Date 31.05.20
Current & Pending Maintenance Work Request
Requested By: Md.Nawsher Alam
SL No Request Date Equipment Name Scope R/H Description of Work Request Shift Remarks/ Status Maintenance
person
Engine Side
HFO booster module auto back wash filter again DP came from
1 30.05.20 HFO Booste(1-5) MM B side need to clean N Done
2 30.05.20 E-07 MM LO leakage from intermediate gear lubricating line B bank N Done Jahangir
Pending Works
1 27.05.20 Scada 03 EM After thundering SCADA 03 programme could not load D Done RR
2 28.05.20 HFO Sep.03 EM/MM Water block solenoid problem need to check D Done Ripon
3 23.05.20 E#15,14 EM /MM HT PID not working properly again. N Ongoing RR
4 25.05.20 HFO Serves tank MM Level gauge rope got broken D
5 21.05.20 Control Room Admin Printer black cartridge is very low D Urgent
EM & Rain water dropping on top of alternator and shaft from Roof
6 21.05.20 STG D Urgent
MM top
7 22.05.20 STG CR EM Mobile phone network problem at STG control room D Urgent
8 18.05.20 EGB 10-16 EM Soot blowing status is not showing in DCS N On-going
9 12.05.20 STG 1 EM Woodward control panel showing incorrect date D
10 20.03.20 STG-2 MM High speed coupling side oil leaking and gearbox blind plug oil C
leaking.
11 10.05.20 Sub-station EM Grid voltage 138KV,tap position 1 but LV side voltage is 11.6 - N
11.7 kv which may cause for STG trip. Need to check
Spare not available
1 19.05.20 EGB-4&5 MM EGB# 4&5 Soot blowing drain valve steam passing at closed N
position.
2 16.05.20 EGB #12,13 MM Soot blowing drain line steam passing at closed position N
3 17.05.20 Hydrophore Pump-01 MM Hydrophore pump-01 in WTP has abnormal sound and water N
leakage increased.
4 16.05.20 STG Hall MM STG-1 Inlet steam 8' valve gland packing leakage D
2 28.05.20 E-03 EM Start air solenoid again air leakage D ongoing RR
5 17.05.20 EGB & STG EM Need Emergency DC lighting for Turbine area N
6 17.05.20 EGB# 1-16 EM Lighting required for EGB D
7 18.05.20 EGB 16 MM EGB #16 Soot blowing drain valve steam passing at closed N
position
8 16.05.20 Turbine EM Need Emergency DC light for turbine area D
9 16.05.20 STG Hall EM North side light is blinking continuously N
10 15.05.20 E#03 EM JW preheating system indication lamp not working. N Done
Soot blowing drain line pneumatic valve steam passing at
11 15.05.20 EGB 10,11 MM/ EM N
closed position.
12 15.05.20 STG-01 EM Generator RMS panel light faulty D
13 14.05.20 Control air module -02 EM Control air module-02 dryer fan not working. N Ongoing RR
Alternator generating voltage getting high. Previously worked
14 10.05.20 STG 1 EM by EM, Need to check again. N
15 14.05.20 STG & EGB EM Auxiliary consumption Kwh data showing different in DCS and D
STG LV room multifunction meter.
SOOT BLOWING DRAIN LINE PNEUMATIC VALVE FEEDBACK
16 12.05.20 EGB 6,7 & 10,11 EM N
PROBLEM
Needle valve closed but steam passing through it from HP
17 12.02.20 HP Drum# 01-09 MM Drum manual glass level indicator, the glass indicator tubes A
also found broken.
18 08.04.20 EGB-14 EM /MM Soot blower motor burnt (14.3) D
STG-2 hot well level Controller showing abnormal data
19 07.03.20 STG-02 EM /MM C
(High/Low value alarm)
Impeller
20 29.03.20 EGB-03 & 10 MM Soot blower fan motor abnormal vibration N
problem
21 12.03.20 EGB-09 MM Superheater pneumatic vent valve body cracked. B
22 25.11.19 STG - 01 MM Ejector drain steam trap defective B
23 23.02.20 E # 10 MM TC washing line leakage inside cover in B-bank A
24 25.10.19 E - 02, 09 MM HFO C/O pump pressure gauge faulty B
25 09.07.19 E # 14-16 MM C/A Drain line hose pipe missing from cooler side. A Waiting for RR Urgent
Modification & Additional works
1 16.04.20 1 KL pump MM 1 KL pump need to support from rain water D
Both STG's present working hour needs to be matched with
2 19.05.20 STG-1&2 EM D
actual running hour.
