approved
material, disposing off excavated stuff as
directed by Engineer in charge.etc complete.
Ordinary Soil
a) Depth upto 3 m
b) 3 m to 6 m depth
c) Above 6 m depth
( Depth upto 3 m )
a) Ordinary rock (not requiring blasting)
b) Hard rock (requiring blasting)
233
Reference to
MORT&H
Sr.
Specification Description Unit
No.
Cl. 4th
Revision.
a) Hard rock (Blasting Prohibited) Cu.m.
4 304 Earth work in excavation in marshy soil for Cu.m.
foundation of structure by manual /
mechanical means as per drawing and technical
specification, including setting out, construction
of shoring and bracing, removal of stumps and
other deleterious matter, dressing of sides and
bottom and disposing off excavated stuff as
directed by Engineer in charge etc complete.
234
Bridge Work
CHAPTER - 1
EARTHWORK
Completed
Rate For
the year
2011-12
101.00
133.00
173.00
254.00
441.00
235
Completed
Rate For
the year
2011-12
618.00
246.00
827.00
236
Bridge Work
CHAPTER -2
FOUNDATION
Reference to
MORT&H
Sr.
Specification Description Unit
No.
Cl. 4th
Revision.
235
Reference to
MORT&H
Sr.
Specification Description Unit
No.
Cl. 4th
Revision.
5 710 IRC 78 & Providing Back Filling behind abutment, Cu.m.
2204 wing wall and return wall including watering
and compacting complete as per drawing
and technical specification.
b) Sandy material
236
Completed
Rate For the
year 2011-12
2927.00
2295.00
57857.00
770.00
237
Completed
Rate For the
year 2011-12
384.00
576.00
459.00
65474.00
400.00
6615.00
238
Bridge Work
CHAPTER -3
SUBSTRUCTURE
Reference to
MORT&H
Sr.
Specification Description Unit
No.
Cl. 4th
Revision.
1 1500 & 1700 Providing and laying in situ plain/ Cum.
reinforcement cement concrete with trap
stone aggregates 20 mm nominal size
mechanically mixed and vibrataed for sub
structure including centering and shuttering,
scaffolding, laid in position and curing,
finishing with 1:3 Cement morter, if required,
compacting by vibrating etc. complete.
237
Reference to
MORT&H
Sr.
Specification Description Unit
No.
Cl. 4th
Revision.
Between 5m to 10m hight -
Above 10m hight -
238
Reference to
MORT&H
Sr.
Specification Description Unit
No.
Cl. 4th
Revision.
6 2000 Supplying,fitting and fixing in position, true Per
to line and level POT- PTFE bearing Tonne
consisting of a metal piston supported by a Capacity
disc or unreinforced elastomer confined
within a metal cylinder, sealing rings, dust
seals, PTEE surface sliding against
stainless steel mating surface, complete
assembly to be of cast steel / fabricated
structural steel, metal and elastomer
elements to be as per IRC: 83 part-I & II
respectively and other parts conforming to
BS: 5400, Sections 9.1 & 9..2 and clause
2006 of MORTH specifications complete as
per drawing and approved technical
specifications
239
Reference to
MORT&H
Sr.
Specification Description Unit
No.
Cl. 4th
Revision.
10 2600 Providing & laying expansion joint with
corrugated copper plate, compressible
fibre board,premoulded joint filter and joint
sealing compound complete as per drawing
and technical specification
240
Reference to
MORT&H
Sr.
Specification Description Unit
No.
Cl. 4th
Revision.
12 2600 Providing and fixing single strip modular Rmt
type expansion joint material inclusive of
german imported edge beams and
elastomeric strip seal along with indigenous
fabricated anchorage system for fixing the
deck for movement of +/-35 mm (total 70
mm) as per MORT&H specification under
supervision of specilised manufacturere.
241
Completed
Rate For the
year 2011-12
-
3858.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
242
Completed
Rate For the
year 2011-12
-
-
406.00
678.00
219.00
1.30
243
Completed
Rate For the
year 2011-12
168.00
249.00
111.00
111.00
1023.00
244
Completed
Rate For the
year 2011-12
###
5798.00
1386.00
893.00
8.00
17201.00
9301.00
245
Completed
Rate For the
year 2011-12
13796.00
16353.00
246
Bridge Work
CHAPTER -4
SUPERSTRUCTURE
Reference to
MORT&H Completed
Sr.
Specification Description Unit Rate For the
No.
Cl. 4th year 2011-12
Revision.
Deleted
1 1800 Providing and fixing in position to exact Rmt. -
profile prestressing high tensile steel of
specified ultimate strength including bending
cutting laying and providing strands all anch
rage cable as per detailed drawing
including necessary plant and machinery for
prestressing etc. complete,
2 1900 & 2700 Providing the railing of mild steel angle Rmt 2728.00
post or mild steel channel post ,mild steel
flat ,nuts and bolt as per detailed drawing
including scaffolding and fixing complete(As
per MORT&H drawing BD/1-88)
242
Reference to
MORT&H Completed
Sr.
Specification Description Unit Rate For the
No.
Cl. 4th year 2011-12
Revision.
6 1500 & 1700 Providing Fusion Bonded epoxy coating Tonne
to reinforcing bars as per IS:3620-1993
specification for a thickness of 175+/- 50
microns including testing of coating at plant,
extra cost for careful handing using PVC
coating, binding wires instead of G.I. Wires,
touching up the material suplied repair work
etc. complete as per detailed specification.
(Lead 200 Km to and fro from plant)etc.
complete.
243
Bridge Work
CHAPTER - 5
PROTECTIVE WORKS
Reference to
MORT&H Completed
Sr.
Specification Description Unit Rate For the
No.
Cl. 4th year 2011-12
Revision.
1 2503 Providing and laying apron With trap / Cum. 814.00
boulder etc. complete as per the drawings
and technical specifications.
244
Bridge Work
CHAPTER -6
REPAIR AND REHABILITATION
Reference to
MORT&H Completed
Sr.
Specification Description Unit Rate For the
No.
Cl. 4th year 2011-12
Revision.
245
Reference to
MORT&H Completed
Sr.
Specification Description Unit Rate For the
No.
Cl. 4th year 2011-12
Revision.
246
TRANSPORTATION
CHARGES
Transportation charges over distance 0.05 to 200.00 kms. Including loading & unloading
charges.
STATEMENT 'C' FOR 2011-12
Lead Avrg Factor No.of trips Kms Qty. of Cost Qty. Cost Cost of Hire Total 10% Gross Cost Lead
in Speed N= Done Diesel of of Oil of Oil 6 Charg Cost over Total per trip in kms
kms. km./Hr. (8/(F*(L/S)) Diesel Mazdoor es of head (14/4)
+1)) Truck charges
L S F (L/S))+1)) FNL+6 in Ltrs Rs. in Ltrs Rs. Rs . Rs. Rs. Rs. Rs. Rs. L
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
0.50 15 2 7.5 13.5 3.38 160.35 0.1 18.8 1422.00 1500 3101.15 310.11 3411.26 375.2 0.50
1.00 16 2 7.11 20.22 5.06 240 0.14 26.32 1422.00 1500 3188.37 318.84 3507.21 493.28 1.00
1.50 16.5 2 6.77 26.31 6.58 312.16 0.19 35.72 1422.00 1500 3269.88 326.99 3596.87 531.29 1.50
2.00 17 2 6.48 31.92 7.98 378.57 0.23 43.24 1422.00 1500 3343.81 334.38 3678.19 567.62 2.00
2.50 17.5 2 6.22 37.1 9.28 440.24 0.26 48.88 1422.00 1500 3411.12 341.11 3752.23 603.25 2.50
247
3.00 17.5 2 5.96 41.76 10.44 495.27 0.3 56.4 1422.00 1500 3473.67 347.37 3821.04 641.11 3.00
3.50 18 2 5.76 46.32 11.58 549.36 0.33 62.04 1422.00 1500 3533.40 353.34 3886.74 674.78 3.50
4.00 18 2 5.54 50.32 12.58 596.8 0.36 67.68 1422.00 1500 3586.48 358.65 3945.13 712.12 4.00
4.50 18.5 2 5.38 54.42 13.61 645.66 0.39 73.32 1422.00 1500 3640.98 364.1 4005.08 744.44 4.50
5.00 18.5 2 5.19 57.9 14.48 686.93 0.41 77.08 1422.00 1500 3686.01 368.6 4054.61 781.24 5.00
6.00 19 2 4.9 64.8 16.2 768.53 0.46 86.48 1422.00 1500 3777.01 377.7 4154.71 847.9 6.00
7.00 19 2 4.61 70.54 17.64 836.84 0.5 94 1422.00 1500 3852.84 385.28 4238.12 919.33 7.00
8.00 19.5 2 4.39 76.24 19.06 904.21 0.54 101.5 1422.00 1500 3927.73 392.77 4320.50 984.17 8.00
9.00 19.5 2 4.16 80.88 20.22 959.24 0.58 109 1422.00 1500 3990.28 399.03 4389.31 1055.12 9.00
10.00 20 2 4 86 21.5 1020 0.61 114.7 1422.00 1500 4056.64 405.66 4462.30 1115.58 10.00
15.00 20 2 3.2 102 25.5 1210 0.82 154.2 1422.00 1500 4285.88 428.59 4714.47 1473.27 15.00
20.00 25 2 3.08 129.2 32.3 1532 0.92 173 1422.00 1500 4627.27 462.73 5090.00 1652.6 20.00
Lead Avrg Factor No.of trips Kms Qty. of Cost Qty. Cost Cost of Hire Total 10% Gross Cost Lead
in Speed N= Done Diesel of of Oil of Oil 6 Charg Cost over Total per trip in kms
kms. km./Hr. (8/(F*(L/S)) Diesel Mazdoor es of head (14/4)
+1)) Truck charges
L S F (L/S))+1)) FNL+6 in Ltrs Rs. in Ltrs Rs. Rs . Rs. Rs. Rs. Rs. Rs. L
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
25.00 25 2 2.67 139.5 34.88 1655 1 188 1422.00 1500 4764.71 476.47 5241.18 1962.99 25.00
30.00 30 2 2.67 166.2 41.55 1971 1.05 197.4 1422.00 1500 5090.53 509.05 5599.58 2097.22 30.00
35.00 30 2 2.4 174 43.5 2064 1.24 233.1 1422.00 1500 5218.76 521.88 5740.64 2391.93 35.00
40.00 35 2 2.43 200.4 50.1 2377 1.29 242.5 1422.00 1500 5541.26 554.13 6095.39 2508.39 40.00
45.00 35 2 2.24 207.6 51.9 2462 1.33 250 1422.00 1500 5634.18 563.42 6197.60 2766.78 45.00
247
50.00 35 2 2.07 213 53.25 2526 1.36 255.7 1422.00 1500 5703.86 570.39 6274.25 3031.04 50.00
60.00 35 2 1.81 223.2 55.8 2647 1.41 265.1 1422.00 1500 5834.23 583.42 6417.65 3545.66 60.00
70.00 40 2 1.78 255.2 63.8 3027 1.45 272.6 1422.00 1500 6221.27 622.13 6843.40 3844.61 70.00
80.00 40 2 1.6 262 65.5 3107 1.49 280.1 1422.00 1500 6309.44 630.94 6940.38 4337.74 80.00
90.00 40 2 1.45 267 66.75 3167 1.51 283.9 1422.00 1500 6372.50 637.25 7009.75 4834.31 90.00
100.00 40 2 1.33 272 68 3226 1.53 287.6 1422.00 1500 6435.56 643.56 7079.12 5322.65 100.00
248
125.00 40 2 1.1 281 70.25 3333 2.01 377.9 1422.00 1500 6632.54 663.25 7295.79 6632.54 125.00
150.00 40 2 0.94 288 72 3416 2.06 387.3 1422.00 1500 6724.96 672.5 7397.46 7869.64 150.00
175.00 40 2 0.82 293 73.25 3475 2.09 392.9 1422.00 1500 6789.90 678.99 7468.89 9108.4 175.00
200.00 40 2 0.73 298 74.5 3534 2.12 398.6 1422.00 1500 6854.84 685.48 7540.32 10329 200.00
L S F (L/S))+1)) FNL+6 in Ltrs Rs. in Ltrs Rs. Rs . Rs. Rs. Rs. Rs. Rs. L
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
7) L.F. Pay load factor / Trip.
