GEO-TECHNICAL INVESTIGATION REPORT

FOR
Construction of Judicial Complex
(Double Basement with 10 Storied)
near Bhubaneswar Court, Kalpana,
Bhubaneswar.

Client :
IDCO BCD-II, IDCO Tower, Janpath, Bhubaneswar

Consultant :
S.M. Consultants
An ISO 9001 – 2008 Company
Plot No. 130, S.M. Tower, Mancheswar Industrial Estate
Bhubaneswar – 751010
Project Ref: SMC/SubsoiIl1672

We are pleased to present the results of "geotechnical test and investigation of the proposed
Judicial Complex (Double Basement witb 10 storied) near Bbnbaneswar Court, Kalpana,
Bhubaneswar". This report summarizes the results of our field & laboratory investigation works
and presents geotechnical recommendations for the design and construction of the proposed
structure with necessary ground improvement techniques.

Based on the results of the geotechnical investigations, we believe the proposed project is
feasible from a geotechnical point of view, provided the recommendations in this report are
incorporated in the design and implemented during the construction of the project

If any question arises regarding this report, please feel free to contact the consultant These
conclusions and recommendations should not be extrapolated to other areas without our prior
review.

Total No. of pages contained in this report: 74

Cbecked by: Approved by:

For S.M.CONSULTANT~
ror 5 . M . CONSULTANTS r. r- . !' :(. Dash
~yv./ ~!' , 32lore)
Gc.'-.'. . expert
~r.S&"li~t 8. QII.Mgr.{Lab1
Co rlS 1I rIa rl I: Sub-Soil Investigation Cuerlt:
Report
EJ::E!,'1 S.M. CONSULTANTS Jov 050
:NiJ.:
ilJt ~
~i BHUBANESWAR DOC. :N".:
IsslIp 'J)ale
1672
- -
13/05/2016
BHUBANESWAR

CONTENTS
Chapter No. Description .... .__ I~g_e no.
List of Tables ___L_l
J:.ist of Figures ~~.-l 1
Appendix _-.J_ 1
Executive Summary ___J__ 2_
Introduction • _L 3
Purpose and scope of services ~ 3_
Project Description .J~_
Location And Topography of Bhub<l.~esw'3.r. 1 4_
Field Investigation Program _._1....
_ .. __
Present Site Condition I 6
Methodology of Investigation_ ._
~--l_.__ L
Ground water 1
1
7.-
Logging and Sample collection I 7
Laboratory Testing _.____ _ J 8
Discussion on the Engineering properties of the I 8
Sub-Strata at the project site. _ --1 _
Abstract of Safe Bearin.g Pressure ( SBP L _~I _
Safe Bearing capacity of soil strata 1 10
Conclusion 1 I1
Closure -__J 12
Reference , 74

I ('llnstrllctiolllll'.!lILiici,,1
C,~nple" (Double Basement with 10 storied) near
I Bhubancs\\ar Cumt. Kalp~la. B~lIbanes\\~ar:...... _
Consu{tant: Geo -Technical Investigation Cfient:
ReDort
Er:I3 S,M, CONSULTANTS JoV:N"o,: 050
'DOc. :Ni).: 1672
~
BHUBANESWAR
- I
.dec»
• i 'Mi. , I
Issue Date 13/05/2016
BHUBANESWAR

LIST OF TABLES

Table 1 Depth of ground water table of bore holes

Table 2 Laboratory tests GOhcLueted

Table 3 Abstract of safe bearing pressure

LIST OF FIGURES

Figure 1 Seismic zone of Odisha

APPENDICES

Appendix-A Bore Logs

Appendix-B Laboratory test results

Appendix-C Calculation of Safe Bearing Capacity

Appendix-D Calculation of Settlement of Footing

Appendix-E Computation of Design Geo- Technical Parameter from N value

Appendix-F Corrected SPT Value

Appendix-G Grain size distribution curve

Appendix-H Soil Profile

Appendix-I Location Map

Appendix-J Site Photo Graphs

CUlistructi')lIoi'.Iudicial Complex (Double Basement with 10 storied) Ileal'


I Hllllb~!.!.les~\'ar ('Ollrt, Kalp_a_lla_,_Ll_h_lI_ba_ll_e_sw_a_r_. _
-I-
ConSll{tant: Geo -Technical Investigation Client:
Re~ ort
S.M. CONSULTANTS J06 :N,).: 050
BHUBANESWAR 'DOc. :N"o.: 1672
~
- .dec»
Ii .i!!.~

Issue 1)ule 13/05/2016


BHUBANESWAR

EXECUTIVE SUMMARY

General Objectives of Investigation: The scope of work is to complete a geotechnical


investigation for "Construction of Judicial Complex (Double Basement with 10 Storied
building) near Bhubaneswar Court, Kalpana, Bhubaneswar". This report presents the results of
the site investigation and geotechnical recommendations related to the project.

Fieldwork and Laboratory Testing: 3 nos. of boreholes were drilled during summer season.
Field testing was conducted and samples (soil & stone sample) were collected during drilling. Field
Standard penetration lesls (SPT) were conducted in the boreholes during drilling. Geotechnical
properties of collected soil samples were conducted at the NABL accredited laboralory in
Bhubaneswar. These lesls include the sieve analysis, free swell index, Atlerberg's limits and
specific gravity.

Geotechnical Foundation Report: A general description of the strata encountered during


boring. the soil properties. anticipaled behavior of soils during construction and measured
groundwater levels are provided in this report. Confirmation of design SBC at foundation depth with
other general geotechnical engineering paramelers related to the proposed structure are provided in
this report.

Construction or .Iudicinl COlllpleX (Double 13asement with 10 storied) near


I Bhubaneswar lourt. Kalpana. Bhubancswar.
--------
-2-
COl1Suftant: Geo -Technical Investigation Cfienl :
Report
S.M. CONSULTANTS Jo6 :N(,.: 050

~l
II~ I
BHUBANESWAR
-
'DOc. No.:
-
Issue '})ate
1672
13/05/2016
.dec»
r

BHUBANESWAR
i.~

1.0. INTRODUCTION
This report presents results of geotechnical investigation for "Construction of Judicial Complex
(Double Basement with 10 Storied building) near Bhubaneswar Court, Kalpana,
Bhubaneswar". This work was performed by Mis. S. M. Consultants, Bhubaneswar which was
assigned by IDCO BCD-II, IDCO Tower, Janpath, Bhubaneswar. At the proposed site three
numbers of bore holes were drilled to know the strata and design SBC. Conclusions and
recommendation presented in this report are based on our current knowledge of the proposed
location, subsurface conditions encountered at exploration site and results of laboratory testing.
These conclusions and recommendations should not be extrapolated to other areas without our
prior review.

2.0. PURPOSE AND SCOPE OF SERVICES

The purpose of the current geotechnical investigation was to explore and determine the
existing sub-strata conditions such as stratification. denseness or hardness of the strata, position of
ground water table at the location etc. and to evaluate approximate range of safe bearing capacity
for the proposed structure using empirical formulas provided in the relevant IS codes. The goal of
our investigation was to identify the key geotechnical issues that could potentially impact the
proposed project and to develop geotechnical recommendations for design and construction of the
project.
Our scope of services included the following tasks:
• Field marking of boring locations

• Drilling of 3 numbers of bore holes (BH-1, BH-2 and BH-3) up to the depth as instructed by the
engineer in-charge of the concern department.
• Bore holes were drilled below the respective existing ground level in order to know the sub
surface stratification. conducting necessary field tests and collection of sub-strata samples for
laboratory testing.

• engineering

strata for given foundation sizes.

l
:.Nil/lie uI1'rujecl: CPllstnrctiotl ol'.Iudicial ClllllpleX (Double Basement
I 1\ Iiubllncs\\ Ill' Court. Kalpalla. Bhuballcswar.
with 10 o;toried) near

-J -
COl1Sultal1/: Geo -Technical Investigation Cfiel1/ :
Reoort
[r.Ei S.M. CONSULTANTS J06 :Ni,.: 050

~\I BHUBANESWAR 'DOc. :N'o.:


--
1672
13/05/2016
<
iidcc»
• i.~
Issue Dale BHUBANESWAR

• Preparation of this report containing our findings and recommendations including:


a) Brief description of the proposed project;
b) Description of the field exploration and laboratory testing programs;
c) Discussion of the site surface and subsurface conditions;

3.0. PROJECT DESCRIPTION


Proposed site is located at Kalpana, Bhubaneswar.

3.1. Location And Topography of Bhubaneswar

3.1.1. Geography

The capital city of Odisha, Bhubaneswar is located between 20°25' N latitudes and 85055'E
longitude on the western fringe of coastal plain across the main axis of Eastern Ghats in Khurda
district of Odisha. The city lies on the low lateritic plateau and the erosion has made its topography
a valley and ridge one, having series of drainage channels. The average elevation is 45 m above

MSL

3.1.2 Climate

Bhubaneswar is located on the coastal plains of Odisha, south-west of the River Mahanadi.
It experiences typical tropical weather conditions, and succumbs to the heat and cold waves that
sweep in from north India. The summer months from March to May are hot and humid, and
temperatures often shoal past 40. C in May. The south west monsoon lashes Odisha in June,
bringing relief to the parched environs of Bhubaneswar. July and August receive the maximum
rainfall, which may average over 220 mm a month.

3.1.3. Wind speed

As per Appendix-A of IS: 875(Part-3)-1987 in Bhubaneswar, basic wind speed at 10m


height is 50 m/sec.

Construction ol'.Iudicial Complex (Double Basement with 10 storied) near


I Hhllhancswar Court. KalpalH:: 13hubaneswar.
----------
-4 -
....-;,.....
...
., ..... .,... ...' .-~ _ 3'tl.

COllSu[tant: Geo -Technical Investigation Client:

[AI
~
S.M. CONSULTANTS
BHUBANESWAR
]06 No.:
'Doc. No.:
Re ort
050
1672
13/05/2016
Issue 'Date BHUBANESWAR

3.1.4. Rain fall

Generally the monsoon comes to Bhubaneswar in the second week of June. Monsoon
presence from June to October. July and August receive the maximum rainfall, but from June to
October receive average rainfall due to presence of monsoon.

3.1.5. Seismic zone

EARTHQUAKE ZONES OF ORISSA


.----'-'-
.

"
"

.N--
__-----
0..- __ ~
____
_.- •• _00: ...-..-- ...•

Figure 1. Seismic zone of Odisha

Bhubaneswar area falls in the Seismic Zone III & Seismic Intensity "moderate". This zone is called
the moderate damage risk Zone & Zone factor Z = 0.16 as per IS: 1893 (Pt.1). Recently. in April
2015, Bhubaneswar was affected by mild tremors due to major earthquake with epicenter at Nepal.
In recent past. in May 1 2014 Bhubaneswar suffered from a moderate earthquake whose magnitude
in Richter scale was 6.

Name of Project: Construction of Judicial Complex (Double Basement with to storied) near
Bhubaneswar Court, Kal Bhubaneswar.
- 5-
Consu(tant: Geo -Technical Investigation cfient:
Relort

;j S,M, CONSULTANTS
BHUBANESWAR -
J06 :NiJ,:
'DOC, :Ni),:

Issue 'J)ate
050
1672
13/05/2016
r
.dec»
• '+ry-;-=-)
BHUBANESWAR

4.0. FIELD INVESTIGATION PROGRAM

Field investigation work was in accordance with IS: 1892 -1979.


Field works include
, Boring in the sub-strata by Rotary Drilling Method
., Conducting SPT in soil as per IS: 2131 and collection of SPT samples
., Collection of disturbed samples from bore holes.
, Collection of stone cores.

4.1. Present Site Condition

The present site is located at Bhubaneswar judicial court, Kalpana, Bhubaneswar. BH-1 to
BH-3 were conducted for the proposed project. The average R.L. of all the Bore holes is found to be
100.377 m (considering the nearest road level as 100 m). This shows that the present site is plain
terrain. Site photographs are attached with this report in Appendix-J which provide a clear view
about the existing condition of the site.

4.2. Methodology of Investigation

By using rotary drilling rigs, the boreholes were progressed up to desired depth of 20.0 m.
Rotary method of boring is most widely used method of advancing a boreholes. This method along
with use of drilling mud to stabilize the side of the borehole is likely to give the least disturbance to
soils beneath the base of the borehole and permit taking near to truly undisturbed samples.
Diameter of boreholes was 150 mm Where caving of boreholes occurred, casings were used to
keep the boreholes stable.
Standard Penetration Tests (SPT) were conducted in the boreholes. By connecting a split
spoon sampler to 'A' rods and driving it by 45 em using a 63.5 kg hammer falling freely from a height
of 75 em. The tests were conducted in accordance with IS: 2131-1981(Reaffirmed 1987).
Number of blows required for each 15 em penetration of the split spoon sampler was
recorded. First 15 cm penetration is ignored. The cumulative no. of blows required to penetrate the
rest 30 em of the 45 cm sampling interval is reported as the SPT value (N value).
For collection of un-disturbed sample thin wall samplers have been used. In order to reduce
wall friction, suitable precautions such as oiling the surface shall be taken.

COllstructioll ,)1" Judicial Complex (Double Basement with 10 storied) Ileal'


I Bhllballcs\\ar C'IHlrt. Kalpana, f3_lll_lb_a_"_c,_-,_vi_lr_. _
- Ii -
Consu(tant: Geo -Technical Investigation Crient:
Re~ort
S.M. CONSULTANTS J06 :N().: 050
'DOc. :N"o.: 1672
BHUBANESWAR - .dec»
51• ,*.8m
~ Issue Date 13/05/2016
BHUBANESWAR

In case of refusal strata (N)5D) hard strata (Stone sample), bore hole is reduced to NX
(76mm) for drilling. Stone coring has been carried out using diamond bits or tungsten carbide (T.C)
bits. Bits were attached to the Core barrels of double tube type in rotary core drilling. For diamond
core drilling IS: 6926-1982 was followed.
Bore logs showing field data of each borehole has been attached in this report. (APPENDIX-A)

4.3. Ground Water

During drilling of bore holes ground water table was investigated and were found as below.

Table 1. Depth of ground water table of bore holes


-

Bore hole Ma x depth of Ground water table


Reference__ _ expl oration in m below E.G.Uml

BH-1 20.00 9.5 m.

BH-2 20.00 9.0 m.

BH-3 20.00 9.0 m.

Note: E.G.L. = Existing Ground Level.

4.4. Logging and Sample Collection

The bore logs of bore holes show about the details of the exploration of bore holes. Samples
were collected by the split spoon sampler after conducting SPT. The collected samples were
preserved in transparent polythene bags with proper identification mark.
Cores recovered from hard strata were arranged in a core box with proper leveling and identification
mark. From the stone strata core recovery {CR% = (Length of Core ILength of run) x 1DO} & stone
quality designation (ROD) = (total length of core pieces of more than 1DDmm Ilength of run) x 1DO}
were computed for every drilling run. Details of CR and ROD in different boreholes are presented in
the report.
For further examination and testing, all samples were transported to our NABL accredited laboratory
at Bhubaneswar.
A~~~
;/'e..
,,'I.~.
~,'>:~
\~:.
'/'I ,."•
I '''f 1\ C1 N,"'! iI"~
\ ;~\ tOi ;ilGl. t.;;j~.J
________________ .V"'\. /..ij
C\lIJslruclilln Ill' .Indicial CClillplex(Double I:laselllelll wilh 10 storied) near ':.-'.;f;;'
"-~t.~.
I BlJuham:swar ('ourt. Kalpanu: Bhubaneswar. _
-7-
Consultant: Geo -Technical Investigation C(lent:
Re~ort
S.M, CONSULTANTS Jo6 :Ni,.: 050
'DOc. :N(,.: 1672
BHUBANESWAR -- .dcCllt
Ii • •
11-"
~
t

ISSUe! ]Jal e 13/05/2016


BHUBANESWAR

5.0. LABORATORY TESTING

Laboratory methods in accordance with relevant standard codes of practices were adopted
to ascertain different essential characteristics of sub-soil using field samples obtained in course of
field investigations. The tests as under were conducted to ascertain the parameters indicated in the
test. The finding of these tests are required for use in relevant engineering designs. The Table 2
shows the laboratory tests with concerned IS codes.

Table 2. Type of laboratory tests conducted

51. No. Laboratory tests IS Codes

1 Grain size analysis IS: 2720(part-4)

2 Atterberg's limits IS: 2720(part-5)

3 Specific gravity IS: 2720(part-3)


.-
4 Free swell Index IS: 2720(part-40)
'-
5 Moisture Content IS: 2720(part-2)

6.0. DISCUSSION ON THE ENGINEERING PROPERTIES OF THE


SUB-STRATA AT THE PROJECT SITE

6.1. BH-1

1. From E.G.L. to 1.5 m depth, it was found that a medium plastic & low expansive clayey sand
with gravels stratum exists, from which one OS was collected at 0,0 m depth.
2. From 1.5 m to 2.0 m depth, a disintegrated rock stratum exists whose field SPT N value was
found to be greater than 50,
3. From 2.0 m to 3.0 m depth, a laterite stratum is encountered from which laterite p~eces were
collected and the field SPT N value was found to be greater than 50.
4. From 3.0 m to 4.5 m depth, a laterite stratum is encountered from which laterite core samples
were collected whose core recovery is 20% & ROD is nil.
5. From 4.5 m to 7.5 m depth, a sand stone stratum is present from which core samples were
collected whose core recovery is found to be 21.33% & ROD is nil. A
..,P/-'' '~' ' l.'' T;;:'' ':J'~\
li.rY
~t~{ f egd. NQ.
<?~
~:
'------------------------------------+.~, ~~H~"'<"..Vrt
,a:~)
[
:N,'lIIe of'Proje_ct~ I[ COllslruclioll
Bhuballeswar
or.!ud;c;,,1 Complex (Double Basemellt
COLlrt. Knlpnna. HhubmlCS\Var. .
wilh 10 storied) near
.
~'2i ,.4.'"
-8 -
Consu(tant: Geo -Technical Investigation Cllent:
Reoort
S.M, CONSULTANTS JoG :N,).: 050
'DOc. :Wo.: 1672

~
BHUBANESWAR
--
Issue Date 13/05/2016
ridr~
BHUBANESWAR

6. From 7.5 m to 200 m depth, a disintegrated rock stratum exist, whose field SPT N values were
found to be greater than 50.