3 15.03.20 Aux Boiler MM Bellow Feed water tank for condense operating v/v need A Urgent
ladder system
4 19.01.20 EGB-08 EM/MM Soot blower fan huge sound & vibration. A
5 04.02.20 FTP MM All TDM Need to proper support by welding A
6 22.02.20 All (9nos) HP Drum MM All (9nos) HP drum Vent Valve need to be prolonged. A
Today's Additional works
1
113 MW Confidence Power Rangpur Ltd.
Date 01.06.20
Current & Pending Maintenance Work Request
Requested By: Md.Nawsher Alam
Maintenance
SL No Request Date Equipment Name Scope R/H Description of Work Request Shift Remarks/ Status
person
Engine Side
1 31.05.20 E-3 MM A Bank side waste fuel line jam D Done Motiur
2 31.05.20 E-13 MM 6A cyl.tem 456 at 100% load need to check N Done Akter
3 31.05.20 E-07,11 MM TC wash inlet line hose pipe gasket damage D Done Motiur
4 31.05.20 E-14 MM TC wash drain pot got jam D Done Motiur
5 31.05.20 HFO booster -11 EM/MM Several time low level in mixing tank alarm came. N Done Akter
6 31.05.20 WTP EM/MM Smoke came from Fire pump shaft gland during running. Need D Done Akter
to check
7 31.05.20 E-02 EM EMCC -02 Ventilation fan burnt out N Done Rana
8 31.05.20 E-06,15 EM Exh.back pressure sensor showing wrong value N Done Rana
3 31.05.20 HPFWP1_1(unit-1) EM VFD showing Thermal Motor Protection alarm. Need to work N Done Rana
there ungent
Pending Works
1 23.05.20 E#15,14 EM /MM HT PID not working properly again. N Ongoing RR
2 28.05.20 E-03 EM Start air solenoid again air leakage D ongoing RR
3 14.05.20 Control air module -02 EM Control air module-02 dryer fan not working. N Ongoing RR
4 31.05.20 SCADA-02 RR Screen got blank in several times D RR
5 31.05.20 SCADA RR Real time and server time is not same. Need to adjust. D RR
6 25.05.20 HFO Serves tank MM Level gauge rope got broken D
7 21.05.20 Control Room Admin Printer black cartridge is very low D Urgent
8 21.05.20 STG EM & Rain water dropping on top of alternator and shaft from Roof D Urgent
MM top
9 22.05.20 STG CR EM Mobile phone network problem at STG control room D Urgent
10 18.05.20 EGB 10-16 EM Soot blowing status is not showing in DCS N On-going
11 12.05.20 STG 1 EM Woodward control panel showing incorrect date D
12 20.03.20 STG-2 MM High speed coupling side oil leaking and gearbox blind plug oil C
leaking.
13 10.05.20 Sub-station EM Grid voltage 138KV,tap position 1 but LV side voltage is 11.6 - N
11.7 kv which may cause for STG trip. Need to check
Spare not available
EGB# 4&5 Soot blowing drain valve steam passing at closed
1 19.05.20 EGB-4&5 MM position. N
2 16.05.20 EGB #12,13 MM Soot blowing drain line steam passing at closed position N
3 17.05.20 Hydrophore Pump-01 MM Hydrophore pump-01 in WTP has abnormal sound and water N
leakage increased.
4 16.05.20 STG Hall MM STG-1 Inlet steam 8' valve gland packing leakage D
5 17.05.20 EGB & STG EM Need Emergency DC lighting for Turbine area N
6 17.05.20 EGB# 1-16 EM Lighting required for EGB D
7 18.05.20 EGB 16 MM EGB #16 Soot blowing drain valve steam passing at closed N
position
8 16.05.20 Turbine EM Need Emergency DC light for turbine area D
9 16.05.20 STG Hall EM North side light is blinking continuously N
10 15.05.20 EGB 10,11 MM/ EM Soot blowing drain line pneumatic valve steam passing at N
closed position.
