1 Earth Work in Embankment & Sub grade

1.1 Liquid Limit 70 % Maximum

1.2 Plasticity Index 2) 2 45 % Maximum 2) 2


Tests per 3000 m3 Tests per 3000 m3
1.3 Maximum Dry Density requirements for various works Items

Maximum Dry Density for 1) At the beginning for approval of each 1.52 g/cc Minimum 1) At the beginning for approval of each
1.3.1
Emb. up to 3m source and change of source source and change of source

Maximum Dry Density for


1.3.2 1.60 g/cc Minimum
Emb. more than 3m

Maximum Dry Density for 1) At the beginning for approval of 2)


each
2 1.75 g/cc Minimum 1) At the beginning for approval of 2)
each
2
1.3.3
Subgrade & Earthen Shoulders source and
Tests per change
3000 m3 of source source and
Tests per change
3000 m3 of source

6 % Minimum
California Bearing Ratio for
1.4 1) At the beginning for approval of each 1) At the beginning for approval of each
Subgrade Earthen Shoulders
source and change of source source and change of source

2) 1 2) 1
Tests per 3000 m3 The size of coarse material should not exceed Tests per 3000 m3
1.5 Grain size analysis 1) At the beginning for approval of each 75mm in embankment and 50mm in subgrade 1) At the beginning for approval of each
source and change of source source and change of source
No of samples
2) 2
0.5
No of samples
2) 2
0.5

1.6 Free Swelling Index Tests per 3000 m3 50% Maximum Tests per 3000 m3

1) At the beginning for approval of 2) 2 1. Material should be free from swamps


each 1) At the beginning for approval of 2) 2
each
Tests marshes and bogs
sourceper 3000
and m3 of source
change Tests
sourceper 3000
and m3 of source
change
1.7 Deleterious Constituents
2. Any soil that comes
under classification of OL,OI and OH is treated
as unsuitable

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
1.8 Field Tests 1) 1 Test per 250 m3 1) 1 Test per 250 m3
Moisture Content Prior to
1.8.1 -2, +1 of OMC
Compaction
Field Dry Density of
1.8.2 Embankment Layers up to 6m 1) 1 Test per 1000 m2 95 % Minimum 1) 1 Test per 3000 m2
height
Field Dry Density of
1.8.3 Embankment Layers more 1) 1 Test per 1000 m2 97 % Minimum 1) 1 Test per 3000 m2
than 6m height 1) 1 Test per 500 m2 1) 1 Test per 2000 m2
Field Dry Density of Sub grade
1.8.4 97 % Minimum
layers
Nothan
Mean Density should not less of samples
the
0.5
Nothan
Mean Density should not less of samples
the
0.5

........1.65
1.9 Acceptance Criteria Specified density + [ 1.65 - ----------------------] X SD Specified density + [ 1.65 - ---
..( No of samples)0.5 ..
No of samples0.5 No of samples0.5
2 Granular Sub-Base ( GSB)

Table 400-2 (Grading 1)


% Passing by
1) At the beginning for approval of each IS Sieve (mm) 1) At the beginning for approval of each
weight
source and change of source source and change of source
75 100

53.00 -

26.50 55-75
2.1 Sieve Analysis
9.5 -

4.75 10-30

2) 1 Test per 2.36 - 2) 1 Test per


200 m3 400 m3
1) At the beginning for approval of each 0.425 - 1) At the beginning for approval of each
source and change of source source and change of source
0.075 0-5

2.2 Liquid Limit 25 % Maximum


1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
2.3 Plasticity Index 6 % Maximum
At the beginning for approval of each At the beginning for approval of each
source and change of source source and change of source
2.4 California Bearing Ratio 2) 1 Test per 30 % Minimum 2) 1 Test per
200 m3 400 m3

2.5 10% Fines value 50 KN Minimum

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
At the beginning for approval of each At the beginning for approval of each
source and change of source source and change of source

2.6 Water Absorption < 2%

As above If water absorption value is > <12% (Na2So4) As above If water absorption value is >
2.7 Soundness Test
2% <18% (MgSo4) 2%

2.8 Field Tests


Moisture Content Prior to
2.8.1 1. 1 Test per 250 m2 -2, +1 of OMC 1. 1 Test per 400 m2
Compaction
Field Dry Density of
2.8.2 1. 1 Test per 500 m2 98 % Minimum 1. 1 Test per 1000 m2
Compacted Layers
Mean Density should not less than the Mean Density should not less than the
1.65 ........1.6
2.9 Acceptance Criteria
Specified density + [ 1.65 - ----------------------] X SD Specified density + [ 1.65 - ---
.. No of samples0.5 .. No of sam

3 Wet Mix Macadam (WMM) No of samples0.5 No of samples0.5

% Passing by
IS Sieve (mm)
1) At the beginning for approval of each weight 1) At the beginning for approval of each
source and change of source source and change of source
53 100

45 95-100

22.4 60-80
3.1 Sieve Analysis
11.2 40-60

4.75 25-40

2.36 15-30
1) At the beginning for approval
2) 1 Testofper
each 1) At the beginning for approval
2) 1 Testofper
each
0.600 8.-22
source
100 m3 and change of source source
200 m3 and change of source
0.075 0-8

1) At the beginning for approval of each 1) At the beginning for approval of each
3.2 Los Angles abrasion value source and change of source 40 % Maximum source and change of source

3.3 Aggregate Impact Value 30 % Maximum

2) 1 Test per 2) 1 Test per


200 m3 1000 m3

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source

At the beginning for approval of each At the beginning for approval of each
3.4 Flakiness & Elongation Index source and change of source . If water 30 % Maximum source and change of source . If water
absorption value is > 2% absorption value is > 2%

3.5 Soundness Test 1) At the beginning for approval each <12% (Na2So4)
2) 1 Testofper 2) 1 Testofper
1) At the beginning for approval each
200 m3 and change of source
source <18% (MgSo4) 500 m3 and change of source
source