247
TRANSPORTAION CHARGES
Statement 'C1' FOR 2010-2011
Statement 'C1' FOR 2011-2012
Lead in Cost Earth, Sand, Hand Rubble Steel, Bulk Hot mix Concrete Bricks Roofing All R.C.C. Hume Pipe For
km per trip murum, crushed Broken cement, Bitumen bituminous Block and Tiles types of C.D. work
bldg, Metal, metal RCC material Laterite flooring
debris Stone 40mm blocks Stone
lime Dust and G.I.sheets
Timber above
Task/ 6.00 cumt 5.75 cumt 5.50 4.70 9.00 M.T. 7.50 M.T. 5.50 cumt 6.0 cumt 3500 5000 No. 110 30 15
trip cumt cumt No. Sqm. Rmt. Rmt.
Unit Per per cumt per cumt per cumt per cumt per M.T. per M.T. per cumt per cumt 1000 1000 No. per Rmt Rmt
No. sqm.
0.50 375.20 62.53 65.25 68.22 79.83 41.69 50.03 68.22 62.53 107.20 75.04 3.41 12.51 25.01
1.00 493.28 82.21 85.79 89.69 104.95 54.81 65.77 89.69 82.21 140.94 98.66 4.48 16.44 32.89
1.50 531.29 88.55 92.40 96.60 113.04 59.03 70.84 96.60 88.55 151.80 106.26 4.83 17.71 35.42
2.00 567.62 94.60 98.72 103.20 120.77 63.07 75.68 103.20 94.60 162.18 113.52 5.16 18.92 37.84
2.50 603.25 100.54 104.91 109.68 128.35 67.03 80.43 109.68 100.54 172.36 120.65 5.48 20.11 40.22
3.00 641.11 106.85 111.50 116.57 136.41 71.23 85.48 116.57 106.85 183.17 128.22 5.83 21.37 42.74
3.50 674.78 112.46 117.35 122.69 143.57 74.98 89.97 122.69 112.46 192.79 134.96 6.13 22.49 44.99
249
4.00 712.12 118.69 123.85 129.48 151.51 79.12 94.95 129.48 118.69 203.46 142.42 6.47 23.74 47.47
4.50 744.44 124.07 129.47 135.35 158.39 82.72 99.26 135.35 124.07 212.70 148.89 6.77 24.81 49.63
5.00 781.24 130.21 135.87 142.04 166.22 86.80 104.17 142.04 130.21 223.21 156.25 7.10 26.04 52.08
6.00 847.90 141.32 147.46 154.16 180.40 94.21 113.05 154.16 141.32 242.26 169.58 7.71 28.26 56.53
###
7.00 919.33 153.22 159.88 167.15 195.60 102.15 122.58 167.15 153.22 262.67 183.87 8.36 30.64 61.29
8.00 984.17 164.03 171.16 178.94 209.40 109.35 131.22 178.94 164.03 281.19 196.83 8.95 32.81 65.61
9.00 1055.12 175.85 183.50 191.84 224.49 117.24 140.68 191.84 175.85 301.46 211.02 9.59 35.17 70.34
10.00 1115.58 185.93 194.01 202.83 237.36 123.95 148.74 202.83 185.93 318.74 223.12 10.14 37.19 74.37
71.54 11.92 12.44 13.01 15.22 7.95 9.54 13.01 11.92 20.44 14.31 0.65 2.38 4.77
15.00 1473.27 245.55 256.22 267.87 313.46 163.70 196.44 267.87 245.55 420.93 294.65 13.39 49.11 98.22
35.87 5.98 6.24 6.52 7.63 3.99 4.78 6.52 5.98 10.25 7.17 0.33 1.20 2.39
20.00 1652.60 275.43 287.41 300.47 351.62 183.62 220.35 300.47 275.43 472.17 330.52 15.02 55.09 110.17
62.08 10.35 10.80 11.29 13.21 6.90 8.28 11.29 10.35 17.74 12.42 0.56 2.07 4.14
25.00 1962.99 327.17 341.39 356.91 417.66 218.11 261.73 356.91 327.17 560.85 392.60 17.85 65.43 130.87
26.85 4.47 4.67 4.88 5.71 2.98 3.58 4.88 4.47 7.67 5.37 0.24 0.89 1.79
30.00 2097.22 349.54 364.73 381.31 446.22 233.02 279.63 381.31 349.54 599.21 419.44 19.07 69.91 139.81
58.94 9.82 10.25 10.72 12.54 6.55 7.86 10.72 9.82 16.84 11.79 0.54 1.96 3.93
35.00 2391.93 398.66 415.99 434.90 508.92 265.77 318.92 434.90 398.66 683.41 478.39 21.74 79.73 159.46
23.29 3.88 4.05 4.23 4.96 2.59 3.11 4.23 3.88 6.65 4.66 0.21 0.78 1.55
40.00 2508.39 418.07 436.24 456.07 533.70 278.71 334.45 456.07 418.07 716.68 501.68 22.80 83.61 167.23
51.68 8.61 8.99 9.40 11.00 5.74 6.89 9.40 8.61 14.77 10.34 0.47 1.72 3.45
45.00 2766.78 461.13 481.18 503.05 588.68 307.42 368.90 503.05 461.13 790.51 553.36 25.15 92.23 184.45
52.85 8.81 9.19 9.61 11.25 5.87 7.05 9.61 8.81 15.10 10.57 0.48 1.76 3.52
50 3031.04 505.17 527.14 551.10 644.90 336.78 404.14 551.10 505.17 866.01 606.21 27.55 101.03 202.07
51.46 8.58 8.95 9.36 10.95 5.72 6.86 9.36 8.58 14.70 10.29 0.47 1.72 3.43
60 3545.66 590.94 616.64 644.67 754.40 393.96 472.75 644.67 590.94 1013.05 709.13 32.23 118.19 236.38
29.90 4.98 5.20 5.44 6.36 3.32 3.99 5.44 4.98 8.54 5.98 0.27 1.00 1.99
70 3844.61 640.77 668.63 699.02 818.00 427.18 512.61 699.02 640.77 1098.46 768.92 34.95 128.15 256.31
49.31 8.22 8.58 8.97 10.49 5.48 6.58 8.97 8.22 14.09 9.86 0.45 1.64 3.29
80 4337.74 722.96 754.39 788.68 922.92 481.97 578.37 788.68 722.96 1239.35 867.55 39.43 144.59 289.18
250
49.66 8.28 8.64 9.03 10.57 5.52 6.62 9.03 8.28 14.19 9.93 0.45 1.66 3.31
90 4834.31 805.72 840.75 878.97 1028.58 537.15 644.57 878.97 805.72 1381.23 966.86 43.95 161.14 322.29
###
48.83 8.14 8.49 8.88 10.39 5.43 6.51 8.88 8.14 13.95 9.77 0.44 1.63 3.26
100 5322.65 887.11 925.68 967.75 1132.48 591.41 709.69 967.75 887.11 1520.76 1064.53 48.39 177.42 354.84
52.40 8.73 9.11 9.53 11.15 5.82 6.99 9.53 8.73 14.97 10.48 0.48 1.75 3.49
125 6632.54 1105.42 1153.49 1205.92 1411.18 736.95 884.34 1205.92 1105.42 1895.01 1326.51 60.30 221.08 442.17
49.48 8.25 8.61 9.00 10.53 5.50 6.60 9.00 8.25 14.14 9.90 0.45 1.65 3.30
150 7869.64 1311.61 1368.63 1430.84 1674.39 874.40 1049.29 1430.84 1311.61 2248.47 1573.93 71.54 262.32 524.64
49.55 8.26 8.62 9.01 10.54 5.51 6.61 9.01 8.26 14.16 9.91 0.45 1.65 3.30
175 9108.40 1518.07 1584.07 1656.07 1937.96 1012.04 1214.45 1656.07 1518.07 2602.40 1821.68 82.80 303.61 607.23
48.83 8.14 8.49 8.88 10.39 5.43 6.51 8.88 8.14 13.95 9.77 0.44 1.63 3.26
200 ### 1721.54 1796.38 1878.04 2197.70 1147.69 1377.23 1878.04 1721.54 2951.20 2065.84 93.90 344.31 688.61
R.C.C. Hume Pipe For
C.D. work
5 Rmt.
Rmt
75.04
98.66
106.26
113.52
120.65
128.22
134.96
142.42
148.89
156.25
169.58
183.87
196.83
211.02
223.12
14.31
294.65
7.17
330.52
12.42
392.60
5.37
419.44
11.79
478.39
4.66
501.68
10.34
553.36
10.57
606.21
10.29
709.13
5.98
768.92
9.86
867.55
9.93
966.86
9.77
1064.53
10.48
1326.51
9.90
1573.93
9.91
1821.68
9.77
2065.84
Statement 'C2'
LOADING, UNLOADING & STACKING
Rates for
Loading Unloading
Sr. No. Materials Unit carriage carriage
upto 50 m upto 50 m
lead lead
1000
5 Bricks 20.00 17.00
Nos.