6.2. BH-2

1. From E.G.L. to 2.0 m depth, a medium plastic, low expansive & very dense compacted clayey
gravel stratum exists from which one OS was collected at 0.5 m depth & field SPT N value was
found to be greater than 50 at 1:5 m depth.

2. From 2.0 m depth to 3.2 m depth, a laterite stratum presents from which laterite pieces were
collected and the field SPT N value of this stratum was found to be greater than 50.

3. From 3.2 m depth to 20.0 m depth, a disintegrated rock stratum exists whose field SPT N values

were found to be greater than 50.

6.3. BH-3

1. From E.G.L. to 1.5 m depth, a medium plastic & low expansive clayey gravel stratum exists

from which one OS was collected at 0.5 m depth.

2. From 1.5 m depth to 4.5 m depth, a medium plastic, low expansive & very dense compacted
clayey sand mixed with gravel stratum exists whose field SPT N values were found to be

greater than 50.

3. From 4.5 m depth to 20.0 m depth, a disintegrated rock stratum exists whose field SPT N values

were found to be greater than 50

b"'~~.
1'(>:" ,0',.
q'?i \~~
,..~>\
I, -~(
4"
'"
~
t;qj
~.•. 2 .11.00; :OJ:
,r
No.1,
i~
',~
-

L_:rv,-'-'-IJ-] e-Oj-'-7-) r-o-Ij-e-C-l :--1-(-" (-"-15-' r-lI-d-j'-"-'- ('-I' .-IU-<l-;,-' i ,-, I-C-O-II-' I-)-I-e-x-:' (-O-=--=-Ol-'-b-=-'-=-e-I3--a:s-e-=-II-' .,.~-;I;'~r.;,
-e-=-II--t-\-\-'-i-'-h-=--I-O-=--=-st-o--=-ri-=-ed-=-)-=-n-:ea-~r-.J'."ti"-1} ••

[ _____ Hhubancs\\'ar Court. Kalpalla! Uhubaneswar. _


-9-
Con .,uii-a 11 I: Geo -Technical Investigation Cfiel1l:
Relort
S.M. CONSULTANTS JoG :NcJ.: 050

~I
'@j BHUBANESWAR
--
'DOC :M,.:

Issue 1)all'
1672
13/05/2016
iidcc»
hi • •
!

BHUBANESWAR
j i_I. ,

7.0 ABSTRACT OF SAFE BEARING PRESSURE (SBP)

7.1 Safe Searing Pressure (SSP) of Soil Strata


Table 3. Abstract of safe bearing pressure
~ -- ----

Safe Bearing
Net Safe
Depth Field SPT Group of Pressure for
Location Bearing Settlement
inm value sample 60mm
Capacity inmm
settlement
in Tim2
- in Tim2
1.5 N >50 01 rock 41 39 41
-_. _.-

BH-1 3.0 N >50 Laterite 80 63 76.2


I--- -
RL(+) 100.60 m 7.5 N >50 01 rock 244 165 88.7
f- -

9.0 N >50 01 rock 314 211 89.3


- -

1.5 N >50 GC 41 39 41
1---. - _.
3.0 N >50 Laterite 80 63 76.2
-- .. -

BH-2 4.5 N >50 01 rock 127 93 81.9


I--- --
RL(+) 100.23 m
6.0 N >50 01 rock 181 126 86.2
- --
7.5 N >50 01 rock 244 165 88.7
-- --
9.0 N >50 01 rock 314 211 89.3
- ._-

1.5 N >50 SC 41 39 41
- --
3.0 N >50 SC 80 63 76.2
- --
BH.3 4.5 N >50 01 rock 127 93 81.9
f--- -- --
RL(+) 100.30 m
6.0 N >50 01 rock 181 126 86.2
-
7.5 N >50 01 rock 244 165 88.7
I--- -

90 N >50 01 rock 314 211 89.3


.- -

Note. The ground surface level of bore tlOles are measure by considering the nearest road level as
(+) 100.0 m. d- -:-£ULTA
:;:..
'/9
{~'I :l':G1 N
;C::'l

'.\';:\'
•• f~ In' "
[ :Ni7l11eof 1'roject: I t"llllSlruclioll nl' .JudicialComplex (Double Basement with 10 storied) near \'i?~~~~
~.ts(3""
HlllIba!lt:~\\'ar euun. Kalpalla, Bhubaneswar. ~~. 'Xi-'\-
-
- 10.
Consuftant: Geo -Technical Investigation Cfient:
Re~ort

; S.M. CONSULTANTS
BHUBANESWAR
-
J06 :Nn.:
'DOc. :Ni,.:
Issue'l.Jate
050
1672
13/05/2016
!
.dec.
• il'.~
BHUBANESWAR

8.0. CONCLUSION

lOCO has planned for "Construction of Judicial Complex (Double Basement with 10
Storied) near Bhubaneswar Court, Kalpana, Bhubaneswar". MIs S.M. Consultants was
conducted geotechnical investigation for this project. The proposed building is a double
basement with 10 storied building. The foundation is expected at about 8 m. below the N.G.L.

Site stratigraphy:
:;., Boring is conducted as per assumed RL (+) 100.000 m by considering the nearest road level.
In this case the RL of BH-1, BH-2 and BH-3 are (+) 100.600 m, (+) 100.230 m and
(+) 100.300 m respectively. The average RL of the three bore holes is (+) 100.377 m.
:;., At the proposed site these three boreholes were drilled up to 20 m depth each below their
existing ground levels.
, Clayey sand strata is available for <lverage depth of 2.67 m from lop. Lateritic soil strata is in
compression stage at a average depth of 1.85 m below the clayey sand strata. This strata is in
early rock formation stage. This Lateritic strata is followed by soft sand stone strata from
which core could not be obtained. The soft sand stone strata will be available at founding
level.
Ground water level:
, Ground water level was found at 9.0 m to 9.5 m depth below the existing G. L in the month of
April, 2016. Since the drilling work was done during non-monsoon period, the ground water
level may rise during the monsoon period.
:.- Lateritic soil strata is porous and may be water bearing in monsoon.

Criteria for recommendation of foundation:

;.. The foundations typically must satisfy two independent design criteria. Firstly, there
must be an acceptable factor of safety (FOS) against bearing capacity failure of the soil
under the maximum design load In this case FOS of 3 has been considered. Secondly, the
total settlement of the foundation due to initial distortion and consolidation of the soils under
sustained loading during the lifetime of the structure should fall within the limits that are
structurally tolerable (Refer IS 6403:1981.Clause-6.1 & 6.1.1). In this case 60 mm settlement

IS considered as per IS 1904'1986-Table-1. f1;~


l- -"'If~
.. --,P"",. ~ 1 1\.; ~l
'__!

,~.;.\
:0:2001 C!j;r
,••4
(\1Ilstrllctioll or .JlIdicial COlllplex (Double Bascmcilt with 10 storicd) Ilcar '~~6:~ /~~
":...~>- y~
I Ilh"ba"c,:;",," COlirt. Kalpalla. Bhuballeswar. ~\~_:~::.:.;...--
- II -
COl1su{tant: Geo -Technical Investigation cflent:
Re ort
S.M, CONSULTANTS J06 :Ni,.: 050
'lJOc. :NiJ.: 1672
l ......
BHUBANESWAR
- -- .dec»
"t!.~
P!'. __
~ Issue Date 13/05/2016
BHUBANESWAR

.,. The selection of type of foundation is therefore governed primarily by the magnitude of
the maximum and permanent loading conditions, type of structure and allowable
settlements,
, The foundation recommendation is based on the height of structure and possible settlement.

Foundation recommendations:

r The structural loading pattern of the structure is not provided by the client.
.,. The sse at founding level of 8.0 m from N.G.L may be considered at 60 T/m2.
, Before laying of basement, plate load test should be conducted at the foundation level to
confirm the recommended sse as per IS 1888:1982.
Safety precautions:.

y Adequate water proofing measures should be provided below basement.


r Perforated pipe for the basement envelope with connected wells to release water pressure
build up may be required.
r This general recommendation is proposed and the designer is at liberty to decide the depth and
the type of foundation intended basing on the sub-soil characteristics made available in this
report.

9.0. CLOSURE

It was a great pleasure working for this project and performing this Sub-soil investigation for you.
Here with we are submitting this report. Please contact us for further service if required.

Quality Control Division


S.M. Consultants, Shubaneswar

£G}J~~r.
,7(J/
,.'I-~'I
~
. <p
'/".,/
'10, ( Re,.: No.
'"
)~.t
\\~,\20i,0102 *9
L-
~~~
~cfr
••...'~_=~:.
:C:, F~ ~
;}.~;;

[:Ntlme of 1'roject: t 'ollstruc!;ollofJudiciai Complex (Double t3asemellt with 10 storied) near


I BllUballt.:sw<I r C DurL Ka Ip_a_"_"._B_'_ll_,b_a_l_c,_'\_va_r_. _
- 12 -
Const/(tant: Geo -Technical Investigation Cuent:
Relort
S.M. CONSULTANTS J06 :Ni,.: 050

@J
~
BHUBANESWAR DOC. :No.:
-.
Issue '}Jute
1672
13105/2016
,i~.,.~
BHUBANESWAR

Appendix-A
Bore Logs

:Nil me of l)roject: Construc!;on of.ludicial Complex (Double l3asemen! with 10 storied) ncar
[
-- -_._- I Hhllb~!.!!.e~\VarCourt. Kalpana, Bhubaneswar.
- 13 -
COl1Su(tant: Geo -Technical Investigation Cuent:
Re~ort

; S.M. CONSULTANTS
BHUBANESWAR
J06 :Nil.:

--
'DOc. :No.:
Issue 'lJate
050
1672
13/05/2016
.dec»
£.• i

BHUBANESWAR
!,+t'Tm

A.BORE LOGS
.,.,. Of LoOn.UIu-nUi; •••,., =->.P'I. ~.un: ••"Ui, a-nLlDHln •• _lIr.
Name of" the client ; lOCO lICD_n. lOCO To-.r • .Joanpath. eSSR
Nalln" of Work : Cons.l.ructjon uf .:Judic;:ioll Conlpl •• (Double Ba_ment _itch 10 :storied) n.ar
UhubHlnelf\Nor Court. K.iIIlpana, Bhublln __ ar.

Ground .urface level: R. L. ( ..•.


) 100.6 "1,
Type of boring : Rol •••
,.y boring BH-1
OlolTleter o~ borlny : l.=-Omrn Loc.aUon: .Judicial Court,.. Kalppna Chhak

IncllnatJon : vertical Dillte of bo •..•


ng stllrtlech

Ground _","e,. tJIlbl. ; 9.5 n. depth bello_ th •••exining G.L Dat. of' boring cornp'et:edl

E
.5

z
ui
"

I Ollyey
sDnd
n?
'j" , < [S.P.T " >50 >50 0.17
n, 0.5 ?n

2.5
I L<1lertu.'
[~~,., I S.P.T
Uotcrlta pieces col~d

. '"
Cor. 1'I.ecov..-y_21.33%

6.0 sand
RQD-NU'"
3.0 -
slone

n? [ S.P.T ,n >"'0 n no:

[~p, <n >o;n .n.no:;;

nQ .,~, S.P.T SO >

10 ,p.' _n > ••0 0.04

S.P.T 50 > 0 n n<


12.5

1Ied<l,~ S.f>.T SO >50 n n,

•••.'ioU"" S.P.T "0 >0;0 n n':ll

W•• heel Out sample


c.olJocted

S.P.T so >50 n n:>

LM/llle Of 'Project: ('onstruction "I' Judicial Complex (Double Basement with 10 storied) near
I~IJ1Ibaneswar COlln,_ Ki! l~al1a. Bhubaneswar.
- 14 -
COI1Su{taJlt: Geo -Technical Investigation Cf,ent:
Report
S.M. CONSULTANTS J06 :N".: 050
DOC. :Ni).: 1672
BHUBANESWAR - .dec»
p• i. ! JX'T"C"":I
~ Issue 1!ate 13/05/2016 BHUBANESWAR

II'I~me Of' (;;onaUlltanJ:S: M'" s ••••••iLonllU tlllOtlll, u anes_ar.


N.'UYUilof the

NaR'lG 0" Work


cHent: , lOCO BCD-n.
: Conl5lt:ruction of .Judicial

DhuboAne._ •••.Cuun,
lOCO Towur, .Janpath.
Co",plex

Kulp •••
nill.
(Double
Bhuban __
DOSR
o ••••unent: _ith
••••_
10 .-t:oried) ..-r
Ground .urtace level: R.. L. (+) 100.23 ITI

Type of boring : Rotary boring OU-2

DI.nMrte •• of boring , 1S0nlrn LoCIItlon: ::Judlcl.1 Court" toIlP8n. Cha.k

:Inclination : Vertical Date of boring Jrtarted:


Ground _a~r bible : !I.O nl dept:h below the existing G.L Date or borIng c::ompleted:

fi
E
E " E
"
•ti"
'" ~ "
'"f.1
OIl
1;
~ ~
~
13
1il t;;2 1!!E ~C
z
" '"lii
'8 ~l5 N~
~l5
M
+
~
~
." ~ ~
! 5l'"E
C ~
~
-1t
E
-n
:;5
1< ~
~Jl
.e~
~~ ~1 "
N

"l
'l>
l5
ci ~
E
b
0

'"
~ 0 ."~ :ll
0 :a!l. "iii
~ ~ h. " >
,..:
=
~
-E
z
in
il
i!'
"
..J ! ><.
!!i
!l.
~
0

8
!l.
~
oli
ci~
z~
05
ci~
z~
'l> 5
ci~
z_
~
on .!' .li!
~
'"
'" ~~ - --- --- - ---
~
0'

t ~. Clayey
•• _" •• 1'1
-
D.S --- --- --- --- ---
2.0

~
G.",vcl
R ••-.J<Jo ••II S.P.T >5" --- --- >50 "n
04 I ,n
1••___ •
- - --- --- --- ---

1.2 ~ Lalerite
. ; .•...P.T --- --- 0_02
Uiltertte pklc:e$ oollected

~ ->...0. ><" >50

~2~~ W.shed Out sample


<OOedod
07 ~O:lf<'
•. ,6:..{.~
.. I ••_.•..•.
_h OpT >-- --- --- >00 10.0,

Washed Ql.It:Sarnp'"
~Il,,,,''''
OR
~f~~
o'~Q'; 10.••••• ", •• , "'PT >50 --- --- >00 0.05
l;i~o> Washed au.: S6rnpJot
ooUed.ed

~ ~~~ ,< -~~ > ..~


--- --- >50 10.04

rY.;~9~
r.q: .•s:r,~ Washed au.: 5amplQ

~?'~?:
""'9'ci,?...~~ , " .. -~ >'~ --- --- >50 10_04
<Oll<dod

.-.-..
'0

[g-S~~ Washed Out: Sarnplo!

11
~~~~
~h~. •••"w•••" <':.P.T >50 --- --- >"'0 0.0"'
DisinlL ••••
r..tcc
~<
$~-~~
~p~,%
Washl!!ld OUt: Sample
<00._

12
16.8
- p.~~~ R ',"- --~ >-- --- --- >50 00<>
---a'(fp W•• "od Out sample
~1IedOd
~~~ ---
" - 9.o:?' R <1.11.1'1 S.P.T >-- --- >50 00.

g';o:r;>,,};
,. -
:4'~
ttB,O'.
Q'~,?' r•• ,.••• " ~PT ><n --- --- >0" no.
washed Out sample
«>O<d<d

n:t:>'~] Washed OUt


<OOedod
sample

>S
-
~~g;t: - """<t ••" S.P,T ><n --- --- >00 nm

~:O..r4:
o;q~'Q
. >0: WIIWled O\.It S4mple

b~;~
«>O<d<d

'6 g:'-'Q.",
"'0'
:0" ••..,'l<ll"" f'".p ...•.. ><" --- --- >00 n,

:b.?Q
,~
Washed o •..•t S.mple

.17
:q~;'f:r;
W-~""
.~ .. -.~.-' , •• ,,1<1'.1'1 5.P.T ><0 --- -- »0 00'
col,,.,cbtd
..c~,lJLi~~
:[>~ ~"'oS'
" ,;/ I, 'c,t
., •• I :,It',
'di
'11"
. ," '. . ~U
~ ~'~'
__ ~I~.
I ; ;.1~1
[Nillile of 1'roject: ('ollstructioll of.llldicial Complex (Double Basement with 10 storied) near .....~:;-I~.,,_,:>y!
Bhllball~~war Court. Kalpan<l. I3hubaneswar. .________ :::::J-
- 15 -
Consultant: Geo -Technical Investigation ellent:
Relort

; S.M. CONSULTANTS
BHUBANESWAR
--
J06 :N(I.:
'DOc. :Wo.:
Issue 1Jate
050
1672
13/05/2016
.dec»
Ii• !,• rr:;=-=:a
!

BHUBANESWAR

IImel of Conaulblnb: ""/&. S.M. Can.uli::efrt8, BhubaneInVar.


Name of the a'ent : IDCO BCD-II, lOCO Tu_ •••.•.Janpath. BBSR
NOilme or Work : CUnutn.Jctlon 0' .ludlclal Complex (DoLlibl. __ ment: 'W1U110 atorl.d)n_r
llhubtllnea_ •••.Court, K••lp•••
n••• Ohuban•• _.r.

Ground "UrlillC"," level: R. L. (+) 100.30 '1'1.

Typo or boring : Rot.ary boring BH-3


Diamete,. 0' boring : 1S0nuTi Loc.tlon: .ludia •• Court:.,. Ko1IIlpan. Chhak
IncUn.1:lon : Vertical Dllte or boring .-t.aned:
Ground waur bible ; !>I.Uhi depth beJo_ the cxJ•.Ung G.L D.to 01 boring conlple1:ed;

~
c Ii Ii
.,
E

~
"~
."
.5
0;
1; ~
'2
lJ 1;;3
~N"
C
z

~
.5

'"a
l' • '8 ~8 "2
g
"ii!
~
"
~
~ '"
~ g'
'8 ~
E
-g
.ill ~lai~
~~
+
~

J:;
~
"
e:
"
c
E .~
~ 111 li c~ • w
,g :l'!i!:. - ~
0

~ a 0
'0 p ~~ !l'
p
~
0 c
~ ~ ~
z
in ~
...l

"' 5
£
~
~ ~
~
.Q
B ~ " "s
o~
z_ci~
E
v
z_
"s
o~
z_
~
on :D
~
E
i!J.
... n n
- --- --- ---
-I2.L I Clayey
0.5 --- --- --- --- ---
1.5
03 --- . - Gravel
I ••. ," 5.P.T ><n --- --- ><n nM

-ll::L 3.0

--

_ ..

"
...

A .. U'~~~
.n
Rr.<J<I"'''1 <:;: D T _""n c;j, :-.=~~J
!/ ~; \~}~
-r",
"
I~,."l
".
r.'..... \::j.
t.,]
~~~ .\'?I'. J _,' /"t.."
[:NtWle of 'Project: (',,"slruct;,," "r.ludicial Complex (Double Basemellt with 10 storied) Ileal' -.':,,'.~ I _,,{'J,l
I HllIbancswar (',IlIH. Kalpall<l:.13l1ubanes\var. ~ ~ ..... 'l -, ••
-- - --
- 16-
Consu{tant: Geo -Technical Investigation Caent:
Report
S.M. CONSULTANTS J06 No.: 050
'DOc. No.: 1672
BHUBANESWAR I-
.dec»
'.
••• • •
~ Issue 'lJate 13/05/2016
BHUBANESWAR