Specific Gravity and Water


3.6 2 % Maximum for water absorption
absorption
1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source

3.7 Plasticity Index 2) 1 Test per 100 m3 6 % Maximum 2) 1 Test per 200 m3

3.8 Field Tests

Field Dry Density of


3.8.1 1) 1 Test per 500 m2 98 % Minimum 1) 1 Test per 1000 m2
Compacted Layers

Mean Density should not less than the Mean Density should not less than the
........1.65 ........1.65
3.8.2 Acceptance Criteria Specified density + [ 1.65 - -----------------------] X SD Specified density + [ 1.65 - ---------------------
.. No of samples0.5 .. No of samples0.5

4 Asphalt Works No of samples0.5 No of samples0.5


4.1 Prime Coat

1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
4.1.1 Quality of Prime Coat emulsion Manufacturer's Test Certificate
2) 2 Tests per Lot 2) 2 Tests per Lot

4.1.2 Field Tests

1) 1 Test per 500m2 and not less than 2


4.1.3 Rate of Spread 6Kg-9Kg per 10 Sqm 1)3 Tests per day
Tests per day

4.2 Tack Coat

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
4.2.1 Quality of Tack Coat emulsion -
2) 2 Tests per Lot 2) 2 Tests per Lot

4.2.2 Field Tests

3.0 to3.50kg/10m2 over concrete surface

1) 1 Test per 500m2 and not less than 2 2.5 to 3.0 kg/10m2 over granular surface
4.2.3 Rate of Spread of Binder 1) 3 Tests per day
Tests per day treated with primer

2.0 to 2.5kg/10m2 over bituminous surface

4.3 Aggregates
1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source

4.3.1 Cleanliness (Dust) Max 5% passing 0.075mm sieve

1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
35 % Maximum
Los Angeles abrasion value
2) 1 Test per 50 30 % Maximum 2) 1 Test per
4.3.2 a) DBM
m3
350 m3
b) BC
1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
Aggregate Impact Value
2) 1 Test per 50 a) 27 % Maximum 2) 1 Test per
4.3.3 a) DBM
m3 b) 24% Maximum 350 m3
b) BC

Three tests on agregates for each 400 Three tests on agregates for each 400
4.3.4 Sand Equivalent Test + of mix subject to two tests per plant + of mix subject to two tests per plant
per day per day
1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
30 % Maximum
2) 1 Test per 50 2) 1 Test per
4.3.5 Flakiness & Elongation Index
m3 350 m3

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
Sodium Sulphate-12% Maximum
1) At the beginning for approval of each 1) At the beginning for approval of each
4.3.6 Soundness
source and change of source source and change of source
Magnesium
Sulphate-18% Maximum

2 % Maximum for water absorption


Specific Gravity and Water 1) At the beginning for approval of each 1) At the beginning for approval of each
4.3.7
absorption source and change of source source and change of source

1) At the beginning for approval of each 1) At the beginning for approval of each
4.3.8 Stripping Value Minimum retained coating should be 95%
source and change of source source and change of source

1) At the beginning for approval of each 1) At the beginning for approval of each
4.3.9 Stone Polishing Value 50 % Minimum
source and change of source source and change of source

4.4 Bitumen VG-30 Grade 1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
2) Two 2) Two
4.4.1 Absoult Viscosity (Poise) tests per lot 2400 tests per lot

1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
2) Two 2) Two
4.4.2 Kinematic Visocity(cSt) tests per lot 350 tests per lot

1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
2) Two 2) Two
4.4.3 Penetration tests per lot 50 -70 tests per lot

1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
2) Two 2) Two
4.4.4 Ductility tests per lot 40 Cms Minimum (After TFOT) tests per lot

1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
2) Two 2) Two
4.4.5 Softening Point tests per lot 470C Minimum tests per lot

1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
2) Two 2) Two
4.4.6 Specific Gravity tests per lot 0.99 Minimum tests per lot

1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
2) Two 2) Two
4.4.7 Flash point tests per lot 220 0C Minimum tests per lot

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
Three test on agregates for each 400 Three test on agregates for each 400
4.4.8 Sand Equivalent Test plus of mix subject to two tests per plus of mix subject to two tests per
plant per day plant per day

4.5 Dense Bituminous Macadam (DBM) Nominal Aggregate Size

40mm Grade-1

Layer thickness 80-100mm


Percent passing Percent passing
Sieve Designation Grade 1 Grade 2
1) At the beginning for approval 1) At the beginning for approval
No of samples0.5 No of samples0.5
45mm 100 -
37.5mm 95-100 100
4.5.1 Sieve Analysis 2) A set of 2) A set of
three specimens for each 400 tons of 26.5mm 63-93 90-100 three specimens for each 400 tons of
mix subject to a minimum of 2 tests per mix subject to a minimum of 2 tests per
19mm - 71-95
plant per day plant per day
13.2mm 55-75 56-80
4.75mm 38-54 38-54
2.36mm 28-42 28-42
300micro 7-21 7-21
75micron 2-8 2-8
Modified Marshall Method
4.5.2 Marshall Stability
1) At the beginning for approval 20.25KN Minimum 1) At the beginning for approval
4.5.3 Flow 3 mm Minimum
4.5.4 Air Voids 2) A set of 3%-6% 2) A set of
three specimens for each 400 tons of three specimens for each 400 tons of
4.5.5 Voids in mineral aggregate 12% Minimum
mix subject to a minimum of 2 tests per mix subject to a minimum of 2 tests per
4.5.6 Voids filled with Bitumen plant per day 65 % - 75 % plant per day
4.5.7 Min. Bitumen Content 4.0 % for Grade - I, 4.5% for Grade - II

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
4.5.8 Field Tests

Control of mix temp. at the


4.5.9 1) 1 Test per every load of mix 1400C Min 1) 1 Test per every load of mix
time of Laying