251
3 101 metres to 200 metres Cu.m. 19.00
252
KING
Rates for
Stacking
carriage
upto 50 m
lead
10.00
6.00
12.00
20.00
10.00
1.10
9.00
8.00
5.50
12.00
16.00
2011-2012
17.50
13.20
253
21.00
254
MATERIAL RATES
STATEMENT OF MATERIAL RATES FOR D.S.R.-2011-12
Sr. No. Description Unit R Rate
aProposed for
t 2011-2012
e
s
1 2 3 ### 4
1 A.C. Bend 100 mm No. ###f 77
2 A.C. Bend 75 mm No. ###o 63
3 A.C. Collar No. ###r 46
4 A.C. Cowl Dome 100 mm dia No. ### 83
0
5 A.C. Cowl Dome 75 mm dia No. ###7 69
6 A.C. Cowl Vent 100 mm dia No. ###/ 82
7 A.C. Cowl Ventilator 100 mm No. 0
### 66
8
8 A.C.Corrugated Sheet 6 mm thick Sq.M. ### 313
9 A.C. Double 'Y' Junction 100 mm No. ### 107
10 A.C. Double 'Y' Junction 150 mm No. ### 126
11 A.C. Double 'Y' Junction 75 mm No. ### 76
12 A.C. pipe 100 mm diameter Rmt ### 85
13 A.C. pipe 150 mm diameter Rmt ### 111
14 A.C. plain sheet 6 mm thick Sqm. ### 295
15 A.C. plug bend 100 mm dia No. ### 105
16 A.C. plug bend 150 mm dia No. ### 166
17 A.C. plug bend 70 mm dia No. ### 96
18 A.C. rain water pipe 100 mm dia M ### 109
19 A.C. rain water pipe 150 mm dia M ### 139
20 A.C. rain water pipe 75 mm dia M ### 84
21 A.C. sheet 4.0 milimetre thick plain Sqm. ### 186
22 A.C. sheet ridge Pair ### 235
23 A.C. sheets (trafford) 6 mm thick Sqm. ### 259
24 A.C. shoe 100 mm dia No. ### 69
25 A.C. Shoe 75 mm dia. No. ### 48
26 A.C. Shoe for 150 mm dia. No. ### 75
27 Accoustic Board (60 x 60 cm) No. ### 80
28 Acrylic Plain Sheet - 2 mm thick Sq.M. ### 783
29 Acrylic Plain Sheet - 3 mm thick Sq.M. ### 905
30 Acrylic Plain Sheet - 4 mm thick Sq.M. ### 1246
31 Acrylic Washable Distemper Per Litre### 110
32 Aldrop 300 x 16 mm chromium plated No. ### 165
33 Aldrop 300 x 20 mm-Brass oxidised No. ### 457
34 Aldrop Aluminium 300 x 16 mm No. ### 165
35 Aldrop Iron Oxidised 300 mm long (20 mm dia) No. ### 112
252
Sr. No. Description Unit R Rate
aProposed for
t 2011-2012
e
s
36 Alluminium Jali Sq.M. ### 1378
37 Aluminium Sections Kg. ###
f 252
38 Aluminium Sheet 24 B w.g. Sqm. o
### 430
39 Aluminium Sliding door bolt No. r
### 90
40 Aluminium Stay No. ### 76
0
41 Aluminium Strips Kg. ###
7 255
42 Anglo Indian Orissa - White No. ###
/ 1483
43 Anglo Indian W.C.Pan - White No. 0
### 1175
Ball cock 12 mm dia. cromium plated 8
### 164
44 No.
45 Ballcock 15 mm dia with P.V.C. float No. ### 182
46 Ballcock 25 mm dia with P.V.C. float No. ### 374
47 Barbed Wire Kg ### 87
48 Basin & foundation- Brass Chromium plated No. ### 488
49 Bearing roller for glazed window shutter No. ### 73
50 Bed washer Kg ### 68
51 Bees wax Kg ### 68
52 Bell mouth cover (100 mm) dia No. ### 65
53 Bend 110 mm-PVC No. ### 177
54 Bend 75 mm dia -plain-PVC No. ### 106
55 Bend 75 mm-PVC No. ### 142
56 Bend/plug (18 guage) G.I. No. ### 140
57 Bib stop tap brass heavy 15 mm No. ### 177
58 Bib stop tap brass heavy 25 mm No. ### 308
59 Bib tap 12 mm brass medium No. ### 217
60 Bib tap 12 mm cast iron No. ### 113
61 Bid stop tap brass heavy 20 mm No. ### 255
62 Binding wires Kg ### 82
63 Bitumen (compound) Kg ### 70
64 Bitumen fillers Kg ### 49
65 Bitumen pad 25 mm thick Sqm. ### 1364
66 Bitumen washers Kg ### 68
67 Bituminous felt Sqm. ### 95
68 Black bakelite seat to European closet pan No. ### 75
69 Black kadappa (hand cut) 25 mm thick Sqm. ### 372
70 Black kadappa (Machine cut) 25 mm thick Sqm. ### 400
71 Black kadappa 40 mm / 35 mm. Sqm. ### 385
72 Black Kadappa stone 25 mm thick rough Sqm. ### 389
73 Black Kadappa stone 50 mm thick rough Sqm. ### 429
253
Sr. No. Description Unit R Rate
aProposed for
t 2011-2012
e
s
74 Black Kadappa stone polished 1.5 x 0.45 m size No. ### 306
75 Black kadappa stone-Both sides polished Sqm. ### f 507
76 Blasting powder Kg ### o 172
77 Block Board 25 mm thick Sqm. ### r 57
78 Boiled Linseed oil Litre ### 119
0
79 Boll Cock 40 mm dia and PVC float No. ### 7 966
80 Boll Cock 50 mm dia and PVC float No. ### / 1488
81 Box chamber with lock No. ### 0 335
Bracket chromium plated 8
82 No. ### 87
83 Brass nozzle pillar Tap 12 mm No. ### 255
84 Brick bats Cum. ### 495
85 Bricks (I class) No. ### 319
86 Bricks (II class) 1000 Nos.### 3373
87 Bricks Aggregate (20 to 40 mm) Cum. ### 329
88 Brush for lettering No. ### 67
89 Brush for road marking 4" dia. No. ### 197
90 Butt hinges 125 mm-Brass oxidised No. ### 207
91 Butt hinges aluminium 100 mm No. ### 49
92 Butt hinges aluminium 125 mm No. ### 64
93 Butt hinges aluminium 90 mm No. ### 43
94 Butt hinges iron oxidised 100 mm No. ### 29
95 Butt hinges iron oxidised 125 mm No. ### 66
96 Butt hinges iron oxidised 90 mm No. ### 26
97 C.C. septic tank 0.90 m dia and 2.50 m long No. ### 18948
98 C.C. septic tank 1.20 m dia and 2.50 m long No. ### 11694
99 C.I. bend 100 mm No. ### 246
100 C.I. brackets No. ### 73
101 C.I. coller 100 mm dia No. ### 210
102 C.I. coller 150 mm dia No. ### 478
103 C.I. coller 75 mm dia No. ### 201
104 C.I. cover 45 x 30 cm with frame No. ### 712
105 C.I. cover with frame (gully trap) No. ### 266
106 C.I. cow/vent 100 mm dia No. ### 495
107 C.I. cow/vent 150 mm dia No. ### 191
108 C.I. cow/vent 75 mm dia No. ### 120
109 C.I. grating 100 mm dia. No. ### 68
110 C.I. grating 75 mm dia. No. ### 62
111 C.I. manhole cover (75 kg) No. ### 944
254
Sr. No. Description Unit R Rate
aProposed for
t 2011-2012
e
s
112 C.I. manhole cover 32 kg No. ### 738
113 C.I. Nahani trap 100 mm dia No. ###
f 321
114 C.I. Nahani trap 75 to 80 mm dia No. o
### 295
115 C.I. pipe 100 mm dia M r
### 1007
116 C.I. pipe 150 mm dia M ### 1795
0
117 C.I. pipe 75 to 80 mm dia M ###
7 951
118 C.I. plug bend 100 mm dia No. ###
/ 321
119 C.I. plug bend 150 mm dia No. 0
### 670
C.I. shoe 75-100 mm dia (18 guage) 8
### 314
120 No.
121 C.I. Tee No. ### 464
122 C.I. Trap Grating 15 x 10 cm No. ### 233
123 C.I. 'Y' junction 100 mm dia No. ### 482