Appendix-B
Result Sheets

,>(;f~~
<f'\
;,ffJY'1 --...•..
1/,/
to: f
\~v
Pgd Nc. 1~
\.. ';' 7- ~;<''l ....~ .1
\~.'\ • l,. '-'- ,. 'vi;;)
L _-N-"C-71-n-e-o-u-- -I-(-~
'j-'-r-o)-,e-c-t-: '-"-'S-lr-lIC-I-;O-II-,,-r-J '-Il-' ;c-';-al-C-O-'-II'-' I-CX-'-(D-O-lI-b-Ie-B-a-s-e,-n-e,-,t-,-v;-tl-' -I O-s-to-r-;e-d-)-n-ea-r-"" :""i,-''::E12~L'::'
..:....'.
[ Bh Hball~S\"ar Court. Ka Ipana. B_I_ll_lb_a,_,e_s_w_a1_'. _
- I7 -
,
CotlSu'iun'l: Geo ':'Techl1icallnvestigation Report Caent:
£I'E S,M. CONSULTANTS ]06 No.: 050
I€~ BHUBANESWAR 'DOc. No.: 1672 ,i"f.!!
I 'c;;jfI
i,.,;,;;:~
BHUBANESWAR
Issue 'Dale 13/05/2016

B.O. TEST RESULT OF THE SUB-STRATA.


H.1. H.H-l
TEST COI'\DUCTED AS PER IS: 2720 (PI. I, Pt. fl, PI. III, Pt. IV, PI. V, PI. XI/PI. Xfll)
,
Clwin si/~ analysis i\t!~rht:rg's [.imits I

I I I
:!'.
C ~
~
" .=c "E
c
~
..
'0

u
~ - ,... g E
E
.. E -gE ,..0 :!'.
C
¥~ I u u
"
.~
Z :!'.
.. c ~
"
.c
.~ • •
.= ~,
'r.
C
~ ,;:;
.2 c' cO .- ~. :L
-
Co ~;
- J
z :; "8 - '" -
'r.
e; '" ~ .S ~
e.' - /
.- .~
.-
-g - .- '- "
~ J g '-
'J

'J" 'c~

;:;
>
E
~ ~2
f-
,
I v:: E
~
or. ~ --g
E
~"
E
Ci 'r.
/,
I

-
E , E ~
.~ .z - -;:;
"
~;
..," ~;
.g "
>
" .0
/.

s
I :::' •~
I
" ~
~ i

"g !::!.
C
C
I
I
U
S ,;)
:::
.~ I ~ 'r> ~ •...
5 , g N
=>
~
s- ~•.
.~
:~ ~ ~
S
'iii
~
'0
'J .S
u
'.= E I z
I ""-
~
:r. ,"
~ "-
I,
0
0 '"
'C

:?:" ~ "- 2- i:r. cO


- 0:
v:
0:
~ ;:;
C =" c
'-'
ei;---
c-e-
<-
'u
'J

"-
or.
'0
>
'0
~
15
I
f-

~
I At. 0.0 depth D.S
'" </)

III 17.61 825 21.54 22.42 30.18 29.0 15,0 14.0 ... ... ... ... 2.69 ... 10 ... SC
2 At. 1.5 In depth S.P.T 1.46 44.91 50.86 0.56 ... ... ... ... ...
2.21 18 NP 2.65 ... 0 N>50 .. .
3 At 2.0 In depth S.P.T Laterite Pieces Collected N>50 ...
From 3.0 m to
4 Laterite
4.5 In depth Laterite strata, Core Rccovery=20%, RQD=Nil ... ...
From 4.5 m to Sand
5
6.0 In deDth stone Sand stonc. Core Recovery='21.33o/ •. RQD=Nil ... ...
6 At. 7.5 In depth S.P.T 0.79 0.16 40.69 ... ... ... ...
54.46 3.9 18 NP ... 2.65 ... 0 N>50 .. .
7 At. 9.0 In depth S.P,T 0 0.23 44.40 ... ... ... ...
54.48 0,89 18 NP ... 2,65 ... 0 N>50 .. .
8 At. 10.5 In depth S,P,T 0.08 0.35 41.38 ... ... ...
55.36 2.83 18 NP ... ... 2.65 ... 0 N>50 .. .
9 At. 12.0 In depth S.P,T 0.28 39.0 5,0 ... •..
50,22 5.5 19 NP ... .. . ... 2.68 ... 0 N>50 .. .

:Name of 1'roject: Construction of Judicial Complcx (Double Basemcnt with 10 storied) near Bhubaneswar Court, Kalpana, Bhubaneswar.

- 18 -
COllsu{tall'l: .. Geo :"Tech'nical Investigation report C[{ellt: .
S.M. CONSULTANTS J06 No.: 050

~~ BHUBANESWAR 'Doc. :N(J.: 1672 iJ1f.Cl


BHUBANESWAR
~-==--.J ISSLle'Dale 13/05/2016

Contd .....
TEST CONDUCTED AS PER IS: 2720 (1'1. I, 1'1. II, 1'1. Ill, 1'1. IV, 1'1. V, 1'1. XI/Pt. XIII)

I I I Grain size analysis I\ttcrhcrg's 1 imits I I I I I I I


-----,---,.-----------_._._-'-'
•;.!'. ."."
.: e

-
i
"
""
;:;" ,. E
E '#. E
E E
~
'"'" ';!. ;.!'. •;.!'.
C
~
u
~
"E

':L""
el)
"~i!
'in

'7 ~
"8'"
~
e" or.
...,
•""e g e N'n
o~
E
...,
'n
•;.!'. - -

-
.:
, U
c c
;i; g.
'C

'"
- ""~~
~i
""0 cO
.- ~ ~.
,
.- c
"'g" ~
.:
~. U "
~ i!
" .f'
> '"c
'0
"
"'C e
C '0 "~ -g E U EE '. -::r. 01, E01,
U ~
~
> ~
0 '/0
- .:::' '6 'zil ~ "C OJ
.g > 'r.
~
I 2 VJ
~ g r7. ~lonE ~ 0'n ~ .~ ::;: C c
'"'"
Z
c C e 'J E •... :2~
C
E
'"
0..
">, U
~'r;
..., '0
c
u 0
..,. .E- ~ "C
"C '<;'
)!
U
Oi.;-
0
'u ~ >c
0..
0..
0 " ." " '" "
10
.~
At. 13.5 m depth S.P.T
;?
1.34
N
c

5.35
::;:
56.22
N
c
i.Z cO
36.42
0
V;
- 0:
""
"'C
i.Z ~ ;C ;i-f> ~ " ~
~
c
0..
vi
C
("

0.67 18 NP 2.65 0 N>50

II At. 15.0 m depth S.P.T 0 1.77 43.17 54.65 0.41 19 NP 2.65 0 N>50

12 At. 16.5 m depth S.PT 0.19 0.72 54.30 44.57 0.22 19 NP 2.65 0 N>50

13 At. 18.0 m depth S.P.T 0 0.95 55.67 41.68 1.70 18 NP 2.65 0 N>50

14 At. 20.0 m depth S.PT 0.11 1.14 48.00 49.00 1.75 18 NP 2.65 0 N>50

NOTE: From 1.5 m. to 2.0 m. and From 7.5 m. [0 20.0 m. 1)1 rock strata found from which core sample couldn't be collected only washed out sample collected

.v=~~
. ,;.:< S. /.. i'~,
>~-...;,(~~
/ ~,~
;'3
f
,,~;.")
t.l.
"til'
C,
r.~,iI_-------------------------------------------- -- J
.. '" "1
, ",}}
i:~;:r.:~:Name of 'Project: Construction of Judicial Complex (Double Basement with 10 storied) near Bhubaneswar Court, Kalpana, Bhubaneswar.

- 19 -
CotlSu{tant: _ Geo .:-Tech'nical Inv(''itigation Report C{f~nt :

1EJ:;I3 S,M, CONSULTANTS J06 No,: 050


ideo
W
li, ,
q,
,,;;:J
\
I BHUBANESWAR 'Doc. No,: 1672 =
BHUBANESWAR
Issue 'Dale 13105/2016

B.2. B.H-2
TEST CONDUCTED AS PER IS: 2720 (Pt. I. PI. Il, PI. Ill, Pt. IV, Pt. V, PI. XI/Pt. XIII)

I I Grain size analysis


I
Atterberg's Limits
!
I I I I I I I I I
:!(
• ~
= I .- ~
~
E = ~
c
z
"B
tl E
E
E :?
• E
E E 0
:? :?
#. "=
~
oj
-"E
u
~;
."2
.='-
E 0
:!(
• ." :?
• 0 • • :3
.2
"8
'#. or,E 0
0 .= 'n
.= = oJ)
'"
oJ)
=
"
N

- - ,,;
; ?t .E ~Q
2 .- 'C
.f' 1
"
'J

"= ~
'J
~ .- .-
Q
'E ] = :.- :]
:.; Q
>, 'J

.oj;

0
[:
~
0
- :r.
'J
E
=
:r. c

.2 =E
2 E
E
:r. 'n
=
G =
,ii
.-..
.-
-,
:~
.'g
Q
;;;
::'
.z
-='l
i5
7
Q
~,
~
c
~;
.g
2
->
Z
'l.
Q
":;; .- >~
'J
~.E '[; ,ii
-=u c g ~ N
" '"- = '7
:: -=
=~ ~ u .~ -= ~ Co

- 3"
c. = ":1. ~ el;- ~ ;r. =
>, .E N "
:5 ~ ~ =-e- '0 0:
;;; N 0 :r. ~ 8 <- I Co
:r. > '" v: ~
,\t. O.S m depth D.S 40.24 18.43 12.41 7.74 21.18 32 17 15 2.69 16 GC
2 At. 1.5 m depth S.I',T 51.9 22.4 I 1.23 1.49 12.'18 31 18 13 2.68 14 N>50 GC
3 At 3.0 lit depth S.P,T Laterite Pieces Collected N>50

4 At. 4,5 m depth S.I'.T 2.04 4.03 42.30 24,11 27.52 28 20 8 2.69 0 N>50

5 At. 6.0 m depth S.P.T 0.31 0,72 55.93 37.22 5,82 18 --- NP 2.68 a N>50

6 At. 7,5 m depth S.P.T 0.19 0.53 65,53 32.96 0.79 18 NP 2.65 0 N>50

7 At. 9.0 m depth S.P,T 0.48 0.72 66.10 24.45 8,25 19 NP 2,68 a N>50

8 At, 10.5 m depth S.P,T 0,86 6.06 51.82 34.82 6.44 18 NP 2.68 0 N>50

0.23 3.35 44.9 41.02 10.5 19 NP 2.68 a N>50


A~~
Iff:
.fer)
9: ~ ~~ \<;
~Ju..'1
'I;j g -' IC"
\'1 ~ ;;
\~ • .-::;
'7~;171'
--d,:j1
'-------------------------------- -'
'~7r:;--;-----;O-;:::----;~~---_,r=--_;_-;:_;__;_:_:_:__;:____:-o:::___,_:_:::__--__,_;_:_::____;____::_-_:::.,.......,---_;:_-:_;_:__-=__:_--___,
:Name of 'Project:
- 20-
£i an't: ,
/.'OI]SU Geo ':"Tecr.:nicalInvestigation Repor.. Cfient: t •.•

rr:E S.M. CONSULTANTS Jon No.: 050


ideo
W -J
BHUBANESWAR DOC :Wo.:
Issue 'Date
1672

13/05/2016
mrZOJ

BHUBANESWAR

Conld .....
TEST CONDUCTED AS PER IS: 2720 (Pt. I, Pt. II, Pt. III, Pt. IV, Pt. V, Pt. XII Pt. XIII)


""E
E .
E

;~g ~ '

0'
.•
I ;;._ '"c
- r-i ,...
~ -
> -
." c
='-
l' .S:
.;;
z
S~co=E ~
~.;:; e
."'0
,. N ,6 ~ u;
>
\0 At. 13.5 m depth S.P.T 0.33 1.54 60.94 35.68 1.51 18 NP 2.65 N>50

II At. 15.0 m depth S.P.T 0.\6 2.23 57.62 35.02 4.97 18 NP 2.65 o N>50

12 At. \6.5 m depth S.P.T 0.76 1.73 59.6\ 34.89 3.01 18 NP 2.65 o N>50

\3 At. \8.0 m depth S,P.T 0.8\ 4,02 62.96 29.19 3.02 19 NP 2.65 o N>50

14 At. 20.0 m depth S.P.T 0.6\ 4.02 65.04 25.96 4.37 18 NP 2.65 o N>50

NOTE: From 4.5 m. to 20.0 m. 01 rock strata found from which core sample couldn't be collected only washed out sample collected .

. .~}6*S.:...:~
.:.~'/i';Y:;"
l.i1
-r C.:::tl
0,2
110{~
1~
i~' ~ ...:.. c:
:,,~\ : 5 L-J:.
/.~~.;If------------------------------------------------------ ..J
".:t/,••.. '.' /:Jib
.•t..
~;--.----.1l. y;
'~..:.::~::::;.~
..
r:~----;"'=--:--..,.------r::;;-----;---::-:--;-;-;--;--:::---:--..,.-:::----:-;--::-----;-;--:-:;---..,.---::---=.,.-.,.----:::----;c;-;----=--;---_-,
Name of 'Project:
- 21 -
ConslIfiant: , >f;eo":Technical Investigat;on Report CCient': I, '.,

S.M. CONSULTANTS j06 No.: 050


itlf!!
G
~
BHUBANESWAR DOC. No.:
Isslle Date
1672

13/05/2016
BHUBANESWAR

B.3. B.H-3
TEST CONDUCTED AS PER IS: 2720 (Pt. I, PI. II, Pt. Ill, PI. IV, PI. V, PI. XI/PI. XIIl)
I I I
I
,
I I
CJrain size analysis I
I
'j
"c' u
~
~ .::: "'E ~
E E
E ;:; ;,'? ~ 0 u
'2"
.;;
c E
~
E
~ E ':L"
.'- .'g- '"
,c
E :!!. 0
~ -'E" 01;
z -< ~
,F.
"
0

.:
or;
N
,r;
":
,c
c' -c -
0'

-
.:: c
:..; :1; ."
.~ ~
<- N "
0' - ;-
<
u .- :..- ~ 'j .f'
~
v> ;:. " " F: "~ Ci
~C "
.- ~
~ e E
E
:.:i
~
.Z .~. 'j

-5.
2
01, ~ Co
> .:;;
2 v: E
I/>
E E
~
-
.~ 2:' ~ ~
C
'j

"".S
2.
,1:
.:2
.: z .~
E E
~~ v: ,r; ''> :g ~ u
"
.:r,
~~,
c.
G E E
"" - ~
'j
<d :r. ~
~I
'j
'j

-E
t ''>
": '0 50 ~ ~
-¥ ~ 'u I/>
~
0.
1E!. 8 :;; d '" .:::
w.. S :..r.
- ~ c: ::'" "'"
~ :::; ~-e-
<-
u
c.
'" ~ 0
c.
:r.
2
G

At. 0.5 In depth D.S 39.95 13.86 12.99 11.83 21.37 32 17 15 2.68 10 GC

2 At. 1.5 m depth S.P.T 21.84 13.27 22.14 10.21 32.54 31 17 14 2.70 10 N>50 SC

3 At 3.0 m depth S.P.T 23.73 13.70 20.66 8.6 33.31 32 18 14 2.69 12 N>50 SC

4 At. 4.5 m depth S.P.T 1.95 3.19 43.5 24.28 27.08 28 20 8 2.69 0 N>50

5 At. 6.0 m depth S.P,T 0.33 .71 55.54 38.22 5.2 18 NP 2.65 0 N>50

6 At. 7.5 m depth S.P.T 0.18 0.63 65.63 32.13 1.43 18 NP 2.65 0 N>50

7 At. 9.0 m del,th S.P.T 0.45 0.78 65.30 26.24 7.23 18 NP 2.68 0 N>50

8 At. 10.5 m depth S.P.T 0.75 5.04 52.54 35.35 6.32 19 NP 2.68 0 N>50

9 At, 12.0 m depth S.P.T 0.32 3.42 47.20 41.0 8.06 18 NP 2.68 a N>50

I Construction of Judicial Complex (Double Basement with 10 storied) near Bhubaneswar Court, Kalpana, Bhubaneswar.