4.5.10 Field Density of Asphalt layers 1) 1 Test per 250 m2 98 % Minimum 1) 1 Test per 700 m2

Mean Density should not less than the Mean Density should not less than the
........1.65 ........1.65
4.5.11 Acceptance Criteria Specified density + [ 1.65 - --------------------------------] X SD 5.16 Specified density + [ 1.65 - ---------------------
.. No of samples0.5 .. No of sample
4.6 Bitumen VG-40 Grade 1) At the beginning for approval
No of of each 0.5
samples 1) At the beginning for approval
No of of each 0.5
samples
source and change of source source and change of source
2) Two 2) Two
4.6.1 Penetration tests per lot 40 - 60 tests per lot

1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
2) Two 2) Two
4.6.2 Absoult Viscosity (Poise) tests per lot 3200 tests per lot

1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
2) Two 2) Two
4.6.3 Kinematic Visocity(cSt) tests per lot 400 tests per lot

1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
2) Two 2) Two
4.6.4 Ductility tests per lot 40 Cms Minimum (After TFOT) tests per lot

1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
2) Two 2) Two
4.6.5 Softening Point tests per lot 50 0C Minimum tests per lot

1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
2) Two 2) Two
4.6.6 Specific Gravity tests per lot 0.99 Minimum tests per lot

1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
2) Two 2) Two
4.6.7 Flash point tests per lot 220 0C Minimum tests per lot

Three test on agregates for each 400 Three test on agregates for each 400
4.6.8 Sand Equivalent Test plus of mix subject to two tests per plus of mix subject to two tests per
plant per day plant per day

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
4.7 Bituminous Concrete (BC)
% Passing by
IS Sieve (mm)
weight
26.50 100
19.00 79-100
1) At the beginning for approval 13.20 59-79 1) At the beginning for approval
9.50 52-72
4.7.1 Sieve analysis 4.75 35-55
2) A set of three specimens for each 2) A set of three specimens for each
400 tons of mix subject to a minimum 2.36 28-44 400 tons of mix subject to a minimum
of 2 tests per plant per day 1.18 20-34 of 2 tests per plant per day
0.600 15-27
0.300 10.-20
0.150 5.-13
0.075 2.-8

4.7.2 Marshall Stability 12 KN Minimum

4.7.3 Flow 2.5 mm - 4 mm

1) At the beginning for approval 1) At the beginning for approval


4.7.4 Air Voids 3%-5%

2) A set of three specimens for each 2) A set of three specimens for each
4.7.5 Voids in mineral aggregate 400 tons of mix subject to a minimum 14 % Minimum 400 tons of mix subject to a minimum
of 2 tests per plant per day of 2 tests per plant per day

4.7.6 Voids filled with Bitumen 65 % - 75 %

4.7.7 Min. Bitumen Content 5% Min

4.7.8 Field Tests

Control of mix temp. at the


4.7.9 1) 1 Test per every load of mix 120-1450C 1) 1 Test per every load of mix
time of Laying

4.7.10 Field Density of Asphalt layers 1) 1 Test per 250 m2 98 % Minimum 1) 1 Test per 250 m2

Mean Density should not less than the Mean Density should not less than the
........1.65 ........1.65
4.4.11 Acceptance Criteria Specified density + [ 1.65 - --------------------------------] X SD Specified density + [ 1.65 - ---------------------
.. No of samples0.5 .. No of samp

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
5 Cement OPC53 Grade
1) At the beginning for approval
No of of each 0.5
samples 1) At the beginning for approval
No of of each 0.5
samples
5.1 Chemical Tests source and change of source source and change of source

5.1.1 Chlorides(as cl) 1) At the beginning for approval of each 0.05 % Maximum 1) At the beginning for approval of each
source and change of source source and change of source

Ratio of alumina to that of iron 1) At the beginning for approval of each 1) At the beginning for approval of each
5.1.2 0.66 Minimum
Oxide source and change of source source and change of source

5.1.3 Magnesium (MgO) 1) At the beginning for approval of each 6.0 % Maximum 1) At the beginning for approval of each
source and change of source source and change of source

Sulphuric Anhydrade 1) At the beginning for approval of each 3.0 % Maximum 1) At the beginning for approval of each
5.1.4
(% by mass) source and change of source source and change of source

5.1.5 Loss on Ignition 1) At the beginning for approval of each 5.0 % Maximum 1) At the beginning for approval of each
source and change of source source and change of source

5.1.6 Insoluble Residue 1) At the beginning for approval of each 3.0 % Maximum 1) At the beginning for approval of each
source and change of source source and change of source

5.1.7 Lime saturation factor 0.66 - 1.02


1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
5.2 Physical Tests

5.2.1 Standard Consistency 1) At the beginning for approval of each


2) Not Specified 1) At the beginning for approval of each
2)
source
One and
test perchange of source
lot subject to a maximum source
One and
test perchange of source
lot subject to a maximum
of 500Tonnes of 500Tonnes

5.2.2 Initial Setting Time 1) At the beginning for approval of each


2) 30 minutes Minimum 1) At the beginning for approval of each
2)
source
One testand
perchange of source
lot subject to a maximum source
One testand
perchange of source
lot subject to a maximum
of 500Tonnes of 500Tonnes

5.2.3 Final Setting Time 2) 600 minutes Maximum 2)


One test per lot subject to a maximum One test per lot subject to a maximum
of 500Tonnes of 500Tonnes

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
1) At the beginning for approval of each 1) At the beginning for approval of each
5.2.4 source and
Cement Mortar cubes Compressive change of source
Strength source and change of source

Compressive Strength

5.2.4.1 1) At the beginning for approval of each


2) Not less than 27 Mpa Strength 1) At the beginning for approval of each
2)
source
One testand
perchange of source
lot subject to a maximum source
One testand
perchange of source
lot subject to a maximum
i) At 3 days of 500Tonnes of 500Tonnes

