Sie sind auf Seite 1von 1

CAM HIGH LOW GEAR SHIFTING 000031181B12

Capacity Analysis Sheet


Part No. - 000031181B12
Takt Time (s): 1800
Part Name - CAM HIGH LOW GEAR SHIFTING
Operation Nos. 10 20 30 40 50 60 70 80 90
Type Of Machine

Hole Final Oiling and


Process name Casting Inspection Drilling Broaching Drilling Tapping
Deburring
Hardening
Inspection Packaging

Operation Time
Actual Cycle time (seconds)
No. of parts / cycle 1 1 1 1 1 1 1 1 1
Production / Hr #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
No of shifts planned 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Available hrs for planned shifts (exclude lunch break) 22 22 22 22 22 22 22 22 22
Avg. available Hrs /Shift 10.8 10.8 10.8 10.8 10.8 10.8 10.8 10.8 10.8
Production / Shift #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Production / Day #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Production / Week (6 days) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Production / Month (25 days) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Production / Year (300 days) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Efficiency for capacity analysis 99.52% 99.52% 99.52% 99.52% 99.52% 99.52% 99.52% 99.52% 99.52%
Scrap rate 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
% OK parts (excluding scrap rate) 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Capacity for year #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Parts / Vehicle 1 1 1 1 1 1 1 1 1
No. of Vehicle sets / Yr #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Yuvraj NXT contracted requirement (Vehicles / year) 96,000 96,000 96,000 96,000 96,000 96,000 96,000 96,000 96,000

Assumptions for capacity analysis:


Actual Working
Hrs: 10.5
Working days/
month: 26
Working days/
year: 300
Scrap Rate is based on rejections on H1 Line

Das könnte Ihnen auch gefallen