- 22-
COl1sultarN: Geo '-TechnicaLlnvestigation Report Cfient:

S.M. CONSULTANTS J06 No.: 050


ideo'
m:::Ann::o::J
DOC. No.: 1672
BHUBANESWAR BHUBANESWAR
Issue Date 13/05/2016

Contd .....
TEST CONDUCTED AS PER IS: 2720 (Pt. I, Pt. II, Pt. III, Pt. IV, Pt. V, I't. XII Pt. XIII)

I I I
Grain size analysis Atterberg"s Limits
I I I I I I I I
I
,
0
""~
---
.""" "2 ~
I ""." """
'0 ~ u ~ .(;,
i I u
E = 0 0

""" 01 ~
" U E
~ I
0
•"" '#.
"" .r;
.. -. :L
-.
0 0
"B ~
'?; 'r, ef. g "O' 0 '.J
"/.
-"C - '" = - ~ .~;

-"'" " ="


-
E "I ,0
'0
.- ~ ~
" ' - , 0
I
/
u
'0
U I
.:
;::. '-'- :,:j
u
" I ~ -
~~ ~ = =
0
~ ~ CL E ~ ~.
s "0
v. "e ~
> 0
.~
:/;f- '0
= 'nE :J~ 'n= :'2
~
-
.g :::'
7-
'0
:;;:
'~

~ = ~ '0
u :.I; .;
z c
.g :g .SO 0 ,.2
I ~.•.. ~"I"
'J C " E '0 .S E
c. "
I "g oc,~ I ~
~
,r;
'"" ~ I "0 .~
N 0 = v. '0 ~
I,
v.
2
"
:i;- .~ '0
i(-
~ Co.

,?-
I- I ." - I :r. -
'0 V-
"
J:
c-
>. 0
'"' I
u
i ;:. ~
c.. ~ ;3"""
u
.~ I '0
> r; :;; I
'
==
10 At. 13.5 m depth S.P.T 0.22 2.21 60.76 34.2X 2.53 18 --- NP --- _ .. --- --- 2.65 ._- 0 N>50 ---
il At. 15.0 m depth S.P.T 0.41 3.22 57.43 34.12 4.82 19 --- NP --- --- --- --- 2.65 _ .. 0 N>50 ---
12 At. 16.5 m depth S.P.T 0.82 2.42 58.53 35.19 3.04 18 .-. NP --- --- --- --- 2.65 --- 0 N>50 --.
13 At. 18.0 m depth S.P.T 0.84 3.59 63.82 28.73 3.02 18 -.- NI' --- --- --- ._. 2.65 ... 0 N>50 ---
14 At. 20.0 m depth S.P.T 0.63 4.04 64.57 26.44 4.32 18 ._. NI' ... --- --- --- 2.65 --- 0 N>50 ---
NOTE: From 4.5 m. to 20,0 m. DI rock strata found from which core sample couldn't be collected only washed out sampk collected

)\fame of 'Project: Construction of Judicial Complex (Double Basement with 10 storied) near Bhubaneswar Court, Kalpana, Bhubaneswar.

- 23 -
Consultant: Geo -Technical Investigation Caent:
Reoort
S.M. CONSULTANTS JoG No.: 050
1672
BHUBANESWAR
DOC. No.:
_._. .dec»
p' a.' " , 8, I

~ Issue 1)<1 Ie 13/05/2016 BHUBANESWAR

Appendix-C
Calculation of Safe Bearing Capacity

I ('ollslructioll
_Bhuballes\var
or Judicial Complex (Double Basement
Court. Kall~ml. Bhubaneswar.
with 10 storied) near

- 24 -
COIISII(tallt: Geo -Technical Investigation Cflent :
Report
S.M. CONSULTANTS .JoE :N().: 050

:~
~
BHUBANESWAR 'DOc. :N().:
--
Issue 'J)a te
1672
13/05/2016
.dcCII
p,
• !*rrz:=3
BHUBANESWAR
I

C.O. CALCULATION OF SAFE BEARING CAPACITY


C.1. Calculation of Safe Bearing Capacity from Standard Penetration Test at 1.5 m Depth

Soil Investigation Data

Site Information
1 Bore Hole No
2 Depth 01Sample Collectl'"
3 Inclination of load to the vert!cal
"
Laboratory Investigations
1 Standard Penetration Value from Field -I 50lsPT
Corrections as perC!. 36 of IS 2131'1981
a) Due 10Overburnen 0.15 kg / em2 5000[ 1 CoheslonlesslSdl Faelor = 1.000
Overburden presuure = q = i D = 0.15 kg / em'
b) Due 10Dilalancy N 32.50 Strala below Water Tabl~.:..Fi",ne=San=d..:a:.;;nd::.;S",I:.:.lt _
2 Angle oIlntemal Fnc1ion 0 36.5 ' ReI: Fig. lollS 6403: 1981
3 Speaftc Gravity of Sal G 265
4 Submerged Density of S"1 i ,- (J( i kg/an 1

Assumptions
1 Width of Foundation B 200 em
2 Depth of Foundallon [) 150 em
3 Length of Foondalon L 200 em
4 Shape of Base S,Ju ••,e
5 Depth of Water Table D,<.' 950 em
Effect of Water Table IN 0.500 Worst eandllon
6 Factor of Safety lor 5,md 3
Calculations
SUbmerged Density 01S",I 0.001 kg/em'
" 36.5 Q

N(, 3.936
Surcharge Intensity =q= y' 0/1000 015 kg/em'
Bearing Capadty Faders fer •• 36 5 ~ Shape Factors Depth Factors Indination Factors

N, 42.570 SQ 1200 d, 1.1490 i, 1.0000


Nr 66 444 S, 0.800 d, 1.1490 i, 1.0000
Angle of Internal Fncbon $ = 26
NJ 12.L08
N) 13184
Difference in Nfl 30.362 Cmerenee in Ny 53.2600
From Interpotatioo the required values of Nq & Ny are ::
N, = 44468
N•. = 69.l!3
Ultimate Net Bearing C~paaty q.j= q (NoJ - 1),')~ d 11., t is B r N, 5, d, i.•
W
= 0 150, i 44468 - 1) x 1.200 x 1.149 x 1.000
, Y, x 200 0 x 0 001 x 69773 x 0.800 x 1.149 x 1.000 x 0.500/1000
899 + 3207
Ultimate Net Bearing Capadly qd = 12.1968 kg/em"

Net Safe Bearing Capaclly I NSBC)= 41 Tim"

('ollsII'UClioll ol'.Judiciol Complex (Double Bosemem with 10 storicd) Ileal'


I Bh u hall.e'0val' C ollll. Ka II'_a_l1_a_.
_B_h_"_b_a_"_cs_"_v_U1_
.. _
- 25 -
COl1su{tal1t: Geo -Technical Investigation Cuel1t:
Re~ort
S,M, CONSULTANTS Jo6 :Ni,,: 050

~i BHUBANESWAR
--
'DOc. :Nc),:
Issue 'Date
1672
13/05/2016
."CCIt
Ie;, '*'


BHUBANESWAR
H. ,

At 3,0 In Depth of BH-1

Soli Investigation Data

Site Information
1 Bore Hole No
2 Depth of Sample Colleclim D
3 Inclination of load to the vertical

laboratory Investigations
1 Standard Penetration Value from Field "LI _-""".OISPT
Cor,eclionsasperc/36 01 IS 2131't981
a) DJe to Overburden 0.30 kg 1 an2 '--"50".00""1 ICOheSloniesslScil Factor = 1.000
Overburden preswre = q=i D= 0.30 kg / an'
b) DJe to Dilatancy N 3250 Stiata below Water Tabl~.:..Fi::.:ne::..S",an=d",a",nd,-,S",il,,-t ...J
2 Angle of Intemal FOClJon i 36.5 0
ReI: Fig. 1 oIlS 6403: 1981
3 Speaflc Gravity of Scil G 265
4 Submerged Density of Sal i 0.00'1 kglan3

Assumptions
1 Width of Foundation B 200 em
2 Depth of Foundation Q 3C0 em
3 Length of Foundation L 200 em
4 Shape of Base Sauare
5 Depth of Water Table 950 om
Effect of Water Tabfe 0.500 Wcrst condition
6 FactO' of Safety fO' 3
Calculations
SUbmerged Density of Sal i 0.001 kg/an'
+ 36.50
N. 3.936
SUrcharge Intenslrl " q " " D 11000 0.30 kg/an'
Beanng Capaaly FactO's fO' + 36.5 r. Shape Factors Depth Factors IodinaTIon Factors

No 42.570 " 1.200 d" 1.2980 1.0000


Ny 66 444 ~ 0800 d, 1.2980 1.0000
Angle of Intemal Fllcbon <Ii " 26
N" 12208
Ny 13.184
Dffeence in N~ 30362 DIfference in N.( 53.2600
From Interpolatloo the reqUired values 01 Nq & Ny are ::
N.," 44.468
Ny:: 69773
Ultimate Net Beaong Capaaty q,," q(N'J .1)sqdqi~ +J1ByN,s, dr i,W
= 0~<lOxl44.468-1IX 1.200 x 1.298 x 1.000
+ Y>x2000x0001 x 69.773 x 0.800 x 1.298 x 1.000xO.5OO/1oo0
= :0.3116 + 3.623
Ultimate Net Beanng Capadty qJ = 23.9342 kg/cm~

Net Safe Bearing Capilcily (NSBC)=

('ollstructioll of.ludici,,1 Complex (Double Basemcnt with 10 storied) near ~


I 11Ilu b}!!..!.e~var ( 'llllrl~Ka Ip_,,_n_a.
__B_h_u_b_aJ_le_s_'W_'_lr_, ~
- 26 -
Consu (tan t: Geo -Technical Investigation C{lent:
Reoort

r; S.M. CONSULTANTS
BHUBANESWAR
J06 :Ni,.:
'DOc. :Ni,.:
--
Issue ,}.Jate
050
1672
13/05/2016
.dc~
i".~
pi.

BHUBANESWAR

At 7.5 m Depth of BH-1

Soillnvesligation Data

Site Information
1 Bore Hole No
2 DepUl of Sample Collection
3 Inclinaion of load 10the vertical "

laboratory Investigations
1 Standard Penetration Value from Field t.OISPT
Coneclions as perC/. 3.6. of IS 2131:1981
a) DJe to Overllurden 0.75 kg / em2 50 001 I Cohesloolesslsol Factor = 1.000
Overllurden presuure = q=i D= 0,75 kg / em'
b) DJe to Dilatancy N 3250 Strata below Water Tabl~2-'Fi~ne:..S~an~d~a~nd~S~i~lt --l
2 Angle of Internal Fnclon • 365 ' Ref: Fig, 1 of IS 6403: 1981
3 Speefic Gravity of Scil G 265
4 Submerged Density of Sol .,. 000, kg/an)

Assumptions
1 Width of Foundaion B 200 em
2 Depth of Foundatioo D {50 em
3 LengUl of Foundaion I 20C em
4 Shape of Base Sau<'l'''.!
5 DepUl of Water Table D<'! 950 em
Ellecr of War.rTabl. W 0.500 Werst condlbon
6 Factor of Safety for Sand 3
Calculations
Submerged DenSity of SOl 0001 kg/em'
& 36.5 '
Ni 3936
Surcharge Infensity = q = i D /1000 075 kg/em'
Beanng Capaely Factors fer i 36.5 " Shape Factors Depth Factors Indination Factors

42.570 5'1 1.200 d, 1,7440 1.0000


Ei6444 " 0.800 d, 1.7440 1.0000
Angle of Internal FrictIOn (If " 26
N,~ 12.208
Nr 1".184
OflE:rencein N" 30.362 C~fference in Ny 532600
From interporatioo the required values of Nq &. Ny are :;
No = 44468
Nt:; 69.773
Ultimate Net Bearing Capaaly q,,= q(N .. 41)s,)d<)i., "YzB,rNrs, d, i,W
= 0750 X{ 44463-11' 1.200, 1.744 x 1.000
+ y, x 200 0 x 0 001 , 69,773 x 0.800 x 1.744 x 1.000 x 0.500/1000
= 68.2268 , 4867
Ulbmate Net Beanng CapaCity q~;; 73.0941 kg/em?

Net Safe Bearing Capacily (NSBC);;

l
:N,IfJle Of 'Project: ('onstruction
I Bhubaneswar
,,(.Iudicial Complex (Double Basement with 10 storied) near
Court. Kalpana, Bhubaneswar.
- 27-
COl1su(tant: Geo -Technical Investigation Cuent:
Rei ort
S.M. CONSULTANTS J06 :Ni,.: 050
DOC. :Ni).: 1672
BHUBANESWAR
-- .dCat
54• ,*,•. •i !

~ Issue 'Date 13/05/2016


BHUBANESWAR

At 9.0 III Depth of BH-1

Soil Investigation Data

Site Information
1 Bore Hole No
2 Depth of Sample COllection D,
3 Inclination of load to the verllcal
"
Laboratory Investigations
1 Standard Penetration Value from Field -1~__ 50_lsPT
Corrections as perC/. 36. of IS 2131.'1981
a) Due to Overburden 0.90 kg I on2 50001 ! cOheslooiesslSoil Factor = 1.000
Overburden presuure = q =i0 = 0.00 kg I an2
b) Due to Dilatancy N 32.50 Strata below Water TablE:t~F_in_e_S_a_n_d_a_nd_S~i_II ~
2 Angle of Internal Friction e, 36.5 ReI: Fig. lollS 6403.' 1981
3 SpeaficGravityof Soil G 2 6~.
4 Submerged Density of SOli y' (; \"\11 kg/an3

Assumptions
1 Width of Foundation B 200 em
2 Depth of Foundation [), WO em
3 Length of Foondation L 200 em
4 Shape of Base Square
b Depth of Water Table 950 em
Effect of Water Table 0500 Werst condition
6 Fadex' of Safety fC( 3
Calculations
Submerged Density of Sol ..., 0001 kg/em'
36.5.J
3.936
SUrcharge Intensity = q = .,.. D /1000 090 kg/em'
Beanng CapaCIty Factors for 0 365 (I Shape Factors Depth Factors Indination Factors

Nil 42.570 5-.1 1.200 dq 1.8930 1.0000


N-r 66.4,14 S, 0.800 d, 1.8930 1.0000
Angle of Internal Fric110n CIl' ;; 26
N~ 12,208
Ny 13.184
DlItfe-llce III Nq 30 362 Difference in Ny 53.2600
From interpolatico the reqUired values of Nq &. Ny are =
N" = 44.468

N,-:: 69 773
Ultimale Net Bearing CalJcloly qd = q(N<) -1)s"d~;,;j +:1ByN,s, d, i,W
= 0900,(44468.')",200, 1.893 x 1,000
+ l\ x 200,0 x 0 001 x 69. n3 x 0.800 x 1.893 x 1.000 x 0.500 /1000
88867 5.283
Ultimate Net Beanng Capaoty q,j = 94.1502 I(g/cm~

Net Safe Bearing Capadty (NSBC)=

( ',,"strllcr;OI "I' J lId;c iaI Complex (Double Basement with 10 storicd) near
Ilhllbancswar C,,"I'!. Kall'ana. Bhubaneswar.
- 2X -
COII.'u{tant: Geo -Technical Investigation Cfient :
Re~ort
S.M. CONSULTANTS jOv :Ni,.: 050
DOC. :Nc).: 1672
BHUBANESWAR
- .dcCIJ
'4 '*'
j !all! MiS! i
~ Issue'lJate 13/05/2016
BHUBANESWAR

At 1.5 m Depth of BH-2

SOIl 1nvestigatlon Data

Site Information
1 Bore Hole No
2 Deplh of Sample Collectl", D- ~m
3 Inclination of load to the vertical o t::=j,
Laboratory Investigations
1 Standard Penetration Value ~om Field =_1 __ 5c_'lsPT
Cweclions as per CI 36. of fS 2131'1981
a) Due to Overburden 0.15 k~ f an2 50001 ICoheSionJesslS,,1 Factor = 1.000
Overburden presuure = q = l' D = 0.15 kg / an'
b) Due to Dilatancy N 3250 Slrata below Water Tabl~_F_in_e_S_an_d_a_nd_S_i1t _
2 Angle of Internal Fliction 0 36.5 Ref: Fig. 1 otiS 6403: 1981
3 Speofie Gravity of SOIl G 2.68
4 Submerged Density of S"I "

Assumptions
1 Width of Foundation B 2OC' em
2 Deplh of Foundation D- 150 em
3 Length of Fcundation L 20G em
4 Shape of Base $q""aro=
5 Deplh of Water Table l»! 90C em
Effect of Water Table IN 0500 Worst condition
6 Factor of Safety for Sand 3
Calculations
Submerged Density of S"I 0.001 kg/an'
36.5
3936
Surcharge Intensity = q = )' D /1000 0.15 kg/an'
Beanng Capaety Factors for ~ 36.50 Shape Factors Depth Factors Inclinatioo Factors

N, 42570 s, 1.200 d, 1.1490 io 10000


Ny 66 444 s, 0.800 dj 1.1490 i, 1.0000
Angle of Infernal Fne"on Ill' 0 26
No 12.208
Ny 13.184
D1Hertnceill N.~ 30362 Dfference in Ny 53.2600
From interpolatioo the reqUired values of Nq & Ny are =
No 0 44468
N, = 69 113
Ultimate Net Bearing Capaaty q1= q (N) - 1) Sq d,! i: + H B.v N, 5, d, i, W

= 0 150x (44468-1/'
1.200, 1.149 x 1.000
+ % x 200.0, 0 001 , G9.773 , 0.800 x 1.149 x 1.000 x 0.500/1000
899 + 3207
Ultimale Nel Beanng Capadiy q. = 12.1968 kg/cnr