5.2.4.2 ii) At 7 days 1) At the beginning for approval of each


2) Not less than 37 Mpa Strength 1) At the beginning for approval of each
2)
source
One testand
perchange of source
lot subject to a maximum source
One testand
perchange of source
lot subject to a maximum
of 500Tonnes of 500Tonnes

5.2.4.3 iii) At 28 days 1) At the beginning for approval of each


2) Not less than 53 Mpa Strength 1) At the beginning for approval of each
2)
source
One and
test perchange of source
lot subject to a maximum source
One and
test perchange of source
lot subject to a maximum
of 500Tonnes of 500Tonnes

5.2.5 Specific Gravity 1) At the beginning for approval of each


2) 3.15 Minimum 1) At the beginning for approval of each
2)
source
One and
test perchange of source
lot subject to a maximum source
One and
test perchange of source
lot subject to a maximum
of 500Tonnes of 500Tonnes

5.2.6 Fineness of Cement 1) At the beginning for approval of each


2) 10 % Maximum 1) At the beginning for approval of each
2)
source
One testand
perchange of source
lot subject to a maximum source
One testand
perchange of source
lot subject to a maximum
of 500Tonnes of 500Tonnes

Soundness
5.2.7 2) 10 mm Maximum 2)
(Le-Chatlier method) One test per lot subject to a maximum One test per lot subject to a maximum
of 500Tonnes of 500Tonnes
6 Concrete Works

6.1 Coarse Aggregates - IS:383

% Passing by
IS Sieve (mm)
weight

1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source 80 100 source and change of source
Sieve analysis for all in
6.1.1 2) 2)
aggregate 40 95-100
Once test for every days work of each Once test for every days work of each
fraction of coarse aggregate 20 45-75 fraction of coarse aggregate
4.75 25-45
0.600 .8-30
0.150 0-6
1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
6.1.2 Flakiness Index 35 % Maximum
2) 2)
Once in a month Once in a month

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
% Passing by
Deleterious
weight
Materials
(Maximum)
Coal& Ignite 1

1) At the beginning for approval of each Clay Lumps 1 1) At the beginning for approval of each
6.1.3 Deleterious Materials source and change of source source and change of source
Material finer than
3
75 microns sieve
Soft Fragment -
Shale -

Total 5

1) At the beginning for approval of each 1) At the beginning for approval of each
6.1.4 Water absorption source and change of source 2 % Maximum source and change of source

1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
6.1.5 Aggregate Impact Value 45% Max
2) 2)
Once in a month Once in a month
6.2 Fine Aggregates - IS:383
% Passing by
IS Sieve (mm)
weight
10 100
4.75 90-100
1) At the beginning for approval of each 1) At the beginning for approval of each
Sieve analysis for fine 2.36 60-95
6.2.1 source and change of source source and change of source
aggregate Zone - I
1.18 30-70
0.600 15-34
0.300 5.-20
0.150 0.-10
% Passing by
IS Sieve (mm)
weight
10 100
4.75 90-100
Sieve analysis for fine 1) At the beginning for approval of each 2.36 75-100 1) At the beginning for approval of each
6.2.2
aggregate Zone - II source and change of source source and change of source
1.18 55-95
0.600 35-59
0.300 8.-30
0.150 0-10
% Passing by
IS Sieve (mm)
weight
10 100
4.75 90-100
Sieve analysis for fine 1) At the beginning for approval of each 2.36 85-100 1) At the beginning for approval of each
6.2.3
aggregate Zone - III source and change of source source and change of source
1.18 75-100
0.600 60-79
0.300 12.-40
0.150 0-10

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
% Passing by
Deleterious
weight
Materials
(Maximum)
Coal& Ignite 1
Clay Lumps 1
1) At the beginning for approval of each 1) At the beginning for approval of each
6.2.4 Deleterious Materials source and change of source source and change of source
Material finer than
3
75 microns sieve

Soft Fragment -
Shale 1

Total 5
1) At the beginning for approval of each 1) At the beginning for approval of each
Material finer than 75 micron
6.2.5 source and change of source 3 % Maximum source and change of source
sieve
1) At the beginning for approval of each 1) At the beginning for approval of each
Specific Gravity and Water
6.2.6 source and change of source - source and change of source
absorption

7 Water - IS:456

7.1 Chemical Tests

1) At the beginning for approval of each 1) At the beginning for approval of each
7.1.1 PH Value source and change of source 6 Minimum source and change of source

1) At the beginning for approval of each 1) At the beginning for approval of each
7.1.2 Sulphates (So3) source and change of source 400 mg /liter Maximum source and change of source

500 mg /liter Maximum for psc concrete


1) At the beginning for approval of each 1) At the beginning for approval of each
7.1.3 Chlorides (Cl) source and change of source source and change of source
2000 mg /liter for concrete not embedded steel

1) At the beginning for approval of each 1) At the beginning for approval of each
NaOH (Neuterlisation with Maximum of 5ml of 0.02 normal NaOH to
7.1.4 source and change of source source and change of source
phenolphthlein as indicator) neutralise 100ml of water

1) At the beginning for approval of each 1) At the beginning for approval of each
HCl (Neuterlisation with methyl Maximum of 25ml of 0.002 normal H2So4 to
7.1.5 source and change of source source and change of source
orange as indicator) neutralise 100ml of water

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
7.2 Physical Tests

1) At the beginning for approval of each 1) At the beginning for approval of each
7.2.1 Suspended matter 2000mg /liter Maximum
source and change of source source and change of source

1) At the beginning for approval of each 1) At the beginning for approval of each
7.2.2 Organic matter 200mg /liter Maximum
source and change of source source and change of source

1) At the beginning for approval of each 1) At the beginning for approval of each
7.2.3 In-organic matter 3000mg/ liter Maximum
source and change of source source and change of source