11 15.05.20 STG-01 EM Generator RMS panel light faulty D
Alternator generating voltage getting high. Previously worked
12 10.05.20 STG 1 EM by EM, Need to check again. N
Auxiliary consumption Kwh data showing different in DCS and
13 14.05.20 STG & EGB EM STG LV room multifunction meter. D
14 12.05.20 EGB 6,7 & 10,11 EM SOOT BLOWING DRAIN LINE PNEUMATIC VALVE FEEDBACK N
PROBLEM
Needle valve closed but steam passing through it from HP
15 12.02.20 HP Drum# 01-09 MM Drum manual glass level indicator, the glass indicator tubes A
also found broken.
16 08.04.20 EGB-14 EM /MM Soot blower motor burnt (14.3) D
17 07.03.20 STG-02 EM /MM STG-2 hot well level Controller showing abnormal data C
(High/Low value alarm)
18 29.03.20 EGB-03 & 10 MM Soot blower fan motor abnormal vibration N Impeller
problem
19 12.03.20 EGB-09 MM Superheater pneumatic vent valve body cracked. B
20 25.11.19 STG - 01 MM Ejector drain steam trap defective B
21 23.02.20 E # 10 MM TC washing line leakage inside cover in B-bank A
22 25.10.19 E - 02, 09 MM HFO C/O pump pressure gauge faulty B
23 09.07.19 E # 14-16 MM C/A Drain line hose pipe missing from cooler side. A Waiting for RR Urgent
Modification & Additional works
1 16.04.20 1 KL pump MM 1 KL pump need to support from rain water D
2 19.05.20 STG-1&2 EM Both STG's present working hour needs to be matched with D
actual running hour.
3 19.01.20 EGB-08 EM/MM Soot blower fan huge sound & vibration. A
4 04.02.20 FTP MM All TDM Need to proper support by welding A
5 22.02.20 All (9nos) HP Drum MM All (9nos) HP drum Vent Valve need to be prolonged. A
Today's Additional works
1
113 MW Confidence Power Rangpur Ltd
Date 02.06.20
Current & Pending Maintenance Work Request
Requested By: Md.Nawsher Alam
SL No Request Date Equipment Name Scope R/H
Engine Side
1 01.06.20 E-10 & 12 Control air MM
Engine Side
Control air module Regulator gasket leakage.Safety valve air leakae N
(E-12)
Power Tx. 01 & 02 silica gel need to change N
Turbine & Boiler Side
CBD pneumatic valve closed but water passing through it N
Pending Works
Urgent
113 MW Confidence Power Rangpur Ltd.
Date 02.06.20
Current & Pending Maintenance Work Request
Requested By: Md.Nawsher Alam
Maintenance
SL No Request Date Equipment Name Scope R/H Description of Work Request Shift Remarks/ Status
person
Engine Side
1 01.06.20 E-10 & 12 Control air MM Control air module Regulator gasket leakage.Safety valve air leakae N Done Akter
(E-12)
Request Maintenance
SL No Date Equipment Name Scope R/H Description of Work Request Shift Remarks/ Status person
Engine Side
1 03.06.20 E # 09 MM A Bank side waste fuel line jam D Done Motiur
2 06.06.20 E-13 EM/MM C/A PID doesn’t work properly LO & CA temp.high N
3 02.06.20 E-15 EM HT PID not working properly again. N
4 02.06.20 E # 6,13 & 16 EM Exh. Back pressure value abnormal N
5 02.06.20 HFO sep.02 EM PLC Card have no power N Done Rana
Turbine & Boiler Side
1 03.06.20 EGB # 03 & 12 MM Exh. Back pressure found of EGB# 03 & 12 (252 & 241 mm WC respectively) need to Water clean manually D
2 03.02.20 Soot blowing unit MM steam pipe line elbow joint body cracked and huge steam leak aging. Need to work there with Urgency. N Done Ashraf
2_2(EGB-2) (M.M)
3 03.02.20 LP feed water EM Only(unit-1) is running at a time in Auto mode, though drum level is too low. N
pump(unit-1)
4 03.02.20 EGB-06 to EGB-11 EM Soot blowing command is not being processed from DCS.(E.M) N
Pending Works
Cranckase
2 05.06.20 ventilation fan EM Schedule cleaning of Fan & filter Done Al-amin
panel
3 05.06.20 FTP EM Schedule maintenance of all motor in FTP Done Al-amin
4 05.06.20 Instrument A/C-1 MM Instrument air compressor-01 drive belt tear up need Spare need
to replace.
