AL BAWANI -KAFD TOWER 2.

14

HEALTH & SAFETY DAILY OBSERVATION TR


OBSR.NO. DATE PARCEL LOCATION Code MAJOR HAZARD BRIEF DESCREPTION
1 01.02.2020 2.14 Level 2 20-Emergency Arrangments Smoke Detectores Not Working
Improper waste management for project waste - No
2 01.02.2020 2.14 All 22-Houskeeping
skip
3 01.02.2020 2.14 Laydown 27-Storage Scaffold Material Improperly stored
4 01.02.2020 2.14 All 19-Wellfare Absence Of Wellfare facilites, Mess hall , toilets
5 03.02.2020 2.14 All 22-Houskeeping Flammable material improperly stored
During site inspection the ladder was observed on
6 03.02.2020 2.14 level-11 26-Slip Trip Fall slippery surface

During site inspection the workers was observed


7 08.02.2020 2.14 level-9 19-Wellfare
eating in the room

During site inspection the chemicals was found not


8 08.02.2020 2.14 Ground floor 27-Storage store properly

During site inspection the scaffolding materail


9 08.02.2020 2.14 level-3 stair 1-Acssess/Egress blocked the access

During safety inspection the edge protection was


10 08.02.2020 2.14 Resid area 15-Open Edges observed open

11 08.02.2020 2.14 Resid stair area 2-Lighting Poor lighting was observed from level 2 to level 1
12 08.02.2020 2.14 Ground floor 15-Open Edges Open shaft area was observed in room

During site inspection the open hole in front of


13 09.02.2020 2.14 Ground floor 15-Open Edges parcel was observed

During site inspection the poor lighting was


14 09.02.2020 2.14 Resid G.f area 2-Lighting
observed
During site inspection the scaffolding material was
15 09.02.2020 2.14 laydown area 27-Storage
not arrange
16 09.02.2020 2.14 laydown area 19-Wellfare The workers using the laydown area to store food

the workers put ladder on the access result in the


access blockage
17 09.02.2020 2.14 level-8 1-Acssess/Egress

During site inspection the cigratess buds was


18 10.02.2020 2.14 level-5 12-Fire
observed at the site.

During site inspection the scaffold tag was not


19 10.02.2021 2.14 laydown area 17-Scaaffolding
updated

during site inspection the skip bin was observed full


20 10.02.2022 2.14 laydown area 33-Waste Management
with waste bin

21 10.02.2023 2.14 level-3 1-Acssess/Egress The improper access way was observed at the site

During site inspection the poor lighting was


22 10.02.2023 2.14 Basement. 01 2-Lighting
observed in the Basement B2

During site inspection the transformer room was


23 10.02.2023 2.14 Basement. 02 37-Other
observed open
During site inspection the personal wear like jackets
24 10.02.2023 2.14 level-03 36-PPE
was observed

During site inspection the improper use of the safety


25 10.02.2023 2.14 level-03 36-PPE
harness is observed
During site inspection the open trench was
26 11.02.2020 2.14 level-02 37-Other observed at the site

During site inspection the poor lighting was


27 11.02.2020 2.14 Basement. 03 2-Lighting observed in the staircase

during site inspection poor housekeeping was


28 12.02.2020 2.14 Basement. 03 22-Houskeeping observed on the staircase

During site inspection the washrrom was observed


29 12.02.2020 2.14 Ground floor 19-Wellfare
functional not having water in it
During site inspection the ladder was observed in
30 12.02.2020 2.14 Basement. 02 1-Acssess/Egress
the a improper way
During site inspection the electric cable was
31 12.02.2020 2.14 level-17 21-Electrical
manage impropelry
During site inspection the steel rebars was
32 13.02.2020 2.14 level -03 37-Other observed uncovered

laydown masjid During site inspection the open trench was


33 13.02.2020 2.14 arae 15-Open Edges observed

laydown masjid
Observed the Electric panel not barricated
34 13.02.2020 2.14 arae 21-Electrical

During site inspection the scaffolder was doing work


35 13.02.2020 2.14 level-03 37-Other
on slippery surface

36 13.02.2020 2.14 level-07 27-Storage During site inspection the glass was observed

Observed the Electric Panel not hard barricated


37 13.02.2020 2.14 level-03 21-Electrical
Observed poor houskeeping in basement B2
38 15.02.2020 2.14 Basement.02 22-Houskeeping
during site inspection the flammable chemicals was
39 15.02.2020 2.14 Basement.01 34-Chemicals
observed at
During site inspection no lighting was observed in
40 15.02.2020 2.14 laydown area 2-Lighting the washroom area

During site inspection there was open edge was


41 15.02.2020 2.14 laydown area 15-Open Edges observed

During site inspection the poor houskeeping was


42 15.02.2020 2.14 Basement-03 22-Houskeeping observed

During safety inspection no safety signage was


43 15.02.2020 2.14 Ground floor 13-Signages
observed in the smoking area

44 15.02.2020 2.14 Resid area 26-Slip Trip Fall During safety inspection the wet floor was observed

During site inspection the door was open by steel


44 15.02.2020 2.14 Basement-04 1-Acssess/Egress
rods

During site inspection the open area was observed


45 16.02.2020 2.14 Ground floor 15-Open Edges
which was blocked

the poor lighting was observed at hte chilled water


46 16.02.2020 2.14 Basement -02 2-Lighting room

During site inspection the poor housekeeping and


47 16.02.2020 2.14 Basement -02 22-Houskeeping
improper stacking was observed

During site inspection the activity was carried out


48 16.02.2020 2.14 Basement -02 4-Safe System Of Work
without Permit and TAB

The open electric room was observed at the parcel


49 16.02.2020 2.14 level-01 37-Other
2.14

During site inspection the activity was carried out


50 16.02.2020 2.14 Basement -02 4-Safe System Of Work
without Permit and TAB
During site inspection the air condition units was
Basement -03 &
51 16.02.2020 2.14 37-Other observed without hard barrication /warning
04
tape/safety signages