8 Steel (Fe500)- IS:1786

8.1 Chemical Tests

1) At the beginning for approval of each 1) At the beginning for approval of each
8.1.1 Carbon 0.30 Maximum
source and change of source source and change of source

1) At the beginning for approval of each 1) At the beginning for approval of each
8.1.2 Sulphur 0.055 Maximum
source and change of source source and change of source

1) At the beginning for approval of each 1) At the beginning for approval of each
8.1.3 Phosphorous 0.055 Maximum
source and change of source source and change of source

1) At the beginning for approval of each 1) At the beginning for approval of each
8.1.4 Sulphur+Phosphorous 0.105 Maximum
source and change of source source and change of source

8.2 Physical Tests


1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source 8 % more than the actual 0.2% proof stress but source and change of source
8.2.1 Ultimate Tensile Strength
2) 1 not less than 545 Mpa 2) 1
Test per Consignment Test per Consignment
1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
8.2.2 0.2 % Proof stress 500 Mpa Minimum
2) 1 2) 1
Test per Consignment Test per Consignment
1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
8.2.3 Elongation 14.50 % Minimum
2) 1 2) 1
Test per Consignment Test per Consignment
1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
8.2.4 Bend Test Bent to included angle of 135 0
2) 1 2) 1
Test per Consignment Test per Consignment
1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
8.2.5 Re-Bend Test Bent to included angle of 157.5 0
2) 1 2) 1
Test per Consignment Test per Consignment

8.2.6 Elastic Modulus (Gpa) As Above 200 As Above

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
6.310 + 3% for 32mm dia
4.830 + 3% for 25mm dia
2.470 + 3%
for 20mm dia
1) At the beginning for approval of each 1) At the beginning for approval of each
Mass per meter run/ 1.580 +
source and change of source source and change of source
8.2.7 5% for 16mm dia
2) 1 2) 1
Rolling margin 0.888 + 5% for
Test per Consignment Test per Consignment
12mm dia
0.617 + 7% for 10mm
dia
9 Admixture (Super plasticiser)- IS:9103 0.395 + 7% for 8mm dia

9.1 Uniformity Tests


1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source Within 3% of the value stated by the source and change of source
9.2 Dry material content
2) 1 manufacturer 2) 1
Test per Consignment Test per Consignment
1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source Within 1% of the value stated by the source and change of source
9.3 Ash content
2) 1 manufacturer 2) 1
Test per Consignment Test per Consignment
1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source Within 0.02 of the value stated by the source and change of source
9.4 Relative Density
2) 1 manufacturer 2) 1
Test per Consignment Test per Consignment
1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
9.5 Chlorides ion content 0.20 % maximum
2) 1 2) 1
Test per Consignment Test per Consignment
1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
9.6 PH 7 to 8
2) 1 2) 1
Test per Consignment Test per Consignment
10 Concrete

one test per each transit mixer at both one test per each transit mixer at both
batching plant and site initially when PCC 50 + 25 mm batching plant and site initially when
10.1 Workability of fresh concrete
work starts.Subsequently sampling may RCC 100 + 25 mm work starts.Subsequently sampling may
be done from alternate transit mixers M10 - 10 Mpa be done from alternate transit mixers
(1-5cum)/One set (1-5cum)/One set
M20 - 20 Mpa
(6-15)/Two sets (6-15)/Two sets
(16- (16-
M25 - 25 Mpa
30)/Three sets 30)/Three sets
Compressive Strength of (31-50)/Four sets (31-50)/Four sets
10.2 M30 - 30 Mpa
Concrete
51 and above 51 and above
M35 - 35 Mpa
4+1 4+1
M40 - 40 Mpa
additional set for each 50 m3 additional set for each 50 m3
M45 - 45 Mpa

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
11 Hume Pipes(NP-4) - IS:458

Tolerances in dimensions for


11.1 Over 95mm + 7mm, - 3.5mm
wall thickness
1) At the beginning for approval of each 1) At the beginning for approval of each
Tolerances in dimensions for source and change of source source and change of source
11.2 Over 600mm + 10mm
internal dia of pipe 2) 2)
As per IS: 458-2003 Table-22 As per IS: 458-2003 Table-22
Tolerances in dimensions for
11.3 .+ 1 % of standard length
overall length

Three Edge Bearing test (Load 1) At the beginning for approval of each 1) At the beginning for approval of each
to produce 0.25mm crack) source and change of source source and change of source
11.4 Working load 66.30 KN
1) 900mm 2) 2)
dia As per IS: 458-2003 Table-22 As per IS: 458-2003 Table-22

1) At the beginning for approval of each 1) At the beginning for approval of each
Three Edge Bearing test (Load
source and change of source source and change of source
to produce 0.25mm crack)
11.5 Working load 72.60 KN
1) 1000mm
dia
2) As per IS: 458-2003 Table-22 2) As per IS: 458-2003 Table-22
1) At the beginning for approval of each 1) At the beginning for approval of each
Three Edge Bearing test (Load source and change of source source and change of source
to produce 0.25mm crack)
11.6 Working load 88.30 KN
1) 1200mm
dia 2) As per IS: 458-2003 2) As per IS: 458-2003
Table-22 Table-22
1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
3mm/1Rm
11.7 Straightness Straightness
Maximum
2) As per IS: 458-2003 Table-22 2) As per IS: 458-2003 Table-22
1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
11.8 Hydrostatic Pressure Test Pressure 1.50 N/mm2

2) As per IS: 458-2003 Table-22 2) As per IS: 458-2003 Table-22


Initial Permiability should not
1) At the beginning for approval of each 1) At the beginning for approval of each
exceed 2.0 cm3 and the difference
source and change of source source and change of source
in any two readings during initial
11.9 Permiaility
readings should not be more than
0.8 cm3 , Final Permiability should
2) As per IS: 458-2003 Table-22 2) As per IS: 458-2003 Table-22
not exceed 0.3 cm3