124 C.I. 'Y' junction 150 mm dia No. ### 1582
125 C.I. 'Y' junction 75 mm dia No. ### 446
126 C.T.W. above 2.5 m length Cum. ### 61556
127 C.T.W. batten 50 x 25 mm M. ### 85
128 C.T.W. battern 50 x 12 mm M. ### 85
129 C.T.W. bullies 100mm dia M. ### 103
130 C.T.W. bullies 125mm dia M. ### 117
131 C.T.W. bullies 150mm dia M. ### 127
132 C.T.W. frame superior Cum. ### 73378
133 C.T.W. girder (joist) Cu.M. ### 64745
134 C.T.W. Particle board face laminated Sq.M. ### 841
135 C.T.W. Plank 1 to 2 metre length Cu.M. ### 57460
136 C.T.W. Plank 15 to 50 mm thick 10 - 15 cm/wide Cu.M. ### 66195
137 C.T.W. Plank 20 mm thick 10 - 15 cm wide Cu.M. ### 66456
138 C.T.W. Pulins/Planks in General Cum. ### 58993
139 C.T.W. sash bars/T.W. glass beading Cu.M. ### 50145
140 C.T.W.plank superior Cu.M. ### 75341
141 Cast iron hinged cover with frame No. ### 316
142 Cast iron shoe for 150 mm dia No. ### 343
143 cast iron-Bend No. ### 49
144 Cellular core flush door 35 mm thick Sqm. ### 984
145 Cement- Coloured Kg ### 67
146 Cement paint Kg ### 93
147 Centering oil Litre ### 61
148 Ceramic tiles marble finish 200 x 200 mm Sqm. ### 788
149 Ceramic tiles marble finish 300 x 300 mm Sqm. ### 806
255
Sr. No. Description Unit R Rate
aProposed for
t 2011-2012
e
s
150 Ceramic tiles Plain Coloured 200 x 100 mm Sqm. ### 771
151 Ceramic tiles Plain Coloured 200 x 200 mm Sqm. ### f 813
152 chain 12 mm dia-G.I. M ### o 48
153 chain 28 mm dia-G.I. M ### r 56
154 Charcoal Kg ### 28
0
155 Chequrred cement tile Sqm. ### 7 360
156 Chicken proof jali mesh Sqm. ### / 319
157 clamp 100 to 150 mm pipe-G.I. No. ### 0 48
clamp for 40 to 80 mm dia pipe-G.I. 8
158 No. ### 53
159 Clamp for G.I. pipe No. ### 13
160 Clamps-PVC No. ### 31
161 Coal tar Kg ### 46
162 Collapsible gate complete with accessories Sqm. ### 2664
163 Collers-PVC No. ### 94
164 Colour powder (yellow earth) Kg ### 19
165 Colours powder bag / 50 kgs. No. ### 1380
166 Connector for W.C.-PVC No. ### 438
167 Corner stones 38 x 20 x 30 cm No. ### 51
168 Corner/quions 30 x 20 x 30 cm No. ### 62
169 Coupling cast iron 80 mm No. ### 151
170 Coupling cast iron 100 mm No. ### 168
171 Cow Dung Kg ### 27
172 Cowl \-dome- 110 mm outer diemater-P.V.C. No. ### 65
173 Cowl dome - 100 mm. Dia-A.C. No. ### 92
174 Crimped wire mesh Sqm. ### 135
175 D.D.V.P. 100% emulsion concentration Litre ### 166
176 Detonator No. ### 47
177 Double acting spring hinges-Brass No. ### 427
178 Dungry cloth 42" wide Mtr. ### 42
179 Engraver for lettering skilled Sqm. ### 357
180 Epoxy coal tar for 1st coat/2nd coat Litre ### 363
181 F.R.P. Door Shutter 30mm thick Sq ft ### 370
182 F.R.P. Door Shutter Frame 35mm thick Rmt. ### 899
183 Face veneer board 20 mm thick Sqm. ### 470
184 Ferrule for C.I. pipe 100 mm No. ### 397
185 Fevicol Kg ### 194
186 Fire bricks No. ### 21
187 Fire wood Quintal ### 429
256
Sr. No. Description Unit R Rate
aProposed for
t 2011-2012
e
s
188 Flooring Roll 1 mm thick, 2m. Wide.-PVC M ### 422
189 Flush tank 10 litre capacity-Low level glazed No. ###
f 981
190 Flush tank Automatic for Urinal 10 Litre No. o 1280
###
191 Flushing cistern 5 litre capacity No. r
### 710
192 Flushing cistern -Coloured H.D.P. - conforming to I.S. - No. ### 1405
0
193 7231/1994
Flushing cistern -White H.D.P. conforming to I.S.-7231/1994 No. 7 1112
###
194 Flushing tank for W.C.-Enamelled No. /
### 976
195 Flushing Tank-PVC No. 0
### 993
8
196 Fly proof G.I. wire mesh Sqm. ### 177
197 Foot rest chequerred 25 x 10 cm Pair ### 121
198 Formica Lamination Sheet Sqm. ### 523
199 Fountain jet-Brass Chromium plated No. ### 126
200 French Polish Litre ### 121
201 Fuse No. ### 16
202 G.C.I. sheets (corrugated) 22BwG MT ### 47677
203 Gasket Rmt ### 14
204 Gasket-PVC M. ### 24
205 Glass 3 mm thick Sqm. ### 312
206 Glass 4 mm thick Sqm. ### 344
207 Glass 5 mm thick Sqm. ### 370
208 Glazed tiles 15 x 15 cm- Colour Dozen ### 197
209 Glazed tiles 20 x 10 cm-Colour No. ### 30
210 Gravel at Nalla Bed Cum. ### 160
211 Gully trap cover with frame No. ### 116
212 Gun metal stop cock crutch wheel 20 mm No. ### 210
213 Gun metal stop cock crutch wheel 25 mm No. ### 247
214 Gun metal stop cock crutch wheel 32 mm No. ### 253
215 Gun metal stop cocks crutch 15 mm cl. wheel No. ### 204
216 Gun metal stop tap & crutch wheel 20 mm No. ### 216
217 Gun metal stop tap & crutch wheel 25 mm No. ### 269
218 Half round chromium ware pipe 100 mm M ### 398
219 Half round earthenware pipe 100 mm M ### 514
220 Half turn flush cock 25 mm dia No. ### 54
221 Hand Rail-PVC M. ### 51
222 Handle 125 mm Chromium plated No. ### 53
223 Handle aluminium 125 mm No. ### 52
224 Handle for steel windows 150 mm No. ### 47
225 Handle iron oxidised 100 mm No. ### 28
257
Sr. No. Description Unit R Rate
aProposed for
t 2011-2012
e
s
226 Handle iron oxidised 125 mm No. ### 35
227 Handle iron oxidised 150 mm No. ###
f 44
228 Handle-ornamental-Brass No. o
### 260
229 Handles 100 mm -Brass oxidised No. r
### 98
230 Hard Board 6 mm thick Sqm. ### 175
0
231 Hard murum Cum. ###
7 79
232 Hemp rope Kg ###
/ 100
233 Heritage grains plasters Sqm. 0
### 540
Hinges 125 mm (Chromium plated) 8
### 98
234 No.
235 Hinges 125 mm-Brass oxidised No. ### 99
236 Hinges 75 mm-Iron No. ### 20
237 Hinges iron chromium plated 100 mm No. ### 45
238 Hinges iron oxidised 225 mm No. ### 118
239 Hinges-strap-Iron oxidised No. ### 43
240 Hold fast 300 x 40 x 5 mm-Iron No. ### 35
241 Holdfast strong for steel gate-Iron No. ### 102
242 Hollow blocks CC'0.1 x 0.2 x 0.4 M No. ### 21
243 Hollow blocks CC'0.2 x 0.2 x 0.4 M No. ### 31
244 Hook and eye aluminium 75 mm No. ### 40
245 Hook and eye chromium plated No. ### 54
246 Hook and eye iron oxidised 75 mm No. ### 16
247 Hook and eyes 225 mm iron oxidised No. ### 25
248 Hooks "J" 6 mm dia-G.I. No. ### 15