Net Safe Bearing Capacity INSBC)=

[,va me of 'Project: I
Construction ofJ",licial Complcx (Double Basemem with 10 storied) near
Bhubane~\v:u' C(Jllri. Kalp~l!!:. Bhubaneswar. _
---------
- 29 -
ConslI(tant: Geo -Technical Investigation C{lent:
Relort
S.M. CONSULTANTS J06 :No.: 050
BHUBANESWAR 'DOc. :NiJ.: 1672
-- - .dcCl>
hi • ,Ii! ,., '" i
~ Issue 'lJate 13/05/2016
BHUBANESWAR

At 3.0 m Depth of BH-2

Soil I nvestigation Data

Site Information
1 Bore Hole No
2 Depth bf Sample Collec\lOn [) r===1m
3 Inclination of load to the vertIcal l=j.
laboratory Investigations
1 Standard Penetra!en Value from Field o LI _--,50",lsPT
CorrecUons as perCI 36 of IS 2131"1981
aj Due 10 Overburden 0.30 kg f em2 '-"'W""". 0"'0 I ICoheslonlesslscil Factor = 1.000
Overburden presuure = q = r' D = 0.30 kg f em'
b) Due to Dilatancy N 32.50 Strata b~ow Water Tabl~LCF~in~e~S~an"d~a~nd~Si::;lt --l
2 Angle of Inl€l11aJ Fne!on 0' 36.5 ' Ref: Fig. 1otiS 6403: 1981
3 Speofie Gravity of SOIl G 268
4 Submerged Density of SOIl j 0011 kg/em)

Assumptions
1 IMdth of Founda!on B 200 em
2 Depth of FOlIldation [} 300 em
3 L«lgth of Founda!on L 200 em
4 Shape of Base
5 Depth of Water Table Dh- WO em
Effect of Water Table W 0.500 Wocstcondition
6 Factor of Safety for Sand 3
Calculations
Submerged DenSlty of SOIl r' 0001 kg/em'
~ 36.5 (l

N, 3936
Surcharge Intensity = q = y' D I 1000 0.30 kg/em'
Beanng Capaety factors for ! 26.5 c, Shape Factors Depth Factors Iodination Factors

N~ 42570 S, 1.200 dq 1.2980 1.0000


N1 66 444 S, 0.800 d, 1.2980 1.0000
Angle of Int€l11aJ Fnetio" (1)" = 26
N, 12208
N", 13184
[)1I('I"('ncein N~ 30362 Olference in Ny 53.2600
From interpolatioo the required values of Nq & Ny are::.
N<l = 44.46B
N, = 69 773

Ultima Ie Net BearingCapilr.tly qG= q(N" -1)s"d'.jI~ +%B,N,s, d, i,W


= 0.300 x ( 44468 - 11x 1.200 x 1.298 x 1.000
+ l\ x 200.0 x 0 001 x 69773 x 0800 x 1298 x 1000 x 0500 flOOO
" 20.3116 t 3623
Ullimate !>JetBearing (;a!Jdoly q,j = 23.9342 kg/em'"

Net Safe Bearing Capacily (NSBC)=

Construction of Judicial Complcx (Double Basemcnt willi 10 storied) near


I Hhubancs\var Court. Kalpa~a. Bhubaneswar. . _
- 30 -
Cot/w(tant: Geo -Technical Investigation Cflent:
Report
S.M. CONSULTANTS Jon :N,'.: 050
'DOC. :NiJ.: 1672
BHUBANESW,A R
t- -- .deel)•
Fe! • " la,.
~ Issue Date 13/05/2016
BHUBANESWAR

At 4.5 In Depth of B H-2


Sorllnvesligation Data

Site Information
1 Bore Hole No
2 Depth of Sample CoIlectlm
3 Inchoabon of load to the vertIcal .J

Laboratory Investigations
1 Standard Penetration Value from Field :LI _-,5~0IsPT
CorreclJons as perCI. 3.6 of IS 2131'1981
a) Due to Oveiburden 0.45 kg / an2 50.001 ICoheslmiess ISal Factor: 1.000
Overburden preswre : q: iD: 0.45 kg / an'
b) Due to Dilatancy N 32.50 Strata below Water Tabl~c-FI~'ne~S~an~d~a~nd=Si~lt _
2 Angle of Intemal Fnction • 36.5 ' Ref: Fig. 1 otiS 6403.' 1981
3 Speofic Gravity 01Sal G 2.69
4 Submerged Density of Sal i (0 ()J 1 kg/an'

Assumptions
1 Width of Foundation B 200 cm
2 Depth of Foundatim D, 450 cm
3 Length of Foondation L 200 em
4 Shape of Base $f'luare
5 Depth of Water Table IAv 900 cm
Effect of Water Table W 1---",0.50"",,0Worst condition
6 Factor of Safety for Sand 3
Calculations
Submerged Density of Sal i 0.001 kg/an'
~ 36.5'
1'., 3.936
Surcharge Intensity: q: i D /1000 045 kg/an'
Bearing Capadty Factors fa $ 36.50) Shape Factors pepth Factors Iodination Factors

Na 42570 s, 1.200 d, 1.4460 i, 1.0000


Ny 66.444 S, 0.800 d, 1.4460 ~ 10000
.Angle of Intema! fncllon CO''" 26
Nq 12.203
1') 13184
DtfE...
rence In No 30.362 Differencein Ny 53.2600
Frominterpolatioothe reqlllrtd values of Nq & Ny are:;
1',: 44468
1',: 69713

Ultimate Net Bearing Ca~daty q<i = q (N,; - 1) $'1 d'l i'l + }1 B 1 N. $, d, i. W


: 0450 x I 44.468 - Ii x 1.200 x 1.446 x 1.000
+ %x2oo.Ux0001 x69773x08OOx 1446x l000x05OO/1000
339413 + 4036
Ulllma~e Net Bearing Cil~(]alyql = 37.9770 kgJcm~

Net Safe Bearing Capacily (NSBC)= 127 Tim'

l
:N{lIlle of l'rojeCI: COllstructioll
Bhubanes\var
or.llldie;,,1 Complex (Double Basemellt
l \.)ur(. Kalp<.lI~" Bhubancswar.
with 10 storied) Ileal'

- 31 -
COl1su{tant: Geo -Technical Investigation C{fent:
Rei ort

; S.M. CONSULTANTS
BHUBANESWAR
Jov :Ni,.:

--
'DOc. :Ni,.:
Issue 'J)a te
050
1672
13/05/2016
p
.dee:-
• *r:r:T:":?
BHUBANESWAR
! i i

At 6.0 m Depth of BH.2

Soil Investigation Data

Site Information
1 Bore Hole No .
2 Deplll of Sample Colleehon 6m
3 Inchnabon of load to the vertIcal ~ C'

laboratory Investigations
1 Standard Penetration Value from FIeld = _~50"lsPT
LI

COfIectJonsas perCI. 36 of IS 21311981


aj DJe fa Overburden 0 60 kg / em2 50001 ICoI1esloolesslScil Factor = 1.000
Over1JUrdenpresuure = q = y' D = 0.60 kg I em'
b I DJe to Dilatancy N 32.50 Strata below Water Tablq_FJ_.ne_San_d_a_nd_S_i_II _
2 Angle of Internal Fnction
3 Specific Gravity of Scil

G
36.5 "
268
Ref: Fig. 1 otiS 6403: 1981

4 Submerged Density of S"I 0001 kg/em'

Assumptions
1 Width of Foundation B 200 em
2 Deplll of Foundation f} 000 em
3 Lenglll of Foundation 200 em
4 Shape of Base Sauare
5 Deplll of Wafer Table DN 900 em
Effect of Water Table W 0.500 Wocst condition
6 Facte<of Safety Ie< SaM 3
Calculations
Submerged Density of S"I y' 0001 kg/em'
36.5
3.936
SUrcharge IntenSity = q = y' D / 1000 060 kg/em'
Beanng Capaety Facte<s fe< \. 365 ' Shape Factors Depth Factors Iodination Factors

Nq 42570 S, 1.200 d, 1.5950 I, 1.0000


Nj 66.444 s, 0.800 d, 1.5950 i, 1.0000
Angle of Internal FnCllon (j) = 26
Nq 12.208
Ny 13184
Difference in Nlj 30.362 [)fference in Ny 53.2600
From mterpolatlCfl the reqUired values of Nq & Ny are :=

Nq = 44468
N, := 69773
Ultimate Net Bearing Capilcity q,l;; q(N, ~ 1)5>/d"I) T~B1N,s, d, i,W
=
0.600, (44.468-1)x 1.200 x 1.595 x 1.000
+ l\' 200 Ox 0001 x 69773x 0800x 1.595 x 1.000 x 0.500/1000
= 499182 + 4.452
Ultimate Net Beanng Capaaly q, = 54.3697 kg/em'

Net Safe Bearing Capacity (NSBC)= 181 TIm'

ri7llle of'l'rojecl: COllstructioll


I IllJubaneswar
or Judiciol
Cour~, Kalpana.
Complex

- 32 -
(Double
Bhubaneswar.
Basement with 10 storied) Ilear. -r
-.-----J
COI1.\U(ta 11 t: Geo -Technical Investigation Cfient:
Rei ort
S.M. CONSULTANTS JoG :No.: 050

~! BHUBANESWAR DOC. :Nc,.:


-- --
Issue 'Date
1672
13/05/2016
.dec.•
q d,.

BHUBANESWAR
! , '*' M ..

1117.5 III Deplh of BH-2

Soil Investigation Data

Site Information
1 Bore Hole No
:2 Depth of Sample ColiectiOl D, 1.:Jm

~ Inclination of load to the VE:IIIGll ,. ~ 0'

Laboratory Investigations
1 Standard Penetration Value Irom Field =~I__ 5~0IsPT
Corrections as per CJ 36 of IS 2131"1981
aj eNe to Overburden 075 k~ 1 on2 50.001 ICohes,mlesslScil Factor = 1.000
Overburden presuure = q = ). D = 0.75 kg 1 on'
b) eNo to Dilatancy N 32.50 Slrata below Water Tabr~~F_in_e_s_an_d_a_n_d_S_ilt _
2 Angle of Intemal Friction v 36.5 ReI; Fig. 1 oilS 6403. 1981
3 Spedfie Gravity of Sdl G 2.65
4 Submerged Density of Sod -( 0001 kg/on'

Assumptions
1 Width of Foundation B 200 em
2 Depth of Foundatim D, i50 em
3 Length of Foundation I 200 em
4 Shape of Base Siluare
5 Depth of Water Table D,! 950 em
Effect of Water Table W 0500 We<st eondlMn
6 FaCIe<of safety fe< Sand 3
Calculations
Submerged DenSity of S"I 0.001 kg/on'
36.5
3.936
Surcharge Intensity = q :: y' 0/ 1000 0.75 kg/on'
Beoring Capadty Foclors fex- 4' 36,50 Shape Factors Depth Factors lndloabon Factors

Nq 42.570 Sc 1.200 do 1.7440 iq 1.0000


Ny 66444 S, 0800 d, 1.7440 i, 1.0000
Angle of Internal Frictlon $' :: 26
N'-l 12.208
N) 13 184
Otffer~l1ceIn N.. 30,362 Dfference in Nl' 53.2600
From interpolatioo the requi/l;d values of Nq & Ny are;::
N" = 44468
N. = 69773
Ultimate Net Bearing Capaaly q,j = q(N'J -1)sqdqi.l .•.UBrN,s, d, I.W
= 0750 x \ 44468 -I) x 1.200 x 1.744 x 1.000
+ l\ x 200 0, 0.001 x 69 773 x 0.800 x 1.744 x 1.000 x 0.500 11000
= 68 2208 + 4 867
Ulhmate Net Beanng Caf'~C1ty q,j = 73.0941 kg/em:

Net Safe Bearing Capacity (NSBC)= 244 TfJTI2

(',,"structioll "I' Judicial Complex (Double Basement with 10 storied) Ileal'


Hhllbancswar ('olin. Kalpnna. Bhubancswar.
- 33 -
COl1su{tal1t: Geo -.Technical Investigation caent :
. Re~ort

; S.M. CONSULTANTS
BHUBANESWAR ._-
J06 :Ni,.:
'DOc. No.:
Issue 'Date
050
1672
13/05/2016
I
.dcc» •
i.

BHUBANESWAR
""., •..•

At 9.0 In Depth of BH-2

Soillnvesligation Data

Site lnfornation
1 Bore Hole No
2 Depth of sample C<>lIeetl'" ~m
3 Inclination of load to the vertical ., t==jjl
Laboratory Investigations
1 Standard PeDetrabon Value from Field . ,I 5O'.ISPT
Cooeclions as perC/. 3.6. of IS 213U981
al Due to Overburden o.m kg /on2 50001 IcohesionlessJSoil Factor = 1.000
Overburden presuure: q : y' D: o.m kg / an'
b) Due to Dilatancy N 32.50 Strata below Water Tablq~F_,n_e_S_a_n_d_a_nd_S_i_lt _
2 Angle of Internal Fliction 6 36.5 Ref: Fig. 1otiS 6403: 1981
3 Speonc Gravity of Sc;I G 263
4 Submerged Density of S",I ,. -~~;:.() t kglon3

Assumptions
1 VVidth of Foundation u :?GO cm
2 Depth of Foundati", [), 900 em
3 Length of Foundation L 200 em
4 Shape of Base SQuare
5 Depth of Water Table D", 950 cm
Effect of Water Table 'II o SOO We.-st condition
6 Facte.-of safety te.- Sand 3
Calculations
Submerged DenSity of Sc;i 0.001 kg/an'
'1 36.5
No 3.936
Surcharge Intensity: q : l' D /1000 090 kg/an'
Beanng Capaety Facte.-s fe.- ~ 36.5 0 Shape Factors Depth Factors Indination Factors

I'J.~ 42570 s, 1.200 d., 1.8930 i, 1.0000


Ny 66 444 s, 0.800 d, 1.8930 i, 1.0000
Angle of Internal Fnclion (1)'= 26
N, 12208
Nj' e 13~
l)fferencein N~ 30362 DiffErence in Ny 53.2600
From interpolatioo the reqUIred values of Nq & Ny are =
N,,: 44468
N,: 69773
Ultimate Net Bearing CapaCIty qj= q (N,., - 1) s.; doJi, + Yz B r N, s, d.~ i, W
: 0.900 x 144.468.1IX 1.200 x 1.893 x 1.000
+ l\ x 200 0 x 0001 x 69.773 x 0 BOO x 1.893 x 1.000 x 0.500 /1000
83 867 + 5.283
Ulbmate Net Beanng CapaCIty Q,l::; 94.1502 kg/ern'

Net Safe Bearing Capacity (NSBC)= 314 T/rn2

tCll1le Of 'Project: ( 'o11struct;o11 01' .Iud icial Complex (Double Baseme11t with 10 storied) near
IlhubaJlcywar C OUI'l. Ka IPC'a
..."...a~'.:cB:::I~lL~lb~a~l~le:::s::\~va
...I':":' --I
_ 34 _
Consu(tant: Geo -Technical Investigation Crient:
Relort
S.M. CONSULTANTS J06 :N(J.: 050
DOC. :Wo.: 1672
BHUBANESWAR
-- ,
.dec»
i ,*' • • Ii; t_.

~ Issue 'j)ate 13/05/2016


BHUBANESWAR

All.5 m Depth of BH-3


Soil Investigation Data

Site Information
1 Bore Hole No
2 D€pth of Sample ColiectlOil D
3 Inclination of load to the ve-rtlcal "

Laboratory Investigations
1 Standard Penetration ValuE' from Field =~I 5C~,lsPT
CorreclJons as perC/. 3.6 of IS 2131'1981
a) OJe to Overburden 0.15 kg / an2 50 001 Ieoheslonlesslsoil Faefor = 1.000
Overburden presuure = q = l' 0 = 0.15 kg / an'
b) OJe to Dilatancy N 3250 Strata below Waler Tabl~~F_in_e_S_an_d_a_n_d
_S_III _
2 Angle of Internal Friction 36,50 Ref: Fig. 1 ofiS 6403: 1981
3 Speafic Gravity of Soil G 270
4 Submerged Density of SOli i o ((it kg/an'

Assumptions
1 Width of Foundation B 200 em
2 Depth of foundation [I 150 em
3 lrogth of Foundation l 200 em
4 Shape of Base SQuare
5 Depth of Water Table Ow 000 em
Effect of Water Table W 0.500 Worst condition
6 Factor of Safety for Sand 3
Calculations
Submerged DenSity of Sal 0.001 kg/an'
36.5 '
3.936
Surcharge Intensity = q = .,. 0/1000 015 kg/an'
Bearing Capadty Factocs fa ~ 36.5' Shape Factors Depth Factors lndination Factors

N, 42570 s,' 1.200 dq 1.1490 iq 1.0000


N, 66444 S, 0800 d, 1.1490 i, 1.0000
Angle of Internal Friehon (1) :; 26
N, 12203
Ny 13.184
D1ffffcncein N" 30.362 (Afference in N)' 53.2600
from interpolatloo the required values of Nq & Ny are =
N, = 44468
N, = 69.773
Ultimate Net Beanng Capaclly q, = q(N., . 1)S'1 d.•'0 +%Bi'N.s, d, i .• W
= 0150 x I 44.468 - 1) x 1 200 x 1.149 x 1.000
, Y, x 200.0 x 0 001 x 69 773 x 0.800 x 1.149 x 1.000 x 0.500 /1000
899 , 3207
Ultimate Net Beanng Capaaty q, = 12.1968 kg!em'

Net Safe Bearing Capacity (NSBC)=

l
:Na file oJ 'lJ/:OjeCl: t 'ollstruct;oll
nlltlbancswar
of .Iudieial COlllplex
COlI,"t. I(alpan~.
(Double
Bhubaneswnr.
Basellleillwith 10 storied) Ileal'

- 35 -
COIl.\urtant: Geo -Technical Investigation cfient:
Re~ort
S.M. CONSULTANTS J06 :NiJ.: 050
'DOc. :No.: 1672
BHUBANESWAR ---_._ .. .dcc»
,,! '*,. ,
P' • •
~ Issue'Dale 13/05/2016
BHUBANESWAR