During safety inspection the machine closet door


52 16.02.2020 2.14 Basement -02 13-Signages
was open without any warning sign

During site inspection the access way that leads to


53 17.02.2020 2.14 level-03 1-Acssess/Egress
elevator machine was blocked

During site inspection the Electric cable was


54 17.02.2020 2.14 Basement-03 21-Electrical
observed in the access

During site inspection the improper lighting was


55 17.02.2020 2.14 Basement-03 2-Lighting observed

During site inspection the open Elecator machine


56 17.02.2020 2.14 level-03 37-Other
room eas observed

57 17.02.2020 2.14 Basement-04 15-Open Edges During the site inspection open hole was observed

During site inspection flammable chemicals was


58 17.02.2020 2.14 Basement-03 34-Chemicals
observed

59 19.02.2020 2.14 Lay down area 37-Other the dust at the site was not covered

The waste bin was observed with full of waste


60 19.02.2020 2.14 Basment B1 33-Waste Management
materail

The site inspection the highly flammable chemcial


61 19.02.2020 2.14 Residental area 34-Chemicals
was found
During site inspection the improper stacking is
62 17.02.2020 2.14 Basement-03 27-Storage
observed

The workers shifted the ladder on the access way


63 20.02.2020 2.14 Resid G/F area 1-Acssess/Egress
which block the access

64 20.02.2020 2.14 Resid area 15-Open Edges During site visit the open area was observed

65 20.02.2020 2.14 Basement-03 21-Electrical The live Electric cable was managed poorly

The highly flammble chemicals was not stored


66 24.02.2020 2.14 Basement -01 34-Chemicals

During inspection the electric cables was stored not


67 24.02.2020 2.14 Level 14 21-Electrical
properly

During visit the dusty materail was not coverd


68 29.02.2020 2.14 Laydown area 37-Other
propelry

69 29.02.2020 2.14 laydown area 27-Storage The scaffolding materail was not stored properly

70 29.02.2020 2.14 Basement -01 2-Lighting Observed that the poor lighting in Basement B1

The chemicals was observed in the Electric store at


71 1.03.2020 2.14 Basement -01 27-Storage
the basement B1

72 1.03.2020 2.14 Lay down area 26-Slip Trip Fall The water was observed on the floor of basement 2

the Electric cable of Exhaust fan was not managed


73 1.03.2020 2.14 Basement -02 21-Electrical
propely
During the site visit the panel was not locked ,No
74 15.03.2020 2.14 Laydown 13-Signages
contact numbers of Concern Person

75 15.03.2020 2.14 Laydown 25-Inspection/Certification The ladder was not inspected and coluour coded

During the safety inspection no safety signage was


76 16.03.2020 2.14 Ground floor 13-Signages
observed

77 16.03.2020 2.14 Level 1 22-Houskeeping Bad housekeeping was observed at the Level 1

The castor wheel of the mobile tower scaffold was


78 16.03.2020 2.14 Basement 1 17-Scaaffolding
not locked

Observed the spary paints and empty chemicals


79 16.03.2020 2.14 Level 1 34-Chemicals
bottles

80 16.03.2020 2.14 Level 2 22-Houskeeping The dirty hand gloves was observed at the site

81 17.03.2020 2.14 Basement -01 25-Inspection/Certification The Non Conductive Ladder was found not inspected

82 17.03.2020 2.14 Level 1 2-Lighting No proper lighting was observed at the staircase

During site visit joints were observed in the Electric


83 19.03.2020 2.14 Basement -01 21-Electrical
cables

84 19.03.2020 2.14 Basement -01 21-Electrical The worker was observed repairing Electric tools

No proper plug was observed with the electric


85 21.03.2020 2.14 Laydown 21-Electrical
socket
86 22.03.2020 2.14 Lay down area 33-Waste Management The skip bin was observed full of waste

The flammable materail was observed due to


87 23.03.2020 2.14 Lay down area 33-Waste Management
overlodding of skip

The contact numbers and pictures of Electric person


88 25.03.2020 2.14 Basement -02 13-Signages
was not found

89 26.03.2020 2.14 Level 1 12-Fire The flammable materail was observed at level 1

90 26.03.2020 2.14 Ground floor 11-Hand Tools The fabricated hand tools was observed at the site

The workers were observed not wearing safety


91 26.03.2020 2.14 Level 1 Tower B 36-PPE
harness

Manual Emergency pressure horn was observed


92 29.03.2020 2.14 Level 2 20-Emergency Arrangments
broken

92 29.03.2020 2.14 Laydown 37-Other The woods having the nails were observed

The chemical storage area was observed without


93 30.3.202 2.14 Lay down area 13-Signages
signages

94 30.03.2020 2.14 Laydown area 27-Storage The construction materail was observed not arrange

The green net and fire blanket was observed


95 30.03.2020 2.14 Lay down area 22-Houskeeping
scattersd and not utilized properly

The fire extinguishers was observed not inspected


96 1.04.2020 2.14 Level 1 25-Inspection/Certification
and colour coded
The concrete waste was observed not barricated
97 1.04.2020 2.14 Laydown 33-Waste Management
and no signage was observed

98 2.04.2020 2.14 Out side road 13-Signages The safety sign board was observed damage

99 5.04.2020 2.14 laydown area 25-Inspection/Certification The hand trolley was observed not inspected

The bobcat was observed with 1) Reverse Alarm


100 5.04.2020 2.14 Lay down area 14-Plant & Equipment not functional 2) Hazard beacon light was not
working properly

101 5.04.2020 2.14 laydown area 25-Inspection/Certification The TUV of the operator of the bob cat is expired