5
6
7
113 MW Confidence Power Rangpur Ltd.
Current Maintenance Work Request
Date 06.06.20
Requested By: Md.Abdul Matin
3 06.06.20 E# 1,2,5,9 MM HFO leakage drop by drop from inlet line flange. D 1,9 Done Sourov
2 07.06.20 E # 10 MM Exhaust leakage from B5,B7 & B8 cyl. Indicator cock D Done Kamrul
3 07.06.20 E # 11 MM Exhaust manifold main line cover support bolt missing D Done Kamrul
(near A7 cylinder)
4 07.06.20 E # 04 & 11 EM & MM Exhaust back pre. Showing zero at running condition D 11 Done Sifat
6 06.06.20 E# 2,3,4,5,6 MM HFO leakage drop by drop from inlet line flange. D Done Shourov
Exhaust back pressure showing value when EGB OFF
7 07.06.20 E#13,15,16 EM& MM condition. D On-going Shifat
2 07.06.20 EGB # 3,4,5 MM Sootblowing drain line jam need to be check D 3 Done jr.Harun
3 07.06.20 STG# 01 MM Ejector drain line steam trap huge steam passing D Done Al-mamun
5 07.06.20 EGB# 10,11 EM Sootblowing doesn't working from DCS D Done Al-amin
9 07.06.20 EGB-10 EM Flue gas out Temperature not showing in DCS N Done Sohel
SL No Request
Date
Equipment
Name Scope R/H Description of Work Request Shift Remarks
Status
Maintenance
person
Engine Side
1 08.06.20 E # 13 MM Before engine LO temp. high # 69 ' C D Done Sr.Harun
2 08.06.20 E # 13 MM Cylinder 4B exhaust temp. high 453 ' C N Done Kamrul
Exhaust leakage at E1# A3,A7 , E2# B7, E3# A4,A6, E4 #
3 08.06.20 Engine Hall-01 MM N
A2,A7, E5# A3,B5,B8 ,E8# A3,A4 & A7 cylinder.
6 07.06.20 E # 04 EM & MM Exhaust back pre. Showing zero at running condition D On-going
EGB-3 sootblowing motor 3.1 & 3.5 motor side valve staem
3 08.06.20 EGB# 03 MM passing at closed position. D
7 08.06.20 EGB # 4-5 EM EGB-4,5 sootblowing not working in automode from DCS N Need spare Sohel
LP feed water LP feed water pump VFD doesn't work properly as per drum
10 06.06.20 pump EM requirment for Unit -02 D Done Al-amin
11 07.06.20 EGB # 4,5 MM Sootblowing drain line jam need to be check D Done Mamun
LP feed water LP feed water pump -01 for station -01 doesn't work
13 07.06.20 pump -01 EM automatically as per EGB's requirement N Done Sohel
SL No Request Equipment Scope R/H Description of Work Request Shift Remarks Maintenance
Date Name Status person
Engine Side
1 09.06.20 E # 12 MM TC -B bank water inlet line Jam found at TC wash time D
2 09.06.20 E # 01 MM TC washing water drain line Jam D Done Kamrul
3 09.06.20 E # 01 MM Water leakage from TC washing inlet line plastic filter D Done Kamrul
4 09.06.20 E #14 MM FIPC inlet pressure low alarm pump not working properly D Done Kamrul
5 09.06.20 E # 10 MM Huge exhaust leakage from B7 cylinder indicating cock N Done Sojib
6 09.06.20 Pit pum-01 MM Outside oily water pit pump not working (Outside E#1) N
7 09.06.20 E # 10 MM Both bank fuel gallery jam N
8 09.06.20 E # 04 MM Fuel gallery jam at B-bank side also need to engine clean. N Done Kamal
20 07.06.20 E # 04 EM & MM Exhaust back pre. Showing zero at running condition D Done
STG-2 main 8" valve upper drain line valve gland packing
2 09.06.20 STG-2 MM D
leakage.
3 09.06.20 EGB-13 MM EGB-13 soot blowing all line jam need to check D Done
EGB-4&5 sootblowing drain line steam passing at closed
4 09.06.20 EGB-4 & 5 MM D
position.