1) At the beginning for approval of each 1) At the beginning for approval of each
Compressive Strength of
11.10 source and change of source 35 Mpa source and change of source
Concrete

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
12 Elostomeric Bearings

12.1 Tests on Elostomer

1) At the beginning for approval of each 1) At the beginning for approval of each
12.1.1 Hardness 60+5 IRHD
source and change of source source and change of source

1) At the beginning for approval of each 1) At the beginning for approval of each
12.1.2 Minimum Tensile Strength 17 Mpa
source and change of source source and change of source

1) At the beginning for approval of each 1) At the beginning for approval of each
12.1.3 Minimum Elongation at break 4
source and change of source source and change of source

1) At the beginning for approval of each 1) At the beginning for approval of each
12.1.4 Maximum compression set 0.35
source and change of source source and change of source

12.2 Accelerated ageing

1) At the beginning for approval of each 1) At the beginning for approval of each
12.2.1 Maximum change in hardness 15 IRHD
source and change of source source and change of source

Maximum change in Tensile 1) At the beginning for approval of each 1) At the beginning for approval of each
12.2.2 -0.15
Strength source and change of source source and change of source

1) At the beginning for approval of each 1) At the beginning for approval of each
12.2.3 Maximum change in Elongation -0.4
source and change of source source and change of source

12.2.4 Tests on finished bearings

12.3 Dimensions

12.3.1 Overall plan dimensions 1) All Bearigs -0, + 6 mm 1) All Bearigs

12.3.2 Total bearing thickness 1) All Bearigs -0, + 5 mm 1) All Bearigs

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
12.4 Parallelism

Of top surface of bearing with


12.4.1 respect to bottom surface as 1) All Bearigs 1 in 200 1) All Bearigs
datum

Of one side surface with


12.4.2 1) All Bearigs 1 in 100 1) All Bearigs
respect to the other as datum

Thickness of the individual


12.4.3 1) All Bearigs +20%(Max.2mm) 1) All Bearigs
internal layer

Thickness of the individual


12.4.4 1) All Bearigs -0, + 1 mm 1) All Bearigs
outer layer

Plan dimensions of the


12.4.5 1) All Bearigs -3mm, + 0 1) All Bearigs
laminate

12.4.6 Thickness of laminate 1) All Bearigs '+10% 1) All Bearigs

Parellelism of the laminate


12.4.7 with respect to bearing base 1) All Bearigs 1 in 100 1) All Bearigs
as datum

12.5 Tests on brearings


1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
12.5.1 Shear Modulus 0.80 to 1.20 Mpa
2) Two bearings per 2) Two bearings per
1) At the beginning for approval of each 1) At the beginning for approval of each
Lot Lot
source and change of source source and change of source
12.5.2 Elastic Modulus -
2) Two bearings per 2) Two bearings per
1)
LotAt the beginning for approval of each 1)
LotAt the beginning for approval of each
source and change of source source and change of source
12.5.3 Ultimate Compressive strength 60 Mpa Minimun
2) Two bearings per 2) Two bearings per
1)
LotAt the beginning for approval of each 1)
LotAt the beginning for approval of each
source and change of source source and change of source
Test piece shows no evidence of peeling or near
12.5.4 Adhesion Strength the interface between rubber and reinforcement
layers
2) Two bearings per 2) Two bearings per
Lot Lot

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
13 Strip Seal Expansion Joints

1) At the beginning for approval of each 1) At the beginning for approval of each
13.1 Hardness 63 + 5 shore A
source and change of source source and change of source

1) At the beginning for approval of each 1) At the beginning for approval of each
13.2 Tensile Strength 11 Mpa Minimum
source and change of source source and change of source

1) At the beginning for approval of each 1) At the beginning for approval of each
13.3 Elongation at break 350 % Minimum
source and change of source source and change of source

13.4 Tar Propagation strength Minimum 10 N/mm


1) At the beginning for approval of each 1) At the beginning for approval of each
source and change of source source and change of source
13.5 Longitudinal

1) At the beginning for approval of each 1) At the beginning for approval of each
13.6 Traverse Minimum 10 N/mm
source and change of source source and change of source

1) At the beginning for approval of each 1) At the beginning for approval of each
13.7 Shock Elasticity Minimum 25%
source and change of source source and change of source

1) At the beginning for approval of each 1) At the beginning for approval of each
13.8 Abrasion Minimum 220mm3
source and change of source source and change of source

Residual compressive 1) At the beginning for approval of each 1) At the beginning for approval of each
13.9 Minimum 28%
strain(22h/700C/30% strain) source and change of source source and change of source

13.10 Ageing in hotair (14day/700C)

1) At the beginning for approval of each 1) At the beginning for approval of each
13.11 Change in Hardness Maximum 5 Shore A
source and change of source source and change of source

1) At the beginning for approval of each 1) At the beginning for approval of each
13.12 Change in Tensile Strength Maximum -20%
source and change of source source and change of source

Change in elongation at 1) At the beginning for approval of each 1) At the beginning for approval of each
13.13 Maximum -20%
fracture source and change of source source and change of source

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
Swelling behaviour
13.14
in oil
1) At the beginning for approval of each 1) At the beginning for approval of each
Maximum 5%
source and change of source source and change of source
13.15 Volume change

1) At the beginning for approval of each 1) At the beginning for approval of each
13.16 Change in hardness Maximum 10 shore A
source and change of source source and change of source

13.17 ASTM oil No.3


1) At the beginning for approval of each 1) At the beginning for approval of each
Maximum 25%
13.17.1 Volume change source and change of source source and change of source

1) At the beginning for approval of each 1) At the beginning for approval of each
13.17.2 Change in hardness Maximum 20 shore A
source and change of source source and change of source