102 5.04.2020 2.14 Lay down area 25-Inspection/Certification The TUV of the skid loader was expired

103 5.04.2020 2.14 Basement B3 21-Electrical The damage plug being inserted in the socket

During the site visit the safety sign board board


104 6.04.2020 2.14 Ground floor 13-Signages
was observed fall down

The Electric extension cable was not inspected and


105 6.04.2020 2.14 Ground floor 21-Electrical
colour coded

106 9.04.2020 2.14 Ground floor 11-Hand Tools Observed the fabricated and heavy hand shovel

107 9.04.2020 2.14 Laydown 1-Acssess/Egress The acccess was observed blocked by the skip

108 11.04.2020 2.14 Basement -02 14-Plant & Equipment The grinder was observed without having the guard
The sign board was observed fall down during the
109 12.04.2020 2.14 Ground floor 13-Signages
site visit

110 12.04.2020 2.14 Basement -02 22-Houskeeping During site visit the dirty hand gloves were observed

111 18.04.2020 2.14 Mosque area 1-Acssess/Egress During site visit the access was observed blocked

The chemiclas store fire blanket was observed


112 18.04.2020 2.14 laydown area 27-Storage
damage

113 18.04.2020 2.14 laydown area 1-Acssess/Egress The unsafe access can break at any time

The Electrical panel board was observed not in a


114 18.04.2020 2.14 laydown area 21-Electrical
proper position

The bad houskeeping and flammable materail was


115 18.04.2020 2.14 Basement B1 22-Houskeeping
observed near to the store

116 18.04.2020 2.14 Basement -03 15-Open Edges The open hole was observed in the basement 3

The plastic caps was observed scattered and rebars


117 18.04.2020 2.14 Resid area 37-Other
was not covered properly

118 18.04.2020 2.14 Basement -01 22-Houskeeping The damage chairs was observed in the store in B 1

The damage pressure was observed and not being


119 18.04.2020 2.14 Ground floor 30-MEP
utilized properly

With the pressure horn the no safety signage was


120 18.04.2020 2.14 Level 3 13-Signages
observed to utilized it propely
121 19.04.2020 2.14 Basement -02 21-Electrical The Communication panel was observed open

122 19.04.2020 2.14 Lay down area 33-Waste Management The trash bag full of the waste was observed

The dirty face mask was observed at the smoking


123 19.04.2020 2.14 Lay down area 12-Fire
area

124 19.04.2020 2.14 Lay down area 22-Houskeeping The little waste materail was observed

125 19.04.2020 2.14 Lay down area 17-Scaaffolding The scaffolding was observed not inspected

126 20.04.2020 2.14 laydown area 22-Houskeeping The dirty hand gloves was observed at the site

127 20.04.2020 2.14 laydown area 25-Inspection/Certification The ladder was store not propely and not inspected

The wooden sign board was observed damage and


128 20.04.2020 2.14 Lay down area 13-Signages
inverted

The workers was observed eating food in chemiclas


129 20.04.2020 2.14 Lay down area 19-Wellfare
store

130 20.04.2020 2.14 Ground floor 13-Signages The No safety signage was observed

131 20.04.2020 2.14 Lay down area 17-Scaaffolding The Scaffold was observed not inspected

132 20.04.2020 2.14 Resid area 12-Fire The fire extinguisher was observed expired
133 21.04.2020 2.14 Lay down area 36-PPE The damage PPES were observed

134 21.04.2020 2.14 Ground floor 36-PPE Observed the SAfety helmet not use propelry

135 21.04.2020 2.14 Ground floor 13-Signages Observed the wooden sign baord not having signage

136 21.04.2020 2.14 Laydown 22-Houskeeping Observed the bad houskeeping at the site

The access was observed narrow and broken


137 21.04.2020 2.14 Resid area 1-Acssess/Egress
glasses was observed

138 21.04.2020 2.14 Basement B1 26-Slip Trip Fall The standing water was observed at the floor

No hard barrication was observed near to the


139 21.04.2020 2.14 Ground floor 15-Open Edges
broken glasses

140 22.04.2020 2.14 Ground floor 1-Acssess/Egress The block access was observed open

The mobile tower scaffold was observed without


141 22.04.2020 2.14 Basement -01 17-Scaaffolding
having access

142 22.04.2020 2.14 Basement -01 17-Scaaffolding The scaffold was observed having no tag and access

143 22.04.2020 2.14 Basement -01 17-Scaaffolding The workers was observed on incomplete scaffold

143 22.04.2020 2.14 Ground floor 19-Wellfare The wash room having no water was in Use
144 22.04.2020 2.14 Resid area 37-Other The fire hydrant box was observed open

The access was observed narrow and broken


145 22.04.2020 2.14 Ground floor 1-Acssess/Egress
glasses was observed

The worker was observed not wearing and hooking


146 23.04.2020 2.14 Basement -01 36-PPE
full body harness

The castor wheel of the mobile tower scaffold was


147 23.04.2020 2.14 Basement -01 17-Scaaffolding
not locked

148 23.04.2020 2.14 Ground floor 34-Chemicals Chemicals observed near to drinking water

149 23.04.2020 2.14 Ground floor 22-Houskeeping the waste materail was observed

150 23.04.2020 2.14 Basement B 1 21-Electrical the switch of the extension cable was damage

151 23.04.2020 2.14 Basement -01 21-Electrical The expired dry battery was observed

152 25.04.2020 2.14 Basement -01 21-Electrical The Wires were observed without plugs

The ladder was observed not inspected and colur


153 26.04.2020 2.14 Basement -01 25-Inspection/Certification
coded

154 26.04.2020 2.14 Basement -01 34-Chemicals The chemicals was observed

The disposable cups and waste is observed in the


155 26.04.2020 2.14 Ground floor 22-Houskeeping
ASh tray
156 26.04.2020 2.14 Basement -01 20-Emergency Arrangments The Emergency Light was observed not functional