At 3.0 m Depth of BH-3

Soil Investigation Data

Site Information
1 Bore Hole No
2 Depth of Sample CollectiOll 1\
3 Inctlnallon of load to the venlcal
"
laboratory Investigations
1 Standard Penetration Value from Field = •...
1 _--,-50",/SPT
Corrections as perCr 36 of IS 2131'1981
aj ClJe to Overburden 0.30 kg / em2 '-'50""'.00"'1 I CoheslOlliesslSoil Factor = 1.000
Overburden presuure = q = ). D = 0.30 kg / em'
b) ClJe to Dilatancy N 32.50 Strata below Water Tabl~l':F",in"e"S",an.:::d,"a",nd=Si"lt _
2 Angleof InternalFriction v 36.5 ' Rei: Fig. IoilS 6403: 1981
3 Speofie Gravity of Soil G ~69
4 Submerged DenSity of SOli i 0001 kgJan~

Assumptions
1 Width of Founda!on B 200 eM
2 Depth of Foundatioo C\ 300 cm
3 Length of FOlUnda!on L 200 cm
4 Shape of Base 5QU<lr<:
5 Depth of Water Table 0. 000 em
Effect of Water Table W 0.500 Worst condition
6 Factor of Safety for Sand 3
Calculations
Submerged Density of S"I ;' 0.001 kg/em'
y 36.5 '
N, 3.936
Surcharge Intensity = q = y' 0 J 1000 0.30 kg/em'
Beanng Capadty Factors fer ~ 36.5 ,) Shape Factors Depth Factors Indination Factors

N" 42.570 5" 1.200 do 1.2980 iq 1.0000


Ny 66444 '. 0800 d, 1.2980 i, 1.0000
Angle of Internal Foelion oj) " 26
N'l 12.203
N) 13.1e4
Dllefel1ce in N1 30,362 DIfferencein Ny 53.2600
From interpolatioo the reqUlfE":dvalues of Nq & Ny are =
N," 44468
N, = 1$.773
Ultimate Net Bearing CapJClty q,,= q(N . .1) S" d"Jv
.1 '+ YiBl N, s. d, i. W
"0.300x(44468-11x 1.200 x 1298x 1.000
+ y, x 200 0 x 0.001 x 69 773 x 0.800 x 1.298 x 1.000 x 0 500 /1000
203116 + 3.623
Ulbmate Net Beanng Copaaty q, = 23.9342 kg/em'

Net Safe Bearing Capacity {NSBC)= 80 Tlm1

----
l
:Nl.lIlle oI'l'rojeCI:
I
CUllstructioll of Judicial COlllplex (Double Basement
Bl1tl~t..!!t'swarCOII!"l. Kalpanu. Bhubaneswar.
- 36 -
with 10 storied) Ilear
~
~
COI1Sll{tall t: Geo -Technical Investigation Cflel1t:
Relort
S.M. CONSULTANTS J06 :Nil.: 050
'DOc. :N11.: 1672
~
BHUBANESWAR
-- ...
!
.dec»
d' i*~
Issue 'Date 13/05/2016
BHUBANESWAR

At 4.5 In Depth of B H-3

Soil Investigation Data

Site Information
1 Bore H<>eNo
2 Depth of Sample Collection [).

:3 Inclination of load to the JClllr.o.l

laboratory Investigations
1 Standard Penetration Value from Field ~~I
_~5=0IsPT
Corrections as perCI 36 of IS 2131'1981
aI Due to Overburden 0 45 kg I an2 wool ICOheSloolesslSC;I Facto," 1.000
Overburden presuure; q; ). D; 0.45 kg I an'
b) Due to Dilatancy N 32.50 Strata below Water Tabl~_F_in_e_S_an_d_a_nd_Si_lt _
2 Angle of Internal Friction ,t. 36.5 Ref: Fig. 1oflS 6403: 1981
3 Specific Gravity of Sal G 269
4 Subm€fged Density of S,,' i C.(ry kglOT1~

Assumptions
1 Width of Foundation ~ ::00 em
2Depth of Foundatioo D 450 em
3Lffigth of Frundation I. 2'JO em
4Shape of Base SQUdi.e-
5Depth of WatE! Table u.....
' 9JC em
Effect of Water Table W 0000 Wast condition
6 FactO'of Safety fO' Si:lnd 3
Calculations
Submerged Density of S", ,
,,'
0.001 kg/an'
36.5 ;
3.936
Surcharge Intensity ~ " ~ i D f 1000 045 kg/em'
Bearing Capadty Fi.lCIOCs for ~ 36.5 •... ShaDe Factors pepth Factors Iodination Factors

Nil 42,570 S'j 1.200 d, 1.4460 i, 1.0000


N) 66 444 S, 0.800 d, 1.4460 i, 1.0000
Angle of Internal Fncuon <D'~ 26
N~ 12.208
Ny 13184
[)Herencein N" 30362 Ofference in Ny 53.2600
From interpolatioo the reqiUred values of Nq & Ny are ::::
N.,~ 44468
N,; 69.773
Ultimate Net Bearing Capaaty q,J:::: q(N" .1)s"doJi'1'+Yz8rN,s, d, i.W
; 0450, (44 468-1),1.200,1.446,1.000
+ y" 2000,0001' b9.773 , 0800' 1.446, 1.000,0.000/1000
3.19413 + 4036
Ultimate Net Beanng L ••~aclly q1= 37.9770 kgicm-

Net Safe Bearing Capacity (NSBC)= 127 T/fll~

('llllstrLlctioLi L,I'.IL1dicialComplcx (Double Basemcllt with 10 storied) Ilear


Hllllbancswar Court. KalpallH. Bhubaneswar.
- 37 -
COI1SII(tallt: Geo -Technical Investigation C(tent:
Relort
S.M. CONSULTANTS J06 :No.: 050
'DOc. :No.: 1672
BHUBANESWAR
-- - .dec»
QI I.'•
• i ! H.!

~ Issue 'Date 13/05/2016


BHUBANESWAR

AIG.O m Deplh of BH-3

Soil Investigation Data

Site Information
t Bore Hole No
2 Depth of sample Collectl"" ~m
3 Inclination of load to Ihe vertical t=j'l
laboratory Investigations
1 Standard Penetration Value from Field ;~I __ W_ISPT
CorrectlOnsasperC/36 of /52131'1981
a) CAleto OiertJurden 0.60 kg / an2 wool ICoheslonlesslSoil Factor; 1.000
OiertJurden presuure ; q ; l' D ; 0.60 kg / an'
b I CAle10 Dilatancy N 32.50 Strala below waler Tabl~_F_in_e_S_an_d_a_nd_S_ilt _
2 Angle of Inlernal Fnetion i 36.5 Ret: Fig. 1 otiS 6403: 1981
3 Speofie Gravity of Soil G 2.65
4 Submerged Density of 3011 .,. 000'1 kg/anJ

Assumptions
1 Width 01Foundation B 200 em
2 Depth ot Foundallon D, 600 em
3 L<flgth of Foundation l 200 em
4 Shape of Base Square
5 Depth of Water Table Ow %C em
Effect of Water Table W 0.500 Worst condition
6 Factor of Safety fa Sand 3
Calculations
Submerged Density of S"I y' 0.001 kg/an'
36.5
3.936
Surcharge Inlensity; q ; y' D /1000 060 kg/an'
8eanng Capaaty Faelors lor t 36.5 ~ ShaDe Factors Depth Factors Iodination Factors

N, 42.570 s,' 1.200 d, 1.5950 I, 1.0000


Ny 66.444 S, 0.800 d, 1.5950 iT 1.0000
Angle of Inlernal Fnetlon <l> ' 26
N~ 12.208
Ny 13.184
OIl1erent:ein N~ 30,362 Differencein Ny 53.2600
From interpolation the reqUlrej values of Nq & Ny are.:.
N,; 44468
Nl';: 69,773
Ulbmate Net Beanng Cap<wty q.j = q(N'l -1)s'Jdqi,~ +Y:BrN,Sr d, i,W
; 0 600 x 144468- 11x 1.200 x 1.595 x 1.000
+ l\ x 200.0 x 0.001 x 69 773 x 0800 x 1595 x 1.000 x O.WO /1000
; 49.9182 + 4.452
Ultimale Net 8eanng Capaoly q,; 54.3697 kg/em'

Net Safe Bearing Capacity (NSBC)= 181 Tim'

[ :Na me OJ l'n~iecl: , ('ollstructioll of Judicial COl1lpl~x (Double 8asemellf with 10 storied) near
I
I{hub~cs\\'ar C llurt ....Kalp<llla, Bhubaneswar.
- .18 -
Con~"u(tant: Geo -Technical Investigation Cfient:
Relort
S.M, CONSULTANTS j06 :N,).: 050
DOC. :N".: 1672
BHUBANESWAR
-- .dec»
fl' • i'!i.i',~
~ Issue '})u/e 13/05/2016
BHUBANESWAR

At 7.5 m Depth of B H-3

SOli Investigation Data

Sire Information
1 Bore Hole No .,
2 Depltl of Sample Collect"" ';'5 m
3 Inclination of load to the vertIcal ~ 0'
"

Laboratory Investigations
1 Standard Penetration Value from Field ; LI_-"50,,,lsPT
Corrections as perC/. 36 of IS 2131'1981
aJ DJe to Overburden 075 k~ lon2 50001 ICohesioolesslSoil Factor= 1.000
Overburden presuure; q; l' D; 0.75 kg I on'
b) DJe to DIlatancy N 32.50 Strata below Water Tabl~lCF~in~e-,S~an~d~an~do:S~i~It _
2 Angleof InternalFriction 4, 365 ' Ref: Fig. 1 otiS 6403: 1981
3 Speafic Gravity of Scil G 265
4 Submerged Density of 5"1 f i}m I kglan3

Assumptions
1 Width of Foundation B XlOcm
2 Depth of Foundation l), 750 em
3 Lengltl of Foundation 200 em
4 Shape of Base ~are
5 Depltl of Water Table Ow 950 em
Effect of Water Table IV 0.500 Wocst condibon
6 Facte< of Safety fe< Santi 3
Calculations
Submerged Density of S"I y' 0.001 kg/on'
t 36.5"
N.;. 3.936
SUrcharge Intensity; q; i l) /1000 0.75 kg/on'
Bearing Capadty Fa.-:tcys for Q :30.t> (> ShaDe Factors Depth Factors Iodination Factors

42.570 51; 1.200 1.7440 Iq 1.0000


66.444 5./ 0800 1.7440 i, 1.0000
Angle of Internal Friction qr = 26
N" 12~203
N'I 13 184
Dffefence in N'1 30 362 DIfference in N, 53.2600
From interpolation the required v<.llues of Nq & Ny are '"
NQ::. 44468

I'll ~ ill 773


Ultimate Net Bearing Capaoly q,j = q (N 1 w 1) S ,; d'i J.r + }1 B.r N, s, d,. i, W
; 0750 x ( 44468. 1) x 1.200 x 1.744 x 1.000
+ J? x 200 0.0001 x 69 773.0.800 x 1.744 x 1.000 x 0500 /1000
; 68 Z'68 + 4.867
Ultimate Net Beanng Cap<1oly Q,1 = 73.0941 kg/cm~

Net Safe Bearing Capacily (NSBC)= 244 TIIIl'

COllstructioll "I' Judicial Complex (Double Basemel1f with 10storied) lIear


Hhubancs\\ar Cuurt, Kalpa.!.!.~.Gillibaneswar.
.39 -
Conslirtant: Geo -Technical Investigation Cflent:
Re ort
S.M. CONSULTANTS J06 :Nc).: 050
~i DOC. :Nc).: 1672
BHUBANESWAR
-- - p
.dec.
'I_I'
._
• !

Issue 'nate 13/05/2016


BHUBANESWAR

At 9.0 In Depth of BH-3

Soil Investigation Data

Site Information
1 Bore Hole No
2 Depth of Sample Collectim O. F1m
3 Indmation of load to the vertical a t=jj3
Laboratory Investigafions
1 Standard Penetration Value from Field ~ cl 5_0IsPT
COllections as perCI. 3.0 or IS 2131:1981
a I Due to Overburden 0.90 kg I an2 50001 ICoheslC:nlesslSoil Factor;; 1.000
Overburden
presuure::; q::;y'0::; 0.00kgI an2
b) Due to Dilatancy N 32.50 Strata below water Tabl<lcF~in_e~S~an=d~a~nd=S_i1t ~
2 Angle of Internal Friction oj 36.5 Ref: Fig. 1 ol/S 6403' 1981
3 Speafle Gravity of Sol G 2G8
4 Submerged Density of SOli y' (} 00 I kg/on3

Assumptions
1 \/Vidth of Foundation B 200 em
7 Depth of Foundatioo D. 900 em
3 Length of Fcundation L 200 em
4 Shape of Base &:luare
5 Depth of Water Table CNt 950 em
Effect of Water Tabfe W 0500 Worst condition
6 Factor of Safety rex- Sand 3
Calculations
Submerged Density of SOli 0.001 kg/an'
\' 36.!;'
Nt, 3.936
Surcharge Intensity =q= y' 0/1000 0.90 kg/an'
Bearing Capadty Fadors for if 36.5 ~ Shape Factors Depth Factors lodjnation Factors

N" 42.570 SQ, 1.200 d, 1.8930 i, 1.0000


Ny 66.444 s, 0.800 d, 1.8930 i, 10000
Angle of Intemal Fnchon (j) =- 26
N.1 1~.208
Ny 13.184
Df1erence In N 30 367 532600
From interpolation the required values of Nq & Ny are ::
N'l= 44463
N,:: 69 71-:',
Ultimate Net BeanngCapaclty q,.= q(N! -1}s., d.: j.~ .•.MBr N, $ .• d .• i, W

= 0.900 x (44468- 1) x 1.200 x 1.893x 1.000


+ y, x 200 0 x 0 001 x 69773 x 0.800 x 1.893 x 1.000 x 0.500 /1000
88 867 + 5283
Ultimate Net Bearing Copaoty q,J:: 94.1502 kg/cm~

Net Safe Bearing Capacity (NSBC)= 314 Tim'


f.'Nl.Cme a/Project: Construction "f.ludicial COlllplex (Double Basement with 10 storied) near
BlllIhancswar C\~urt. Kalpana, I3hubunes\\iar.
- 40 -
Consu(tant: Gea -Technical Investigation Cuent:
ReI art
S.M. CONSULTANTS Jo6 :N(,.: 050
DOC. :Ni,.: 1672
~
BHUBANESWAR
- Idec»

••• * T"TT"'7::"?
Issue .nate 13/05/2016 ! i'

BHUBANESWAR

Appendix-D

Calculation of Settlement of Footing

.;.
L- --' -~

('<)Ilstructioll ,,1. .Judic;al Complex (Double Basemellt with 10 storied) near


I I ~h uballes\\(1 r ('olin. Ka IfX~t_n_a._I3_h_u_b_31_'e_S\_V,_.u_
.. _
- 41 -
CClI1.w{tant: Geo -Technical Investigation Cflent :
Reoort
j10'
!.~
: S.M. CONSULTANTS
BHUBANESWAR
Job :NiJ.:
'DOc. :Wo.:
050
1672
iidcc»
-- h.
T'T"!'i'=='
4
Issue'lJate 13/05/2016 ! i! •

BHUBANESWAR

CALCULATION OF SETTLEMENT OF FOUNDATION


AS PER IS:8009 (Part -1)-1976
AT 1.5 m depth of BH-1

Depth of foundation from ground level 1.5 m

Corrected N Value 325

Settelment from Fig 1~09 of IS: 8009. 7.5 mm (For 10 T/m2)


1976

Effect of water table (W) 0.5 Insert fig of fig g, IS:8009-


1976

Corrected Settlement 15.00 mm As per cI. No. 9.1.4 of IS


8009(P-1 )-1976

Imposed load = NSBC = 41.00 tlm1

Settlement for imposed load (Sf) = 61.50 mm

Depth factor = 0.785 As per Fig NO.12 of IS


8009(P-1 )-1976

SId= Sf x Depth factor = 48.28 mm

Rigidity factor = 0.8

Final settlement ( S ) = 38.6 mm ( Say 39 mm)


(Sfd x Rigidity Factor)

~N(lJl1e of Projecl: I ('""structioll or Judicial Co",plex (Double Base","nt with I 0 storied) near ~
[
. -- --- nhuballeswar (\lurt. Kalp_a_l!<:_I._B_IJ_u_ba_I_le_Sl_va_r_. ~_--.J
- 42 -
COI1Sl1(tant: Geo -Technical Investigation Cltent:
Report

; S.M. CONSULTANTS
BHUBANESWAR
J06 :No.:
DOC. :Nc).:
-
Issue Date
050
1672
13/05/2016
\
Idec».
d_ i

BHUBANESWAR
i * •

CALCULATION OF SETTLEMENT OF FOUNDATION


AS PER IS:8009 (Part -1)-1976
AT 3.0 m depth of BH-1

Depth of foundation from ground level 3 m

Corrected N Value 32.5

Settelment from Fig No.9 of IS 8009- 7.5 mm (For 10 T/m2)


1976

Effect of water table (W) 0.5 Insert fig of fig 9, IS:8009-


1976

Corrected Settlement 15.00 mm As per cI. No. 9.1.4 of IS


8009(P-1)-1976
,
Imposed load = NSBC = 80.00 Um'

Settlement for imposed load (S0 = 120.00 mm

Depth factor = 0.66 As per Fig No.12 of IS


8009(P-1)-1976

Sid= Sfx Depth factor = 79.20 mm

Rigidity factor = 0.8

Final settlement ( S ) = 63.4 mm ( Say 63 mm)


(Sfd x Ri9idity Factor)

---
[ :N,lIlle oI1'roje~~
I
Construction
I HlLlballeswar
of Judicial Complex
('0111'1. Kalpana.
(Double
I3hubanes\var.
Basement with 10 storied) near
_
- 43 -
ConsLI(tant: Geo -Technical Investigation Cf,ent:
Ret ort

; S.M. CONSULTANTS J06 :N1J.:


BHUBANESWAR
050
VOc.
-
:Nl).:

Issue 'l)ate
1672
13/05/2016
,i~!r.c;»,
BHUBANESWAR

CALCULATION OF SETTLEMENT OF FOUNDATION


AS PER IS:8009 (Part -1)-1976
AT 7.5 m depth of BH-1

Depth of foundation from ground level 7.5 m

Corrected N Value 32.5

Settelment from Fig NO.9 of IS: B009. 7.5 mm (For 10 T/m2)


1976

Effect of water table (W) 0.5 Insert fig of fig 9, IS:B009.