1) At the beginning for approval of each 1) At the beginning for approval of each
13.17.3 Cold hardening point Minimum -350C
source and change of source source and change of source

14 Thermoplastic Road Paint Material

1) Once at the beginning for approval of 1) Once at the beginning for approval of
14.1 Binder Content each source and change of source 18 % Minimum by weight each source and change of source

1) Once at the beginning for approval of 1) Once at the beginning for approval of
14.2 Glass Beads each source and change of source 30 - 40 % each source and change of source

1) Once at the beginning for approval of 1) Once at the beginning for approval of
14.3 Titanium Dioxide content each source and change of source 10 % Minimum each source and change of source

1) Once at the beginning for approval of 1) Once at the beginning for approval of
Calcium Carbonate and innert
14.4 each source and change of source 42 % Maximum each source and change of source
fillers

1) Once at the beginning for approval of 1) Once at the beginning for approval of
14.5 Day light luminance at 450C each source and change of source 65 % Minimum each source and change of source

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
1) Once at the beginning for approval of 1) Once at the beginning for approval of
14.6 Drying time each source and change of source 15 Minutes Maximum each source and change of source

1) Once at the beginning for approval of 1) Once at the beginning for approval of
14.7 Skid Resistance each source and change of source 45 % Maximum each source and change of source

1) Once at the beginning for approval of 1) Once at the beginning for approval of
14.8 Softening Point each source and change of source 102 + 9.50C each source and change of source

1) Once at the beginning for approval of 1) Once at the beginning for approval of
14.9 Flow Resistance each source and change of source 25% Maximum each source and change of source

1) Once at the beginning for approval of 1) Once at the beginning for approval of
14.10 Yellowness Index each source and change of source 0.12 Maximum each source and change of source

Percent Retained

Type-1 Type-2
0-3 -
Once at the beginning for No
approval of 0.5
of samples 39953.00 0-5No of samples
0.5 Once at the beginning for approval of 0.5
No of samples
each source and change of source and each source and change of source and
14.11 Gradation - 5-20
each consignment each consignment
65-95 -
- 30-75
0-10 10-30
- 0-15
Once at the beginning for approval of Once at the beginning for approval of
each source and change of source and each source and change of source and
14.12 Roundeness Minimum 70% true spheres
each consignment each consignment

Once at the beginning for approval of Once at the beginning for approval of
each source and change of source and each source and change of source and
14.13 Refractive index Minimum 1.50
each consignment each consignment

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
OR CONSTRUCTION ACTIVITIES

MORT&H Specification V Revision

Acceptance Criteria

50 % Maximum

25 % Maximum

1.52 g/cc Minimum

1.60 g/cc Minimum

1.75 g/cc Minimum

8 % Minimum

The size of coarse material should not exceed


75mm in embankment and 50mm in subgrade

No of samples0.5
50% Maximum

1. Material should be free from swamps


marshes and bogs

2. Any soil that comes


under classification of OL,OI and OH is treated
as unsuitable

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
-2, +1 of OMC

95 % Minimum

97 % Minimum

97 % Minimum
Nothan
Mean Density should not less of samples
the
0.5

........1.65
Specified density + [ 1.65 - ----------------------] X SD
..( No of samples)0.5
No of samples 0.5

Table 400-2 (Grading 1)


% Passing by
IS Sieve (mm)
weight
75 100

53.00 -

26.50 55-75

9.5 -

4.75 10-30

2.36 -

0.425 -

0.075 0-5

25 % Maximum

6 % Maximum

30 % Minimum

40% Max-Wet AIV Test according to IS:5640

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
< 2%

<12% (Na2So4)
<18% (MgSo4)

-2, +1 of OMC

98 % Minimum

Mean Density should not less than the


........1.65
Specified density + [ 1.65 - ----------------------] X SD
.. No of samples0.5
No of samples0.5

% Passing by
IS Sieve (mm)
weight
53 100

45 95-100

22.4 60-80

11.2 40-60

4.75 25-40

2.36 15-30

0.600 8.-22

0.075 0-5

40 % Maximum

30 % Maximum

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
35 % Maximum

<12% (Na2So4)
<18% (MgSo4)

2 % Maximum for water absorption

6 % Maximum

98 % Minimum

Mean Density should not less than the


........1.65
Specified density + [ 1.65 - -----------------------] X SD
.. No of samples0.5

No of samples0.5

Manufacturer's Test Certificate

7.0Kg-10.0Kg per 10 Sqm

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
-

3.0 to3.50kg/10m2 over concrete surface

2.5 to 3.0kg/10m2 over granular surface treated


with primer

2.0 to 2.5 kg/10m2 over bituminous surface

Max 5% passing 0.075mm sieve

35 % Maximum
30 % Maximum

a) 27 % Maximum
b) 24% Maximum

35 % Maximum

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
Sodium Sulphate-12% Maximum

Magnesium Sulphate-18%
Maximum
2 % Maximum for water
absorption

Minimum retained coating should


be 95%

55 % Minimum

2400

350

50 -70

40 Cms Minimum (After TFOT)

470C Minimum

0.99 Minimum

220 0C Minimum

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
Nominal Aggregate Size

40mm Grade-1

Layer thickness 80-100mm


Percent passing Percent passing
Sieve Designation Grade 1 Grade 2
No of samples0.5
45mm 100 -
37.5mm 95-100 100
26.5mm 63-93 90-100
19mm - 71-95
13.2mm 55-75 56-80
4.75mm 38-54 38-54
2.36mm 28-42 28-42
300micro 7-21 7-21
75micron 2-8 2-8
Modified Marshall Method
9.0 KN Minimum
2 - 4 mm Minimum
3 % -5 %
Minimum % VMA as per Table 500-13
65 % - 75 %
4.0 % for Grade - I, 4.5% for Grade - II

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
1400C Min

92 % Minimum of Gmm

Mean Density should not less than the


........1.65
Specified density + [ 1.65 - --------------------------------] X SD
.. No of samples0.5