157 27.04.2020 2.14 Ground floor 11-Hand Tools Observed the damage hand tools

158 28.04.2020 2.14 Level 1 37-Other The damage ladder was observed at the site

158 29.04.2020 2.14 Level 5 25-Inspection/Certification The charging light is not inspected

159 29.04.2020 2.14 Basement -01 34-Chemicals The chemicals were in the basement

160 30.04.2020 2.14 Lay down area 37-Other The rebars are been observed not covered

161 2.05.2020 2.14 Level 18 25-Inspection/Certification The edge protection was observed not inspected

The fire extinguishers was observed not inspected


162 2.05.2020 2.14 Level 18 25-Inspection/Certification
and colour coded

The fire extinguishers was observed not inspected


163 2.05.2020 2.14 Basement -01 25-Inspection/Certification
and colour coded

164 2.05.2020 2.14 Basement -01 30-MEP The leakage was observed at the basement B1

165 2.05.2020 2.14 Basement -01 21-Electrical The Electrical room was observed open

166 3.05.2020 2.14 Lay down area 37-Other The rebars are been observed not covered
167 3.05.2020 2.14 Level 18 25-Inspection/Certification The emergency Light was observed not inspected

168 3.05.2020 2.14 level 18 20-Emergency Arrangments The fire extinguisher on the ground

169 3.05.2020 2.14 Ground floor 34-Chemicals The chemicals were observed

The fire extinguishers was observed not inspected


170 4.05.2020 2.14 level 1 25-Inspection/Certification and colour coded

171 4.05.2020 2.14 Basement -01 21-Electrical The Electric panel was observed open

The castor wheel of the mobile tower scaffold was


172 4.05.2020 2.14 Basement -01 17-Scaaffolding
not locked

173 5.05.2020 2.14 Basement -01 19-Wellfare The urine was observed at the Basmenent B1

The woker was observed on incomplete scaffold


174 5.05.2020 2.14 Basement -01 4-Safe System Of Work
and no TAB was observed

175 5.05.2020 2.14 Level 18 25-Inspection/Certification The ladder without serail number and inspection tag

176 5.05.2020 2.14 Basement -01 21-Electrical The Electric extension cable was found without plug

177 6.05.2020 2.14 laydown area 29-Bilogical The water filter was observed dirty

The bad houskeeping and flammable materail was


178 6.05.2020 2.14 basement b1 22-Houskeeping
observed in the Basement B1
Electrical Panel not having unique serial number
179 6.05.2020 2.14 Level 3 21-Electrical
and no colour code

180 6.05.2020 2.14 Basement -03 25-Inspection/Certification Electrical Panel not having the safety TAG

181 7.05.2020 2.14 Level 1 tower B 25-Inspection/Certification Ladder not inspected ,colour coded

182 7.05.2020 2.14 Level 1 tower B 25-Inspection/Certification Ladder not inspected ,colour coded

183 7.05.2020 2.14 Lay down area 27-Storage Scaffolding materail observed scattered

184 7.05.2020 2.14 Lay down area 25-Inspection/Certification Wheel cutter not inspected and colour coded

185 7.05.2020 2.14 Lay down area 25-Inspection/Certification No checklist in drinking water station

186 7.05.2020 2.14 Lay down area 29-Bilogical The water filter was observed dirty

187 7.05.2020 2.14 basment 4 25-Inspection/Certification The electrical panel not colour coded

188 10.05.2020 2.14 Basement -01 13-Signages The signages was observed fall on the ground

190 11.05.2020 2.14 Resid area 20-Emergency Arrangments The emergency light was removed

191 11.05.2020 2.14 Ground floor 17-Scaaffolding The scaffold did not have any tag
192 11.05.2020 2.14 Ground floor 36-PPE The full body harness not inspected

193 11.05.2020 2.14 Ground floor 25-Inspection/Certification The ladder did not having the inspection tag

194 11.05.2020 2.14 Ground floor 25-Inspection/Certification The hand tools are observed not inspected

195 11.05.2020 2.14 Ground floor 25-Inspection/Certification The extension cable not colour coded

The Lighting level was not good near to the drinking


196 13.05.2020 2.14 Ground floor 2-Lighting water station

No Safety signage was observed with the electrical


197 13.05.2020 2.14 Basement -01 13-Signages panel

198 13.05.2020 2.14 Basement -01 21-Electrical The plug of extension cable inner side exposed

During site inspection the scaffolding tag was not


inspected
199 14.05.2020 2.14 Basement -01 25-Inspection/Certification

During site inspection the electric cable and rope


200 14.05.2020 2.14 Basement -01 1-Acssess/Egress was observed in access

Observed the ladder with no monthly colur code and tag


201 14.05.2020 2.14 level -03 25-Inspection/Certification

202 14.05.2020 2.14 Level 1 36-PPE Observed the sub contractor not wearing PPEs

203 14.05.2020 2.14 Ground floor 25-Inspection/Certification Observed the ladder not having the inspection tag
Observed the worker working on scaffold with no
204 14.05.2020 2.14 Ground floor 17-Scaaffolding access and no tag

205 14.05.2020 2.14 Level 11 20-Emergency Arrangments Observed the charging light not functional

206 16.05.2020 2.14 Basement -03 21-Electrical Observed the Electric panel open

207 16.05.2020 2.14 Basement -01 34-Chemicals OIl spillage was observed

208 16.05.2020 2.14 Basement -01 25-Inspection/Certification Observed the fire extinguisher tag not updated

209 16.05.2020 2.14 Basement -03 27-Storage the chemiclas was observed in the basement B3