1976

Corrected Settlement 15.00 mm As per cl. No. 9.1.4 of IS


B009(P.1 ).1976

Imposed load = NSBC = 244.00 tlm2

Settlement for imposed load (S~ = 366.00 mm

Depth factor = 0.563 As per Fig NO.12 of IS


.B009(P-1 ).1 976

=
Sid SI x Depth factor = 206.06 mm

Rigidity factor = O.B

Final settlement ( S ) = 164.B mm ( Say 165mm)


(Sfd x Rigidity Factor)

'. - '~ -
, C',llstructioll ol'Judicial COlllpleX (Double Basemcilt with 10 storicd) Ilcar
I nliubancs\\ar CUlirt. Kalpana, Rhllbancswar. _
- 44 '
COl1sultant: Geo -Technical Investigation Cuent :
Relort
S.M. CONSULTANTS Jov:N;J.: 050
DOC. :Ni.J.: 1672
~
BHUBANESWAR
--- .dec»
K; • II: la, M"

Issue 1)(./11' 1310512016
BHUBANESWAR

CALCULATION OF SETTLEMENT OF FOUNDATION


AS PER IS:8009 (Part -1)-1976
AT 9.0 m depth of BH-1

Depth of foundation from ground level 9 m

Corrected N Value 32.5

Settelment from Fig N09 of IS: B009- 7.5 mm (For 10 T/m2)


1976

Effect of water table 0/1/') 0.5 Insert fig of fig 9, IS:B009.


1976

Corrected Settlement 15.00 mm As per d. No. 9.1.4 of IS


B009(P.1).1976

Imposed load" NSBC = 314.00 Um2

Settlement for imposed load (Sf) = 471.00 mm

Depth factor = 056 As per Fig NO.12 of IS


B009(P-1 )-1976

SId" Sf x Depth factof = 263.76 mm

Rigidity factor = 0.8

Final settlement ( S ) = 211.0 mm ( Say 211mm)


(Sfd x Rigidity Factor)

l_ :Ni/ me of 1'roject: t \",structioll l,f Judicial Complex (Doublc Bascmcilt wilh 10 storied) Ileal' ~
I BlJlIhuncswar Court. Kalpana: Bhubaneswar. _~
- 45 -
CO/lst/(tant: Geo -Technical Investigation C[!ent:
Reoort
S.M. CONSULTANTS J06 :Ni>.: 050
DOC :N().: 1672
i@1 BHUBANESWAR
~
-
Issue'lhlle
-
13/05/2016
,.dec»
• , '*rz:i"C?
BHUBANESWAR

CALCULATION OF SETTLEMENT OF FOUNDATION


AS PER IS:8009 (Part -1)-1976
AT 1.5 m depth of BH-2

Depth of foundation from ground level 1.5 m

Corrected N Value 32.5

Settelment from Fig NO.9 of IS: 8009. 7.5 mm (For 10 T/m2)


1976

Effect of water table 0N) 0.5 Insert fig of fig 9, 15:8009.


1976

Corrected Settlement 15.00 mm As per cl. No. 9.1.4 of IS


8009(P-1 )-1976
,
Imposed load = NSBC = 41.00 tim"

Settlement for imposed load (S~ = 61.50 mm

Depth factor = 0.785 As per Fig NO.12 of IS


8009(P-1 )-1976

51,1 = 5, x Depth factor = 48.28 mm

Rigidity factor = 08

Final settlement ( S ) = 38.6 mm ( Say 39 mm)


(Sfd x Rigidity Factor)

('ollstrllctioll "1'.I,,dicial Complex (Do"ble Basemellt with 10 storied) near


I I~llllballcs\\ar C,Hlrt, ~<.alpalla, r3hubaneswar.
- 46-
COl1su(tant: Geo -Technical Investigation Cuent:
Relort
S.M. CONSULTANTS Job :N().: 050
BHUBANESWAR 'DOc. :Wo.: 1672
~
-- p
."Cell
a- "-r:r=:=:J
.
IsslIP '}Jat" 13/05/2016
BHUBANESWAR

CALCULATION OF SETTLEMENT OF FOUNDATION


AS PER IS:8009 (Part -1)-1976
AT 3.0 m depth of BH-2

Depth of foundation from ground level 3 m

Corrected N Value 32.5

Settelment from Fig NO.9 of IS 8009. 7.5 mm (For 10 T/m2)


1976

Effect of water table (W) 0.5 Insert fig of fig 9. IS:8009.


1976

Corrected Settlement 15.00 mm As per cI. No. 9.1.4 of IS


8009(P.1).1976

Imposed load = NSBC = 80.00 tfm2

Settlement for imposed load (Sf) = 120.00 mm

Depth factor = 0.66 As per Fig NO.12 of IS


8009(P.1).1976

79.20 mm

Rigidity factor = 0.8

Final settlement ( S ) = 63.4 mm ( Say 63 mm)


(Sfd x Rigidity Factor)

l
Name OITrOjeCI~
I
COllstruction
Bliuoallcs\\ar
"I'.Iudieiai Co;;;plex (Double Basemelll
Court, Kalpal~. Bhubaneswar.
with 10 storied) ncar
--_._-
~

- 47 -
COllsurtant: Geo -Technical Investigation CCient :
Report
S.M. CONSULTANTS joEi :Ni,.: 050
~l 'DOc. :N(J.: 1672
:~
BHUBANESWAR
- p
.dec>
• rr::r:-="
issue 'j)ute 13/05/2016 i•

BHUBANESWAR

CALCULATION OF SETTLEMENT OF FOUNDATION


AS PER IS:8009 (Part -1)-1976
AT 4.5 m depth of BH-2

Depth of foundation from ground level 4.5 m

Corrected N Value 32.5

Sette/ment from Fig NO.9 of IS: 8009- 7.5 mm (For 10 T/m2)


1976

Effect of water table rN') 0.5 Insert fig of fig 9, IS:8009-


1976

Corrected Settlement 15.00 mm As per cI. No. 9.1.4 of IS


8009(P.1).1976

Imposed load = NSBC = 127.00 tim)

Settlement for imposed load (SD = 190.50 mm

Depth factor = 0.61 As per Fig NO.12 of IS


8009(P-1 )-1976

S'd = S, x Depth factor = 116.21 mm

Rigidity factor = 0.8

Final settlement ( S ) = 93.0 mm ( Say 93 mm)


(Sfd x Rigidity Factor)

e tmslruclioll or J ud ieial Complex (Double Basemellt with 0 storied) Ileal'


I J
Bhubaneswar ('OIlrt. Kalp<IE.~_l3_lll_,b_31_lC_S\_Va_r_. _
- 4X -
Consu(tant: Geo -Technical Investigation C(lent:
Report
S,M, CONSULTANTS J06 :Ni,.: 050
'DOc. :Ni,.:
~
BHUBANESWAR -
Issue 'j)L1I(~
1672

13/05/2016
...deel'
• ! ,a(lm

BHUBANESWAR

CALCULATION OF SETTLEMENT OF FOUNDATION


AS PER IS:8009 (Part -1)-1976
AT 6.0m depth of BH-2

Depth of foundation from ground level 6 m

Corrected N Value 32.5

Settelment from Fig N09 of IS: B009. 7.5 mm (For 10 T/m2)


1976

Effect of water table 0/V') 0.5 Insert fig of fig 9, IS:8009-


1976

Corrected Settlement 15.00 mm As per cJ. No. 9.1.4 of IS


8009(P-1 )-1976

Imposed load = NSBC = 181.00 t1m2

Settlement for imposed load (Sf) = 271.50 mm


Depth factor = 0.58 As per Fig NO.12 of IS
B009(P-1 )-1976

Sfd = Sf x Depth factor = 157.47 mm

Rigidity factor = 0.8

Final settlement ( S ) = 126.0 mm ( Say 126 mm)


(Sfd x Rigidity Factor)

[.:Na me of Yrojecl: Construction ,)1' Judicial Complcx (Double l3asemCfl1 with 10 storied) near ~
I Bhubaneswar COflrt. Kalpana. I3hubaneswar.
- 49 -
--l
ConSl/{tant: Geo -Technical Investigation cfient:
Report
S.M. CONSULTANTS Jov:MJ.: 050
'DOc. :N(J.: 1672
~
BHUBANESWAR
t-. - .dc~
HI
" , '*lTii'C"?
Issl/e Date 1310512016
BHUBANESWAR

CALCULATION OF SETTLEMENT OF FOUNDATION


AS PER IS:8009 (Part -1)-1976
AT 7.5 m depth of BH-2

Depth of foundation from ground level 7.5 m

Corrected N Value 32.5

Settelment from Fig No.9 of IS: 8009. 7.5 mm (For 10 T/m2)


1976

Effect of water table 0Nl 0.5 Insert fig of fig 9, IS:8009.


1976

Corrected Settlement 15.00 mm As per cL No. 9.1.4 of IS


8009(P-1 )-1976

Imposed load = NSBC = 244.00 tlm2

Settlement for imposed load (SQ = 366.00 mm

Depth factor = 0.563 As per Fig NO.12 of IS


8009(P-1 ).1976

Sid = SI x Depth factor = 206.06 mm

Rigidity factor = 0.8

Final settlement ( S ) = 164.8 mm ( Say 165mm)


(Sfd x Rigidity Factor)

('(lnstructioll (lrJudicial Complex (Double Basemell! with 10 storied) near


I 1l111lbaneswar COIIII. Kalpaua. Bhubaneswar. _
- 50 -
Consu{tant: Geo -Technical Investigation C{fent :
Re~ort
S.M. CONSULTANTS J06 :NiJ.: 050

BHUBANESWAR 'DOc. :NiJ.: 1672


~
-- .dca.
p• '+rxm==J
Issue Date 13/05/2016
! !

BHUBANESWAR

CALCULATION OF SETTLEMENT OF FOUNDATION


AS PER IS:8009 (Part -1)-1976
AT 9.0 m depth of BH-2

Depth of foundation from ground level 9 m

Corrected N Value 32.5

Settelment from Fig N09 of IS 8009- 7.5 mm (For 10 T/m2)


1976

Effect of water table (W) 0.5 Insert fig of fig 9, 15:8009-


1976

Corrected Settlement 15.00 mm As per cI. No. 9.1.4 of IS


8009(P-1 )-1976

,
Imposed load = NSBC = 314.00 tim"

Settlement for imposed load (Sf) = 471.00 mm

Depth factor = 056 As per Fig NO.12 of IS


8009(P-1 )-1976

S," = Sf x Depth factor = 263.76 mm

Rigidity factor =
0.8

Final settlement ( S ) = 211.0 mm ( Say 211mm)


(Sfd x Rigidity Factor)

l:Nc/11le--oj'l'rojecl: i l'onstruction of Judicial Complcx (Double Basemcnt with 10 storicd) ncar


I Blluballcswar Coun. Kalpana. Bhubaneswar.
- 51 -
Consu {ta nt: Geo -Technical Investigation ('{lent:
Rei ort
S.M. CONSULTANTS J06 No.: 050

:~I
~
BHUBANESWAR DOC. :Wo.:
-
Issue'lJate
1672
13/05/2016
.dee-
" • *rr;;:==:J
BHUBANESWAR

CALCULATION OF SETTLEMENT OF FOUNDATION


A5 PER 15:8009 (Part -1)-1976
AT 1.5 m depth of BH-3

Depth of foundation from ground level 1.5 m

Corrected N Value 32.5

Settelment from Fig NO.9 of IS: 8009- 7.5 mm (For 10 T/m2)


1976

Effect of water table 0N) 0.5 Insert fig of fig 9, IS:8009.


1976

Corrected Settlement 15.00 mm As per cI. No. 9.1.4 of IS


8009(P.1).1976

,
Imposed load = NSBC = 41.00 Um'

Settlement for imposed load (SD = 61.50 mm

Depth factor = 0.785 As per Fig NO.12 of IS


8009(P-1)-1976

Sid = Sf x Depth factor = 48.28 mm

Rigidity factor = 0.8

Final settlement ( S ) = 38.6 mm ( Say 39 mm)


(Sfd x Rigidity Factor)

r .'NaII/C_ of 'I'rojecl: I \ '"nstrllction "I' JlIdicial Cumplex (Dollble Basemelll with to storied) near
1 Bliubanes\\ar Court, Kalpall3, Bhubaneswar.
- 52 -
Consu{tant: Geo -Technical Investigation Cfient:
Rei ort
S.M. CONSULTANTS J06 :Ni,.: 050

i@
~
BHUBANESWAR "DOc. :Wo.:
-- -
ISSlI e 'l)a Ie
1672
13/05/2016
p
.dec:.
• !'*'*m
BHUBANESWAR

CALCULATION OF SETTLEMENT OF FOUNDATION


AS PER IS:8009 (Part -1)-1976
AT 3.0 m depth of BH-3

Depth of foundation from ground level 3 m

Corrected N Value 32.5

Settelment from Fig No.9 of IS: 8009- 7.5 mm (For 10 T/m2)


1976

Effect of water table (W) 0.5 Insert fig of fig 9, IS:8009-


1976

Corrected Settlement 15.00 mm As per cl. No. 9.1.4 of IS


8009(P-1 )-1976

1
Imposed load = NSBC = 80.00 tim'

Settlement for imposed load (Sn = 120.00 mm

Depth factor = 0.66 As per Fig NO.12 of IS


8009(P-1 )-1976

S"1= SI x Depth factor = 79.20 mm

Rigidity factor =
0.8

Final settlement ( S ) = 63.4 mm ( Say 63 mm)


(Sfd x Rigidity Factor)

Construction "I"Judicial Complex (Double Basement with 10 storied) near


I I SlIllbancswar ('0111'1.Kalpan3. Bhubancswar. _
- 53 -
Const/rtanl: Geo -Technical Investigation CCienl:
Report
S.M. CONSULTANTS JoG :N"o.: 050
1JOc. :N"o.: 1672
BHUBANESWAR
- .dec:.
Ii!,,!• '-rxr;:=;w
~ Isst/e 'J)ate 13/05/2016
BHUBANESWAR

CALCULATION OF SETTLEMENT OF FOUNDATION


AS PER 15:8009 (Part -1)-1976
AT 4.5 m depth of BH-3

Depth of foundation from ground level 4.5 m

Corrected N Value 32.5


0
Settelment from Fig NO.9 of IS: 8009- 7.5 mm (For 10 T/m<)
1976

Effect of water table IN) 0.5 Insert fig of fig 9, IS:8009.


1976

Corrected Settlement 15.00 mm As per cL No. 9.1.4 of IS


8009(P.1 ).1976

Imposed load = NSBC = 127.00 tim'

Settlement for imposed load (Sn = 190.50 mm

Depth factor = 0.61 As per Fig NO.12 of IS


8009(P-1 ).1976

S", = Sf x Depth factor = 116.21 mm

Rigidity factor = 0.8

Final settlement ( S ) = 93.0 mm ( Say 93 mm)


(Sfd x Rigidity Factor)

CllllSlructiollllf.ludici,,1 COlllplex (Double Basement with 10 storied) near


I I~hllballes\var Court. Kalp~~. Bhubaneswar. _
- 54 -
COilS l/ f)'a 11t: Geo -Technical Investigation Cuenl:
Relort
!I'E S.M. CONSULTANTS joV :N(l.: 050

I@
L"-'
BHUBANESWAR VOc. :Ni,.:
.. --
1672
.dec»
P!.i!i.~

Issl/e 'nu Ie 13/05/2016


BHUBANESWAR

CALCULATION OF SETTLEMENT OF FOUNDATION


AS PER IS:8009 (Part -1)-1976
AT 6.0 m depth of BH-3

Depth of foundation from ground level 6 m

Corrected N Value 32.5

Settelment from Fig NO.9 of IS: 8009- 7.5 mm (For 10 T/m2)


1976

Effect of water table 0N) 0.5 Insert fig of fig 9, IS:8009-


1976

Corrected Settlement 15.00 mm As per cI. No. 9.1.4 of IS


8009(P-1 )-1976

Imposed load = NSBC = 181.00 tlm2

Settlement for imposed load (S~ = 271.50 mm

Depth factor = 0.58 As per Fig NO.12of IS


8009(P-1 )-1976

SI,j= Sf x Depth factor = 157.47 mm

Rigidity factor = 0.8

Final settlement ( S ) = 126.0 mm ( Say 126 mm)


(Sfd x Rigidity Factor)

COllstructioll of' Judicial COlllplex (Double Baselllellt with 10 storied) near


I Bhubaneswar CCIlJr!. Kalp~lIla. 13hubanes\var. _
- 55 -
Co I1S11(ta11t: Geo -Technical Investigation Cflel1t:
Relort
S.M. CONSULTANTS J06 :Ni,.: 050
'DOc. No.: 1672
~
BHUBANESWAR
- .dec»
'*r-rn::-?
'drilL!
Issue 1)ate 13/05/2016
BHUBANESWAR

CALCULATION OF SETTLEMENT OF FOUNDATION


AS PER IS:8009 (Part -1)-1976
AT 7.5 m depth of BH-3

Depth of foundation from ground level 7.5 m

Corrected N Value 32.5

Settelment from Fig Nag of IS: 8009- 7.5 mm (For 10 T/m2)


1976

Effect of water table (yV') 0.5 Insert fig of fig 9, IS:8009-


1976

Corrected Settlement 15.00 mm As per cI. No. 9.1.4 of IS


8009(P-1).1976

Imposed load = NSBC = 244.00 t1m~

Settlement for imposed load (Sf) = 366.00 mm

Depth factor = 0.563 As per Fig NO.12 of IS


8009(P-1)-1976

SId = SI x Depth factor = 206.06 mm

Rigidity factor = 0.8

Final settlement ( S ) = 164.8 mm ( Say 165mm)


(Sfd x Rigidity Factor)

[Na me oj' 'j'roject: l'ottSlructiOtt "r Judicial


COlllplex (Double l3asel11ctttwith 10 storied) near
I Ilhubanes\\ar C"urt. KaIJl~na. Bhubaneswar. _
- 56 -
ConslI{tal1t: Geo -Technical Investigation Cuent:
Reoort
S,M, CONSULTANTS J06 :Ni),: 050

~I
- I
BHUBANESWAR
--
'DOc. :Ni),:
Issue '1)ute
1672
13/05/2016
.dec»
hi i_"
+_ !