5 09.06.20 EGB-6-9 MM EGB_6-9 sootblowing not working in auto mode from DCS. D
STG-2 both CEP pump tripped several times in both auto &
6 09.06.20 STG-2 EM & MM D Spare Al-amin
manual mode.
Need to manual cleaning due to Exhaust back pressure is
7 08.06.20 EGB# 13 MM N Done Jr.Harun
high 260 mmWC
EGB-12 sootblowing motor 12.2, 12.4 motor side Valve
8 08.06.20 EGB# 12 MM steam passing at closed position D
EGB-3 sootblowing motor 3.1 & 3.5 motor side valve staem
9 08.06.20 EGB# 03 MM D On-going Mamun
passing at closed position.
EGB-9 sootblowing motor 9.2 motor side Valve steam
10 08.06.20 EGB# 09 MM D
passing at closed position.
SL No Request
Date
Equipment
Name Scope R/H Description of Work Request Shift Remarks
Status
Maintenance
person
Engine Side
1 10.06.20 E#05 EM Frequently power failure at turning gear module. N Done Sohel
2 10.06.20 E#10 EM Running hour problem need to be resolved N U/O Sohel
3 10.06.20 E#07 MM NTC oil level goes low two times. N Done Jr.Harun
4 10.06.20 Hose pipe MM Need 2 nos hose pipe ready for CT taking purpose only. N
6 10.06.20 Service air line MM Service air line need to ready from all control air module. N
HFO leakage from High pressure pump dirty leak line E #03
8 10.06.20 E#03,09 MM (8A), E#09 (8A) D Done Shourov
9 09.06.20 E # 12 MM TC -B bank water inlet line Jam found at TC wash time D Done Kamrul
10 09.06.20 E # 10 MM Both bank fuel gallery jam. N Done Kamrul
11 09.06.20 E # 03 MM Charge air cooler side PIT need to clean again. N Done Kamrul
12 09.06.20 E # 07 EM Exhaust back pressure not showing correct value D Done Sifat
13 09.06.20 E# 10-16 EM Auxiliary side not have enough lighting. D
Exhaust leakage at E1# A3,A7 , E2# B7, E3# A4,A6, E4 #
14 08.06.20 Engine Hall-01 MM A2,A7, E5# A3,B5,B8 ,E8# A3,A4 & A7 cylinder. N Done Kamrul
Waiting for
15 07.06.20 E # 15 EM & MM HT PID not working in auto mode N Isolation MM
4 09.06.20 EGB-6-9 EM EGB_6-9 sootblowing not working in auto mode from DCS. D Done Al-amin
EGB-3 sootblowing motor 3.1 & 3.5 motor side valve staem
6 08.06.20 EGB# 03 MM D Done Mamun
passing at closed position.
EGB-9 sootblowing motor 9.2 motor side Valve steam
7 08.06.20 EGB# 09 MM passing at closed position. D
9 08.06.20 EGB-02 EM EGB-2 flue gas In temperature not showing in DCS. N Done Al-amin
SL No Request
Date
Equipment
Name Scope R/H Description of Work Request Shift Remarks
Status
Maintenance
person
Engine Side
Starting air solenoid v/v was not closed after blowthrough
1 11.06.20 E#11 EM two times. D Done Al-amin
8 08.06.20 Engine Hall-01 MM Exhaust leakage at E5# A3,B5,B8 ,E8# A3,A4 & A7 cylinder. N E 1,4 Done Kamrul
9 07.06.20 E # 15 EM & MM HT PID not working in auto mode N U/O Both MM & EM
Turbine & Boiler Side
EGB-10 sootblowing motor 10.2 junction box support has
1 12.06.20 EGB-10 MM been broken need to fix it D Done Mamun
Chemical dosing Chemical dosing pump 9both unit0 motor require oil
2 12.06.20 station MM filling(oil type- MOBILGEAR 600*P150 or SHC 629) D
6 12.06.20 Pump station MM Cooling water pump #2,3 gland packing leakage N Done Kamrul
7 10.06.20 EGB-10 EM EGB-10 flue gas in temperature not showing in DCS N Need spare