No of samples0.5

40 - 60

3200

400

40 Cms Minimum (After TFOT)

50 0C Minimum

0.99 Minimum

220 0C Minimum

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
% Passing by
IS Sieve (mm)
weight
26.50 100
19.00 79-100
13.20 59-79
9.50 52-72
4.75 35-55
2.36 28-44
1.18 20-34
0.600 15-27
0.300 10.-20
0.150 5.-13
0.075 2.-8

12 KN Minimum

2.5 mm - 4 mm

3%-5%

14 % Minimum

65 % - 75 %

5.2 % for Grade - I, 5.4% for Grade - II

120-1450C

92 % Minimum of Gmm

Mean Density should not less than the


........1.65
Specified density + [ 1.65 - --------------------------------] X SD
.. No of samples0.5

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
No of samples0.5

0.05 % Maximum

0.66 Minimum

6.0 % Maximum

3.0 % Maximum

5.0 % Maximum

3.0 % Maximum

0.66 - 1.02

Not Specified

30 minutes Minimum

600 minutes Maximum

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
Not less than 27 Mpa Strength

Not less than 37 Mpa Strength

Not less than 53 Mpa Strength

3.15 Minimum

10 % Maximum

10 mm Maximum

% Passing by
IS Sieve (mm)
weight

80 100
40 95-100
20 45-75
4.75 25-45
0.600 .8-30
0.150 0-6

35 % Maximum

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
% Passing by
Deleterious
weight
Materials
(Maximum)
Coal& Ignite 1
Clay Lumps 1

Material finer than


3
75 microns sieve
Soft Fragment -
Shale -

Total 5

2 % Maximum

45% Max

% Passing by
IS Sieve (mm)
weight
10 100
4.75 90-100
2.36 60-95
1.18 30-70
0.600 15-34
0.300 5.-20
0.150 0.-10
% Passing by
IS Sieve (mm)
weight
10 100
4.75 90-100
2.36 75-100
1.18 55-95
0.600 35-59
0.300 8.-30
0.150 0-10
% Passing by
IS Sieve (mm)
weight
10 100
4.75 90-100
2.36 85-100
1.18 75-100
0.600 60-79
0.300 12.-40
0.150 0-10

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
% Passing by
Deleterious
weight
Materials
(Maximum)
Coal& Ignite 1
Clay Lumps 1

Material finer than


3
75 microns sieve

Soft Fragment -
Shale 1

Total 5

3 % Maximum

6 Minimum

400 mg /liter Maximum

500 mg /liter Maximum for psc concrete

2000 mg /liter for concrete not embedded steel

Maximum of 5ml of 0.02 normal NaOH to


neutralise 100ml of water

Maximum of 25ml of 0.002 normal H2So4 to


neutralise 100ml of water

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
2000mg /liter Maximum

200mg /liter Maximum

3000mg/ liter Maximum

0.30 Maximum

0.06 Maximum

0.06 Maximum

0.11 Maximum

10 % more than the actual 0.2% proof stress


but not less than 485 Mpa

415 Mpa Minimum

14.50 % Minimum

Bent to included angle of 1350

Bent to included angle of 157.50

200

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
6.310 + 3% for 32mm dia
4.830 + 3% for 25mm dia
2.470 + 3%
for 20mm dia
1.580 +
5% for 16mm dia
0.888 + 5% for
12mm dia
0.617 + 7% for 10mm
dia
0.395 + 7% for 8mm dia

Within 3% of the value stated by the


manufacturer

Within 1% of the value stated by the


manufacturer

Within 0.02 of the value stated by the


manufacturer

0.20 % maximum

7 to 8

PCC 50 + 25 mm
RCC 100 + 25 mm
M10 - 10 Mpa

M20 - 20 Mpa

M25 - 25 Mpa

M30 - 30 Mpa

M35 - 35 Mpa

M40 - 40 Mpa

M45 - 45 Mpa

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
Over 95mm + 7mm, - 3.5mm

Over 600mm + 10mm

.+ 1 % of standard length

Working load 66.30 KN

Working load 72.60 KN

Working load 88.30 KN

3mm/1Rm
Straightness
Maximum

Pressure 1.50 N/mm2

Initial Permiability should not


exceed 2.0 cm3 and the difference
in any two readings during initial
readings should not be more than
0.8 cm3 , Final Permiability should
not exceed 0.3 cm3

35 Mpa

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
60+5 IRHD

17 Mpa

0.35

15 IRHD

-0.15

-0.4

-0, + 6 mm

-0, + 5 mm

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
1 in 200

1 in 100

+20%(Max.2mm)

-0, + 1 mm

-3mm, + 0

'+10%

1 in 100

0.80 to 1.20 Mpa

60 Mpa Minimun

Test piece shows no evidence of peeling or near


the interface between rubber and reinforcement
layers

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
63 + 5 shore A

11 Mpa Minimum

350 % Minimum

Minimum 10 N/mm

Minimum 10 N/mm

Minimum 25%

Minimum 220mm3

Minimum 28%

Maximum 5 Shore A

Maximum -20%

Maximum -20%

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
Maximum 5%

Maximum 10 shore A

Maximum 25%

Maximum 20 shore A

Minimum -350C

18 % Minimum by weight

30 - 40 %

10 % Minimum

42 % Maximum

65 % Minimum

CORR Phase -II from Km 0+000 to Km30+500 Nemilicheri in NH-205 – Minjur-Ponneri-Panchetti (TPP) Road
15 Minutes Maximum

45 % Maximum

102 + 9.50C

25% Maximum

0.12 Maximum

Percent Retained

Type-1 Type-2
0-3 -
No of samples0.5 39953.00 0-5No of samples
0.5

- 5-20
65-95 -
- 30-75
0-10 10-30
- 0-15

Minimum 70% true spheres

Minimum 1.50