BHUBANESWAR
!

CALCULATION OF SETTLEMENT OF FOUNDATION


AS PER IS:8009 (Part -1)-1976
AT 9.0 m depth of BH-3

Depth of foundation from ground level 9 m

Corrected N Value 32,5

Settelment from Fig NO.9 of IS: 8009- 7.5 mm (For 10 T/m


2
)
1976

Effect of water table 0N') 0.5 Insert fig of fig 9, IS:8009-


1976

Corrected Settlement 15.00 mm As per cl. No. 9.1.4 of IS


8009(P-1 )-1976

Imposed load = NSBC ~ 314.00 tlm2

Settlement for imposed load (Sn = 471.00 mm

Depth factor = 0.56 As per Fig NO.12 of IS


8009(P-1)-1976

S," = S, x Depth factor = 263.76 mm

Rigidity factor = 0.8

Final settlement ( S ) = 211.0 mm ( Say 211mm)


(Sfd x Rigidity Factor)

r Name of'l'rojecl: Construction 01' .Iudicial COlllplex (Double l3asellleul wilh 10 storied) near
I Hhllbancswar COllI1. Kalp~lla. Bhubaneswar. _
- :57 -
Consurtant: Geo -Technical Investigation Cfient:
Relort
S.M. CONSULTANTS J06 :No.: 050
BHUBANESWAR 'DOc. :No.: 1672
- ,•••
. • C~ !
• 'A! ••
~ Issue Date 13/05/2016
BHUBANESWAR

Appendix-E

Computation Of Design Geo-Technical Parameter


(From N Value)

L.'N(I1J1~}rOjeCI: ('ullstruetioll uf Judicial CUlllplex (Double Baselllent with 10 storied) near


I IU IIIballes\\ ar COt~.:!.:-Ka Ipalla. Bhubaneswar.
- 58 -
Consultant: Geo -Technical Investigation CClent
Re[ ort
S,M, CONSULTANTS Job :No,: 050

~i BHUBANESWAR DOC
--
Issue Date
:NiJ,: 1672
13/05/2016
...dec»

BHUBANESWAR
• *rz:rr=:'

E.COMPUTAnON OF DESIGN GEO-TECHNICAL PARAMETER (FROM N VALUE)

Depth ove,burde Corrected N Corrected N


Field SPT v,flue Cohesion
51 No. BH No. from G.L Group of soil
(N)
n pressure value due to value due to
(C) in Tlm2 ~In degree
in m. in kg/cm2 overburden Dilatancy

~ 1.5 Dr >~) 500 015 50 32.50 --- 37

~ 30 l/\Tr'RITE >50 500 03 50 32.50 --- 37

.....2- 7.5 "r >50 50.0 075 50 32.50 -- 37

~ 90 or "~J 500 09 50 32.50 --- 37

~ as _. Dr >50 500 1,05 49.25 32.13 --- 36

~ 81-1-1 12.0 Dr >50 SO.O 12 47 31.00 --- 36

~
7 13.5 DI
-
;;.50 500 1 35 455 30,25 --- 36

~ 15.0 or >50 500 15 4375 2938 --- 36

~ 16.5 or >~1t.)
""a 165 42.25 28.63 --- 36
[>i£]
- 10

11
180

200
DJ
Dr >SO
SOD
SOO
18

2
405
385
27.75
2675
---
---
36
35

~
15 GC >50 500 015 50 32.50 --- 37
13 3.0 LATERITE >50 500 03 50 32.50 --- 37
'4 45 Dr ;;.::>0 ,,"0 045 50 32.50 --- 37
15 GO DI >SO 50.0 06 50 32.50 --- 37
DI ---
,.
liS 75 >SO 500 075 50 32.50 37
1;' 90 DI >50 sao 09 50 32.50 --- 37
811-2 10.5 DI >50 SOO 105 4925 32.13 --- 36
1'1 12,0 DI >SO SOD 12 47 31.00 --- 3G
:'0 135 DI >"" ~10 135 45.5 3025 --- 36
/.j 15.0 DI 500 1.5 43.75 29.38 --- 3S
':'2 165 Dr ~ '50 SOO 165 42.25 28.63 --- 36

-
/:"1 180 Dr ~I SOO 18 40 5 27.75 --- 36
74 200 01
L-"'J I ~)IJ0 2 38.5 26.75 --- 35
2:) 1.5 SC >OU tJOO 0,15 SO 32.50 -- 37
:'6 30 SC >00 SOO 03 SO 32.50 --- 37
-
?/ 45 r" >~ll 500 0,45 SO 32.50 --- 37
-
78 G.O Dr >:"10 ~oa 0.6 50 32.50 --- 37
:;:) 7.5 I)j >OQ 500 075 50 3250 --- 37
'0 9.0 Dr >SO 500 09 50 32.50 --- 37

"- 81-1-3 10.5 DI >~) SO.O 1,05 49.25 32.13 -- 36


32 12.0 DI >OQ 500 12 47 31.00 --- 36
33 13.5 01 >bU 000 135 455 30.25 --- 36
:1,1 150 DI >bU 500 15 43.75 29,38 --- 36
:-"!tl 16.5 or >50 SOO 165 42.25 28.63 --- 3G
~G 180 Dr >SO 500 18 405 27.75 --- 36
:~i 20.0 DI >bU lr-;o-o 2 385 26.75 --- 35
Nol~: Above Strength p.:!ramctcrs (C& ~ ) are calculated theontrcally from N value
, As per lerzagh & Peck Ul ease- of col'lt;>slve SOli there 1$a relatIOnship between N value & consistency

Where N is the correr.h'c11-J value II II I II II II II II


In case of coheSlollles~ ror angle of sheaflng reSlbtallCe (tl. fig. 1 of IS 6403 was used

- 3~[In case of GL & CI YP~l iF ':-iC~lI. "j So IOU b(~ em r&lea or y Of ovel.
•• en. sa conen <S

., Imore than 35%. CH S(I,I ',;.I~'Jlllr:Jn'lbe cO'le,.I"" •..


1Ior l)V ••,tllllr.len
I I i i ,
In case Of clay SOLI,II I I .. Ii) then It Inay lx~ COrl:O.l(t.2redlimited to 30 :l;;-
.#

.F/ .-.

:N(lIlle of1'rojeCI: (',,"Slrut!;OI "I'.Iudic;al Complex (Double Basement with 10 storied) ncar '~" "',. I
Hh ubancs\\ ar Coun. Kalpalla. _B_I_ll_,b_a_"_e_s\_v_,,_r_- . ~ I

- 5'-) -
Cansu (ta n t: Geo -Technical Investigation Caent:
Report

;l~
S.M. CONSULTANTS
BHUBANESWAR
-
J06 :Nc).:
'DOC :Nc).:
Issue 'Date
050
1672
13/05/2016
.dec»
p. .

BHUBANESWAR
; _1M, ~

Appendix-F
Corrected SPT N Value

~llIlle of 'Project: ClIJlslrJlClillJllll".JJldicial Complex (Double Basement with 10 storied) near


I --- Court. Kalpanil,
, Bllubnllcswar Bhubaneswar. -
- 60 -
. '.' ,".' ... . •... \'" .
--;
"'
ConslI[tant: Geo -Technical Investigation Client:

I~I S.M. CONSULTANTS 'Doc.


BHUBANESWAR
jo6:No.:
:No.:
Issue 'Date
Re ort
050
1672
1310512016 BHUBANESWAR

STANDARD PENETRATION TEST

Colrected N value
0.00 s.oo 10.00 15.00 20.00 25.00 30.00 35.00
0.0

5.0

E to.O
.E
t
l!l 15.0
r
20.0
I
25.0

Construction of Judicial Complex (Double Basement ,,,;th I0 storied) ncar


Bhubaneswar Court, KliI' Bhubaneswar.
261 -

.•..::.;..:...
COI1.'urtant: Geo -Technical Investigation cnent :
Report
S.M. CONSULTANTS J06 :NcJ.: 050
'DOc. :NiJ.: 1672
BHUBANESWAR
- ~- .dc«»
51 ii.! la, 8.1.

~ Issue 1Jate 13/05/2016
BHUBANESWAR

Appendix-G
Grain Size Distribution Curve

[~iVa1l1eof 1'rojecl: Construction or .Indicial Complex (Double Bascmcnt with 10 storied) ncar ~
I Bhubancs\\';'II" Courl. Kalpana. l3hubaneswar. ~
- 1>2 -
Consu{tant: Geo -Technical Investigation Client:

IAI
@ S.M. CONSULTANTS
BHUBANESWAR
J06 :No.:
'Doc. :No.:
Issue 'Date
Re ort
050
1672
13/05/2016 BHUBANESWAR

GRAIS SIZEDL~TRlBLTIOScllnts OF BO.1


110

100

10
-0.00

10 -+01.5.

+7.5.
70
+u.
i
;:
•••• 10.5.

t +1l.G.
sa -n.l.
-1S.D.
10
-IU ••

1G -+oW.

+2a.a.
1G

10

0
OJllG Lilli lo.aoa
",tiel"•••••

:Name of 'Project: Construction of Judicial Complex (Double Basement with 10 storied) near
Bhubaneswar Court, Kat ana, Bhubaneswar.
- 63-
C011Sll(tant: Geo -Technical Investigation Client:

I~I S.M. CONSULTANTS


BHUBANESWAR
jo6:No.:
'Doc. :No.:
Issue 'Date
Re ort
050
1672
1310512016 BHUBANESWAR

GIUL\ SIlL DISTIUBl11O\ l'URHS Of BU.2

!II
~=
II
+15=
.• 0.

III -0.
+15•

•, +1.0-
ii: _ID.S.
'I.
50 -12J.
-w.
III _1lJ.
+1lJ.
30 ..••IU.

-ab
III

10

I
lllII I.Jll)

hrtIdo !lzr In IIIIIl

Name of 'Project: Conslnlction of Judicial Complex (Double Basement "ith IO sloried) near
Bhubancswar Cowt. Kal ana, Bhubancswar.
- 64-
consultant: Geo -Technical Investigation Cfient:

[AI
@ S.M. CONSULTANTS
BHUBANESWAR
]o6:No.:
VOc. .No.:
Re ort
050
1672

Issue Vate 13/05/2016


BHUBANESWAR

GRAIN SIZE D1STRIBUTIOX OIIm.s OF BII.3

!O +Q.5.

+15.

III -rlh
+lS.
JIl +1.0.
+7.5•

••
0: _UN
~ -1O.l.
50
-12lI.

+1l.5.
+15.0.
•.•.•11.l.
30
_aGo
Jato

10

0
G.llII CDlD D.llII

Particle sht In 111m

Name of 'Project: Construction of Judicial Complex (Double Basement with 10 storied) near
Bhubancswar Court, KaJ ana, Bhubancswar.
- 65-
Consu(tant: Geo -Technical Investigation Cfient:
Rei ort
S.M. CONSULTANTS J06 :N,).: 050
'DOc. :Ni).: 1672
~
BHUBANESWAR
-
Issue Date 13/05/2016
,idfr.ff/».
BHUBANESWAR

Appendix-H
Soil Profile

[:NilmC of 1'rojcct: l"nnSlrUClion nl".Judicial C~1Il1plex (Double Bascmenl wilh 10 sloried) near ~
l Bh(lbal1e~\\t,r COlirt. Kalp~lIla. Bhubancswar. ~
-66-
Consultant: Geo -Technical Investigation Cfient:
Re ort
IfAll
@ S.M. CONSULTANTS 'Doc. :No.:
BHUBANESWAR
jo6 :No.: 050
1672

Issue 'Date 13105/2016


BHUBANESWAR

SOIL PROFILE

f
i
!
;'
:)-
O.ll

••••• L5
U 8:i
u
••••• U ii
,...•
17.••

lUI
3Jl
U
ti
U
l.D

'.5

•••
.~
•••
••••• 6.D
lUll 7~ 7.5 1S
oz.••

-
.1.00 ••• - t~
90." 10.5 •• 50
10.5 . 10.5
Wl Wl N>5O
••••• lUI
17.•• 13~
13.5 u.s •• 50
•••••
es.&I •••• WI Is.a IMO
••••• 16.5 16.5 16.5 IMO
•••••
.,...
ILO
12.•• ILO •••• •• 50

1lO.1lO JO.O 20.0 20.0 lMQ


111-1 1111-2 •••. 5
79."
7J.fiO

CIlIyey SlInd
Laterite
CIlIyey Gl'llvei
sand stone
!*Hog_Rode

,'Warne of 'Project: Construction of Judicial Complex (Double Basement with 10 storied) near
Bhubaneswar Court, Kal ana. Bhubancswar.
- 67-
Consl/(tant: Geo -Technical Investigation Crient:
Relort
S.M. CONSULTANTS J06 :.No.: 050

~
BHUBANESWAR DOC. .'Nil.:
--
Issue 'lJate
1672
13/05/2016
lids.~
BHUBANESWAR

Appendix-I
Location Map

lNa me oj 'lJ~C!jeCI: ("'''S1ructio" "t'.I,,<iici,,1 COIllI.,lex(Double Basement with IU storied) near' "I

I Hhllbuneswar ('olin. Kalpana. Bhubaneswar. .~


- 68 -
Consultant: Geo -Technical Investigation Client:
Re ort

IfAlls.M.cONsULTANTS
@ BHUBANESWAR
JoG :No.:
'DOc. :No.:
050
1672

Issue 'Date 13/0512016


BHUBANESWAR

I•
,r
:~
,
,

I
J
j

:Name of 'Project: Construction of Judicial Complex (Double Basement with 10 storied) nC<lr
Bhubancswnr Cowt., Kal ana, Bhubancswar .
. 69.
Consultant: Geo -Technical Investigation C(fent:
Relort

; S.M. CONSULTANTS J06


BHUBANESWAR
-
:Ni>.:
DOC. :N(J.:
Issue Date
050
1672
13/05/2016
."ec»
! .ilC.'r:3
BHUBANESWAR
8 1+1

Appendix- J
• Site Photo Graphs

I :Na me of 'Project:
I
(',lIlstructiou or.ludicial Complex (Double Basemellt with 10 storied) Ilear
Ilhuba.!.'.cswar Court. Ka Ipaua, __
B_h_ub_a_"_e_s\_v_",_'.
~
--l
- 70 -
Consu(tant: Geo -Technical Investigation Client:

IrAl
@ S.M. CONSULTANTS
BHUBANESWAR
Jo6No.:
VOc. No.:
Re ort
050
1672
Issue Vate 13/0512016
BHUBANESWAR


BH-1

Name of?roject: Construction of Judicial Complex (Double Basement with 10 storied) near
Bhubancswar Cowt, Kal ana, Bhubancswar.
- 71 -
Consultant: Geo -Technical Investigation Client:
Re ort
Jo6No.: 050
IMls.M.cONsULTANTS
@ BHUBANESWAR 'DOc. No.: 1672

Issue 'Date 13/0512016


BHUBANESWAR



BH.2

Name of 'Project: Construction of Judicial Complex (Double Basement with 10 storied) near
Bhubancswar Court, Kal a, Bhubancswar.
. 72.
consultant: Geo -Technical Investigation

I~I
Cllent:
Re rt
050
S.M. CONSULTANTS Jo6 No.:
BHUBANESWAR VOc. No.: 1672
IsslU! Vate 13/05/2016
BHUBANESWAR

• BH-3

Name of 'Project: Construction of Judicial Complex (Double Basement with 10 storied) near
Bhubaneswar Court, KaI a, Bhubaneswar.
-73 -
ConslI(tant: Geo -Technical Investigation ellent :
ReJort
S,M, CONSULTANTS JoG :N(,.: 050
1672
I@ BHUBANESWAR
-
'DOc. :NcJ.:

.dec»
1

• , a 1'A"7=:'
i•

~ Issue Vate 13/05/2016 BHUBANESWAR

References

IL, 1. Bureau of Indian Standards (1970). "IS 1498: Classification and identification of soils for

general engineering purposes."


2. Bureau of Indian Standards (1973). "IS 2720, .Part 2: Methods of test for soils: Determination of

moisture content."
3. Bureau of Indian Standards (1985a). "IS 2720, Part 3 (Sec-1 & 2): Methods of test for soils:

Specific gravity."
4. Bureau of Indian Standards (1985a). "IS 2720, Part 4: Methods of test for soils: Grain size

analysis."
5. Bureau of Indian Standards (1985a). "IS 2720, Part 5: Methods of test for soils: Atterberg

Limits."
6. Bureau of Indian Standards (1971). "IS 2720, Part 13: Methods of test for soils: Tri-axial shear

test."
7. Bureau of Indian Standards (1977). "IS 2720, Part 40: Methods of test for soils: free swell

index."
8. Bureau of Indian Standards (2010). "IS 2911 (Part 1/Sec.2): Code of practice for design &

construction of pile foundation (Bored cast in-situ pile)."

9. Text book by Dr. A K ,Arora. "."Soil Mechanics and Foundation Engineering"


10 Text book by Dr. B.C.Punmia, Ashok Kumar Jain & Arun Kumar Jain ."Soil Mechanics and

Foundations"
11. Text book by Narayan V. Nayak. "Foundation Design Manual"
12. Text book by Bowles, J.E, "Foundation Analysis and design"


lOllstruction <,I'.Iudicial COlllplex (Double Basement with 10 storied) near


I Hhubancs\\:lr COllr!. Knlpana. Bhubancswar. _
- 74 -