EGB-4&5 sootblowing drain line steam passing at closed
8 09.06.20 EGB-4 & 5 MM position. D
5
113 MW Confidence Power Rangpur Ltd.
Current Maintenance Work Request
Date 13.06.20
Requested By: Md.Abdul Matin
Request Equipment
SL No Date Name Scope R/H
Engine Side
1 12.06.20 Dol Fan EM
3 12.06.20 E#06,10 EM
4 12.06.20 E#01 MM
6 12.06.20 E#03 EM
7 13.06.20 FTP MM
8 13.06.20 E#01,04,05,06,07 MM
9 11.06.20 E#13 MM
10 11.06.20 E#09 MM
12 10.06.20 E#10 EM
2 12.06.20 EGB-7 MM
6 12.06.20 EGB-6 to 9 MM
7 12.06.20 EGB-8 MM
8 08.06.20 EGB# 12 MM
Today's Additional works
5
13 MW Confidence Power Rangpur Ltd.
Current Maintenance Work Request
Requested By: Md.Abdul Matin
Remarks Maintenance
Description of Work Request Shift Status person
Engine Side
E#01-09 Dol fan is dirty.(need to clean) N 1,2 Done Al-amin
Comp. Room ventilation fan filter is dirty(need to clean) &
N
one Fan breaker out of order.
Exhaust Back pressure showing fluctueted value. N Done Sifat
Hfo leakage from Transfer pump-1 inlet line v/v D Done Sr.Harun
Hfo leakage rom Hfo change-over pump & motor flange
D Done Sr.Harun
joint slightly.
Exhaust leakage at E5# A3,B5,B8 ,E8# A3,A4 & A7 cylinder. N E 5 Done Kamrul
SL No Request
Date
Equipment
Name Scope R/H Description of Work Request Shift Remarks
Status
Maintenance
person
Engine Side
1 13.06.20 Dol Fan EM E#03-09 Dol fan is dirty.(need to clean) N 3,4 Done Sifat
Comp. Room ventilation fan filter is dirty(need to clean) &
2 13.06.20 Comp. Room EM one Fan breaker out of order. N Done Sifat
3 13.06.20 HFO Sep-03 MM Bowl speed low alarm came several times. N Done Jr.Harun
4 13.06.20 E# 03 MM Charge air cooler side PIT need to clean again. N Done Kamrul
6 12.06.20 E#03 MM Air leakage from Start air solenoide v/v line joint N
7 13.06.20 Crane -02 EM &MM Engine hall -02 crane not working properly. D
8 11.06.20 E#09 MM Again L.O sep-09 steam inlet line of heater gasket leakage N
7 12.06.20 EGB-6 to 9 MM Steam passing from sootblower drain v/v at closed position. N On-going Sr.Harun
8 12.06.20 EGB-8 MM Steam leakage from Sootblower motor 8.2 flange. N On-going Sr.Harun
Today's Additional works
Turbine speed sensor & temp. sensor of alternator schedule
1 14.06.20 STG-1 & 2 EM checking Done Al-amin
5
113 MW Confidence Power Rangpur Ltd.
Current Maintenance Work Request
Date 15.06.20
Requested By: Md.Abdul Matin
5 14.06.20 HFO Sep-01 MM "Bowl speed low" alarm came three times. N Done Sojib
6 14.06.20 IAC-2 Drayer EM Instrument air compressor-2 dryer temp. is high. N Done Al-Amin
13.06.20 Dol Fan EM E#05-09 Dol fan is dirty.(need to clean) N Done Sifat
7 12.06.20 E#03 EM Air leakage from Start air solenoide v/v line joint N Done Al-Amin
8 13.06.20 Crane -02 EM &MM Engine hall -02 crane not working properly. D Al-Amin
9 11.06.20 E#09 MM L.O sep-09 steam inlet line of heater gasket leakage N
10 13.06.20 EGB# 08,10 MM EGB Need manual cleaning exhaust back pressure value 240 N
and 262 mm respectively.
11 10.06.20 E#10 EM Running hour problem need to be resolved N
12 13.06.20 Engine Hall-01 & 2 MM Exhaust leakage at E2# A7, E5# A5 , E8# A3,A4 & A7 ,E11# N
B1 ,E14# A1 cylinder indicating cork.
Turbine & Boiler Side
1 13.06.20 EGB-14 MM & EM 14.3 Sootblower rewinding motor fixing. D Done Al-amin
2 12.06.20 STG-2 EM Running hour meter doesn't working. N Al-amin
3 12.06.20 EGB-7 MM 7.5 Sootblower roller bearing became jam. D Done Mamun
4 12.06.20 EGB 1-16 MM All EGB sootblowing inlet steam valve (80nos) is filled with D
rust that need to clean and painting.
