Beruflich Dokumente
Kultur Dokumente
User Manual
1
1 Product structure
4 5
2
1 12
16
3 14
13
11
6
7 10 15
2
2 Product technical parameters
3 Symbol explain
3
4 Set up
4.2 Step
1) Carry the table to a flat surface of earth.
2) Remove the fixed device of the horizontal and vertical and Line filter
3) Set X-ray tube ,Collimator then console,high voltage wire and control
wire at the end.
When the table frame is in the level then install the stand column
5 Testing
5.2.1 The connect line between radiography table and high voltage generator
Protective
ground wire
4
Protective ground wire between radiography and console must be
good in case of Electric shock risk
5
7 Radiography table schematic diagram, see below
6
8、Rotate the focus radiance diagram
W1 W2