210 16.05.2020 2.14 Level 1 14-Plant & Equipment Observed the wood cutting not having the guard

Observed the workers working without


211 16.05.2020 2.14 Level 1 36-PPE
induction,PPEs,and in unauthorize time

212 16.05.2020 2.14 Ground floor 25-Inspection/Certification Observed the ladder not inspected

231 16.05.2020 2.14 Lay down area 25-Inspection/Certification Observed the bobcat operator with expired TUV

232 16.05.2020 2.14 Lay down area 25-Inspection/Certification Observed the bobcat with expired TUV

233 17.05.2020 2.14 Ground floor 19-Wellfare No water was observed in the wash room
234 18.05.2020 2.14 Basement -01 34-Chemicals The chemiclas was in the basement 1

235 18.05.2020 2.14 Basement -01 17-Scaaffolding Scaffolding materail was found improperly stored

Some Electrical panel without energecy contact


236 18.05.2020 2.14 Basement -01 21-Electrical
number

chemicals store have no siganges and no MSDS is


237 18.05.2020 2.14 Basement -01 34-Chemicals
found

Basement -01 2
238 18.05.2020 2.14 22-Houskeeping Workers done Urine at some places
and 3

235 18.05.2020 2.14 Level 1 Tower A 17-Scaaffolding The workers full on scaffoling with no tag

The ladder was found not inspected and colur


237 19.05.2020 2.14 Level 2 Tower B 25-Inspection/Certification
coded

238 19.05.2020 2.14 Level 1 13-Signages The safety signage was observed on the ground

239 19.05.2020 2.14 Lay down area 19-Wellfare The tag of water filter is not updated

240 19.05.2020 2.14 Lay down area 19-Wellfare The water filter was observed dirty

241 19.05.2020 2.14 Basement 4 2-Lighting The Emergency light not working

242 19.05.2020 2.14 Lay down area 19-Wellfare Stegnant water was found at workers washroom
243 19.05.2020 2.14 laydown area 25-Inspection/Certification The ladder was found not inspected and colur coded

244 19.05.2020 2.14 Lay down area 34-Chemicals Found paint spray bottle at the laydown area
.14

RVATION TRACK
Corrective Action Taken RISK LEVEL STATUS ACTION BY: Done By:
Battery Provided High Closed HSE Team Jamal

Skip Provided High Closed Costruction Team Jamal


Sproper storing Area provided High Closed Costruction Team Jamal
Welfare activity provided High Closed Costruction Team Jamal
muhammed
store flammable materail properly High Closed Costruction Team
mehmood
All site excution should be use
muhammed
ladder safety as they learn from hse High Closed Costruction Team
mehmood
dept
providing a proper mess hall that is
muhammed
up to SAPL& JASARA standard High Closed Costruction Team
mehmood
requirements
Immediately material removed from
muhammed
access way and safely shifted to High Closed Costruction Team
mehmood
store area
Immediately material removed from
access way and safely shifted to High Closed Costruction Team Jamal
store area

Closed the edge protection High Closed Costruction Team Jamal

it reqires a whole parcel inspection


to make sure all the lights are in High Closed Costruction Team Jamal
working condition
closed the door and fiixed the safety
High Closed Costruction Team Jamal
signage

Closed the room door and fixed the muhammed


High Closed Costruction Team
safety signage mehmood
muhammed
Good lighting was arranged High Closed Costruction Team
mehmood
muhammed
Arrange all the scaffolding materail Medium Closed Costruction Team
mehmood
Arrange the mess hall to store the
Medium Closed Costruction Team muhammed mehmood
food propely

Removed the ladder and clear the muhammed


High Closed Costruction Team
access mehmood

Removed the cigrates buds from


Medium Closed Costruction Team Amir Khan
the site .and build a smoking area

Informed the scaffold inspector to


Medium Closed Costruction Team Amir Khan
update the tag

Replace the full skip bin with a new


Medium Closed Costruction Team Amir Khan
one

Informed the scaffolders group to muhammed


High Closed Costruction Team
make good access mehmood

Informed the concern Electrical muhammed


Medium Closed Costruction Team
team to make good lighting mehmood

muhammed
Closed the transformer room High Closed Costruction Team
mehmood
muhammed
Removed the jackets High Closed Costruction Team
mehmood

Informd the concern person to use muhammed


Medium Closed Costruction Team
the safety harnes propely mehmood
Barricate the open trench with
Medium Closed Costruction Team Amir Khan
warning tape

Informed the concern Electrical


Medium Closed Costruction Team Amir Khan
team to make good lighting

Promoted good houskeeping Medium Closed Costruction Team Amir Khan

Closed the washroom permantly Medium Closed Costruction Team Amir Khan
REmoved the ladder from the
Medium Closed Costruction Team Amir Khan
access
Informed the Electrical team to
High Closed Costruction Team Amir Khan
manage electric cable propelry

Covered the steel rebars with muhammed


Medium Closed Costruction Team
plastic caps mehmood

Barricated the trench with soft


muhammed
barrication and fixed the safety Medium Closed Costruction Team
mehmood
signages