7 12.06.20 EGB-6 to 9 MM Steam passing from sootblower drain v/v at closed position. N On-going Sr.Harun
8 12.06.20 EGB-8 MM Steam leakage from Sootblower motor 8.2 flange. N Done Sr.Harun
Today's Additional works
5
113 MW Confidence Power Rangpur Ltd.
Current Maintenance Work Request
Date 16.06.20
Requested By: Md.Abdul Matin
4 15.06.20 E#05 MM FIPC inlet pressure alarm low. D Done Sr. Harun
5 15.06.20 E#14 MM Charge air drain line jam.(Alternetor side) N Done Sr. Harun
6 15.06.20 12 KL pump MM HFO leakage from 12KL pump bottom side.(PHB-01) D Done Sojib
7 15.06.20 E# 1,2,5 MM HFO leakage from return line flange joint. D Done Sr. Harun+Sojib
8 15.06.20 E#01 MM & EM Oil mist concentration high and engine normal stop N Done Sr. Harun + Shohel
10 15.06.20 E#10,11 EM Oil mist converter failure alarm came several time. N Ongoing Shohel
13 15.06.20 IAC-2 Drayer MM Instrument air compressor-2 dryer air filter need to clean. N Done Sr. Harun
14 13.06.20 Dol Fan EM E#07-16 Dol fan is dirty.(need to clean) N 07 & 08 Done Sifat
15 13.06.20 Crane -02 EM & MM Engine hall -02 crane not working properly. D
16 11.06.20 E#09 MM L.O sep-09 steam inlet line of heater gasket leakage N Sojib Isolation needed
17 15.06.20 EGB# 10 MM EGB Need manual cleaning exhaust back pressure value 261 N
mm.
18 10.06.20 E#10 EM Running hour problem need to be resolved N
Exhaust leakage at E2# A7, E5# A5 , E8# A3,A4 & A7 ,E11#
19 13.06.20 Engine Hall-01 & 2 MM N
B1 ,E14# A1 cylinder indicating cork.
Turbine & Boiler Side
1 15.06.20 LP Drum-2 MM Level control pneumatic v/v (LPDLCV2) stem has been bend. D Done Sr. Harun
2 15.06.20 EGB 1-5 ,16 MM & EM EGB 1,2,3,4,5,16 Sootblowing drain valve huge steam D
passsing at closed position
3 15.06.20 Cooling Water MM Water leakage from gland packing. N Done Mamun
Pump-2
4 15.06.20 EGB-2 & 14 MM Water leakage from Jacket water heat exchanger line N Sr.Harun Need to isolation
(JWHPV).
All EGB sootblowing inlet steam valve (80nos) is filled with
5 12.06.20 EGB 1-16 MM D
rust that need to clean and painting.
5
113 MW Confidence Power Rangpur Ltd.
Current Maintenance Work Request
Date 17.06.20
Requested By: Md. Syeful Islam
2 16.06.20 Booster# 06- MM Steam leakage from inlet steam line control D
09 pneumetic valve
3 16.06.20 E # 12 MM TC washing drain line jame D Aktar
8 13.06.20 Dol Fan EM E# 09-16 Dol fan is dirty.(need to clean) N Sifat, Rashed
9 14.06.20 E#14 EM Exhaust back pressure value doesn't showing at D Al- Amin
&MM SCADA in engine running time.
10 13.06.20 Crane -02 EM & Engine hall -02 crane not working properly. D
MM
11 11.06.20 E#09 MM LO sep-09 steam inlet line of heater gasket N Sojib
leakage
Engine Hall-01 Exhaust leakage at E2# A7, E5# A5 , E8# A3,A4 &
14 13.06.20 &2 MM A7 ,E11# B1 ,E14# A1 cylinder indicating cork. N
1 15.06.20 EGB 1-5 ,16 MM & EGB 1,2,3,4,5,16 Sootblowing drain valve huge D Aktar
EM steam passsing at closed position
Water leakage from Jacket water heat
2 15.06.20 EGB-2 & 14 MM exchanger line (JWHPV). N Aktar
3 12.06.20 EGB 1-16 MM All EGB sootblowing inlet steam valve (80nos) is D
filled with rust that need to clean and painting.