249 Hooks and eyes 200 mm-Brass oxidised No. ### 69
250 Housing box to Rolling shutter Sqm. ### 1898
251 Hume pipe septic tank 0.9 m dia (2.5 m) No. ### 8179
252 IRC fabric 150 x 150 mm and 10 guage Sqm. ### 78
253 IRC fabric 75 x 75 mm and 10 guage Sqm. ### 57
254 J.W. Ballies M ### 49
255 J.W. planks & in general Cum. ### 25024
256 Junction plug 110 mm dia.-PVC No. ### 335
257 Khandkies No. ### 38
258 Kota stone (hand cut) 25 mm thick Sqm. ### 714
259 Kota stone (machine cut) 25 mm thick Sqm. ### 674
260 Kota stone 25 to 30mm thick 55 x 55cm wide-Polished Sq.M. ### 574
261 Kota stone step (polished) Sqm. ### 556
262 Laminate board 20 mm thick (10-15 cm wide) Sqm. ### 574
263 Latch 250 mm long iron oxidised No. ### 161
258
Sr. No. Description Unit R Rate
aProposed for
t 2011-2012
e
s
264 Lead paint-White Cum ### 247
265 Lead pipe 32 mm dia Cum. ###
f 228
266 Lead pipe 40 mm dia Kg. o
### 280
267 Lead pipe plate M r
### 142
268 Lime (un-slaked) M ### 17
0
269 Lime filler for bituminous works Kg ###
7 17
270 Lime powder Kg ###
/ 21
271 Lime slaked (fine lime) Kg 0
### 60
Linseed oil double boiled 8
### 106
272 Kg
273 Locking arrangement sliding shutter Kg ### 62
274 Makrana Marble Slab 25 mm-White sq.m. ### 2185
275 Mangalore glass tile No. ### 463
276 Mangalore pattern cowl vent Sq.M. ### 105
277 Mangalore ridge / hip tiles No. ### 37
278 Mangalore tiles class A'A No. ### 22
279 Marble chips Kg. ### 28
280 Marble colour powder Kg. ### 22
281 Marble mosaic chequred tiles Kg ### 387
282 Marble mosaic tiles (gray cement base) Kg ### 338
283 Marble mosaic tiles (white cement base) Sqm. ### 334
284 Marble name plate Sqm. ### 4836
285 Marble powder Sqm. ### 14
286 Mechanical gearbox to rolling shutter Sqm. ### 658
287 Mirror 40 x 50 C.M. No. ### 578
288 Mohagani Seat With Lid No. ### 279
289 Mortice Lock Superior No. ### 572
290 Mosaic tiles (white cement)-Colour No. ### 336
291 Mosquito Proof Coupling No. ### 45
292 Mosquito Proof Jali 26 gauge Sqm. ### 263
293 Mosquito Proof Nylon Net No. ### 110
294 Murum cum ### 63
295 Neel kg ### 174
296 Neeru kg ### 21
297 Netlon PVC Mosquito Proof Jali Sqm. ### 309
298 Netlon PVC Sponge liner Male & Femle Rmt ### 110
299 Nipple For Fastening Detonator No. ### 21
300 Noble Dynamite Kg. ### 118
301 Non Return Valve 15 mm No. ### 237
259
Sr. No. Description Unit R Rate
aProposed for
t 2011-2012
e
s
302 Non Return Valve 20 mm Water metre No. ### 407
303 Non Return Valve 25 mm Water metre No. ### f 585
304 Non Teak/Jungle Wood (normal) Cum. ### o 25110
305 Nut 12 mm dia.-Steel No. ### r 15
306 Nut 16 mm dia.-Steel No. ### 20
0
307 Nut and bolts-G.I. Kg ### 7 112
308 Nut Bolt 16 mm Dia/nails No. ### / 15
309 Nuts and Bolts 16 mm Dia. Kg ### 0 104
Nylon Rope 8
310 Kg ### 195
311 Obscured Glass 3 mm Thick Sqm. ### 309
312 Oil Bound Distemper Kg. ### 118
313 Oil Paint Litre ### 243
314 Oil Paint 100ml pack Tin-White No. ### 56
315 Oil Paint.-Zinc Based Litre ### 328
316 Paint - Coloured-Acrylic Litre ### 370
317 Paint - White-Acrylic Litre ### 400
318 Paint / flat paint-Enamelled Litre ### 234
319 Paint-Aluminium Per Litre### 273
320 Paint-Road marking Per Litre### 327
321 paint-White Zink Litre ### 148
322 Partical Board 12 mm Thick Sqm. ### 490
323 Pedestal (urinal Pan) colour glazed No. ### 1635
324 Pedestal (urinal Pan) White glazed No. ### 1246
325 Pedestal for Wash Basin No. ### 1121
326 Phenol formaldehyde synthetic resin Kg. ### 371
327 Piller Tap 12 mm dia Chromium plated No. ### 258
328 Pin Header Standard Size No. ### 61
329 pipe 100 mm dia heavy type-G.I. Rmt. ### 750
330 pipe 100 mm dia medium-G.I. Rmt ### 706
331 Pipe 100 mmdia.-PVC Rainwater Rmt. ### 261
332 Pipe 15 mm dia heavy type-G.I. M ### 133
333 pipe 15 mm dia medium type-G.I. M ### 119
334 Pipe 15 mm dia.-PVC M ### 43
335 pipe 20 mm dia heavy type-G.I. M ### 132
336 pipe 20 mm dia medium type-G.I. M ### 132
337 Pipe 20 mm dia.-PVC M. ### 50
338 pipe 25 mm dia heavy type-G.I. M ### 176
339 pipe 25 mm dia medium type-G.I. M ### 182
260
Sr. No. Description Unit R Rate
aProposed for
t 2011-2012
e
s
340 Pipe 25 mm dia.-PVC M. ### 73
341 pipe 32 mm dia heavy type-G.I. M ###
f 224
342 pipe 32 mm dia medium type-G.I. M o
### 226
343 Pipe 32 mm dia.-PVC M. r
### 96
344 pipe 40 mm dia heavy type-G.I. M ### 257
0
345 pipe 40 mm dia medium type-G.I. M ###
7 227
346 Pipe 40 mm dia.-PVC M. ###
/ 99
347 pipe 50 mm dia heavy typeG.I. M 0
### 310
pipe 50 mm dia medium type-G.I. 8
### 279
348 M
349 Pipe 60 mm dia.-PVC M. ### 115
350 pipe 65 mm dia heavy type-G.I. M ### 393
351 pipe 65 mm dia medium type-G.I. M ### 366
352 Pipe 75 mm dia-PVC Rainwater M. ### 308
353 pipe 80 mm dia heavy type-G.I. M ### 544
354 pipe 80 mm dia medium type-G.I. M ### 475
355 Pipe for roof 20 mm dia.-Steel M ### 155
356 Pipe for roof 25 mm dia.-Steel M ### 168
357 Pipe for roof 40 mm dia.-Steel M ### 237
358 Pipe for roof 50 mm dia.-Steel M. ### 324
359 Pipe for roof 65 mm dia.-Steel M. ### 434
360 Pipe for roof 75 mm dia.-Steel M. ### 638
361 Plain G.I. Sheet 24 B.W.G. Sqm. ### 405
362 Plaster of Paris Board 45 x 45 cm. No. ### 61
363 Plastic Cover Block No. ### 9
364 Plastic Emulsion Paint Kg ### 358
365 Plug bend - 3"-P.V.C. No. ### 137
366 Plug bend - 4"-P.V.C. No. ### 166
367 plug bend (18 guage) for 75 to 100 mm dia pipe-G.I. No. ### 153
368 Ply veener 4 mm thick-Decorative Sqm. ### 447
369 Ply Wood 12 mm thick Sqm. ### 827
370 Ply Wood 6 mm thick Sqm. ### 428
371 Ply Wood 9 mm thick Sqm. ### 512
372 Polymer based for Ist coat for water proof external coating Litre
### 631
Polysafe-EC (patent No. 571)
373 Polymer based for IInd coat for Water proof external coating - Litre
### 682
Polysafe EC (Patent No. 571)
374 Polymer based for PRIMER for water proof external coating Litre
### 615
Polysafe-EC (patent No. 571)