Provided the hard barrication for the muhammed


High Closed Costruction Team
Electric panel mehmood

Informed the workers about the muhammed


Medium Closed Costruction Team
hazard and give TBT to them mehmood

Stored the glass at the designated muhammed


High Closed Costruction Team
area mehmood

Provided the hard barrication for the muhammed


High Closed Costruction Team
Electric panel mehmood
muhammed
Promoted good houskeeping Medium Closed Costruction Team
mehmood
Removed and store them in the muhammed
High Closed Costruction Team
stiore . mehmood
Provided the good lighting in the muhammed
High Closed Costruction Team
washroom area . mehmood

muhammed
Provided the hard barrication Medium Closed Costruction Team
mehmood

Promote the good housekeeping at


Medium Closed Costruction Team Amir Khan
the site

Provided signage Medium Closed Costruction Team Amir Khan

Clean the floor Medium Closed Costruction Team Amir Khan

remove the rod and close the door Medium Closed Costruction Team Amir Khan

muhammed
Closed the area. High Closed Costruction Team
mehmood

Informed the Forman to arrange muhammed


Medium Closed Costruction Team
good lightinng at the site mehmood
Informed the Forman to maintain
muhammed
good houskeeping and proper Medium Closed Costruction Team
mehmood
stacking
Informed the supervisiors and muhammed
High Closed Costruction Team
engineers to make tab and permits mehmood

muhammed
Closed the Electric room. High Closed Costruction Team
mehmood

Informed the supervisiors and muhammed


High Closed Costruction Team
engineers to make tab and permits mehmood
Barricated the area with warning
Medium Closed Costruction Team Amir Khan
tape

Barricated and fixed the safety


High Closed Costruction Team Amir Khan
signage

Materail removed to make access


muhammed
free High Closed Costruction Team
mehmood

muhammed
Removed the Medium Closed Costruction Team
mehmood

muhammed
Good lighting was arranged Medium Closed Costruction Team
mehmood

Closed the Elevator machine with muhammed


High Closed Costruction Team
open area mehmood

Covered the open hole with steel muhammed


Medium Closed Costruction Team
cover mehmood

Removed all the flammable muhammed


High Closed Costruction Team
chemicals mehmood

Covered the dust High Closed Costruction Team Amir Khan

Remove all the waste material High Closed Costruction Team Amir Khan

Removed all the highly flammable


High Closed Costruction Team Amir Khan
chemicals
muhammed
We arranged the proper stacking High Closed Costruction Team
mehmood

Removed the ladder and clear the


Medium Closed Costruction Team Amir Khan
access
Immediately Take safety crew to
close the area hard cover High Closed Costruction Team Amir Khan

inpection should be carrioud out by


maintaince electric team at all levels
High Closed Costruction Team Amir Khan
to make sure cable proper
arrangements

Store the highly flammable


High Closed Costruction Team Amir Khan
chemicals

Informed the Forman to store


High Closed Costruction Team Amir Khan
Electric cables properly

Covered the dusty material Medium Closed Costruction Team Amir Khan

Arrange the scaffolding materail


propelry Medium Closed Costruction Team Amir Khan

Replace the Poor lights with the


Medium Closed Costruction Team Amir Khan
good ones

Removed the chemiclas and shifted


at the chemiclas store Medium Closed Costruction Team Amir Khan

Informed the FORMAN to remove


the water Medium Closed Costruction Team Amir Khan

Informed the Forman to manage it


Medium Closed Costruction Team Amir Khan
properly
Locked the panel and fixed the
contact numbers of Electrical High Closed Costruction Team Zain Waheed
concern person

Inspected and colur coded the ladder Medium Closed Costruction Team zain Waheed

Display the safety signage Medium Closed Costruction Team Zain Waheed

Promote the good housekeeping at


Medium Closed Costruction Team Zain Waheed
the site

Locked the castor wheel High Closed Costruction Team zain Waheed

Removed the spary paints and dirty


chemicals bottles Medium Closed Costruction Team Zain Waheed

Removed the dirty hand gloves Medium Closed Costruction Team Zain Waheed

Inspected the Non Conductive


ladder
Medium Closed Costruction Team Zain Waheed

Arrange the proper lighting Medium Closed Costruction Team Zain Waheed

Informed the supervisior to use


industrial standard plug Medium Closed Costruction Team Zain Waheed

Removed the persons observed


reparing High Closed Costruction Team Zain Waheed

Fixed it with new plug Medium Closed Costruction Team Zain Waheed
Replace the skip with the new skip
Medium Closed Costruction Team zain Waheed
bin

Removed all the flammable materail High Closed Costruction Team Zain Waheed

Display the picture if competent


person for the Electrical Medium Closed Costruction Team Zain Waheed

Removed all the flammable materail Medium Closed Costruction Team Zain Waheed

removed the fabricated hand tools High Closed Costruction Team Zain Waheed

Informed them to wear and hook full


bo High Closed Costruction Team Zain Waheed
dy harness

Replace it with the new one Medium Closed Costruction Team Zain Waheed

Removed the nails having nails in it Medium Closed Costruction Team Zain Waheed

Fixed the safety signages on the


Medium Closed Costruction Team Zain Waheed
chmeical store

Arrange the construction materail Medium Closed Costruction Team Zain Waheed

Reomved and put in the store and


utilized it properly High Closed Costruction Team Zain Waheed

Inspected and colour coded it with


High Closed Costruction Team Zain Waheed
green
Barricated the concrete waste High Closed Costruction Team Zain Waheed

repair th sign board Medium Closed Costruction Team Zain Waheed

inspected and colur coded hand


High Closed Costruction Team Zain Waheed
trolley

Removed from the site with the new


Medium Closed Costruction Team Zain Waheed
one having good condition

Replace it with operator having valid


High Closed Costruction Team Zain Waheed
TUV

Replace it with the skid loader with


High Closed Costruction Team Zain Waheed
valid TUV

Replace the damage plug with the


High Closed Costruction Team zain Waheed
new plug

make the safety sign board with the


High Closed Costruction Team Zain Waheed
standing position

Inspected and colour coded it with


High Closed Costruction Team zain Waheed
green

Removed and put it in the store High Closed Costruction Team zain Waheed

replace the block access with the


High Closed Costruction Team zain Waheed
new one and access was open

Fixed the guard on the grinder High Partialy Closed Costruction Team zain Waheed
Makr the sign board with the
Medium Closed Costruction Team Zain Waheed
standing position

