5,161.85
12 Beton Hardner K35 (1:1) 22.94 1.00 Liters 225
13 Skudo 1.00 Liters 2050 -
-
14 Stone Soap 0.00 0.00 Liters
21,436.00
15 Beton Guard Lithium 12.43 1.00 Liters 1725
8,820.00
16 Disco lux pad 6.00 1.00 Nos 1470
3,728.00
17 Cementitious Repair 1.00 1.00 Lumsum 0.5
TOTAL MATERIAL (A) 324,664
Labour
19 Accomodation 7 1 man-day
20 Mobilization & demobilization 1 1 Lumsum 6000 6,000
TOTAL LABOUR (B) 35,000
Tools
21 Hand Grinders rent per day 7 1 Day 2 14,912
22 Grinding machine rent per day 7 1 Day -
Polyethene bags, brushes, grider
23 disc, glooves, mask 1 1 Nos 10,000 10,000
24 Electric tools 1 1 Day 0.5 3,728
(C) 28,640
COMBINED TOTAL A+B+C=(D) 388,303.78
Profit % age of D % (E) -
Overheads %age of D % (F) -
TOTAL D+E+F= G 388,303.78
Tax %age of G % -
TOTAL (PKR After Tax) Ʃ 388,303.78
TOTAL (PKR per Unit) 52.08
inventory
210,898.29 28.29 42
1725
1.18 0.95
29,000 3.889485
46.69