261
Sr. No. Description Unit R Rate
aProposed for
t 2011-2012
e
s
375 Polysafe plastone for Polymar Mortar and application - Patent No. Litre
### 565
568 f
376 Polythene sheet-Expanded Sqm. o
### 220
377 Primer for Plaster Surface Litre r
### 118
378 Push button tap of gun metal 15 to 25 mm No. ### 126
0
379 Putty for Cement Plaster Kg. ###
7 64
380 PVC Door shutter 35 mm thick 7' x 3' size No. ###
/ 2779
381 PVC Flushing tank automatic 5 litre for urinal No. 0
### 627
PVC flushing tank for W.C. 10 Litres. 8 1168
###
382 No.
383 Quarry Spouls (trap Rubble) Cum. ### 170
384 R.C.C. cover for gully trap 23 x 30 cm No. ### 88
385 R.C.C. cover for inspection chamber 60 x 45 cm No. ### 243
386 R.C.C. cover for inspection chamber 90 x 45 cm No. ### 279
387 R.C.C. Jali 100mm thick Sqm. ### 778
388 R.C.C. Jali 50 mm thick Sqm. ### 484
389 R.C.C. Jali 80mm thick Sqm. ### 578
390 R.C.C. Pipe 100 mm dia. Sqm. ### 229
391 R.C.C. Pipe 150 mm dia. Sqm. ### 282
392 R.C.C. Pipe 225 mm dia. Sqm. ### 347
393 R.C.C. Pipe 300 mm dia. Sqm. ### 482
394 Red Oxide paint Litre ### 136
395 Red Powder (Geru) Kg. ### 23
396 Red Tape Saftey Fuse Rmt ### 36
397 Reflective Sheet High intensity grade Sqm. ### 10120
398 Retoreflective Sheet Engineering grade SQM. ### 8198
399 Ridge Cap (plain G. I.) M.T. ### 47290
400 Rubber Adhesive Kg. ### 309
401 Rubber Gasket Rmt ### 24
402 Rubber Insertion Kg ### 70
403 Rubber Lining Rmt ### 27
404 Rubber ring No. ### 34
405 Rustonil - Rust remover cum phosphating agent Litre ### 504
406 Rustonil - Rust Remover cum-phosphating Patent No.569 Litre ### 448
407 Salt Glazed Stoneware gully Trap No. ### 92
408 Sand (screened) Cum ### 1020
409 Sand (unscreened) Cum. ### 865
410 Saras Kg. ### 102
411 Scraping sand paper Dozen ### 56
262
Sr. No. Description Unit R Rate
aProposed for
t 2011-2012
e
s
412 screw (25 mm)-Iron Dozen ### 53
413 screw (couch) 50 mm-G.I. Dozen ###
f 173
414 screw 100 mm-G.I. Dozen ###
o 278
415 screw 125 mm-G.I. Dozen r
### 484
416 screw bolts-G.I. No. ### 8
0
417 Screws 75 mm-G.I. Dozen ###
7 92
418 Screws-Aluminium Dozen ###
/ 18
419 Screws-Brass Dozen 0
### 471
420 Seal Cement paint Kg. 8
### 91
421 Sewer Trap No. ### 293
422 Shahabad 25 to 30 mm thick-Rough Sqm. ### 183
423 Shahabad 40 to 50 mm thick-Rough Sqm. ### 209
424 Shahabnad 20 mm thick-Rough Sqm. ### 164
425 Shahbad 25-30 mm thick-Polished Sqm. ### 324
426 Shahbad for steps (25 mm) thick-Polished Sqm. ### 360
427 Shahbad machine cut 25 mm thick-Polished Sqm. ### 416
428 Shahbad stone 55 x 55 cm wide-Polished Sqm. ### 391
429 sheets plain 22 guage (1.2 x 1.8 m)-G.I. No. ### 726
430 Shoe-PVC No. ### 115
431 Shower (bath) (telephonic type) No. ### 453
432 Shower Rose chromium Plated Brass 10 cm No. ### 202
433 sink 0.6 x 0.2 x 0.45 M-White glazed earthen ware No. ### 1062
434 Sink White glazed 45 x 20 x 30 cm. No. ### 1115
435 Sliding Door Bolt (Tadi) No. ### 51
436 Sliding door bolt 300 mm-Brass oxidised No. ### 329
437 Sliding door bolt-Brass oxidised No. ### 204
438 Sliding Door Bolts Chromium Plated No. ### 51
439 Slotted cowl/vent-75 mm dia -PVC No. ### 59
440 Socket 32 mm dia.-PVC No. ### 21
441 socket 40 mm / rivets 12 mm-G.I. No. ### 34
442 Socket Brass for 32 mm Tap No. ### 44
443 Socket Brass for 40 mm Tap No. ### 52
444 Socket Brass for 50 mm Tap No. ### 70
445 Socket Brass for 65 mm Tap No. ### 81
446 Socket for 100 mm Tap No. ### 116
447 Socket for 15 mm Tap No. ### 32
448 Socket for 20 mm Tap No. ### 40
449 Socket for 25 mm Tap No. ### 45
263
Sr. No. Description Unit R Rate
aProposed for
t 2011-2012
e
s
450 Socket for 32 mm Tap No. ### 49
451 Socket for 40 mm Tap No. ###
f 64
452 Socket for 50 mm Tap No. o
### 83
453 Socket for 65 mm Tap No. r
### 99
454 Socket for 80 mm Tap No. ### 119
0
455 Socket for G.I. Pipe 150 mm Dia. No. ###
7 123
456 Soil pipe 110 mm dia.-PVC Rmt ###
/ 278
457 Solid core shutter (commercial 35 mm) thick Sqm. 0
### 1304
Solid core shutter 35mm with TW veneeer on both side 8 1992
###
458 Sqm.
459 Solvent Cement Litre ### 87
460 Sprit for wood polishing Litre ### 84
461 Spun Yarn Kg. ### 113
462 square mesh - 16 guage 3 feet wide-G.I. M. ### 241
463 Standard butt Hing Brass Oxidised 100 mm No. ### 79
464 Standard strap Hing Iron oxidised 200 mm No. ### 34
465 Steel Primer Litre ### 125
466 Steel Sink - 40 x 30 cm. No. ### 2865
467 Steel Sink - 60 x 45 cm. No. ### 3556
468 Stone Dust Cum. ### 331
469 Stone Ware Pipe 100 mm dia. Rmt. ### 120
470 Stone Ware Pipe 150 mm dia. Rmt. ### 164
471 Stone Ware Pipe 225 mm dia. Rmt. ### 248
472 Stop Tap Brass with C Wheel 15 mm No. ### 196
473 Stopper For Steel Window No. ### 47
474 Strainer 15 mm No. ### 66
475 Strainer 20 mm No. ### 129
476 Strainer 25 mm No. ### 208
477 Strainer for 10 mm No. ### 235
478 Strainer for 40 mm No. ### 431
479 Strainer for 50 mm No. ### 516
480 Strainer for 80 mm No. ### 1509
481 Strong Iron bolts 100 mm dia. Kg. ### 61
482 SWG Pipe half round 100 mm dia. Rmt. ### 92
483 Synthetic Paint (Enamel) Litre ### 271
484 Synthetic Polymer based for 1st coat polysafe E.C.(P.No.567) Litre ### 630
485 Synthetic Polymer based for 2nd coat polysafe E.C.(P.No.567) Litre ### 816
486 Synthetic Polymer based primer polysafe E.C.(P.No.567) Litre ### 759
487 Solvent Litre ### 157
264
Sr. No. Description Unit R Rate
aProposed for
t 2011-2012
e
s
488 Tandur (hand cut) 25 mm thick Sqm. ### 273
489 Tandur 25 mm thick (machine cut) Sqm. ###
f 313
490 Tandur 40 mm thick-Polished Sqm. o
### 391
491 Tandur Polish For Steps Sqm. r
### 347
492 Tandur stone 25 mm thick and 55 x 55 cm wide-Polished Sqm. ### 445
0
493 Tar Felt Sqm. ###
7 91
494 Tar Paper 3 mm Thick Sqm. ###
/ 60
495 Tarat (gunny cloth) Sqm. 0
### 36
Thermoplastic paint white 8
### 428
496 Litre
497 Thermoplastic paint Yellow Litre ### 420
498 Thimble socket 32 mm-Brass Pair ### 259
499 Thinner Litre ### 98
500 Throughstone No. ### 58
501 Tile 20 x 10 cm-White glazed No. ### 22
502 Tiles 15 x 15 cm-White Glazed No. ### 196
503 Towel Rod with Clamps 16 mm dia. No. ### 112
504 Tower Bolt 150 mm Iron Oxidised No. ### 121
505 Tower bolt 150 mm-Brass oxidised No. ### 206
506 Tower bolt 250 mm-Brass oxidised No. ### 234
507 Tower Bolt Aluminium 150 mm No. ### 126
508 Tower Bolt Aluminium 200 mm No. ### 161
509 Tower Bolt Aluminium 250 mm No. ### 288
510 Tower Bolt Aluminium 300 mm No. ### 185
511 Tower Bolt Aluminium 75 mm No. ### 45
512 Tower Bolt Iron Oxidised 200 mm No. ### 66
513 Tower Bolt Iron Oxidised 250 mm No. ### 78
514 Tower Bolt Iron Oxidised 300 mm No. ### 74
515 Tower Bolts 200 mm chromium plated No. ### 105
516 Tower bolts 200 mm-Brass oxidised No. ### 104
517 Tower Bolts 250 mm chromium plated No. ### 126
518 Tower Bolts 300 mm chromium plated No. ### 171
519 Tower bolts 300 mm-Brass oxidised No. ### 143
520 Transferent Corrugated Sheets Fibre Sqm. ### 646
521 Transparent glass 5 mm thick Sqm. ### 438
522 Trap grating 15 x 10 cm.-PVC No. ### 261
523 Trap Header (17 x 22 x 60 to 75cm) No. ### 64
524 Trap Header ordinary No. ### 63
525 Trap metal 12 mm/10mm (crushed) Cu.M. ### 551
265
Sr. No. Description Unit R Rate
aProposed for
t 2011-2012
e
s
526 Trap metal 20 mm (crushed) Cu.M. ### 531
527 Trap metal 25 mm (crushed) Cu.M. ###
f 529
528 Trap metal 40 mm (blasted) H.B. Cu.M. o
### 403
529 Trap metal 40 mm (crushed) Cu.M. r
### 574
530 Trap metal 40 mm unblasted (Boulder) Cu.M. ### 391
0
531 Trap metal 50 mm hand broken Cu.M. ###
7 424
532 Trap metal 50 mm unblasted (Boulder) Cu.M. ###
/ 339
533 Trap metal 6 mm crushed Cu.M. 0
### 432
Trap metal 60 mm hand broken 8
### 381
534 Cu.M.
535 Trap metal 60 mm unblasted (Boulder) Cu.M. ### 310
536 Trap metal 80 mm hand broken Cu.M. ### 380
537 Trap metal 80 mm unblasted (Boulder) Cu.M. ### 279
538 Trap Rubble (unblasted for metal) Cu.M. ### 241
539 Trap Rubble 15-23 cm @ Quarry (metal) Cu.M. ### 365
540 Trap Rubble 15-23 cm @ Quarry for (masonary) Cu.M. ### 346
541 Trensferent Corrugated Sheets P.V.C. Sqm ### 508
542 Turpentine Litre ### 64
543 Union 25 mm dia-G.I. No. ### 87
544 Urinal Colour glazed full stall type No. ### 4083