Removed and put the dirty hand


Medium Closed Costruction Team Zain Waheed
gloves in the skip

Removed all the obstructions and


Medium Closed Costruction Team Amir Khan
make the access open

Maintain the damage fire blanket Medium Closed Costruction Team Amir Khan

make it more strong Medium Closed Costruction Team Amir Khan

Fixed the panel with the proper


Medium Closed Costruction Team Amir Khan
position

Remove d all flammable materail


Medium Closed Costruction Team Zain Waheed
and promote good housekeeping

Covered the open hole with steel


Medium Closed Costruction Team zain Waheed
cover

Covered the rebars with the plastic


Medium Closed Costruction Team zain Waheed
caps

Removed the damage chairs Medium Closed Costruction Team Zain Waheed

Replace it with the new one Medium Closed Costruction Team Zain Waheed

Fixed the safety signage with the


Medium Closed Costruction Team Zain Waheed
pressure horn
Closed the communication panel High Closed Costruction Team Zain Waheed

Reomved and put the trsh bag in


Medium Closed Costruction Team zain Waheed
the skip

Reomed the dirty face mask from


High Closed Costruction Team zain Waheed
the site

Removed all the waste materail High Closed Costruction Team zain Waheed

Inspected and tag the scaffold with


Medium Closed Costruction Team Zain Waheed
green tag

Removed the dirty hand gloves Medium Closed Costruction Team zain Waheed

Store the ladder propely and inspect


High Closed Costruction Team zain Waheed
it

Fixed it repair it and make it up to


High Closed Costruction Team zain Waheed
standard

Removed the workers from the


High Closed Costruction Team zain Waheed
chemiclas store

Display the safety signage Medium Closed Costruction Team Amir Khan

Inspected and tag it with green Medium Closed Costruction Team Amir Khan

Replace it with new one Medium Closed Costruction Team Amir Khan
Removed and Put damage PPES in
Low Closed Costruction Team Zain Waheed
the box and locked it

removed and put it in the store Low Closed Costruction Team Zain Waheed

Fixed the safety sign on the board Low Closed Costruction Team Zain Waheed

Promote the good housekeeping at


Medium Closed Costruction Team Zain Waheed
the site

Blocked the narrow access with


Medium Closed Costruction Team Amir Khan
broken glasses

Informed the formen to remove the


Low Closed Costruction Team Amir Khan
standing wate

Provided the hard barrication Low Closed Costruction Team Amir Khan

Block the access with steel barriers High Closed Costruction Team Zain Waheed

Informed the scaffold inspector to


High Closed Costruction Team Zain Waheed
nake good access of the scaffold

Make a new access and make the


High Closed Costruction Team Zain Waheed
scafflold green tag

Removed from the scaffold Low Closed Costruction Team Zain Waheed

Closed the washroom permantly Medium Closed Costruction Team Amir khan
Closed the fire hydrant box Low Closed Costruction Team Amir Khan

Closed the access and barricated


High Closed Costruction Team Amir Khan
the area with broken glasses

Informed him to wear and hook full


High Closed Costruction Team Zain Waheed
boady harness

Locked the castor wheel High Closed Costruction Team zain Waheed

Removed the chemicals and put it


Medium Closed Costruction Team Amir Khan
in the store

Removed the waste material Medium Closed Costruction Team Amir Khan

Replace the damage switch with


Medium Closed Costruction Team Amir Khan
new one

Removed and put it in the store Medium Closed Costruction Team Amir Khan

plugs must be used with the wires Medium Closed Costruction Team Zain Waheed

Inspected and coluour coded the


Medium Closed Costruction Team Zain Waheed
ladder

Removed the chemicals Medium Closed Costruction Team Amir Khan

Remove and clean the tray Medium Closed Costruction Team Amir Khan
Replace it with the working one Medium Closed Costruction Team Amir Khan

Removed the dam


Low Closed Costruction Team Zain Waheed
age tools from the site

Removed from the site High Closed Costruction Team Zain Waheed

Inspected the charging light Low Closed Costruction Team Zain Waheed

Stored in the chemiclas store High Closed Costruction Team Zain Waheed

Covered the rebars with FOAM Caps Low Closed Costruction Team Zain Waheed

edge protection must be inspected


Medium Open Costruction Team Zain Waheed
by certifed scaffold inspector

Inspect and colour code it Medium Closed Costruction Team Zain Waheed

Inspected and coluour coded Medium Closed Costruction Team Amir Khan

Regular maintence is required High Closed Costruction Team Amir Khan

Closed the Electric panel High Closed Costruction Team Amir Khan

Covered the rebars with FOAM Caps High Closed Costruction Team Zain Waheed
Inspected the emergency light High Closed Costruction Team zain Waheed

Put them on the wodden box High Closed Costruction Team Zain Waheed

Removed the chemicals High Closed Costruction Team Zain Waheed

Inspected the fire extinguisher and


High Closed Costruction Team Zain Waheed
coluour coded

Closed the Electric panel High Closed Costruction Team Zain Waheed

Locked the castor wheel High Closed Costruction Team Zain Waheed

Workers should not done urine Low Closed Costruction Team Zain Waheed

Completed the scaffold with green


High Closed Costruction Team Zain Waheed
tag and TAB was made

Given unique serail number and


High Closed Costruction Team Zain Waheed
dispaly unique serial number

New plug is fixed with extension


High Closed Costruction Team Zain Waheed
cable

Replace it with new water filter Medium Closed Costruction Team Zain Waheed

Removed flammable material and


Medium Closed Costruction Team Zain Waheed
done housekeeping
Given unique serail number and
Medium Closed Costruction Team Zain Waheed
colour code it