5
Remarks Status
Done
Done
Ongoing
Done ( E# 09 & 10 )
Ongoing
W/C to RR
Done ( EGB-14)
Done
Done
113 MW Confidence Power Rangpur Ltd.
Current Maintenance Work Request
Date 18.06.20
Requested By: Md. Syeful Islam
SL No Request
Date Equipment Name Scope R/H Description of Work Request Shift Maintenance
person Remarks Status
Engine Side
Aux. Boiler Feed
1 17.06.20 MM Need to fixing comical dossing hose D Ashraf Done
Tank
4 15.06.20 E#10,11 EM Oil mist converter failure alarm came several time. N E-11 bypass
3 15.06.20 EGB-2 MM Water leakage from Jacket water heat exchanger line N Isolation needed
(JWHPV).
4 15.06.20 EGB 3 & 16 MM & EGB 3,4,5,16 Soot blowing drain valve huge steam D Akter Done (EGB-03)
EM passing at closed position
5 12.06.20 EGB 1-16 MM All EGB soot blowing inlet steam valve (80nos) is filled D
with rust that need to clean and painting.
Today's Additional works
DME, Sohel &
1 STG - 01 EM Over Voltage activation problem rectification works Rana Done
4
113 MW Confidence Power Rangpur Ltd.
Current Maintenance Work Request
Date 19.06.20
Requested By: Md. Syeful Islam
SL No Request
Date Equipment Name Scope R/H Description of Work Request Shift Maintenance
person Remarks Status
Engine Side
2 15.06.20 E#10 EM Oil mist converter failure alarm came several time. N
3 13.06.20 E#11-16 EM Doll fan filter is dirty.(need to clean) N Sifat, Rashed Done(E11-12)
4 14.06.20 E#14 EM/MM Exhaust back pressure value doesn't showing at SCADA D
in engine running time.
5 13.06.20 Crane -02 EM/MM Engine hall -02 crane not working properly. D
Exhaust leakage at E2# A7, E5# A5 , E8# A3,A4 & A7
6 13.06.20 Engine Hall-01&02 MM ,E11# B1 ,E14# A1 cylinder indicating cork. N
2 18.06.20 EGB-11 MM Steam leakage from super heater drain line flange N Aktar Done
gasket
3 18.06.20 STG-02 EM/MM condenser hotwel level gauge abnormal showing N Aktar Done
4 17.06.20 EGB-01 MM Steam leakage from LP generator outlet valve flange N Aktar Done
gasket
5 15.06.20 EGB-2 MM Water leakage from Jacket water heat exchanger line N Isolation needed
(JWHPV).
Soot blowing drain valve huge steam passing at closed
6 15.06.20 EGB- 16 MM/EM position D Aktar Done
7 12.06.20 EGB 1-16 MM All EGB soot blowing inlet steam valve (80nos) is filled D
with rust that need to clean and painting.
Today's Additional works
4
113 MW Confidence Power Rangpur Ltd.
Current Maintenance Work Request
Date 20.06.20
Requested By: Md. Syeful Islam
SL No Request
Date Equipment Name Scope R/H Description of Work Request Shift Maintenance
person Remarks Status
Engine Side
1 19.06.20 Eng-07 MM A bank leak fuel drain line jam N
2 19.06.20 Air Com. # 06 MM Air Compressor oil level low 30 % need to refill N
1 19.06.20 EGB # 11 MM EGB Need manual cleaning exhaust back pressure D Ongoing
value 279 mm.
2 15.06.20 E#10 EM Oil mist converter failure alarm came several time. N
Exhaust back pressure value doesn't showing at SCADA
3 14.06.20 E#14 EM/MM in engine running time. D
4 13.06.20 Crane -02 EM/MM Engine hall -02 crane not working properly. D
Exhaust leakage from E2# A7, E5# A5 , E8# A3,A4 &
5 13.06.20 Engine Hall-01&02 MM A7 ,E11# B1 ,E14# A1 cylinder indicating cork. N
6 15.06.20 EGB-2 MM Water leakage from Jacket water heat exchanger line N Isolation needed
(JWHPV).
All EGB soot blowing inlet steam valve (80nos) is filled
7 12.06.20 EGB 1-16 MM with rust that need to clean and painting. D