545 Urinal -Flat Back No. ### 790
546 Urinal Lipped type No. ### 670
547 Urinal semi stall No. ### 1623
548 Urinal-White Glaged full Stall No. ### 2374
549 Varnish Litre ### 182
550 Venner 4 mm thick m2 ### 460
551 Vent-PVC No. ### 67
552 W.C. pan-Colour glazed European type No. ### 1241
553 W.C. Pan-European type glazed No. ### 963
554 W.C. pan-W.G.L. European type coupled closet No. ### 5568
555 W.C.580 mm white glazed Ist Class (Orissa) No. ### 1798
556 W.C.Pan (White)-Europian type No. ### 1115
557 W.C.pan 580 mm I Class with Trap (Indian) No. ### 783
558 W.C.pan colour glazed 23" (Indian) No. ### 800
559 W.C.pan colour glazed 23" (Orissa) No. ### 1604
560 wash basin 0.45 x 0.3 x 0.2-White Glazed No. ### 1729
561 Wash basin 63 x 45 cm-Colour glazed No. ### 1461
562 wash basin 63 x 45 cm-White Glaged No. ### 1455
563 Wash Basin Colour glazed 45 x 30 cm No. ### 1092
266
Sr. No. Description Unit R Rate
aProposed for
t 2011-2012
e
s
564 Wash Basin Colour glazed 56 x 38 cm No. ### 1774
565 Wash Basin White glazed 55 x 40 cm No. ###
f 1256
566 Wash hand basin 55 x 40 cm.-Colour No. o 1222
###
567 Washable Distemper (powder) Kg. r
### 58
568 washer 12 to 16 mm-Iron No. ### 5
0
569 Water Meter 100 mm Non return valve No. ###
7 6882
570 Water Meter 15 mm (non return valve) No. ###
/ 927
571 Water Meter 20 mm (Non return valve) No. 0
### 1288
Water Meter 25 mm (Non return valve) 8 1593
###
572 No.
573 Water Meter 40 mm Non return valve No. ### 5936
574 Water Meter 50 mm Non return valve No. ### 5993
575 Water Meter 80 mm Non return valve No. ### 6043
576 Water Meter Box with Lock 15 mm No. ### 307
577 Water Meter Box with Lock 20 mm No. ### 362
578 Water Meter Box with lock above 25 mm No. ### 405
579 Water proofing Compound Kg. ### 53
580 water tank 1 piece mould PVC Litre ### 12
581 Water tank PVC / fibre 1 piece mould Litre ### 17
582 Wax For Wood Polishing Kg. ### 197
583 Welded Mesh 25 x 25 x 2.54 mm Sq.M. ### 281
584 Welded Mesh 50 x 25 x 5 mm Sq.M. ### 245
585 Welded Mesh 50 x 50 x 2.54 mm Sq.M. ### 197
586 Welded Mesh 75 x 75 x 2.54 mm Sq.M. ### 194
587 wheel stop tap 32 mm dia-Brass No. ### 405
588 wheel stop tap 40 mm dia-Brass No. ### 529
589 wheel stop tap 50 mm dia-Brass No. ### 666
590 wheel stop tap 65 mm dia-Brass No. ### 461
591 Wheel stop tap 80 mm dia-Brass No. ### 573
592 Wheel Stop Tap of Brass 15 mm No. ### 173
593 Wheel Stop Tap of Brass 20 mm No. ### 215
594 Wheel Stop Tap of Brass 25 mm No. ### 274
595 White Cement Tonne. ### 22289
596 Wire Glass 6 mm thick Sqm. ### 900
597 Wood Primer Litre ### 157
598 Wooden Peg No. ### 13
599 X.P.M. 12 mm x 18 gauge No. ### 112
PVC Door frames and window frames 0
600 BLR - 53 - 53 mm x 60 mm Sqm ### 166
267
Sr. No. Description Unit R Rate
aProposed for
t 2011-2012
e
s
601 FLRLI - 40 mm x 57 mm Sqm. ### 398
602 DWUF 405 - 40 mm x 48 mm Rmt. ###
f 287
603 DWUF 412 - 38 mm x 32 mm Rmt. o
### 207
604 DWUF 414 - 40 mm x 48 mm Rmt. r
### 336
605 DWUF 415 - 50 mm x 60 mm Rmt. ### 329
0
PVC Doors/Windows Shutter Frames 7 0
606 DWUF - 406 - 40 mm x 63.50mm For Vertical Central Part 'T' Rmt. /
###
0 229
Sector
DWUF - 302 - 24 mm x 59 mm For Frame Styles 8
### 152
607 Rmt
608 DWUF - 305 - 26 mm x 47 mm For Frame Styles Rmt ### 178
609 DWUF - 306 - 33 mm x 47 mm For Frame Styles Rmt ### 196
610 DWUF - 312 - 24 mm x 100 mm (Lock Rail) Rmt ### 250
611 DWUF - 312 - 26 mm x 94 mm (Lock Rail) Rmt. 278
612 DWUF - 312 - 33 mm x 94 mm (Lock Rail) Rmt ### 313
PVC - Infill Panels 0
613 SPUF - 101 - 20 mm x 200 mm (Panels) Rmt ### 82
614 Rmt
SPUF - 105 - 12 mm x 150 mm (Panels) ### 192
626 bearing (Forged steel roller bearing of 25 tonne) No. ### 114168
627 Bearing (Pot type bearing assembly consisting of a metal piston No ###
supported by a disc, PTFE pads providing sliding surfaces 33918
268
Sr. No. Description Unit R Rate
aProposed for
t 2011-2012
e
s
628 Bearing (PTFE sliding plate bearing assembly of 80 tonnes) No. ### 37799
629 Bearing (supply of sliding plate bearing of 80 tonnes) No. f 34472
###
o
630 Bentonite kg ###
r 33
631 Curing compound liter ### 159
632 Delineators from ISI certified firm as per the standard drawing each 0
###
given in IRC-79 7 916
/
633 Earth cost or compensation for earth taken from private land cum ### 72
0
634 Elstomeric slab seal expansion joint assembly manufactured by metre 8
###
using chlorprene i.e eastomer for elastomerric slab unit conferring 14959
to clause 915.1 of IRC:83 (PartII)
635 Epoxy compound with accessories for preparing epoxy morter 100 nos ###
701
640 Modular strips/box seal expansion joint catering to a horizontal metre ###
movement beyound 140mm and upto 210mm box/box seal 1784
269
Sr. No. Description Unit R Rate
aProposed for
t 2011-2012
e
s
653 Coarse graded Granular sub-base Materials 37.5 mm to 9.5 mm cum
488
f
654 Coarse graded Granular sub-base Materials 53 mm to 26.5 mm cum o 490
r
655 Coarse graded Granular sub-base Materials 53 mm to 9.5 mm cum 487
656 Aggregate 22.4 mm to 2.36 mm cum 0 488
657 Aggregates 22.4 mm to 5.6 mm cum 7 482
/ 481
658 Aggregates 45 mm to 2.8 mm cum
0
659 Aggregates 45 mm to 22.4 mm cum 8 477
660 Aggregates 53 mm to 2.8 mm cum 475
661 Aggregates 53 mm to 22.4 mm cum 477
662 Aggregates 63 mm to 2.8 mm cum 476
663 Aggregates 63 mm to 45 mm cum 481
664 Aggregates 90 mm to 45 mm cum 477
665 Aggregates 10 mm to 5 mm cum 493
666 Aggregates 11.2 mm to 0.09 mm cum 496
667 Aggregates 13.2 mm to 0.09 mm cum 495
668 Aggregates 13.2 mm to 5.6 mm cum 476
669 Aggregates 13.2 mm to 10 mm cum 492
670 Aggregates 20 mm to 10 mm cum 481
671 Aggregates 25 mm to 10 mm cum 481
672 Aggregates 19 mm to 6 mm cum 482
673 Aggregates 37.5 mm to 19 mm cum 488
674 Aggregates 37.5 mm to 25 mm cum 487
675 Aggregates 6 mm nominal size cum 495
676 Aggregates 10 mm nominal size cum 495
677 Aggregates 13.2/12.5 mm nominal size cum 488
678 Aggregates 20 mm nominal size cum 488
679 Aggregates 25 mm nominal size cum 489
680 Aggregates 40 mm nominal size cum 489
270
LABOUR RATES
LABOUR RATES (Per day) FOR THANE DSR 2011-2012
(Rates as per minimum Wages Act - 1948 (effective from 30.06.2011)
DIVISION - Thane (P.W. Division, Thane. CIRCLE : THANE (P.W.) CIRCLE, THANE.
271
Sr. Description of Labours Rates Rates proposed for 2011-2012 Remarks
No. for
2010- Zone - I Zone - II Zone -
2011 III
(Corporation (A&B (Other
Limit) Grade than I
Municipal & II)
Council)
272
Sr. Description of Labours Rates Rates proposed for 2011-2012 Remarks
No. for
2010- Zone - I Zone - II Zone -
2011 III
(Corporation (A&B (Other
Limit) Grade than I
Municipal & II)
Council)
273
RATE SCHEDULE
RATE CONTRACT OF SUPPLYING RCC PIPES @SITE OF WORK FOR THE YEAR 2011-2012.
R.C.C. PIPES IN ALL DIA IN NP-2, NP-3, & NP-4 CLASS WITH ISI MARK AS PER IS-458/2003 AND
ARE INCLUSIVE OF VAT AS CONDITION LET DOWN IN RCC/2007-08 AS PER MSSIDC RATE
CONTRACT NO. MSSIDC/RCT/02-A/RCC/2008-09 Dt. 1st October 2008.
a) Collers Extra @ 10 % of the accepted rate of full length RCC Pipes of the
corresponding dia of 2.5 mtr. Length of RCC Pipes of corresponding diameter.
b) Half Round Pipes At the half prices of full round pipe of coresponding diameter + 10% extra for
NP-2, NP-3 and NP-4 class pipes
c) Non-standard At the rate of full round pipe of corresponding diameter + 10 % Extra
Length Pipes
d) Non-standard Size Rate to be fixed by interpolation without any extra cost.
(diameter) pipe with
Collar
274
d) Non-standard Size Rate to be fixed by interpolation without any extra cost.
(diameter) pipe with
Collar
275
LE
MSSIDC LIMITED
ANNEXTURE 'A'
OF WORK FOR THE YEAR 2011-2012.
WITH ISI MARK AS PER IS-458/2003 AND
N RCC/2007-08 AS PER MSSIDC RATE
08-09 Dt. 1st October 2008.
475.00
463.00
551.00
923.00
1011.00
1024.00
1488.00
1800.00
2591.00
2910.00
3230.00
4015.00
5395.00
7456.00
9667.00
11162.00
14285.00
16388.00
17745.00
25350.00
34761.00
46254.00
276
hout any extra cost.
277
THEOROTICAL
REQUIREMENT OF
MATERIAL
THEORITICAL REQUIREMENT OF MATERIALS BUILDING
EXCAVATION
Sr. Item Unit Rubble in M3 Over size Sand in Quarry in
No. metal in M3 M3 spaul in M3
PILE FOUNDATION
Sr. Item Unit Cement Sand in M3
No.