Fixed the safety tag on Panel Medium Closed Costruction Team Zain Waheed

Inspected and coluour coded Medium Closed Costruction Team Zain Waheed

Inspected and coluour coded Medium Closed Costruction Team zain Waheed

Arranged the scaffold Materail Medium Closed Costruction Team Zain Waheed

Inspected the wheel cutter Medium Closed Costruction Team Zain Waheed

New checklist is diplay at the


Medium Closed Costruction Team Zain Waheed
drinking water station

Replace the water filter with new Low Closed Costruction Team zain Waheed

Colur coded it with green Low Closed Costruction Team Zain Waheed

Fixed them on the ground Low Closed Costruction Team Amir Khan

Fixed the emergency light again Medium Closed Costruction Team Amir Khan

Scaffold inspected and fixed green


Medium Closed Costruction Team Amir Khan
tag
Full body harness inspected High Closed Costruction Team Zain Waheed

Insert the tag on the ladder High Closed Costruction Team zain Waheed

Inspect and colour code it Medium Closed Costruction Team zain Waheed

Colur code it green Medium Closed Costruction Team Zain Waheed

Informed the Electrical team to


arrange lighting Medium Closed Costruction Team Amir Khan

Provided the safety signage Medium Closed Costruction Team Amir Khan

Proved the new plug for the


extension cable Medium Closed Costruction Team Amir Khan

Informed the scaffold supervisior to


Medium Closed Costruction Team Amir Khan
inspect it

Remove and make the access clear Medium Closed Costruction Team Amir Khan

Inspected the ladder and coluor


Medium Closed Costruction Team Amir Khan
code it

Instructed To wear PPE Medium Closed Costruction Team Zain Waheed

Fixed the tag Medium Closed Costruction Team Zain Waheed


Informed the scaffolding supervisior
to make the scaffold good for the
High Closed Costruction Team Zain Waheed
working

Must be provided the new charging


Medium Open Costruction Team Zain Waheed
light

Informed the concern person to


Medium Closed Costruction Team Amir Khan
make it closed

Informed the houskeeping


Medium Open Costruction Team Amir Khan
supervisior to clean it

Update th Tag Medium Closed Costruction Team Amir Khan

Removed the chemiclas and shifted


at the chemiclas store Medium Closed Costruction Team Amir Khan

Removed the machine Medium Closed Costruction Team Zain Waheed

Removed from the site Medium Closed Costruction Team Zain Waheed

Inspected and fixed the inspection


Medium Closed Costruction Team zain Waheed
tag

Informed the concern Manager to


Medium Open Costruction Team Zain Waheed
renew its TUV

Needs fresh inspection and TUV Medium Open Costruction Team zain Waheed

Informed the concern forman to


High Closed Costruction Team Zain Waheed
arrange water for the washroom
shifted them in the chemical store High Closed Costruction Team Zain Waheed

Should be shifted to proper area Medium Open Costruction Team Amir Khan

Provided the signage Medium Closed Costruction Team Amir Khan

Provided the signage and MSDS Medium Closed Costruction Team Amir Khan

Must closed the rooms and


Medium Closed Costruction Team Amir Khan
housekeeping must be done

Removed them from the scaffolding High Closed Costruction Team Zain Waheed

Inspected and coluour coded


Low Closed Costruction Team zain Waheed

Fixed it properly Medium Closed Costruction Team zain Waheed

update the tag Medium Closed Costruction Team Zain Waheed

Replace it with new water filter Medium Closed Costruction Team Zain Waheed

Asked the Electrican to provide a


Medium Closed Costruction Team Amir Khan
new one

Informed houskeeping superviosor


Medium Open Costruction Team Amir Khan
to clean it
Immediately inspected and colour
Medium Closed Costruction Team Amir Khan
code it

Removed from the site Medium Closed Costruction Team Amir Khan
Hazards Code Number For SOR Tracker Observations detected
1-Acssess/Egress 14 Observations detected
2-Lighting 11
3-Safe System Of Work 3 40
4-Permit To work 0
5-Supervision 0
6-Training/Competency 0 35
7-Lifting 0
8-Hazardous Substances 0
9-Machines/Powertools 0 30
10-Hand Tools 3
11-Fire 4
12-Signages 16
13-Plant & Equipment 3 25
14-Open Edges 10
15-Unsecured Structure 0
16-Scaaffolding 12 20
17-Confined Spaces 0
18-Wellfare 16
19-Emergency Arrangments 6 15
20-Electrical 25
21-Houskeeping 21
22-Noise Exposure 0
10
23-Manual Handling 0
24-Inspection/Certification 34
25-Slip Trip Fall 5
26-Storage 12 5
27-Environmental 0
28-Bilogical 3
29-MEP 3 0
30-Dust 0
er k
ne 7 ion

yA S e
er on tru t
e

nm all

29 tal
5- Of W s

w ng

21 rang ces

-E Tr ng
- U t & 1 ls

an ske ts
25 l Ha ing
en
up or
es

nc ed tur
ec Equ Fir
o

-M ou en

27 lip li
Po fti

iro F
en
to

ua ep
vis
em g r

r pa
-E 17 red pm

-S nd
1-

31-Weather 0
ge fin c

nv ip
23 -H m
s / Li
er
st /E

i
Sy ss

S
32-Waste Management 7
f e ss e

S
Sa c

u
3- 1-A

15 lan

33-Chemicals 14
m -C
hi

ns
-P
ac

13

34-Ventelation 0
M
9-

35-PPE 10
19

36-Other 16
Total: 248
Open 13
closed 235
Em 7- d me
er Con Stru nt
ge fin c
nc ed tur
yA S e
r pa
21 rang ces
23 -H m
-M ou en
an ske ts
ua ep
25 l Ha ing
- n
27 S lip dli
-E Tr ng
nv ip
ervations detected
iro F
nm all
en
29 tal
31 -M
-W E
33 ea P
-C th
he er
m
i ca
35 ls
-P
PE