275
BRICK MASONARY
276
15 Fire brick masonary in fire clay M3 - - 480 Fire clay in
1:5 proportion Mortar in M3
0.10
Stone masonary
Sr. Item Unit Cement Screened Trap Corner Rema
No. in bags sand in M3 Rubble / rk
in M3 Quins
inNos
277
11 CR masonary 2nd sort in M3 1.70 0.35 0.35 2 7 50
CM 1:6 in Supersturcture
12 CR masonary 1st sort in M3 1.50 0.30 0.35 2 7 50
CM 1:6 in plinth
13 CR masonary 1st sort in M3 1.50 0.30 0.35 2 7 50
CM 1:6 in Supersturcture
Sr. Item Unit Ceme Screene Trap Corner/ Trap Khan
No. nt in d sand Rubble in Quins Heade dki in
bags in M3 M3 inNos r in Nos
Nos
14 CR masonary 2nd sort M3 1.70 0.35 0.35 2 7 50
using all stones of full
height in each coarse in
CM 1:6 in Plinth
15 CR masonary 2nd sort M3 1.70 0.35 0.35 2 7 50
using all stones of full
height in each coarse in
CM 1:6 in Superstructure
278
6 25mm thick water proof M2 0.27 0.028 - -
bedding in CM 1:3
279
19 Flush pointing in CM 1:3 to M2 0.025 0.003 -
stone masonary
280
11 IPS flooring in 1:2:4 proportion M2 0.365 0.022 0.033 0.011
50mm thick
281
24 P & L in situ cement marble M2 0.20 0.0136 0.0272
mosaic 10mm thick for flooring
282
37 Polished chequered marble mosaic tiles M2 0.16 0.02
20 x 32 cm size for flooring / treads
Bd - W. Miscellaneous
Sr. Item Unit Cement in Screene Crushed metal
No. bags d sand 12/10 mm in
in M3 M3
1 Guiniting by dry mix process in 1:3 1/2
(A) CM for ceiling and soffit
283
d) 50mm thick M2 0.550 0.067 -
284
13 Nahani trap 8 cm or 10cm dia No. 0.10 0.01 - -
14 Gully trap 15 x 10 cm with brick No. 0.55 0.08 52 0.05
chamber
15 Brick masanory inspection chamber 60 No. 2.33 0.35 350 0.194
x 45 cm and 60cm depth with cement
plaster
16 Brick masanory inspection chamber 90 No. 3.53 0.54 527 0.3
x 45 cm and 60cm depth with cement
plaster
17 Intercepting trap chamber 90 x 45 cm No. 3.90 0.57 450 0.45
with brick masonary with cement plaster
285
THEORITICAL REQUIREMENT OF MATERIALS OF BLACK TOP ROAD
(AS PER STANDARD SPECIFICATIONS)
Sr. Item Unit Asphalt in Kg Coarse Aggregate
No
40 mm 25 20 12 10
in m3 mm mm mm mm
in m3 in m3 in m3 in m3
286
Sr. Item Unit Asphalt in Kg Coarse Aggregate
No
40 mm 25 20 12 10
in m3 mm mm mm mm
in m3 in m3 in m3 in m3
287
CK TOP ROAD
Aggregate
6
mm
in
m3
0.60
0.60
0.15
0.90
288
Aggregate
6
mm
in
m3
0.60
0.15
289
THEORITICAL MATERIAL REQUIREMENT
AS PER STANDARD SPECIFICATIONS
(REQUIREMENT OF MATERIALS SHALL BE AS PER ACTUAL JOB
MIX FORMULA)
BRIDGE AND C.D. WORKS
Sr. Item Unit Cement Screened Course Aggreagate
No. in bags sand in
M3 40mm 20mm 12/10mm in
in M3 in M3 M3
1 Plain cement M3 2.60 0.47 0.94 - -
concrete 1:5:10
2 Plain cement M3 3.40 0.47 0.94 - -
concrete 1:4:8
3 Plain cement M3 4.40 0.47 0.70 0.24 -
concrete 1:3:6
4 Plain cement M3 6.40 0.445 - 0.67 0.22
concrete 1:2:4
5 M-10 grade M3 4.40 0.47 0.70 0.24 -
concrete
6 M-15 grade M3 6.00 0.445 - 0.67 0.22
concrete
7 M-20 grade M3 7.00 0.445 - 0.67 0.22
concrete
8 M-25 grade M3 7.50 0.445 - 0.67 0.22
concrete
9 M-30 grade M3 8.00 0.425 - 0.57 0.28
concrete
10 M-35 grade M3 8.25 0.47 - 0.57 0.28
concrete
11 Cast in situ M3 4.40 0.47 0.70 0.57 -
abutment and piers
in M-10
12 Cast in situ M3 6.00 0.47 0.70 0.24 -
abutment and piers
in M-15
288
14 Cast in situ M3 3.90 0.40 0.55 0.24 0.15
abutment and piers
in M-10 with 15%
plum
0.141
289
RCC PIPES
Sr. Item Unit Cement Sand in Weight of pipe in
No. in bags M3 kg./m.
NP-2
pipes
1 P & L cc pipes of NP-2
class/ IRC pipes of NP-3
class
i) 80mm Æ M - - 20
ii) 100mm Æ M - - 24
iii) 150mm Æ M - - 33
iv) 250mm Æ M - - 52
v) 300mm Æ M - - 75
vi) 350mm Æ M - - 92
290
Weight of pipe in
kg./m.
NP-3
pipes
240
269
297
325
410
470
604
754
829
1054
1140
291
THEORITICAL MATERIAL REQUIREMENT
M.O.S.T. 1995 EDITION AND DATA BOOK
(Grading Mateial shall be as per actual job mix formula wherever applicable)
291
Total 1.380 M3
11.20mm
292
ii) Second coat of two coat surface 10.00 Kg/10M2 0.10 M3/10M2
dressing (or as a renewal coat)
6.70mm
ii) Second coat of two coat surface 16 to 18 Kg/10M 2
0.06 to 0.08 M3/10M2
dressing (or as a renewal coat)
8) Open graded premix carpet 20mm thick (Table 500.16 Page 178) Clause no. 509
i) 13.20mm stone chipping 0.18 M3/10M2 Total chippings
ii) Bitumen binder (at 52 Kg/M3) 9.50 Kg/10M2 0.27 M3/10M2
iii) 11.20mm stone chipping 0.09 M3/10M2 Total binder
iv) Bitumen binder (at 569 Kg/M3) 5.10 Kg/10M2 14.60 Kg/10M2
Note:-
i) For binder - Medium setting emulsion
ii) For seal coat - Medium setting emulsion
293
iii) Premix seal coat - Slow setting emulsion
10) Mix seal surfacing (Excluding tack coat) Data book clauseno. 510
11) Bituminous Concrete (Excluding primer /tack coat with cement filler)
Density 2.40 Data Book bitumen content at 6.50 %
13) P & L semidense bituminous concrete with 5.50% Bitumen Clause No. 511
(Excluding primer/tack coat)
14) Providing and applying premixed seal coat type ''B'' Clause no. 513
294
ii) Bitumen 6.80 Kg/10M2
295
THEORITICAL MATERIAL REQUIREMENT
M.O.S.T. 1995 EDITION AND DATA BOOK
(REQUIREMENT OF MATERIALS SHALL BE AS PER ACTUAL JOB MIX
BRIDGES AND CULVERTS
Sr. Item Unit Cement Coarse Course Aggreagate
No. of in MT Sand in
Data M3 40 20 mm
book mm in in M3
M3
295
Sr. Item Unit Cement Coarse Course Aggreagate
No. of in MT Sand in
Data M3 40 20 mm
book mm in in M3
M3
b) Well Steining
b) i) PCC M-15 M3 0.33 0.45 0.52 0.22
c) ii) a) PCC M-20 M 3
0.38 0.45 0.57 0.22
c) iii) b) RCC M-20 M3 0.40 0.425 - 0.57
b) iii) RCC M-25 M 3
0.41 0.45 - 0.63
c) Bottom Plug
PCC M-20 gfrade M3 0.418 0.45 0.57 0.22
(includin
g 10%
extra)
e) Well cap
i) RCC M-20 grade M3 0.38 0.45 0.57 0.22
ii) RCC M-25 grade M 3
0.40 0.365 0.382 0.304
iii) RCC M-30 grade M3 0.42 0.365 0.382 0.304
296
Sr. Item Unit Cement Coarse Course Aggreagate
No. of in MT Sand in
Data M3 40 20 mm
book mm in in M3
M3
Culverts
PCC 1:4:8 M3 0.17 0.47 0.89 -
PCC 1:3:6 M3 0.22 0.47 0.89 -
297
Sr. Item Unit Cement Coarse Course Aggreagate
No. of in MT Sand in
Data M3 40 20 mm
book mm in in M3
M3
298
T
K
CTUAL JOB MIX
Course Aggreagate
10
mm in
M3
0.294
0.304
0.28
0.28
0.11
0.11
0.28
0.27
0.28
0.28
0.294
0.299
0.28
0.28
0.299
0.294
0.299
299
Course Aggreagate
10
mm in
M3
0.28
0.27
0.11
0.11
0.28
0.27
0.11
0.11
0.11
0.299
0.299
0.299
0.304
0.299
0.28
300
Course Aggreagate
10
mm in
M3
0.11
0.11
0.28
0.27
0.28
0.28
0.28
0.27
0.28
0.28
0.28
0.28
0.28
0.28
0.013
0.27
0.11
0.11
-
-
301
Course Aggreagate
10
mm in
M3
-
-
302
ABBREVIATIONS
1 Square Kilometre
2 Kilogram
3 Metric tonne
4 Number
5 Runing metre
6 Cubic centimeter
7 Milimetre
8 Centimeter
9 Metre
10 Kilometre
11 Square Metre
12 Cubic Metre
13 Ministry of Road Transport & Highway
14 Indian Standard
15 Indian Road Congress
21 Pre-Stressed Concrete
22 Ready Mixed Concrete
23 Ground Level
24 Rupees
25 Diametre
26 Minimum
27 Maximum
298
28 Hour
29 That is
30 For Example
31 Water Bound Macadam
32 Bituminous Macadam
33 Lead in Kilometre
34 Optimum Moisture content
35 Hot mix, hot laid
36 Building Works
37 Bridge Works
38 Cross Drainage
39 Road Works
40 Taluka
41 District
44 Mild Steel
45 High Yield Strength Deformed Bar
46 Unplasticized Poly Venyl Chloride
49 Cement Mortar
50 Expanded Mesh
51 Boiling Water Proof
52 Boring
53 Survey Works (Departmental Agency)
299
VIATIONS
Sq.Km.
Kg.
M.T.
No.
R.M.
Cu.Cm.
mm.
Cm.
M.
Km.
Sq.M.
Cu.M.
MORT&H
IS
IRC
T&P
GI
CI
RCC
PCC
PSC
RMC
GL
Rs.
Dia
Min
Max
300
Hr
i.e.
e.g.
W.B.M.
BM
L
O.M.C.
H.M.H.L.
Bd.
Br.
Cd
Rd.
Tal.
Dist.
C.C.T.W.
c/c
M.S.
H.Y.S.D.
UPVC
P.V.C.
A.C.
C.M.
XPM
BWP
B'NG
Survey-D
Survey-P
301
¨ÉÖƤÉ<Ç (ºÉÉ. ¤ÉÉÆ.) |ÉÉnäùʶÉEò ʴɦÉÉMÉ, ¨ÉÖƤÉ<Ç
`öÉhÉä ÊVɱ½þªÉÉEòÊ®úiÉÉ nù®úºÉÚSÉÒ
ºÉxÉ 2011 - 2012
¨ÉÉMÉÇ |ÉEò±{É Ê´É¦ÉÉMÉ, EòÉåEòhÉ ¦É´ÉxÉ, xÉ´ÉÒ ¨ÉÖƤÉ<Ç
300